1 Building the Case for Construction Management Dick Hierstein, IaCMA and Larry Gleason, CPMI Handouts and presentation are available Iowa League of online Cities // 2011 at Outline Owner Perspective Construction Manager as Agent (Cma) Early Involvement of CM
2 Timing of Decisions/Change Owner Perspective Outline Planning Pre-Design Design Construction $ Case Studies Advantages of CM
3 WHAT IS CM? Construction Management is a project delivery method that applies modern management techniques to project planning, design and construction in order to control time and cost and assure quality for the project owner. The CM s primary task is to represent the interests of the owner throughout all phases of the project. Outline Contract Relationships CONTRACTORS OWNER CM DESIGN TEAM
4 Bridging Competing Project Interests BUDGET ADVOCATES Project Costs Contingency 5% Other Owner 20% Outline PROGRAM ADVOCATES CM DESIGN ADVOCATES Direct Construction 68% CM Fee 1% On-Site Staff 4% Genr'l Cond. 2%
5 Why CM? Early Construction Expertise Checks & Balances Value Engineering Targeted Bid Flexibility Bid Package Flexibility Cost Savings Managing Risk Managing Risk When an entity is allocated a risk that it cannot adequately control, it will seek to protect itself against that risk in at least two ways: (1) up front, by increasing its contract price in order to build in additional contingency to cover the risk; and (2) later in the project, by bringing claims or demanding change orders to recover costs resulting from the risk.
6 Managing Risk Bid Strategy Bid Strategy Low Individual Trade Package Bids Low Trade Combination Package Bids Low Traditional General Contractor Bid Sample Contingencies 18% Design Contingency 13% 8% 3% Construction Contingency Design Contract Concept Schematic Development Documents Construction REQUEST BIDS FROM INDIVIDUAL TRADE CONTRACTORS REQUEST COMBINED BIDS FROM TRADE CONTRACTORS REQUEST BIDS FROM GENERAL CONTRACTORS P1 Multi-Scope 1,174,000 $ P1-13,21 Grooms Co. 2,588,000 $ P1-21 Grooms Co. $ 6,585,000 P2 Arch. Woodwork 113,495 P3 Alum,Glass,Glazing 228,311 P4 GWB Systems 496,907 P5 Ceramic Tile 53,832 P6 Terrazzo 35,888 P7 Acoustical 202,962 P8 Aud Floor (Alt #1) - P9 Carpet & Resilient 133,989 P10* Painting,Wallcover 171,190 P11 Lockers 92,000 P12 Lab Casework & FH 106,480 P13 Aud Seating (Alt #1) - P14 Test, Adjust & Bal. 23,575 P14 Systems Mgmt. 23,575 P15 Plumbing & Piping 917,875 P15 AAA Mech. 917,875 P16 Mech. Insulation 142,000 P16 Eller Insulation 142,000 P17 Fire Protection 213,700 P17 Midwest Fire 213,700 P18 Ventilating 951,100 P18 Winger Contract. 951,100 P19 Controls 261,480 P19 Accurate Mech. 261,480 P20 Electrical 1,090,000 P20 DeVries Elec. 1,090,000 P21 Aud Sound (Alt #1) - Total Bids $ 6,408,784 $ 6,187,730 $ 6,585,000 CM Coordination Fee $ 161,310 $ 161,310 $ - Comparative Cost $ 6,570,094 $ 6,349,040 $ 6,585,000
7 Pekin City Hall BID STRATEGY BENEFITS BID STRATEGY BENEFITS Low Combination Trade Package Bids Low Traditional General Contractor Bid P1 Concrete/Earthwork 827,400 $ P1-20 $ 4,831,000 P2 Sewer/Drainage 73,000 P3 Paving 87,000 P4 & 12 Multiscope 380,772 P5 Masonry 658,000 P6 Steel 410,500 P7 Drywall/ACT 299,800 P8 Roofing 87,100 P9 Alum. Storefronts 184,600 P10 & 11 Flooring 89,918 P13 Elevator 48,145 P14 Fire Protection 59,000 P15 Plumbing, Piping 299,500 P16 HVAC & Elec 708,800 & 19 P17 Mech Insulation 68,264 P18 Controls 64,300 SECURE TRUE LOW BIDS REDUCED MARKUPS AND FINANCING COSTS INCREASE LOCAL CONTRACTOR PARTICIPATION INCREASE TRADE CONTRACTOR COMPETITION REDUCE CHANGE ORDER COSTS REDUCE CONSTRUCTION COST BY UP TO 10% P20 Data/Telecom 75,550 $ 4,421,649 $ 4,831,000
8 Outline Pre-construction Process Scope Development Team Development Contract Preparation Master Schedule Cost Estimating/Value Engineering Constructability/Document Review Bidder Interest Campaign Bid Strategy Budget Development Checklist COST COST COST COST PROJECT BUDGET OTHER BUDGETS PROJECT BUDGET OTHER BUDGETS FUNDING ADMINISTRATION Capital Funds $ $ Internal Staff Costs $ $ Bond Proceeds $ $ Advertising $ $ State & Federal Grants $ $ Printing $ $ Historic Preservation Grants $ $ Legal Fees $ $ Hotel and Restaurant Taxes $ $ Building Permits $ $ Department of Commerce & $ $ Builders Risk Insurance $ $ Community Affairs Capital Improvement Budget $ $ Finance Costs $ $ Fund Raising Campaign & Contributions $ $ Grant or Financing Proposal Preparation $ $ Sales Tax Refunds $ $ Feasibility Study $ $ Reinvestment Income $ $ Utility Plant Investment Fees $ $ Utility Rebates $ $ Utility Connection Fees $ $ Code Review of Documents $ $ LAND/BUILDING PREPARATION Bond Printing $ $ Bond Administration $ $ Land/Building Purchase Price $ $ Purchase Closing Costs $ $ PROFESSIONAL CONSULTING SERVICES Land Surveys $ $ Real Estate Taxes $ $ Programming Fees $ $ Appraisal Fees $ $ Preconstruction CM Fees and Reimbursables $ $ Hazardous Materials Surveys $ $ Architectural Fees and Reimbursables $ $ Geotechnical Investigations $ $ Acoustical Consultant $ $ Environmental Impact $ $ Laboratory Consultant $ $ Historic Preservation Research $ $ Structural Consultant $ $ Demolition (Construction Cost) $ $ Mechanical/Electrical Consultant $ $ Clearing and Grubbing (Construction Cost) $ $ Kitchen Consultant $ $ Asbestos Abatement $ $ Special Inspections $ $ Hazardous Waste Removal $ $ Soil and Material Testing $ $ Testing & Balancing $ $ Asbestos Monitoring $ $
9 Budget Development Checklist COST COST COST COST PROJECT BUDGET OTHER BUDGETS PROJECT BUDGET OTHER BUDGETS CONSTRUCTION COSTS GENERAL CONDITIONS (cont.) Sitework $ $ Temporary Water $ $ Foundations $ $ Temporary Gas $ $ Floor System $ $ Temporary Sewer $ $ Columns $ $ Temporary Office $ $ Roof System $ $ Building Layout $ $ Exterior Wall $ $ Exterior Glazing $ $ Interior Wall $ $ OCCUPANCY COSTS Doors $ $ Specialties $ $ Movable Fixtures, Furnishings and Equip. $ $ Equipment $ $ Artwork $ $ Conveying Systems $ $ Relocation/Moving $ $ Plumbing $ $ Technology $ $ Fire Protection $ $ Occupancy Permit $ $ Heating, Ventilating & Air Conditioning $ $ Open House/Dedication $ $ Electrical $ $ Final Cleaning $ $ General Conditions, Overhead and Profit $ $ Signs $ $ Management Fees $ $ Keying $ $ Design Contingency $ $ Phone System $ $ Escalation $ $ Custodial Equipment $ $ Construction Contingency $ $ GENERAL CONDITIONS NOTES: 1. Indicate cost or budget amount for each applicable item. Job Sign $ $ 2. If the cost or budget amount is not known but the item is applicable indicate with Site Fence $ $ a star. Temporary Roads $ $ 3. If an item is not applicable indicate with NA or a dash. Temporary Heat $ $ Temporary Electric $ $ Construction Process On-Site Staffing Quality Control CPM Scheduling Financial Status Reports Payment Control Change Order Control Warranty and Long Term Support Dick Hierstein [email protected] Larry Gleason [email protected]
Cost Planning. Project Kaleidoscope Drury University 2003. Larry Gleason CPMI
Cost Planning Project Kaleidoscope Drury University 2003 Larry Gleason CPMI Cost Management Cycle Planning & Preliminary Budgeting Post Construction Pre-Design & Programming Design & Construction Timing
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
NOTICE TO CONTRACTORS
NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS
MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS 1. Cost Certification Guidelines PAGE I General 1 II Identity of Interest
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
KIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015
Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
Repair and Remodeling Estimating Methods. 4th Edition. RSMeans
Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling
ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015
ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013
The following guide is a general list of Builders Mutual s appetite for business classes residential and commercial WorkSafe workers compensation and Builders Best general liability (including trade contractors),
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION
Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Architectural and Engineering Basic Services Fee Estimating Guidelines
Architectural and Engineering Basic Services Fee Estimating Guidelines Basic Services is the design work customary on a typical project to take an established building program, site, and budget, and then
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through
APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT
PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o
Exhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
Saxe Middle School Auditorium Renovation February 4, 2015
Saxe Middle School Auditorium Renovation February 4, 2015 OVERVIEW OF PRESENTATION Renovation of Saxe Auditorium State & Federal Testing requirements Town Hires Tighe & Bond to perform testing Summary
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
Think Of Us First! When It s Time to Distribute Your Plans
Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Project Information PS-0748-A Page 1 5/4/2016 Table of Contents Project Budget Worksheet Program Plan Project Location (Site Plan) Scope of Services
Request for Proposal for Construction Management Services
Willmar Public Schools- ISD 347 611 5 th Street SW Willmar MN 56201 Dr. Jeffrey Holm, Superintendent Request for Proposal for Construction Management Services Willmar Public Schools is soliciting Construction
THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
City and County of San Francisco Department of Public Works TABULATION OF BIDS
City and County of Department of Public Works TABULATION OF BIDS SPEC NO.: 7536A(R ) TITLE: Potrero Branch Library Renovation BIDS RECEIVED: March 26.2008 BIDDERS (in the order received & opened): Bid
HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004
HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
NAHB 1-00-0000 PRODUCT DEFINITION
NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
SUCF PROJECT COST REPORTING GUIDE
SUCF PROJECT COST REPORTING GUIDE State University Construction Fund 353 Broadway / ALBANY, NY 12246 SUCF 900 / 11 Table of Contents Page A. Preface 1 B. Area Takeoff Methodology 1. General 2 2. Net Assignable
C-2 Construction, Inc. - NAICS Codes
C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
American Safety Insurance Company
American Safety Insurance Company General Liability Program A- Rated (Non-Admitted) Table of Contents Page 2 Page 3 Page 4 5 Underwriting Guidelines and Coverages Prohibited Classes Underwriting Classification
D Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /
Request for Proposal for Construction Management Services
Request for Proposal for Construction Management Services Moorhead Area Public Schools is soliciting Construction Management Agent of the Owner (CMa) proposals for the construction of a new K-4 elementary
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
SALE OF CONDOMINIUMS, THE NATHANIEL AT BANKS SQUARE 948 MAIN STREET, WALTHAM (Former Banks School)
THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT SALE OF CONDOMINIUMS, THE NATHANIEL AT BANKS SQUARE 948 MAIN STREET, WALTHAM (Former Banks School) A D D E N D U M N O. 2 Sept. 11, 2015 CHANGES,
Gramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
CHARLOTTE COUNTY Community Development Department
CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table
Commercial Markets. Construction Overview. About Zurich Sales and Distribution Services Appetites Your Contacts and Resources
Commercial Markets Construction Overview As one of the leading insurers in the construction industry, Zurich delivers product and service solutions that help our customers reduce injuries, minimize their
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION
REQUEST FOR PROPOSAL For MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES For VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION CITY OF ROCHESTER November 2009 TABLE OF CONTENTS GENERAL INFORMATION
BUILDING MOVE PROCESS INSIDE CITY LIMITS
To move a building from outside or within the City to a site within City limits, the following STEPS must be taken before the move can take place: 1. A written request to relocate a dwelling must be provided
Planning and Construction Management Services
Planning and Construction Management Services Construction Project Management Services New construction, major renovations or improvements to building structures and systems are part of the Department's
Exceptional... Everytime!
Oil & Gas Exceptional... Everytime! Oil & Gas Industry With each Team Leader possessing 10 20 Years experience, BAR Engineering not only contributes high level engineering expertise, but also the practical
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
NORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER
NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Newtown and Holland Middle Schools Construction Project Bid Review
Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,
ATTACHMENT 1 - LEE HIGH SCHOOL CONSTRUCTION MANAGER AT RISK OLD LIBRARY RENOVATIONS PROJECT BID SUMMARY TABULATION. RFCSP #10-13 - Bid Package #1
ATTACHMENT 1 - LEE HIGH SCHOOL CONSTRUCTION MANAGER AT RISK OLD LIBRARY RENOVATIONS PROJECT BID SUMMARY TABULATION RFCSP #10-13 - Bid Package #1 Bid Date: Thursday, January 10, 2013 @ 2:00 pm Addendums
Asbestos Survey Form (See Instructions)
Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: [email protected] 1. Purpose of Survey Renovation Demolition
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
11044 1 VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 31 32 Geotechnical Data 00 70 00 General Conditions 00 73 00 Supplementary Conditions
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency
Seattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668
Inspection Report Property Address: 123 Dream Home Way Frisco, CO 80443 Prepared for: Inspector: Tim Nixon Tim Nixon Inspection date: 3/28/2014 1 of 9 General Information Property Information Address:
CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning
CONSTRUCTION LAW I. Contractor Licensing 1. The Basic Rule: No person who is not certified or registered shall engage in the business of contracting in this state. FS 489.113. Pinellas County Code 22-14
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
1.2.5.1 All references to Pre-Construction Services in this Specification shall apply to requirements for CM-R and DB contract types only.
SECTION 01 32 00 - PART 1 - GENERAL 1.1. RELATED DOCUMENTS 1.1.1. The Contractor's attention is specifically directed, but not limited, to the Uniform General Conditions for University of Texas System
Application for Tax Abatement for Rehabilitation of Property in a Local Historic District
Application for Tax Abatement for Rehabilitation of Property in a Local Historic District Historic Preservation Office Austin, Texas 512-974-2727 Adopted December 2012 To encourage preservation and maintenance
Program Demand Cost Model for Alaskan Schools
Program Demand Cost Model for Alaskan Schools 14th Edition Education Support Services / Facilities 2015 Consultant Editor HMS, Inc. 4103 Minnesota Drive Anchorage, Alaska Division of School Finance &
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
Invesco Advisers, Inc. Minimum Vendor / Contractor Insurance Requirements and Risk Category Schedule
Invesco Advisers, Inc. Minimum Vendor / Contractor Insurance Requirements and Risk Category Schedule All Vendors should demonstrate the following minimum insurance coverage: Commercial General Liability:
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional