1 CONTRACTOR INDUCTION HANDBOOK
2 POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with Sunbury College safety philosophy to protect people, control losses and comply with applicable law. Sunbury College will comply with all applicable laws and regulations; promote waste reduction, resource and property conservation and environment protection, and train employees to be knowledgeable about all matters relevant to their work. PROCEDURES Prior to each job contractors must complete and sign the attached checklist (see Attachment A). Regular contractors carrying out similar work on each visit to the site, eg electricians plumbers and glaziers, should complete and sign when they take on the contract, when there are changes to school procedures or work requirements or when there is a change of personnel. If necessary specific requirements for each job (eg. access arrangements) must be discussed, agreed to, added into, or documented and attached to, the handbook prior to the commencement of work. The safety rules outlined in this handbook are to be strictly observed by all contractors or employees of contractors. It is the responsibility of contractors to pass on to their employees the information contained in this handbook. Failure to observe the safety rules may result in the contractor being required to leave the campus, thereby resulting in their organization being removed from Sunbury College list of approved contractors. All work must be discussed with school management or their representative prior to commencement each day unless otherwise agreed. Contractors are to sign the school visitors/contractors book each day.
3 REGULATORY COMPLIANCE The contractor is expected to comply with the requirements of all relevant Acts and Regulations SCHOOL SPECIFIC REQUIREMENTS Smoking and alcohol consumption is strictly prohibited on school grounds, including the office, amenities and car park areas. No dogs or loud radios are permitted during school hours. SAFETY EQUIPMENT Sunbury College requires personnel to wear the following in signed areas and as required for job specific tasks Approved Hard Hats Eye protection Hearing protection Approved Safety shoes All equipment must be in good repair or access to the college will be denied. The contractor must provide all equipment unless otherwise agreed by college management. Additional equipment that must be supplied by the contractor includes; face shields, welding and grinding masks, goggles, gloves, aprons etc. TOOLS AND EQUIPMENT INSPECTION All tools and equipment used by the contractors must be available for inspection at any time as requested by school management or their representative. All electrical equipment brought onto site by a contractor must have a valid electrical test tag as per AS/NZS SCHOOL ACCESS Contractors shall restrict their movements and activities within the school to those areas, and times agreed to, required by the project or job. Management or their representative must approve entry into other areas of the school.
4 WHEN ACCIDENTS HAPPEN All accidents must be reported to School Responsible Officer Principal, Management Nominee or OHS Staff Representative. Although the school has a first-aid room and first-aid kits are available in various areas around the school, it is expected that the contractor will provide a basic first-aid kit. Any spills of fuel, oil, paint, solvent, chemical or pollutant must be reported to school management immediately. The contractor will be required to participate in completing the environmental investigation and the physical clean up. ALARMS, EVACUATION, EXITS AND FIRE EQUIPMENT The contractors should familiarise themselves with the schools emergency procedures attached to this handbook, as well as observing instructions given by the school via the Public Address (PA) system. Should an emergency arise resulting in part or total school evacuation, the contractor s most senior representative on site is to advise management that all personnel under their control are accounted for and safe. If necessary contractors will be informed of evacuation drills prior to the event. Fire equipment is not to be used for cleaning or construction purposes. If any of the equipment is used, notify school management so it can be documented and replaced if necessary. WORKING WITH CHEMICALS AND MATERIAL WASTE No products classified as Hazardous Substances and/or Dangerous Goods may be brought onto the site without consent of the school management. All Hazardous Substances and Dangerous Goods brought onto the site by contractors (eg cleaners) must be listed and have a Material Safety Data Sheet (MSDS) provided by the contractor. All containers for these products must be correctly labelled and stored while on the site. This would include such things as oxy acetylene sets brought on site by contractors. Contractors are required to remove rubbish that has accumulated from the work task unless arrangements are made for disposal using the school s rubbish disposal system. In addition, no one is allowed to contaminate the sewer system. Be sure to discuss the correct method to dispose of hazardous waste with school management or their representative.
5 FALL PROTECTION POLICY AND PROCEDURE All work that is required to be carried out at a height greater than 2 metres above a level surface and/or within 2 metres of an edge is classified as working at height under the Falls Prevention Regulations and fall protection must be provided. 1. The contractor should have a safe work at heights procedure and follow any school rules (fixed ladder points etc) in regard to compliance with the Regulations. 2. Where possible, the preferred fall protection system for working at height is an elevated work platform, temporary guardrails or scaffolding erected by a competent person. REQUIREMENTS SPECIFIC TO CLEANING CONTRACTORS The contractor must provide information regarding the identified hazards associated with their work and any implemented risk controls. This may take the form of a register of chemicals, Material Safety Data Sheets (MSDS) and documented control measures. Identified hazards, other than chemical hazards, may relate to Manual Handling. In which case documented controls as a result of a risk assessment process should be provided. JOB SPECIFIC INFORMATION & REQUIREMENTS Are any of the following involved in the job Confined Space Entry Requires documented procedure and permit system from contractor. Hot Work - Requires documented procedure and permit system from contractor. Lock Out System (Electrical & Gas work etc) - Requires documented procedure from contractor. Other Requirements
6 Attachment A Sunbury College Contractor Induction Handbook Contractor Management Checklist Minor Works & Maintenance Maintenance and upgrade work can pose risks to the health and safety of staff and students unless work is carefully planned. Under the 1985 Occupational Health and Safety (OHS) Act, the school owes a duty of care to contractors carrying out the work. This duty of care cannot be removed, even by agreement. This checklist is to be completed prior to commencement of work. School Responsible Officer (SRO): Date: Contractor: Signature: Job: Yes No 1. Has the contractor been briefed about known hazards at the school which may affect their work? 2. Has the contractor identified the hazards associated with the proposed works from setting up the work area to completion of the job? 3. Has the contractor documented control strategies to eliminate or reduce the risks associated with these hazards? 4. Has the contractor provided evidence of their competency to undertake the works such as licences & certificates (see Attachment A) as well as public liability and workcover insurance? 5. Has the contractor provided evidence that all equipment to be used is safe, properly maintained and appropriate to the task? 6. Has the contractor been advised about informing the SRO about their location while working at the school? 7. Have access arrangements been confirmed? 8. Have appropriate isolation barriers been put in place? 9. Has the contractor been briefed about relevant school policies such as smoking and alcohol as well as emergency procedures and people to contact in the event of an accident or injury? 10 Has the contractor inducted their employees and sub. contractors about the safety plan for this job? More information can be obtained from the Victorian Schools Reference Guide section For further advice on your specific situation contact Noel Arnold & Associates, Department of Education & Training OHS team on (03)
7 Attachment B Contractor Induction Handbook (for school information only) Contractor Licences/Qualifications Plumbing Trades A Licensed Plumber can hold a licence in some or all of the categories below. Can sign Certificates of Compliance. A Registered Plumber can hold a licence in some or all of the categories below and perform that work as an employee of a licence holder. Cannot sign Certificates of Compliance. Duct-Fixing Gasfitting Mechanical Services [Does not include Plumbing (Gasfitting) work] Roofing Sanitary Water Supply Draining FOR FURTHER INFORMATION SEE THE PLUMBING INDUSTRY COMMISSION WEBSITE: Electrical A contractor carrying out or offering to carry out electrical installation work must be a Registered Electrical Contractor. For a person to be registered they must hold an Electrician s Licence. An Electrician's Licence entitles the holder to carry out all electrical installation work without supervision. A Supervised Worker's Licence entitles the holder to carry out all electrical installation work under the effective supervision of a Licensed Electrician. A Disconnect/Reconnect Workers Licence is held by a person employed in an occupation where there is a need to be able to disconnect and reconnect fixed wired electrical appliances or components of appliances. Occupations such as plumbers, mechanical fitters, refrigeration and air-conditioning mechanics, etc. Holders of all categories of electrical licences must issue a certificate of electrical safety for all electrical installation work undertaken. FOR FURTHER INFORMATION SEE THE OFFICE OF THE CHIEF ELECTRICAL INSPECTOR (OCEI) WEBSITE: Network Cabling Network Cabling installers must be Registered with one of the Australian Communications Authority (ACA) approved Registrars. However some tradesmen may still have a current AUSTEL or ACA Licence. This type of licence is being phased out. The cabler must provide a TCA1 form (Telecommunications Advice), similar to the Certificate of Electrical Safety, at the end of a job. An Electrical Licence alone, DOES NOT cover network cabling installations. FOR FURTHER INFORMATION SEE THE AUSTRALIAN COMMUNICATIONS AUTHORITY'S (ACA) WEBSITE:
8 Building Industry Use only building practitioners registered with the Building Practitioners Board (BPB) or Architect Registration Board of Victoria to design, document and construct your building project. (membership or registration with the Housing Industry Association (HIA) or Housing Guarantee Fund Ltd (HGFL) is not relevant in this context). The following categories and classes of building practitioners are currently required to be registered with the BPB: Building surveyor Building inspector (Unlimited/Limited) Quantity surveyor Engineer (Civil/Mechanical/Electrical/Fire Safety) Draftsperson (Building design architectural, interior, services) Builder (Commercial builder unlimited/limited) Builder (Domestic builder unlimited/limited/manager) Builder (Demolisher low rise buildings/medium rise buildings/unlimited) Erector or supervisor (temporary structures Class 1 and 2). FOR FURTHER INFORMATION SEE THE BUILDING COMMISSION WEBSITE: Architects may be referred to as building practitioners if they are registered with the Architects Registration Board: WorkSafe Victoria issues Certificates of Competency (licences) for 28 regulated classes of plant or types of work. It is a legal requirement that people who carry out any work associated with the operation of this plant or that type of work hold the relevant Certificate of Competency. The classes of certificate most likely to be held by workers on school projects are Scaffolding & Rigging (7 types) and Cranes & Hoists (14 types). For details of each certificate type see: asses.pdf Occupational Hygienists Asbestos Analysts. The Occupational Health & Safety (Asbestos) Regulations 2003 requires the analysis of an asbestos sample to be under taken by an approved analyst. The term approved means "Approved by the National Association of Testing Authorities" (NATA). Asbestos Removalists must be licensed by the Victorian WorkCover Authority. DE&T policy is to use only Class A Removalists for all removal jobs. (No removal to be undertaken with staff or students on the premises). Any analysis of samples gathered by an Occupational Hygienist (dust, noise, fume etc.) should occur in a NATA endorsed laboratory. See the WorkSafe service directory at:
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
Independent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS
Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks
SITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
Safety and Environmental Information for External Companies Koehler Oberkirch
and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,
Contractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
Safety and Environmental Information for External Companies
Health and and al Health and at 1. Delivery, Notice, Signature After receiving the following information sheets, the assembly leader from every external company is required to read through them, explain
Safety and Environmental Information for External Companies
1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl
1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after
Guidelines for. the employment EXTERNAL COMPANIES
Guidelines for the employment of EXTERNAL COMPANIES on the grounds of Institut für Mikroelektronik Stuttgart Allmandring 30a 70569 Stuttgart Contents 1. Purpose and objective... 3 1.1 General directions...
SECTION THREE CONSTRUCTION CODES
SECTION THREE CONSTRUCTION CODES CHAPTER 36: Construction Codes in Michigan Purpose and Applicability of Regulations Manufacturing facilities and other businesses must be designed according to code in
HSE Requirements for Contractors
PROJECT DEFINITION AND CONTACTS Project Title: Kodak is obligated to identify any known and potential Health, Safety, and Environmental (HSE) hazards to individuals who might be affected by them. This
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
WHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
Contractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
Job safety analysis Installing wall frames and roof trusses on-site
Job safety analysis Installing wall frames and roof trusses on-site 1. Taking delivery: - unloading the truck - moving materials manually to the work area Body sprains and strains from lifting materials
WHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
WHS LEGISLATIVE COMPLIANCE GUIDELINES
WHS LEGISLATIVE COMPLIANCE GUIDELINES CONTENTS 1 Introduction... 2 2 Scope... 2 3 Responsibilities... 2 3.1 Manager WHS Unit... 2 3.2 Management of Faculties, Divisions and Research Institutes... 2 4 Maintaining
WHS CONTRACTOR MANAGEMENT PROCEDURE
WHS CONTRACTOR MANAGEMENT PROCEDURE Version No: Issued 3.0 18/11/2013 15/11/2018 1. Overview The District Council of Peterborough as part of its commitment under its WHS Contractor Management policy, recognises
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS
WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,
CONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
CHEMICAL SPILL MANAGEMENT GUIDELINES
WHS Unit CHEMICAL SPILL MANAGEMENT GUIDELINES Contents 1 Purpose... 2 2 Scope... 2 3 Definitions... 2 4 Roles and Responsibilities... 2 5 General... 2 6 Defining Major or Minor Spill... 3 7 Major Spill
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY. The City of Bunbury acknowledges that it has a Duty of Care obligation under the Occupational Safety and Health Act 1984 (Section
WHS CONTRACTOR MANAGEMENT PROCEDURE
MANAGEMENT PROCEDURE 1. OVERVIEW The Flinders Ranges Council as part of its commitment under its WHS Contractor Management Policy, recognises its obligation to: Ensure, so far as is reasonably practicable,
OHSMS Implementation Guide
OHSMS Implementation Guide Developed by the Employee Health Unit, Department of Education and Early Childhood Development and Marsh Pty Ltd. Published by the Employee Health Unit, Department of Education
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
Tremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
Safety and Health Office WORKPLACE SAFETY CHECKLIST
Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting
Contractor Information and Registration Package
Contractor Information and Registration Package Introduction Marmong Point Marina (the Marina) complies with the Work Health and Safety Act 2011 and the Protection of the Environment Operations Act 1997
Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules
Page no: 1 / 12 Contractor rules Table of Contents Purpose... 2 Scope... 2 1. Responsibilities... 2 2. Planning Stage... 3 3. Site induction, emergency procedures and documentation... 3 4. Risk Assessment
Health and Safety Pre-Qualification Application Self-employed/Small businesses and Consultants
Health and Safety Pre-Qualification Application Self-employed/Small businesses and Consultants (less than five employees) 1. Business Information Company name: Address: Phone: Mobile: Email address: Number
Contractor Safety Management
1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor
STCC Contractor/Vendor Rules and Regulations
STCC Contractor/Vendor Rules and Regulations STCC maintains specific rules and regulations that apply to all contractors and vendors who perform work or provide services. It is the responsibility of the
INTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations...
March 2006 INTRODUCTION... 3 1.0 Purpose... 4 2.0 Policy... 4 Exception for Short-Term Workplace Visits... 4 Relevant Legislation and Regulations... 5 Definitions... 5 Contractor Safety Coordination Overview...
Example risk assessment for a motor vehicle mechanical repair workshop
Example risk assessment for a motor vehicle mechanical repair workshop Setting the scene The garage manager did the risk assessment. The business employed 12 mechanics, including two apprentices who carried
Communication of Health and Safety Policy and Information
Modules 1 4 1. Communication of Health and Safety Policy and Information 2. Allocation of Responsibility/Accountability for Health and Safety 3. Purchasing Controls 4. Contractors Communication of Health
WHS Policies and Procedures Package
WHS Policies and Procedures Package The following is an extract to highlight the style and layout of this publication, as well as a snapshot of the content. Some samples may not be included in their entirety
SYDNEY WHARF MARINA. Contractor s registration. Introduction. Contractor s information
SYDNEY WHARF MARINA Contractor s registration Introduction Sydney Wharf Marina complies with the Occupational Health and Safety Act 2000 and the Protection of the Environment Operations Act 1997 to ensure
ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS
GUIDE FOR APPLICANTS ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS TABLE OF CONTENTS INTRODUCTION... 2 WHY YOU NEED A LICENCE... 2 WHY YOU NEED TO NOTIFY... 2 LICENCE TYPES... 2 SCOPE... 2 WHO MAY APPLY
PITTSBURG TANK AND TOWER CO., INC.
PITTSBURG TANK AND TOWER CO., INC. HEALTH, SAFETY & ENVIROMENTAL PROGRAM INDEX 1.SAFETY POLICY & MANAGEMENT RESPONSIBILITIES - Safety Policy - Administrative Duties * Top Management * Safety Director *
Online Health, Safety and Environmental Induction for Contractors
Online Health, Safety and Environmental Induction for Contractors CRICOS Provider Codes: QLD 00219C; NSW 01315F; VIC 01624D Welcome to CQUniversity Australia You will find these icons throughout the induction
AUSTRALIAN AIRCONDITIONING SERVICES SAFETY MANAGEMENT PLAN
AUSTRALIAN AIRCONDITIONING SERVICES SAFETY MANAGEMENT PLAN ISSUE NOVEMBER 2010 AU07899 TABLE OF CONTENTS 1. DOCUMENT CONTROL 3 2. PLAN AND SAFETY OBJECTIVES AND TARGETS 4 3. OCCUPATIONAL SAFETY AND HEALTH
Pre-Qualification Questionnaire Checklist
Pre-Qualification Questionnaire Checklist Thank you for your interest in becoming an Approved Contractor with Christchurch Airport. To ensure efficient processing of your application please utilise the
Asbestos removal and licensing
Applicant Guide Asbestos removal and licensing Includes: Asbestos removal and asbestos assessor licence and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures
Safety Training Needs Assessment
Safety Needs Assessment Form Instructions: Please review each question and either check YES or NO. If a question is checked YES you will be required to complete the training topic before initial assignment
OCCUPATIONAL HEALTH AND SAFETY IN HOSPITALITY
OCCUPATIONAL HEALTH AND SAFETY IN HOSPITALITY Employee Induction Checklist March 2003 CONTENTS HOSPITALITY INDUSTRY OHS EMPLOYEE INDUCTION CHECKLIST... 2 INTRODUCTION... 2 WHAT IS THE OHS INDUCTION CHECKLIST?...
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY Dumfries Timber Co. Ltd. is committed to comply with our legal duties in order to provide a safe and healthy working environment
Event Management Guidelines. Month 2011. 1 Event Management Guidelines (Month, 2011)
Month 2011 1 (Month, 2011) Table of Contents Executive Summary... 2 More information... 2 Event Risk Assessment... 3 Event Checklist... 4 Event Details... 8 Event Contact List... 10 Event Task List...
H2 Opening Statement Asbestos
H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of
Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015
Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
Safety, Health & Environment (SHE) Contractor Management Handbook
Strength. Performance. Passion. Safety, Health & Environment (SHE) Contractor Management Handbook Holcim (Australia) Pty Ltd Explanatory Statement This handbook has been prepared to ensure that the safety,
STALL HOLDER LICENSE APPLICATION FORM
STALL HOLDER LICENSE APPLICATION FORM AGREEMENT made this day of BETWEEN: ALICE SPRINGS TOWN COUNCIL, a municipal council constituted pursuant to the Local Government Act of Council Chambers, Todd Street,
Guide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
Title: Plant and Equipment Management Procedure
Page Number: 1 of 7 1. Purpose: The purpose of this procedure is to ensure that risks associated with plant and equipment within the Department of Education and Early Childhood Development (DEECD) are
Practice Note 2014-62
Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National
COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL
COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL HAZARDOUS MATERIAL MANAGEMENT Effective October 15, 1995 Page 1 of 4 Updated August, 2008 Revised August, 2009 A. Columbus State Community College
CATERING CONTRACTORS General Code of Safety Practice
Residential & Business Services Director s Office CATERING CONTRACTORS General Code of Safety Practice CONTENTS 1 Introduction 2 2 Commencement of Work 3 3 Vehicles 3 4 Temperature control 3 5 Food hygiene
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
Confined Space Management Procedure
1. Overview The District Council of Mount Remarkable as part of its commitment under its Hazardous Work Policy, recognises its obligation to eliminate, or where that is not reasonably practicable, minimise,
Guide for applicants for asbestos removal and asbestos assessor licences and notifications
Guide for applicants for asbestos removal and asbestos assessor licences and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures containing asbestos March 2013
Chemical Spill Response Guideline
ChemicalSpillResponseGuideline Despite the best efforts of researchers to practice safe science in the laboratory, accidents resulting in the release of chemicals will occur. For this reason, it is essential
CSC-DIVISION 1-MASTER SECTIONS Description
CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant
Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
In addition, flammable solvents and thinners are often mixed with the above substances.
1 of 7 This guidance note describes the measures required to control the risk to health and safety when spraying flammable liquids. Flammable liquids Flammable liquids are dangerous goods of Class 3. They
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
Asbestos licensing and notification guide for applicants
Asbestos licensing and notification guide for applicants Use this guide if you are: applying for an asbestos removal work licence applying for an asbestos assessor licence notifying of asbestos removal
Pollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
Millersville University - Office Of Environmental Health & Safety Scope & Application
Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
Contractor Connect Scheme Electrical Contractor and Worker Handbook
Contractor Connect Scheme Electrical Contractor and Worker Handbook January 2016 Document release information Document number 13553681 Document title Revision status Contractor Connect Scheme handbook
Holmesglen Community & Industry Short Courses. Certificate IV in Building & Construction (Building) FAST TRACKED. Builders Registration Course
Holmesglen Community & Industry Short Courses Certificate IV in Building & Construction (Building) FAST TRACKED Builders Registration Course This course has been structured to support an application to
GHD EPCM Standard operating procedure Working at height May 2013 v1
GHD EPCM Standard operating procedure Working at height May 2013 v1 Table of contents 1. Purpose 2. Scope 3. Duty of care 4. Lifesaving rules; An overview 5. Roles and responsibilities 4.1 Operating centre
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]
PICAC TRAINING SCHEDULE
Plumbing Industry Climate Action Centre 6/306 Albert Street Brunswick VIC 3056 T (03) 9356 8902 F (03) 9356 8929 [email protected] PICAC TRAINING SCHEDULE JANUARY JUNE 2014 2014 22138VIC Certificate
ASBESTOS in state and local government
ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.
Welcome to the safe@work Automotive Module.
Welcome to the safe@work Automotive Module. Have you read the General Module, completed the test and gained your safe@work General certificate? The Automotive Module should be done AFTER the General Module
FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS
FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS The attached self-inspection form is intended for staff use at regular, frequent intervals. It should not take the place of two other vital measures
Approved Contractor Application (SAFE Form B)
Approved Contractor Application (SAFE Form B) 1. Business Information Company Name: Postal Address: Physical Address: (If differs from Postal) Phone: Mobile: Email Address: Number of Employees: 2. Key
Release 1. BSBWHS508A Manage WHS hazards associated with plant
Release 1 BSBWHS508A Manage WHS hazards associated with plant BSBWHS508A Manage WHS hazards associated with plant Modification History Release Release 1 Comments This Unit first released with BSB07 Business
Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover. As at: 01.03.
Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover As at: 01.03.2014 Tables of contents The company The sites in Ingelheim,
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work
Removing asbestos in workplaces
Edition No. 1 September 2008 Compliance Code Removing asbestos in workplaces Contents Preface 2 Introduction 3 Purpose 3 Scope 3 Application 3 Consultation 4 General requirements of the Occupational Health
Conducting a Job Hazard Assessment. Environmental, Health and Safety 275-3241
Conducting a Job Hazard Assessment Environmental, Health and Safety 275-3241 EH&S Programs: Fire Safety Blood Borne Pathogens Hazard Communication Personal Protective Equipment Emergency Preparedness General
No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
FARM SAFETY STARTER GUIDE
Property of FARM SAFETY STARTER GUIDE Disclaimer This publication may contain occupational health and safety and workers compensation information. It may include some of your obligations under the various
CONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL
PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL CONTENTS: 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0
Getting Started with Workplace Health and Safety
Getting Started with Workplace Health and Safety An Introduction to Workplace Health and Safety Policies, Procedures and Evaluation Victorian WorkCover Authority Revised June 2001 First published February
GEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT
PURPOSE To protect the health and welfare of GEORGIA TECH employees in areas where there may be a risk of injury or exposure to hazardous substances or conditions employees who work in areas where physical
Issue Date: April 2011 Review Date: April 2013 Page Number: 1 of 8
Issue Date: April 2011 Review Date: April 2013 Page Number: 1 of 8 1. Purpose: The purpose of this procedure is to outline the consultative arrangements that are to be developed and implemented across