APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT



Similar documents
TABLE OF CONTENT

21.1 Functions, Basic Configuration, and Interfaces

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Table of Contents Introduction How to Use This Manual How to Do a Facility Audit

Exceptional... Everytime!

Does Wall Township require an inspection by the building department on resale of a home?

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Data Center Due Diligence List

Advancements in Modularization

SUBJECT CAN: Temporary Systems, Utilities and Equipment. Effective: 4/09/2013. CODE SECTION 2010 California Building Code (CBC)

C P W R. Research & Training

KIEWIT CM/GC Enabling/Utilities

Mechanical Engineer. Process Engineer. Civil Engineer. PFD Inlet works and screening PFD Membrane Bioreactor 34.

contractors, etc. and establish relationships with lease and rental companies.

Exhibit C: Scope of Work and Schedule of Deliverables

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

Five-Year Capital Plan Request FY through FY

Sample - Existing Building Commissioning Plan

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

Scope of EN Clarification Document

B-1 Buildings & Service Maintenance

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

PLANT LOCATION AND LAYOUT

FACILITIES / SYSTEMS REQUIRING ASSESSMENT

Waste Handling & Disposal

Element D Services Plumbing

Facilities Maintenance Standards rev

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

DRAPER ELEMENTARY SCHOOL

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

PLUMMER ELEMENTARY SCHOOL

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

48 No Change to Content of Form Permitted

Free Examples of plant layout drawing

UNIVERSITY OF TOLEDO

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

Acumen Enterprises, Inc.

CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

SECTION MORTUARY REFRIGERATORS


Disaster Prevention and Protection Checklist

NAPCS Product List for NAICS 54134: Drafting Services

Southeast Service Center

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

EXPRESS PERMITS (No Plan Check Required)

SAFETY SELF-INSPECTION PROGRAM

How To Prevent And Manage A Flood And Mold

Storm Water Management Requirements for Construction Projects Less than One Acre

Renovation instructions

1.2 Refrigerant Equipment. General

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance Section 17. Types of Authorized Contractor Licenses.

Reducing Client s Hazardous / Landfill Waste; Improving Air Quality

Electrical. This section applies to the design and installation of building power distribution systems.

Suffolk County Department of Health Services. Division of Environmental Quality

Buildings Construction Procurement Strategy

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Water should be removed as soon as possible once the safety of the structure has been verified.

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

Design and Construction Design Phase Deliverables

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

WHEN IS A PERMIT REQUIRED?

Re-engineering and function testing at Handtmann Zittau WELCOME

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Gramercy Place Condo Association, Inc.

How To Get A Building Permit In Florida

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Outdoor Storage of Raw Materials SC-33

Pressure Vessels (Air Compressors) and LPG Tanks

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.

REGISTRATION OF INTEREST

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

Building Description Project Description Estimated Cost Notes Total Deferred

Schedule B to By-law

PROPROCESS SERVICES & CAPABILITY STATEMENT

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

LOSS PREVENTION IAT GROUP

SUMP PUMP DISCHARGES INFORMATIONAL PACKET

Caretaker Handbook. S:\5 Handbooks\Caretaker Handbook doc Page 1 of 9

HEANEY General Contracting, Inc.

Spill Control Prevention Plan (SCPP)

Ethanol Vehicle and Infrastructure Codes and Standards Citations

COMPLETE MANUFACTURING FACILITY

Transcription:

PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o Feasibility Level (± 30%) o Approval Level (± 20%) o Construction Level (± 10%) Project Scheduling o Design o Construction o Start-up Start-Up Assistance Training and Training Manual Development Vendor Liaison and Coordination Contract Services / Temporary Employee Services for: Retirees still needed on a part-time basis Technical / Engineering / Drafting Assistance Office Assistance Available Options: o Hourly or Salary Basis o Low mark-up if located in your facility (any US location) o Short-term or Long-term o Health Care and 401-K

ARCHITECTURAL / FACILITY / BUILDING SERVICES Access / Egress Plans ADA Compliance Building Additions Clean Room Design Control Rooms Drafting and Documentation Facility Plans Fencing and Security Firewalls Indoor / Outdoor / Area Lighting Locker / Shower Rooms Labs Maintenance Areas Office Renovation OSHA Compliance Outside Storage Tanks Permitting Assistance Power house Modifications Privacy Walls / Sound Barriers Product Flow Analysis Product Storage / In-Process Storage QC Labs Railroad Access Design Roadwork and Building Access Sanitary and Process Sewers Site Plans Space Planning Truck Docks Utilities Air, Steam, Water, Gas, Electric Warehouse Design

Building Additions Concrete CIVIL / STRUCTURAL Civil / Structural Drafting and Documentation Containment Structures Crane Rails and Runways Drainage Systems Floor Loading Design Floor Repair Foundations o Buildings o Equipment o Tanks Loading Docks Monorails Platforms and Mezzanines Railroad Access Design Roadways Roof Loading and Modification Runoff Calculations and Retention Design Sanitary Sewers Stairways Steel Design Storage Tank / Chest Design o Concrete o Steel o Tile Structural Steel Water and Waste Water Treatment Systems Wind Loading

Air Compressors and Dryers Building Ventilation / Air Balance Boilers and Steam Systems MECHANICAL / PIPING Chemical Storage and Delivery Systems Conveyor Systems Containment Structures Dust Collection Systems Equipment Layout and Accessibility HVAC Machine Base Plates Machine Drives o Gearboxes o Belt Drives o Line Shafts Machine Design / Modification Machine Relocation Material Handling Systems Platforms Pilot / Laboratory Equipment Installations Pipe Specifications Piping / Mechanical Drafting and Documentation Process Flow Diagrams (P&ID s) Process Piping Product Storage / Rack Systems Pump Sizing and Specification Runoff Calculations and Retention Design Tank and Vessel Design Trim Systems Utilities Air, Steam, Water, Gas, Electric Vacuum Systems Valve Sizing and Specification Water and Waste Water Treatment

ELECTRICAL AND INSTRUMENTATION AC & DC Drive Systems Cable Trays Communication Systems Control Room Design Conveyor and Transfer Equipment Controls DCS Installation Electrical Drafting and Documentation Electrical and Instrument Installation Details Electrical and Instrument Layout Drawings Equipment Checkout and Startup Fire Alarms Grounding Hazardous Area Evaluation I/O and Termination Panels Instrument Loop Diagrams Instrumentation Selection and Specification Lighting Mass Flow Balance MCC Design and Additions Motor Control Diagrams Operator Interface Panels Packaging Equipment Controls PLC Installation and Programming Power Distribution Power Studies Process Flow Diagrams (P&ID s) Purchase Assistance Relay Controls Roll Handling Controls Specifications Transformers and Substations