CAPABILITY STATEMENT
COMPANY PROFILE Having been in operation for more than 65 years, Hall Contracting has developed a reputation for delivering practical solutions that set the bar in quality. We have proven expertise in working in complex and demanding project environments, and are renowned for tackling some of the world s most challenging and remote dredging projects. As one of Australia s top tier dredging and marine contractors, we deliver large-scale works for ports, major project marine facilities, and canal and other marine developments across Australia, the Pacific Islands and South East Asia. Our civil division operates throughout Queensland and delivers a range of services including major infrastructure works, urban development services and oil and gas pipeline installation. THE COMBINATION OF OUR EXPERIENCE, OUR SAFETY, QUALITY AND ENVIRONMENTAL MANAGEMENT SYSTEMS AND OUR POSITIVE WORKPLACE CULTURE ENSURES HALL CONTRACTING IS MORE THAN JUST A CONTRACTOR; WE RE YOUR PARTNER IN DEVELOPMENT. Led by a strong and experienced senior management team (who have experience at tier one contractor level on national and international projects), our knowledgeable team members work closely with our clients to deliver resourceful and cost-effective solutions that make full use of our comprehensive fleet of equipment and protect the environment. With offices in Australia, Fiji and Malaysia, we work hard to deliver first-rate service to our clients. We pride ourselves on our ability to work within highly regulated environments, while also offering the flexibility to respond to changing site requirements.
OUR SERVICES At Hall Contracting, we possess the knowledge and expertise required to comfortably handle both large and small-scale dredging, infrastructure, environment, urban development and marine civil projects. Our construction capabilities include: DREDGING Capital and maintenance dredging Port and harbour dredging River and waterway dredging Land reclamation Beach replenishment and coastal protection Tailings dredging and dewatering Dredging and construction of canal estates Design and construct services CIVIL INFRASTRUCTURE Airside and non-airside airport civil works Utility installation Gas and water pipeline construction Large diameter pipeline installation (including HDPE, concrete, and steel) Road and bridge construction Earthworks and drainage Golf course and sporting field construction Design and construct services Water and sewerage infrastructure installation Vegetation clearing MARINE CIVIL Construction of seawalls (including geobag groynes) Construction of weirs and navigable lock structures Sheet piling and revetment wall construction Construction of salinity exchange systems Construction of ocean intake and outlet structures Construction of boat ramps and ancillary infrastructure Construction of minor jetties and wharves Design and construct services LNG and water pipeline shore connections ENVIRONMENTAL Fauna and flora management Contaminated land management Cultural heritage site management Coastal land management Acid sulfate soil management Erosion and sediment control Unexploded Ordnance (UXO) site management URBAN DEVELOPMENT Residential developments from small to major master-planned communities Earthworks and drainage Construction of canal and lake developments Service installation Management of environmentally sensitive sites Water and sewerage infrastructure installation
7 ALMOST ACROSS THE DECADES IN BUSINESS ASIA PACIFIC 10 150+ PIECES OF EARTHMOVING CUTTER SUCTION 175 EMPLOYEES EQUIPMENT DREDGES 4 OFFICES
State-of-the-art. Modern. Advanced. OUR EQUIPMENT AS AUSTRALIA S LEADING DREDGING CONTRACTOR, HALL CONTRACTING POSSESSES THE NECESSARY EQUIPMENT AND EXPERTISE TO SUCCESSFULLY MANAGE A WIDE RANGE OF PROJECTS. We own and operate the country s largest fleet of dredges, with vessels currently located across the Pacific Islands, Australia and South East Asia. Our dredge fleet operates with infield technology including GPS units and flow meters as well computer software management systems, allowing our team to constantly view and communicate with dredges wherever they are in the world. Our dredging fleet includes: 10 cutter suction dredges Eight workboats Five barges Eight booster pumps Two water pumps Backed by strong relationships with other independent dredging companies, we are also able to access extra equipment including backhoe dredges where required for a project. We also have an extensive array of ancillary and earthmoving equipment fitted with the latest GPS control technology. This includes specialist equipment for use on coal seam gas and mining projects. Our civil fleet includes: 30 excavators (4-50t) including long reach excavators 16 dump trucks (25t and 40t) 22 rollers and compactors Seven graders Six dozers (D6-D8 models) 20 articulated dump trucks Two scrapers Seven graders 20 compactors/rollers Nine loaders 102 light vehicles Eight heavy vehicles To ensure all equipment is maintained at the highest standard, our head office facility on Australia s Sunshine Coast includes a fully equipped workshop to service our fleet. It also provides our team with the ability to undertake structural steel fabrication works for various projects as required.
FEATURED PROJECTS DREDGING Darwin Marine Supply Base Location Darwin, Northern Territory Client Northern Territory Government and Macmahon Contractors Scope Dredging the Darwin Marine Supply Base approach channel, swing basin and berth Contract value $65 million Start date August 2012 Completion date December 2013 In 2012, Hall Contracting was engaged to carry out the dredging of the Darwin Marine Supply Base approach channel, swing basin and berth. The project involved dredging nearly 700,000m3 of siltstone to adjacent reclamation ponds. Soon after commencement of the works, it became apparent that much of the excavation included particularly hard sandstone and quartz. Hall successfully used its Eastern Aurora dredge to remove most of the sandstone and engaged the BHD Gungner, a 300t machine, to pre-rip the sandstone and quartz reef before the Eastern Aurora pumped it ashore. Despite all the obstacles, Hall succeeded in successfully completing the project for the client. INFRASTRUCTURE Brisbane Airport New Parallel Runway Location Client Scope Contract value Brisbane Airport, Queensland Brisbane Airport Corporation Construction of critical dredge pipeline corridor $16.8 million (AUD) Start date November 2013 Completion date February 2015 In 2013, Hall Contracting was appointed to construct a dredge pipeline corridor for this $1.3 billion project. The project also included the design and construction of a 4km long, 11m wide access track, as well as associated perimeter road diversions and ramp overs. As the dredge pipeline corridor path was to pass through an existing Waste Water Treatment Plant and the operational international airport, Hall Contracting was required to install a 4km long, 1000mm diameter steel pipeline as well as a 6m high, 40m long pipe bridge over an existing outfall structure. The complex project also required installing 270m of welded pipe under the live runway. In successfully completing this project, our team demonstrated their ability to work in a highly regulated environment and in such a way that they did not impact on the operations of the fully functional airport.
URBAN DEVELOPMENT Pelican Waters Estate Location Client Scope Golden Beach (Sunshine Coast), Queensland Cardno Construction of a canal residential estate $150 million (AUD) Contract value Start date 1990 Completion date Ongoing (multi-stage project) Hall Contracting has been the principal contractor for this award winning canal residential estate since its launch in 1990. A total of 2,000 allotments have been constructed to date, with 1,500 more to be completed over the next five to 10 years. Upon completion, Pelican Waters will have a population in the vicinity of 11,000 and will be a suburb in its own right. To-date, Hall Contracting has delivered the following as part of the project: Bulk earthworks Dredging works Construction of an 18-hole Greg Norman-designed championship golf course Bridges (both concrete prestressed and timber) Lock and weir navigation structures Revetment walls Major trunk main infrastructure for sewer, water and roads All subdivisional works ENVIRONMENTAL Brightwater Estate Location Brightwater Estate (Sunshine Coast), Queensland Client Stockland Scope Translocation of native vegetation Contract value $80 million (AUD) Start date October 2007 Completion date May 2009 Hall Contracting has been principal contractor for this large residential development on Queensland s Sunshine Coast since June 2009. As part of the project, our team successfully translocated 12.2ha of native vegetation (including rare and threatened plant species) to the University of the Sunshine Coast. Carefully selected seeds and cuttings from the site were also propagated for establishment in alternative locations. The project also required a compensatory habitat be provided for displaced fauna, including several rare and endangered species such as the acid frog and ground parrot. Our efforts on this project saw Hall Contracting named as a finalist in the prestigious Civil Contractors Federation (CCF) Earth Awards. With the site located adjacent to an environmentally sensitive fish habitat, extra care has been taken to ensure the local environment is protected throughout construction.
Strong. Experienced. Professional. OUR TRACK RECORD OUR ABILITY TO DELIVER HIGH QUALITY PROJECTS THAT NOT ONLY MEET CLIENT EXPECTATIONS, BUT OFTEN EXCEED THEM HAS EARNED OUR TEAM A RANGE OF AWARDS AND RECOGNITION FROM PEAK INDUSTRY BODIES AND CLIENTS IN RECENT YEARS. Throughout our 65-plus years of operation, Hall Contracting has successfully worked with a range of national and international governments, as well as major companies. These include (but are not limited to): BHP/BHP Billiton Xstrata Fortescue Metals Group Brisbane Airport Corporation Australian Government Department of Defence Leighton Contractors Worley Parsons Stockland AVEO (formerly FKP) Northern Territory Government Papua New Guinea Port Corporation The Fijian Government Department of Transport and Main Roads (Queensland, Australia) Brisbane Port Authority Gladstone Ports Corporation Australand We are proud to have been the recipients of the following accolades: 2005 National Winner Civil Contractors Federation (CCF) Earth Award for acid sulphate soils management at Pelican Waters 2009 Queensland State Finalist CCF Earth Award for Brightwater Estate rare species translocation 2010 Queensland Winner CCF Earth Award for Port Douglas boat harbour maintenance dredging 2012 Queensland State Finalist CCF Earth Award for Brightwater Estate 2013 Finalist Healthy Waterways Award for Brightwater Lake 2014 Australasian Winner International Erosion Control Association (IECA) Merit Award for Queens Road, Nudge works (stages 5-7) 2014 Queensland State Finalist CCF Earth Award for Pierce Avenue leachate cut-off wall
OUR MANAGEMENT SYSTEMS At Hall Contracting, we use Mango work management software which enables us to track all work delivery and the performance of our safety, quality, environmental management and risk management systems. An overview of each of these systems is provided below. SAFETY We pride ourselves on operating a certified Safety Management System to AS 4801 and OHSAS 18001 (certified by national standards body BSI) to help us achieve our goal of zero harm. Our team has proven expertise in working in highly regulated environments and we have a strong track record in completing projects with zero safety incidents. QUALITY Quality is more than just delivering an outstanding project; it s a way of life. With quality one of Hall Contracting s core values, our team endeavours to incorporate quality controls into all facets of business. We operate a certified Quality Management System to ISO 9001 (certified by BSI), and our corporate culture embodies a strong belief in providing only first-rate service. ENVIRONMENT At Hall Contracting, a commitment to environmentally responsible contracting is at the forefront of everything we do. We make every effort to maintain the delicate balance between responsible development and preserving the environment, and are proud to operate an Environmental Management System which is certified by BSI to ISO 14001. RISK MANAGEMENT Proactive risk management is a core element of our company s work culture. Hall Contracting has a risk management framework compliant with ISO 31000.
OUR INSURANCES, PREQUALIFICATIONS AND MEMBERSHIPS INSURANCES WorkCover Public liability insurance Professional indemnity insurance PREQUALIFICATIONS National Prequalification System (NPS) for Civil Construction Contracts (R2B1F50) CM3 Contractor Safety Management Prequalification Achilles First Point Supplybase supplier (supplier number 164278) MEMBERSHIPS Hall Contracting is proud to be a member of the following associations:
AT HALL CONTRACTING, WE GO MORE THAN JUST THE EXTRA MILE.
CONTACT US WE RE HERE TO HELP. If you would like to discover how we can assist you to successfully achieve your projects goals, please don t hesitate to contact us. Cameron Hall Managing Director Mobile: 0405 661 478 Email: cameronhall@hallcontracting.com.au Michael Bissett Chief Operations Officer Mobile: 0458 882 323 Email: michaelbissett@hallcontracting.com.au Ian Worthington Business Development Manager Mobile: 0434 182 339 Email: ianworthington@hallcontracting.com.au General Email: mail@hallcontracting.com.au Web: www.hallcontracting.com.au OUR OFFICES AUSTRALIA Head office, Sunshine Coast 149 Sippy Downs Drive (PO Box 519) Buderim Qld 4556 Phone: +61 7 5445 5977 Fax: +61 7 5445 1312 Brisbane 622 Wickham Street Fortitude Valley Qld 4006 Phone: +61 7 3227 1578 Fax: +61 7 5445 1312 ASIA Malaysia Level 36 Menara Citibank 165 Jalan Ampang 50450 Kuala Lumpur Phone: +60 3 2169 7745 Fax: +60 3 2169 7756 PACIFIC Fiji PO Box 4367 Nadi, Fiji Phone: +61 7 5445 5977 Fax: +61 7 5445 1312