Bid Tabulation for IFB #9708 (Asbestos and Mold Abatement Services)



Similar documents
Vendor Selection Overview UNIT PRICES FOR ASBESTOS ABATEMENT & DISPOSAL SERVICES VARIOUS SITES

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

Asbestos Procedures. Asbestos Products

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site

Asbestos Survey Form (See Instructions)

Saxe Middle School Auditorium Renovation February 4, 2015

ASBESTOS MANAGEMENT PROGRAM

Guidelines for Mold Remediation (Removal)

Asbestos Management POLICY

ASBESTOS IN THE HOME

Environmental Education Associates. Asbestos in Construction

STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION

Chicago Public Schools 6 Month Asbestos Surveillance Spring

NDSU TABLE OF CONTENTS

6% Chrysotile NA White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor

Asbestos Frequently Asked Questions

EVERYONE'S RESPONSIBILITY

SECTION 16 ASBESTOS MANAGEMENT

Airborne asbestos is a serious health hazard.

UBC Plant Operations Asbestos Work Procedures April 2004

Regulatory Services. Asbestos in the Home. What is asbestos?

Managing your asbestos hazards

DIVISION 1 THIRD FLOOR COUNTY ATTORNEY. Remediation Plan Remove approximately 6 SF of mold impacted drywall Remove all carpeting in hatched.

ASBESTOS SCIENCE TECHNOLOGIES, INC.

Asbestos Management Program

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Characteristics/Applications

Mold and Mildew Mold and mildew can be detected by sight, smell and touch.

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:


May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

MEMORANDUM. General: Foundation:

ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.

Eco-Friendly Homes Presentation Asbestos, Mold, and Lead-Based Paint

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

Mold Response and Remediation Plan

C P W R. Research & Training

MOLD RESPONSE AND REMEDIATION PLAN

Miami University s Asbestos Operations & Maintenance Program Administered by

The Truth About Asbestos In Your Home

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT AIP 84

Asbestos Operations and Maintenance Program. San José State University

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES

WorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials

APPENDIX B. EPA s Investigating, Evaluating, and Remediating Moisture and Mold Problems (see EPA website for complete details)

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

Asbestos

Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety

Dealing with. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS

RULE 902 ASBESTOS Adopted (Amended , , , , , ) INDEX

Asbestos in the home. for you - for your community - not for profit

Your Basement Remodeling Specialist LLC

UNOFFICIAL. 1. Owner: Delaware Department of Transportation (DelDOT) WEBSITE

Mold Management Plan Operations & Maintenance

MOLD REMEDIATION KEY STEPS

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS

Mould Mould A Basic Guide

Asbestos in Your Home

EXHIBIT A SCOPE OF SERVICES

NORMI Professional Guidance for DIY Projects

Washington University Asbestos Operations and Maintenance Plan

Control Provisions under the Air Pollution Control Ordinance

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

Asbestos at the Work Site

MOLD REMEDIATION PROCEDURES

Building Owners Responsibilities for Asbestos

North Carolina State University. Asbestos Management Plan

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

Re: Addendum to Preliminary Water Damage Report, Mendocino Public Health Branch, 1120 South Dora Street, Ukiah, CA

ASBESTOS OPERATIONS AND MAINTENANCE PLAN

DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS

LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material

University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE. Facilities Maintenance Services

RFI Questions. Reference (Sect/Para/Pag e) QUESTION GOVERNMENT RESPONSE 1 RFP and Drawings

ASBESTOS BACKGROUND INFORMATION

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

Asbestos in the home. WHERE it may be found WHAT to do if you find it. Date: 15/08/14

Transcription:

Bid Tabulation for IFB #9708 (Asbestos and Services) Item IES of Marshall, Inc (SERVPRO) B&R Insulation Inc Major Abatement (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation >2 to 4-inch) Linear Foot (Pipe Insulation >2 to 4-inch) Linear Foot (Pipe Insulation >2 to 4-inch) Linear Foot (Pipe Insulation >2 to 4-inch) Linear Foot (Pipe Insulation >2 to 4-inch) Linear Foot (Pipe Insulation >2 to 4-inch) Linear Foot $13.60 $15.00 $20.00 $18.15 $15.00 $40.00 $19.80 $21.00 $30.00 $26.36 $21.00 $60.00 $26.00 $24.75 $40.00 $38.17 $24.75 $80.00 $14.10 $20.00 $20.00 $18.65 $20.00 $40.00 $20.30 $28.00 $30.00 $26.86 $28.00 $60.00 $26.50 $33.00 $40.00 $38.67 $33.00 $80.00

(Pipe Insulation >4 to 6-inch) Linear Foot (Pipe Insulation >4 to 6-inch) Linear Foot (Pipe Insulation >4 to 6-inch) Linear Foot (Pipe Insulation >4 to 6-inch) Linear Foot (Pipe Insulation >4 to 6-inch) Linear Foot (Pipe Insulation >4 to 6-inch) Linear Foot (Pipe Insulation >6 to 8-inch) Linear Foot (Pipe Insulation >6 to 8-inch) Linear Foot (Pipe Insulation >6 to 8-inch) Linear Foot (Pipe Insulation >6 to 8-inch) Linear Foot (Pipe Insulation >6 to 8-inch) Linear Foot (Pipe Insulation >6 to 8-inch) Linear Foot (Pipe Insulation >8 to 10-inch) Linear Foot $14.60 $25.00 $20.00 $19.15 $25.00 $40.00 $20.80 $35.00 $30.00 $27.36 $35.00 $60.00 $27.00 $41.25 $40.00 $39.17 $41.25 $80.00 $15.10 $30.00 $20.00 $19.65 $30.00 $40.00 $21.30 $42.00 $30.00 $27.86 $42.00 $60.00 $27.50 $49.50 $40.00 $39.67 $49.50 $80.00 $15.60 $30.00 $25.00

(Pipe Insulation >8 to 10-inch) Linear Foot (Pipe Insulation >8 to 10-inch) Linear Foot (Pipe Insulation >8 to 10-inch) Linear Foot (Pipe Insulation >8 to 10-inch) Linear Foot (Pipe Insulation >8 to 10-inch) Linear Foot (Pipe Insulation >10 to 12-inch) Linear Foot (Pipe Insulation >10 to 12-inch) Linear Foot (Pipe Insulation >10 to 12-inch) Linear Foot (Pipe Insulation >10 to 12-inch) Linear Foot (Pipe Insulation >10 to 12-inch) Linear Foot (Pipe Insulation >10 to 12-inch) Linear Foot (Pipe Joint/Fitting/Valve up to 2-inch) Linear Foot (Pipe Joint/Fitting/Valve up to 2-inch) Linear Foot $20.15 $30.00 $50.00 $21.80 $42.00 $37.50 $28.36 $42.00 $75.00 $28.00 $49.50 $50.00 $40.17 $49.50 $100.00 $16.10 $30.00 $25.00 $20.65 $30.00 $50.00 $22.30 $42.00 $37.50 $28.56 $42.00 $75.00 $28.50 $49.50 $50.00 $40.67 $49.50 $100.00 $13.60 $20.00 $20.00 $18.15 $20.00 $40.00

(Pipe Joint/Fitting/Valve up to 2-inch) Linear Foot (Pipe Joint/Fitting/Valve up to 2-inch) Linear Foot (Pipe Joint/Fitting/Valve up to 2-inch) Linear Foot (Pipe Joint/Fitting/Valve up to 2-inch) Linear Foot (Pipe Joint/Fitting/Valve >2 to 4-inch) Linear Foot (Pipe Joint/Fitting/Valve >2 to 4-inch) Linear Foot (Pipe Joint/Fitting/Valve >2 to 4-inch) Linear Foot (Pipe Joint/Fitting/Valve >2 to 4-inch) Linear Foot (Pipe Joint/Fitting/Valve >2 to 4-inch) Linear Foot (Pipe Joint/Fitting/Valve >2 to 4-inch) Linear Foot (Pipe Joint/Fitting/Valve >4 to 6-inch) Linear Foot (Pipe Joint/Fitting/Valve >4 to 6-inch) Linear Foot (Pipe Joint/Fitting/Valve >4 to 6-inch) Linear Foot $19.80 $25.00 $30.00 $26.36 $25.00 $60.00 $26.00 $33.00 $40.00 $38.17 $33.00 $80.00 $14.10 $25.00 $20.00 $18.65 $20.00 $40.00 $20.30 $35.00 $30.00 $26.86 $35.00 $60.00 $26.50 $41.25 $40.00 $38.67 $41.25 $80.00 $14.60 $30.00 $20.00 $19.15 $20.00 $40.00 $20.80 $42.00 $30.00

(Pipe Joint/Fitting/Valve >4 to 6-inch) Linear Foot (Pipe Joint/Fitting/Valve >4 to 6-inch) Linear Foot (Pipe Joint/Fitting/Valve >4 to 6-inch) Linear Foot (Pipe Joint/Fitting/Valve >6 to 8-inch) Linear Foot (Pipe Joint/Fitting/Valve >6 to 8-inch) Linear Foot (Pipe Joint/Fitting/Valve >6 to 8-inch) Linear Foot (Pipe Joint/Fitting/Valve >6 to 8-inch) Linear Foot (Pipe Joint/Fitting/Valve >6 to 8-inch) Linear Foot (Pipe Joint/Fitting/Valve >6 to 8-inch) Linear Foot (Pipe Joint/Fitting/Valve >8 to 10-inch) Linear Foot (Pipe Joint/Fitting/Valve >8 to 10-inch) Linear Foot (Pipe Joint/Fitting/Valve >8 to 10-inch) Linear Foot (Pipe Joint/Fitting/Valve >8 to 10-inch) Linear Foot $27.36 $42.00 $60.00 $27.00 $49.50 $40.00 $39.17 $49.50 $80.00 $15.10 $35.00 $20.00 $19.65 $35.00 $40.00 $21.30 $49.00 $30.00 $27.86 $49.00 $60.00 $27.50 $57.75 $40.00 $39.61 $57.75 $80.00 $15.60 $35.00 $25.00 $20.15 $35.00 $50.00 $21.80 $49.00 $37.50 $28.36 $49.00 $75.00

(Pipe Joint/Fitting/Valve >8 to 10-inch) Linear Foot (Pipe Joint/Fitting/Valve >8 to 10-inch) Linear Foot (Pipe Joint/Fitting/Valve >10 to 12-inch) Linear Foot (Pipe Joint/Fitting/Valve >10 to 12-inch) Linear Foot (Pipe Joint/Fitting/Valve >10 to 12-inch) Linear Foot (Pipe Joint/Fitting/Valve >10 to 12-inch) Linear Foot (Pipe Joint/Fitting/Valve >10 to 12-inch) Linear Foot (Pipe Joint/Fitting/Valve >10 to 12-inch) Linear Foot Pipe Removal (Linear Foot) Pipe Removal (Linear Foot) Pipe Removal (Linear Foot) Pipe Removal (Linear Foot) Pipe Removal (Linear Foot) $28.00 $57.75 $50.00 $40.17 $57.75 $100.00 $16.10 $35.00 $25.00 $20.65 $35.00 $50.00 $22.30 $49.00 $37.50 $28.56 $49.00 $75.00 $28.50 $57.75 $50.00 $40.67 $57.75 $100.00 $7.25 $10.00 $15.00 $7.75 $10.00 $30.00 $10.44 $14.00 $27.50 $11.16 $14.00 $45.00 $13.63 $16.50 $30.00

Pipe Removal (Linear Foot) Flat Insulation (boiler, breaching) Square Foot Flat Insulation (boiler, breaching) Square Foot Flat Insulation (boiler, breaching) Square Foot Flat Insulation (boiler, breaching) Square Foot Flat Insulation (boiler, breaching) Square Foot Cost Holiday Pay (Gross Removal) Flat Insulation (boiler, breaching) Square Foot Cost Holiday Pay (Glove Bag) Flat Insulation (duct) Square Foot Flat Insulation (duct) Square Foot Flat Insulation (duct) Square Foot Flat Insulation (duct) Square Foot Flat Insulation (duct) Square Foot Flat Insulation (duct) Square Foot $29.19 $16.50 $60.00 $15.10 $30.00 $17.00 $19.65 $30.00 $34.00 $21.30 $42.00 $25.50 $27.86 $42.00 $51.00 $27.50 $49.50 $34.00 $39.67 $49.50 $68.00 $15.10 $20.00 $17.00 $19.65 $20.00 $34.00 $21.30 $25.00 $25.50 $27.86 $25.00 $51.00 $27.50 $33.00 $34.00 $39.67 $33.00 $68.00

Scraping texture (Plaster) Square Foot Scraping texture (Plaster) Square Foot Scraping texture (Plaster) Square Foot Scraping texture (Plaster) Square Foot Scraping texture (Plaster) Square Foot Scraping texture (Plaster) Square Foot Scraping texture (Concrete) Square Foot Scraping texture (Concrete) Square Foot Scraping texture (Concrete) Square Foot Scraping texture (Concrete) Square Foot Scraping texture (Concrete) Square Foot Scraping texture (Concrete) Square Foot Removal of Acustic Material and Mastic (Square Foot) $14.10 $7.50 $10.00 $18.65 $7.50 $20.00 $20.30 $10.50 $15.00 $26.86 $10.50 $30.00 $26.50 $12.40 $20.00 $38.67 $12.40 $40.00 $14.10 $7.50 $10.00 $18.65 $7.50 $20.00 $20.30 $10.50 $15.00 $26.86 $10.50 $30.00 $26.50 $12.40 $20.00 $38.67 $12.40 $40.00 $6.80 $4.00 $4.00

Removal of Acustic Material and Mastic (Square Foot) Removal of Acustic Material and Mastic (Square Foot) Removal of Acustic Material and Mastic (Square Foot) Removal of Acustic Material and Mastic (Square Foot) Removal of Acustic Material and Mastic (Square Foot) Floor Tile (Square Foot) Floor Tile (Square Foot) Floor Tile (Square Foot) Mastic Only (Square Foot) Mastic Only (Square Foot) Mastic Only (Square Foot) Floor Tile and Mastic (Square Foot) Floor Tile and Mastic (Square Foot) $9.10 $4.00 $8.00 $9.90 $5.60 $6.00 $13.18 $5.60 $12.00 $13.00 $6.60 $8.00 $19.08 $6.60 $16.00 $2.60 $1.60 $1.75 $4.18 $2.25 $2.50 $5.77 $2.80 $3.25 $1.98 $1.60 $1.50 $2.60 $2.25 $2.25 $3.40 $2.80 $3.00 $3.75 $3.10 $2.25 $5.40 $4.34 $3.25

Floor Tile and Mastic (Square Foot) Block Wall Removal/Disposal (Square Foot) Block Wall Removal/Disposal (Square Foot) Block Wall Removal/Disposal (Square Foot) Carpet Removal/Disposal (Square Foot) Carpet Removal/Disposal (Square Foot) Carpet Removal/Disposal (Square Foot) Drop Ceiling Tile (Square Foot) Drop Ceiling Tile (Square Foot) Drop Ceiling Tile (Square Foot) Ceiling Tile/Mastic (Square Foot) Ceiling Tile/Mastic (Square Foot) Ceiling Tile/Mastic (Square Foot) $7.05 $5.40 $4.25 $6.75 $10.00 $8.00 $9.72 $14.00 $12.00 $12.70 $16.50 $16.00 $2.50 $0.50 $1.00 $3.60 $0.70 $1.50 $4.70 $0.85 $2.00 $1.25 $3.00 $2.00 $1.00 $4.20 $3.00 $2.35 $4.95 $4.00 $4.50 $4.50 $2.00 $6.48 $6.30 $3.00 $8.46 $7.45 $4.00

Ceiling Demolition-Wallboard (Square Foot) Ceiling Demolition-Wallboard (Square Foot) Ceiling Demolition-Wallboard (Square Foot) Ceiling Demolition-Plaster (Square Foot) Ceiling Demolition-Plaster (Square Foot) Ceiling Demolition-Plaster (Square Foot) Wallboard Abatement (Square Foot) Wallboard Abatement (Square Foot) Wallboard Abatement (Square Foot) Asbestos Debris Abatement (Square Foot) Asbestos Debris Abatement (Square Foot) Asbestos Debris Abatement (Square Foot) Asbestos Waste Disposal (Glove Bag) $4.60 $4.00 $5.00 $6.62 $5.60 $7.50 $8.65 $6.60 $10.00 $5.20 $5.00 $8.00 $7.49 $7.00 $12.00 $9.78 $8.25 $16.00 $4.10 $3.00 $5.00 $5.90 $4.20 $7.50 $7.70 $5.00 $10.00 $2.75 $1.00 $25.00 $3.96 $1.40 $37.50 $5.17 $1.65 $50.00 $8.00 $5.00 $25.00

Asbestos Waste Disposal (Glove Bag) Asbestos Waste Disposal (Glove Bag) Asbestos Waste Disposal (Cubic Yard) Asbestos Waste Disposal (Cubic Yard) Asbestos Waste Disposal (Cubic Yard) Nonporous Material Cleaning (Square Foot) Nonporous Material Cleaning (Square Foot) Nonporous Material Cleaning (Square Foot) Porous Material Cleaning (Square Foot) Porous Material Cleaning (Square Foot) Porous Material Cleaning (Square Foot) Dry Wall Demolition (Square Foot) Dry Wall Demolition (Square Foot) $11.52 $5.00 $37.50 $15.04 $5.00 $50.00 $35.00 $25.00 $35.00 $51.00 $25.00 $52.50 $65.00 $25.00 $70.00 $0.70 $1.00 $5.00 $1.00 $1.40 $7.50 $1.30 $1.65 $10.00 $0.80 $1.50 $8.00 $1.10 $2.10 $12.00 $1.40 $2.50 $16.00 $0.50 $2.50 $2.00 $0.80 $3.50 $3.00

Dry Wall Demolition (Square Foot) Ceiling Tile Demolition (Square Foot) Ceiling Tile Demolition (Square Foot) Ceiling Tile Demolition (Square Foot) Plaster Wall/Ceiling Demolition (Square Foot) Plaster Wall/Ceiling Demolition (Square Foot) Plaster Wall/Ceiling Demolition (Square Foot) Carpet Removal/Disposal Demolition (Square Foot) Carpet Removal/Disposal Demolition (Square Foot) Carpet Removal/Disposal Demolition (Square Foot) Mold Waste Disposal (Cubic Yard) Mold Waste Disposal (Cubic Yard) Mold Waste Disposal (Cubic Yard) $1.10 $4.15 $4.00 $0.60 $2.50 $2.00 $0.90 $3.50 $3.00 $1.20 $4.20 $4.00 $2.00 $5.00 $6.00 $2.50 $7.00 $9.00 $3.00 $8.25 $12.00 $1.10 $0.50 $1.00 $1.59 $0.70 $1.50 $2.00 $0.85 $2.00 $14.00 $12.50 $100.00 $21.00 $12.50 $150.00 $28.00 $12.50 $200.00

Total: $2,981.91 $3,618.09 $5,604.50 Other Hourly Rates or List of Equipment+Markup Cost Regular Time Other Hourly Rates or List of Equipment+Markup Cost Overtime Time Other Hourly Rates or List of Equipment+Markup Cost Holiday Time Listed on attachment not listed 10% Listed on attachment not listed 15% Listed on attachment not listed 20% Asbestos Sampling Non-Viable Air Sample or Surface Sample Collection, Analysis and Report Cost 48 Hour Turnaround Listed on attachment $45.00 $150.00 Asbestos Sampling Non-Viable Air Sample or Surface Sample Collection, Analysis and Report Cost 24 Hour Turnaround Listed on attachment $55.00 $175.00 Mold Sampling Non-Viable Air Sample or Surface Sample Collection, Analysis and Report Cost 48 Hour Turnaround Listed on attachment $20.00 $150.00 Mold Sampling Non-Viable Air Sample or Surface Sample Collection, Analysis and Report Cost 24 Hour Turnaround Listed on attachment $25.00 $175.00 Asbestos/Mold Sampling Mobilization Fee (48 hour) Asbestos/Mold Sampling Mobilization Fee (24 hour) Listed on attachment $400.00 $150.00 Listed on attachment $450.00 $175.00 Addendums Received: none none none MBE/WBE Servpro MBE 50% WBE 50% Sub Contr.(Titan) MBE 100% WBE 0% MBE 0% WBE 0% MBE 10% WBE 5% Renewals: 1st Renewal:prices increase up to 5% 2nd Renewal:prices increase up to 5% 1st Renewal:prices increase up to 1% 2nd Renewal:prices increase up to 1% 1st Renewal:prices remain firm 2nd Renewal:prices increase up to 3%

Notes: