Seattle Public Schools Building Excellence IV Projects Under Construction



Similar documents
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Name of course: Residential Construction Site Management (RCSM) Level 1

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

Slavic Village Building Condition Review

Estimating Database Checklist

EAST LYME HIGH SCHOOL

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

NAHB PRODUCT DEFINITION

Additions and Alterations

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Construction Technologies Career Field Pathways and Course Structure

KIEWIT CM/GC Enabling/Utilities

DRAPER ELEMENTARY SCHOOL

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Elevating Your House. Introduction CHAPTER 5

SECTION 3 ONM & J STRUCTURAL ANALYSIS

The minimum reinforcement for the stem wall is the placement of:

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

C-2 Construction, Inc. - NAICS Codes

Schedule B to By-law

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

Page & Turnbull imagining change in historic environments through design, research, and technology

Saint Cloud Business Center

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Basement Moisture Problems

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Engineered Wood Foundations

Single Family Residential Building Permit Questions & Answers

Estimated Cost of Repair

MURCH ELEMENTARY SCHOOL

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Vision Home Inspection

17,280 square feet Overview:

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Structural Assessment Report

Rehab Inspection Report Page 1

Sample Drawing Package for One and Two Family Dwelling Applications

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

School Construction Authority Architecture & Engineering

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

Hartsfield-Jackson Atlanta International Airport s

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

Hunter College school of Social Work Thesis Proposal

Project Management Division

Certification: Building Plans Examiner. Exam ID: B3

Building Condition Assessment Report

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

David C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Facility Assessment for East Main Street, Huntley, IL

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects?

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

Holz Choices & Specifications

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Schedule B to By-law Part A Fees Payable for Permits

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

OHLONE COMMUNITY COLLEGE BOND MEASURE G

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

October 5, 2015 Dear Client,

Commercial Building Valuation Report

FY08 SEWER POINT REPAIRS BID TABULATION

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

A Homeowner s Guide to Building Permits

Estimated Useful Life (EUL) Tables

2009 IECC Update. Scope. Content. International Energy Conservation Code

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

HOMEOWNER S PERMIT GUIDE

Architectural Inspection Site Structures

Building Condition Assessment Report

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

Common Problems with Walls

PDmB, Inc. Definitions

Exhibit C: Scope of Work and Schedule of Deliverables

Transcription:

Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary School 22 Hazel Wolf K-8 at Pinehurst 33 Olympic Hills Elementary School 44 Seattle New World School at TT Minor 53 New Thornton Creek Building 64 October 30, 2015

Arbor Heights Elementary School Elementary School Site: SW 104 th Street is being prepped for concrete curbs, gutters and sidewalk; installation of temporary gravel access around South Building in progress. South Building: Exterior sheathing on-going floor 1. Light-gauge metal framing continues at the exterior and interior walls at floor 2. Hollow metal door frame installation ongoing on floor 2. Mechanical, electrical, and plumbing (MEP) rough-in ongoing at floors 1 and 2. Metal roof decking is being placed and welded. North Building: Installation of capillary break ongoing, concrete slab-ondeck poured at 3rd floor, structural steel erection ongoing, roof joists up to cafeteria have been welded.

Arbor Heights Elementary School Site Plan July 1, 2015 July 10, 2015

Arbor Heights Elementary School Aerial View from the South September 30, 2015

Arbor Heights Elementary School South Building First Floor Exterior Sheathing Commenced October 26, 2015

Arbor Heights Elementary School South Building - Second Floor Interior Wall Installation October 26, 2015

Arbor Heights Elementary School South Building Second Floor Window Opening Blocking October 26, 2015

Arbor Heights Elementary School South Building - Metal Roof Deck Welding Ongoing October 26, 2015

Arbor Heights Elementary School South Building - Roof Welding October 26, 2015

Arbor Heights Elementary School North Building Capillary Break Ongoing October 26, 2015

Arbor Heights Elementary School North Building - Looking West towards Multi-Purpose and Gymnasium October 26, 2015

Arbor Heights Elementary School North Building - Third Floor Slab-on-Deck October 26, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Site Plan

Cascadia Elementary School & Robert Eagle Staff Middle School Aerial Photo

Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School Footings, Looking North West October 21, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School Parking Lot Preparation, Looking South East October 21, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Forming Concrete Curbs at Elementary School Parking Lot October 21, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School Concrete Retaining Wall, Looking South October 21, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Concrete Block Retaining Wall, East of Pilling s Pond October 21, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Middle School Concrete Footings, Looking North October 21, 2015

Cascadia Elementary School & Robert Eagle Staff Middle School Woodlawn Avenue North Street Restoration Work for SPU October 21, 2015

Genesee Hill Elementary School Site: Excavation and installation of the sanitary sewer conveyance system ongoing; importing crushed rock to winterize site around the building. Area 1: Installation of windows ongoing; CMU veneer installation is complete; installation of spray foam insulation is complete; installation of GWB at level 1 is complete; installation of GWB at level 2 ongoing. Miscellaneous electrical rough-in ongoing. Area 2: Exterior and interior framing ongoing at floors 1 and 2; exterior sheathing installation ongoing; HVAC ductwork installation at mechanical mezzanine ongoing; MEP is ongoing. Area 3: Foam insulation installation at exterior walls ongoing; interior wall framing ongoing; MEP ongoing. Area 4: Exterior framing and sheathing complete; MEP is ongoing.

Genesee Hill Elementary School Site Plan 4

Genesee Hill Elementary School Aerial View October 15, 2015

Genesee Hill Elementary School Installation of Deepest Manhole for Sanitary Sewer Conveyance System

Genesee Hill Elementary School Area 1 - North Elevation Envelop System Installation

Genesee Hill Elementary School Area 1 - Floor 3 Gypsum Wallboard Installation Ongoing

Genesee Hill Elementary School Area 2 - Level 1 Main Entry Stairs

Genesee Hill Elementary School Area 2 - Interior Wall Framing at Library

Genesee Hill Elementary School Area 2 - Mechanical Mezzanine Installation of HVAC Ductwork

Genesee Hill Elementary School Area 2 - Installation of Metal Panels at Roof Fascia

Genesee Hill Elementary School Area 4 - Gym and Commons

Hazel Wolf K-8 at Pinehurst Site: Side sewer installation ongoing, backfilling around concrete foundations, general site clean up. Building A: A1 concrete slab completed. Area A2 metal stud framing ongoing on first and second floors and penthouse, MEP installation ongoing. A3 final concrete footings formed and poured, concrete stem wall pours ongoing, waterproofing started and installation of utilities under slab ongoing. Building B: Structural steel for the outside play area completed. Roof decking started. Building C: Metal roof decking installation completed. Skylight frames installed welded and completed. Slab on deck for 2 nd floor (child care) area concrete pour completed.

Hazel Wolf K-8 at Pinehurst Site Plan

Hazel Wolf K-8 at Pinehurst Aerial View looking North West

Hazel Wolf K-8 at Pinehurst Area A2 Looking North West October 20, 2015

Hazel Wolf K-8 at Pinehurst Area A2 First Floor Interior Framing October 21, 2015

Hazel Wolf K-8 at Pinehurst Area A2 First Floor Floor Grinding October 21, 2015

Hazel Wolf K-8 at Pinehurst Area A2 Penthouse October 22, 2015

Hazel Wolf K-8 at Pinehurst Area A2 Penthouse Roofing October 21, 2015

Hazel Wolf K-8 at Pinehurst Area A3 Admin Concrete Stem Wall October 20, 2015

Hazel Wolf K-8 at Pinehurst Area B Structural Steel October 21, 2015

Hazel Wolf K-8 at Pinehurst Area C Gym Metal Deck and Skylights October 20, 2015

Olympic Hills Elementary School Site Plan

Olympic Hills Elementary School Aerial Photo October 15, 2015

Olympic Hills Elementary School Removing Soil Stockpile, Looking South October 21, 2015

Olympic Hills Elementary School Underground Detention Vault Backfilled and Covered, Looking North October 21, 2015

Olympic Hills Elementary School Manhole at Detention Vault October 21, 2015

Olympic Hills Elementary School Underground Utilities, Looking West October 21, 2015

Olympic Hills Elementary School Geothermal Well Drilling, Looking East October 21, 2015

Olympic Hills Elementary School Geothermal Well Drilling, Looking South October 21, 2015

Olympic Hills Elementary School Site View, Looking South October 21, 2015

Seattle World School at T.T. Minor Area A Administration Office, Student Services, Health Clinic and Library: Administration office addition concrete footings poured, underground utilities ongoing, temporary shoring installed. Health Clinic underground utilities ongoing, concrete grade beam complete. Library demolition complete. Area B Multipurpose, Kitchen, Boiler Room: Concrete stem wall pour complete, concrete slab preparation ongoing. Boiler Room hazardous material abatement complete, demolition ongoing. Area C Classrooms: CMU wall layout ongoing, CMU rebar installation ongoing, underground utilities complete, CMU grade beams complete, 2 nd floor demolition ongoing.

Seattle World School at T.T. Minor Site Plan

Seattle World School at T.T. Minor Area A - Administration Addition Concrete Footings Poured October 27, 2015

Seattle World School at T.T. Minor Area A Original Building Seismic Footing Retrofit Concrete Pour October 27, 2015

Seattle World School at T.T. Minor Area A Administration Area Temporary Shoring October 27, 2015

Seattle World School at T.T. Minor Area A Library Hazardous Material Abatement and Demolition Complete October 27, 2015

Seattle World School at T.T. Minor Area A Health Clinic Underground Utilities Ongoing October 27, 2015

Seattle World School at T.T. Minor Area B New Kitchen and Commons Addition Slab Preparation October 27, 2015

Seattle World School at T.T. Minor Area B Boiler Room Abatement Complete Demolition Ongoing October 27, 2015

Seattle World School at T.T. Minor Area C Science Classrooms Underground Utilities Complete October 27, 2015

Seattle World School at T.T. Minor Area C 2 nd Floor Demolition Ongoing October 27, 2015

New Thornton Creek Building Site: Continued installing footing drainage piping and downspouts. Continued remove excess soil stockpile. Began Phase 2 geothermal well drilling in playfield north of the parking lot. Building A: Continued with interior backfill around footings. Began installing below grade masonry around footing. Set subgrade for remaining concrete slab-on-grade. Building B: Continued erecting structural steel in both library and two story academic wing. Began placing steel joist and decking in both library and first story of two story wing. Place edge form for slab-on-deck. Building C: Continued interior framing on classrooms. Continued installing interior hollow metal window frames in hallway for classrooms. Began installing roof. Continued installing HVAC ductwork and above ceiling plumbing and electrical. Continued with MEP rough-in in classroom walls.

New Thornton Creek Building Key Plan

New Thornton Creek Building Aerial Photo October 15, 2015

New Thornton Creek Building Inserting Piping into Geothermal Well

New Thornton Creek Building Building A Preparing to Place Below Grade Masonry

New Thornton Creek Building Building C Installing Backing to Interior Framing

New Thornton Creek Building Building C Installing Hollow Metal Frames for Interior Windows

New Thornton Creek Building Building C Electrical Rough-in

New Thornton Creek Building Building C Installing Exterior Sheathing to Parapet

New Thornton Creek Building Building C Roofing

New Thornton Creek Building Building C Hot Mopping Asphalt on Roof