David C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605
|
|
|
- Vernon Pearson
- 10 years ago
- Views:
Transcription
1 David C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA Winner of the 2014 Cold-Formed Steel Engineers Institute (CFSEI) Design Excellence Award May 2014 The David C. Barrow Elementary School provides facilities for elementary school education from pre-kindergarten through Grade 5. The original structure was built in 1923 from wood framing with brick veneer. Over the years, the school had undergone several renovations and additions, but in 2010, the school district decided that the aging structure needed a major overhaul. The options included: 1) completely closing and relocating the school, 2) completely demolishing the old school and building a new one, or 3) renovating the existing building and providing a major addition. The project team decided to go with the third option, as long as the relocation of the students would only last for one school year. Photo by SP Design Group The design and construction challenges posed by the architectural demands of renovating rather than building a new school, the one-year timeframe for construction, and the budget requirements of the Clarke County School District provided unique solutions that only cold-formed steel (CFS) could provide. The school was completed in summer
2 Scope of the Project The project scope was two-fold: 1) to renovate the portion of the building which housed the administrative offices and classrooms for pre-kindergarten through first grade, and 2) to construct a new two-story addition that included classrooms for second through fifth grades, a media center, specialty classrooms, a gymnasium, and a new dining facility. Cold-Formed Steel is Chosen for Cost-Competitiveness and Innovation Panelized CFS framing was chosen as the primary structural material for the addition and as both primary and secondary structural material for the renovation. DSi Structures and network partner Odom Construction fabricated and installed the CFS materials, while DSi Engineering provided the design and panel drawings. Renovations to the original section included new CFS framed partitions, ceilings, and a new entry/reception area with both loadbearing and non-loadbearing cold-formed steel walls, columns and rafters. The new two-story addition is loadbearing CFS panelized construction. The floor system for the second story is composite concrete with open web bar joists, bearing directly on the CFS panels. All panels have 100% welded Loadbearing panelized CFS walls in front of existing brick structure under renovation. Load distribution members negated the need for alignment framing. Composite headers reduced framing above the openings. Photo by DSi Structures connections. Shear walls are made from X-braced CFS prefabricated panels, both along the central corridor and in the demising walls between classrooms. Abuseresistant gypsum sheathing was used for the classroom and hallway areas. The roof is framed with CFS trusses at 4 feet on center. At either end of the new addition are masonry structures housing the food preparation and dining facility on one end, and the gymnasium on the other. The loadbearing masonry walls support CFS trusses one story at the kitchen area, and two stories at the gymnasium area. All trusses are framed from back-to-back C- shaped webs and chords. Although several other construction types were considered for the two-story classroom addition, loadbearing CFS was not only price-competitive, but also allowed the project to be completed in time for the opening of the school year. Design innovations such as composite beams with the poured concrete slabs, load 2
3 distribution members, special alignment techniques for the shear walls, and composite slabs with bar-joists allowed the loadbearing steel portion of the project to be completed in only a few weeks. The Design and Construction Process Working with the design team, DSi Structures, DSi Engineering, and Odom Construction coordinated both construction and schedule to meet the owner requirements for construction timeframe and classroom appearance. Shear resistance was provided by CFS strapping welded to both bearing panels and partitions. Strap braced walls were shop fabricated and bolted in place. Photo by DSi Structures Through its in-house software program development firm DSi Digital, DSi Structures used its proprietary Intelli- Model software to integrate the panel design with the architectural and structural design. Using 100% Building Information Modeling (BIM) technology, the panels and shear walls were laid out in 3D along with the composite floor system using Ecospan floor joists. The innovative DSi header system allowed for combined use of the slab turn-down, along with the composite CFS top-of-wall load distribution member, to provide the most efficient header design both during the concrete pour and after the concrete reached full design strength to carry live and other loads through the system. This BIM layout and panelization allowed for clash detection and prevention, as well as integration with plumbing and HVAC. Headers at the top of the wall rather than directly above the openings allowed for ductwork to penetrate the non-bearing cripple studs above doors rather than requiring special box-outs or headers. The panels were fabricated on compression jig tables and all connections were welded, which allowed for ease of handling and accuracy in panel construction. Stud fabrication machinery was coordinated with the structural design. All materials were cut-to-length to eliminate waste both on-site and in the shop. The panels were quickly dropped into place, plumbed, braced, and the next panel was ready to set in a matter 3
4 of minutes. The CFS design team considered construction and safety issues and provided design of the OSHA-required safety rails and safety harness tie-off points on the CFS panel system. Solving Complex Problems Design coordination allowed for very few complexities in both the design and construction. However, the design and construction of the curved front entry and rafters for the entry roof did provide some challenges, since this area was not pre-panelized, and member lengths and angles varied around the radius. This portion was field-framed and thus produced the largest amount of scrap for the entire structure, but was still less than typical wood or non-cfs projects. Design Integration Trusses were shop fabricated from back to back unpunched C Because of the flexibility of the CFS sections: all members cut to length, out of the stud fabrication bearing system, no design changes were machine, with very little scrap. Photo by DSi Structures needed to accommodate the CFS system. In addition, the CFS wall system and composite joist floor system were integrated so that alignment issues were avoided. All bearing panels incorporated load distribution members to eliminate alignment and coordination problems between trusses, bearing floor joists, and wall framing. The alignment framing required by AISI S200, North American Standard for Cold-Formed Steel Framing General Provisions, was negated by both the load distribution members and preplanning where heavy joist and truss loads would fall. School s in Session The teamwork exhibited by the members of the design and construction teams, combined with the innovations and inherent durability, straightness and quality of CFS framing, enabled the Clarke County School District to complete the project on time and under budget. The team gets an A+ from the children and the community for creating a safe, attractive and economical learning environment. 4
5 Project Participants and Further Information Project Owner: Clarke County School District Ted Gilbert, Associate Superintendent for District Services Athens, GA Ph: , ext Project Architect of Record: Larry N. Pope, AIA SP Design Group, Architects and Engineers Macon, GA Ph: Engineer of Record for Structural Work: Thad Gilliam, P.E., LEED AP BD+C Principal, GW Design Group, LLC Atlanta, GA Ph: Construction Manager: David Moore, President Piedmont Construction Group, LLC Macon, GA Ph: Cold-Formed Steel Specialty Engineer: Steve Haddad, P.E. Vice President, DSi Engineering, LLC Norcross, GA Ph: Cold-Formed Steel Specialty Contractor: Danny Odom Chief Operating Officer, Odom Construction Systems, Inc. Knoxville, TN Ph:
6 For More Information: Maribeth Rizzuto, LEED AP BD+C Managing Director, Cold-Formed Steel Engineers Institute Director, Education and Sustainable Construction, Steel Framing Alliance 25 Massachusetts Avenue NW, Suite 800 Washington, DC Tel: STEEL or
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
SECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
Seattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
Chapter 6 ROOF-CEILING SYSTEMS
Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;
CPA Steel Stud Framing Page 1 of 11
CPA Steel Stud Framing Page 1 of 11 STEEL STUD FRAMING General Requirements City of Palo Alto (CPA) Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Building Division IVR#
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
Technical Assignment 2 TABLE OF CONTENTS
2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17
Vertex BD. Leading Software Solution for Cold Formed Steel Construction
Vertex BD Leading Software Solution for Cold Formed Steel Construction Architectural Design Framing Engineering Detailing Production One Tool Does It All Leading Software for CFS Construction Vertex BD
HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: 1-800-TEC-WOOD (832-9663)
HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: 1-800-TEC-WOOD (832-9663) Fire-Retardant-Treated Wood Framed Wall Assemblies GENERAL INFORMATION Fire-resistant construction
Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
Expected Performance Rating System
Expected Performance Rating System In researching seismic rating systems to determine how to best classify the facilities within the Portland Public School system, we searched out what was used by other
8/18/14. Introduction to. Framing. Terminology and Concepts
8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:
CWB CERTIFICATION/ CWB CERTIFICATION/ QUALIFICATION QUALIFICATION SERVICES SERVICES CANADIAN WELDING CERTIFICATION AN OVERVIEW Canada, like many countries around the world, has specific rules and regulations
A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS
A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS Insurance Inspection Report 1234 Main Street Tallahassee, Florida Report Prepared For: Charles Smith Report Prepared
Basic Requirements for Residential Plan Review _
Basic Requirements for Residential Plan Review _ Below you will find the basic requirements for your plan submittal. General: Drawn to scale Plan Size minimum: 9 x 12 Designer, Engineer, or Architect name,
REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION
RESIDENTIAL: REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION 2 COMPLETE SETS OF PRINTS WITH ENGINEERS STAMP ON FOUNDATION PLAN INCLUDING ELECTRICAL, PLUMBING, ETC. SITE PLAN SHOWING HOUSE LOCATION
Page & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
Residential Building Permits
LANE COUNTY PUBLIC WORKS Residential Building Permits LAND MANAGEMENT DIVISION 3050 N. DELTA HWY, EUGENE OR 97408 i CONTACT PHONE NUMBERS: Building Program: (541) 682-4651 Inspection Requests: (888) 299-2821
4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.
GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Structural Assessment Report
Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive
MULTI-RESIDENTIAL BUILDING SOLUTIONS
MULTI-RESIDENTIAL BUILDING SOLUTIONS OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Code of Standard Practice for Timber Frame Structures
TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within
Slavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
PDmB, Inc. Definitions
Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or
Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE
How To Design A Post Tensioned Deck For A Building
SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University
Scope of EN 1090-1 Clarification Document
Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical
CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
Additions and Alterations
Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
research report Residential Hip Roof Framing Using Cold-Formed Steel Members RESEARCH REPORT RP06-2 American Iron and Steel Institute
research report Residential Hip Roof Framing Using Cold-Formed Steel Members RESEARCH REPORT RP06-2 2006 American Iron and Steel Institute Residential Hip Roof Framing Using Cold-Formed Steel Members i
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,
Olilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
Connection Solutions
Connection Solutions DESIGN BUILD SYSTEM Connection Solutions for Cold formed Steel Construction Complies with; AS/NZS 4600:2005 AISI S100:2007 AS/NZ 1397 ASTM A653 DESIGN & BUILD SYSTEM FRAMECAD Construction
Project Report. Structural Investigations Hotel del Sol Yuma, Arizona
Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,
Photos showing the change in condition from 2006 to 2012 are located in Appendix A.
January 27, 2012 Ms. Theresa Gallavan Economic Development Director City of Lompoc 100 Civic Center Plaza Lompoc, California 93436 RE: Lompoc Theater Limited Visual Condition Assessment Dear Theresa: Representatives
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders
Facility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
STRUCTURAL TESTS AND SPECIAL INSPECTIONS
CHAPTER 17 STRUCTURAL TESTS AND SPECIAL INSPECTIONS SECTION 1701 GENERAL 1701.1 Scope. The provisions of this chapter shall apply to Class I buildings and shall govern the quality, workmanship and requirements
48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS
609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS INDEX OF DRAWINGS SECTION A: A-1 = METAL TRACK TO PANEL ATTACHMENT A-2 = WOOD PLATE TO
START STRONG. THE SUMMIT
START STRONG. Design. Fabricate. Erect. Take full advantage of TURNKEY construction with light gauge steel framing call Midwest Drywall. FINISH FASTER. FINISH STRONG. THE SUMMIT THE SUMMIT BENEFITS OF
3rd Annual Design Drafting Contest
3rd Annual Design Drafting Contest YTI Career Institute 3 rd Annual Design Drafting Contest The purpose of this contest is to encourage excellence in effort and discipline, and to give recognition to outstanding
Timber Frame Construction
Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction
Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.
SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration law. Overview The
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California
14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102
Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Project No.: 15538.00 Re: Structural Condition Review of the building at 700 4 th St. E. Dear Sarah: We
TIMBER FRAME STANDARD DETAILS SEPTEMBER 09
Building 1 Grosvenor Court, Hipley Street OLD WOKING, SURREY GU22 9LL Tel: +44 (0) 1483 769518 Fax: +44 (0) 1483 770863 E-mail: [email protected] Internet: www.silvatecdesign.com TIMBER FRAME STANDARD
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1
Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT
Property Inspection 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT March 2013 This document has been prepared for the benefit of Clint Marston. No liability is accepted by this company
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
COLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
A Homeowner s Guide to Building Permits
A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is
17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
Marketing Coordinator Bootcamp Session 2: ABCs of AEC
Marketing Coordinator Bootcamp Session 2: ABCs of AEC Debbie Chen, LEED AP, APMP CF Proposal Development Director Louis Berger [email protected] Matthew Daw, PE, LEED AP Principal Keast & Hood [email protected]
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
EARTHQUAKE DESIGN OF BUILDINGS
GAP.2.0.9 A Publication of Global Asset Protection Services LLC EARTHQUAKE DESIGN OF BUILDINGS INTRODUCTION Buildings in many areas of the world are susceptible to damage from moderate to severe earthquakes.
ISO Types 1-6: Construction Code Descriptions
ISO 1 Frame (combustible walls and/or roof) Class 1B Buildings where the exterior walls are wood or other combustible materials, including construction where the combustible materials are combined with
Patio Covers / Carports
Patio Covers / Carports Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing
LIGHT FLOOR AND WALL FRAMING
CHAPTER 1 LIGHT FLOOR AND WALL FRAMING In the normal sequence of construction events, the floor and wall activities follow the completed foundation work. In this chapter, we ll examine established methods
Commercial And Industrial Steel Buildings
Commercial And Industrial Steel Buildings Arco Building Systems, Inc. Since 1979 Arco has been providing the highest quality steel buildings to contractors and owners throughout the United States. Leadership
Construction Technology COURSE OUTLINE
Technology COURSE OUTLINE 1. Course Title: Technology 2. CBEDS Title: Introduction to 3. CBEDS Number: 5501 4. Job Titles: Carpenters Concrete Laborers Managers Drywall installers Electricians Roofers
RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA
234 Abstract RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA Eng. Nandana Abeysuriya B.Sc. Eng (Hons), M.Eng.,C.Eng.,FIE(SL), Int PE(SL) 1A, Ananda Road, Melder Place, Nugegoda, Sri Lanka. Tel/Fax:
TechPractices: Home Front Homes:
TechPractices: Home Front Homes: PATH's Technologies in Practice are large scale housing projects throughout the U.S. where innovative technologies are being installed and used. Information is presented
Engineered Wood Foundations
Engineered Wood Foundations Emeraldfoundations.com 1 EWF Planning and Installation manual This manual will serve as a guide to planning and installing an Emerald Foundation system. This system is comprised
Building Construction. Lightweight construction. Conventional Construction
Ventilation 53 Building Construction The firefighter s ability to safely and efficiently ventilate a building through its roof will depend to some degree on the firefighter s understanding of roof construction.
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
Lesson Plan Course Title: Construction Technology
Lesson Plan Course Title: Construction Technology Session Title: Wall Framing, Doors Performance Objective: Upon completion of this assignment, the student will be able to properly identify, gather sizing
PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
INFORMATION BULLETIN NO.
Requirements for Plans Review Submittal, One- and Two-Family Dwellings INFORMATION BULLETIN NO. 100 (June 26, 1998, Revised March 26, 2009) City Planning & Development - Development Services City of Kansas