C3 Membrane Roofing System (C3 Illusions, C3 Evolution, C3, C3 Plus, and C3 Fleece Back) I. Cooley, mc. 50 Esten Avenue Pawtucket, RI 02860



Similar documents
Jacksonville, FL

Thermo-Flo Basement Waterproofing System. B-Dry System, Inc. 455 South 4th Street, Suite 350 Louisville, KY 40202

ITEM THERMOPLASTIC MEMBRANE ROOFING

Georgia State University. Urban Life Building Roof Replacement

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

SECTION THERMOPLASTIC MEMBRANE ROOFING

CHAPTER 7: Building Systems ROOFING SYSTEMS

FAST FACTS ADVANTAGES OF MULTI PLY BUILT-UP ROOFING. Asphalt Roofing Manufacturers Association

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center

How To Install A Membrane Roofing System

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.

SECTION STANDING SEAM METAL ROOF

PVC ROOFING SYSTEMS BUILDING SOLUTIONS A SINGLE SOURCE FOR SINGLE-PLY ROOFING

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

Preformed Metal Roofing and Siding

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

SECTION FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

REQUEST FOR PROPOSALS

SPECIFICATIONS & CONTRACT DOCUMENTS FOR MEMBRANE ROOF REPAIR

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION

EPDM. Roofing systems

COMPARATIVE PERFORMANCE OF EPDM RUBBER ROOFING MEMBRANE AS PROTECTION AGAINST HAIL DAMAGE

Best Practices in Roof Design: Sustainable Energy Efficient Reroofing

SECTION STANDING SEAM METAL ROOFING

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Polymeric membrane for roof waterproofing

System 5000 FLAME-FREE, FELT SYSTEM, INSTALLED USING HOT AIR, TOTALLY ELIMINATING FIRE RISK AND PROVIDING A BITUMEN ALTERNATIVE TO SINGLE PLY

CRS Sales & Marketing

Building Owners Guide to a Duro-Last System!

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

GUIDELINE SPECIFICATIONS

Roof Restoration System. For building owners, property management firms and facility managers. seamless possibilities

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

The existing roof angle change terminations and flashings when sound and intact can be reused.

HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H SECTION STANDING SEAM METAL ROOFING

SECTION PVC SINGLE PLY ROOFING

Roofing. Sarnafil S EL. Polymeric membrane for roof waterproofing. Product Description

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

Proven roofing SyStemS

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

SECTION PREFORMED METAL STANDING SEAM ROOFING

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

EPDM System Repair and Cleaning

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Prices Effective April 1, 2016

Test report P 7013-E. InoPaz H2O. Pazkar LTD. Alon Tavor Industrial Zone AFULA / Israel. J. Magner Dipl.-Ing. N. Machill.

SECTION METAL ROOF & WALL PANELS

AIA PRESENTATION. Standing Seam Metal Roofing Seminar SSRLU2B 1 LU/HSW Hour

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in one year.

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

INVITATION TO BID. Contractor Services Associated with:

2011 Dodson Publications, Inc. Page 1 of 6 September 16, :19 AM

Firestone RubberGard The EPDM reference

COMMERCIAL BUILDING APPLICATIONS

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

Solicitation DTFACN-11-R Attachment #9

SECTION STANDING SEAM METAL ROOFING

Please read the entire document before purchasing and installing any of these products

Roofing Systems. New Applications / Re-Roofing / Maintenance

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Standing Seam Roof Systems

Dear Contractor: If you have any questions about the Program or your Application, please feel free to call our office at

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Division 9. SignaFlor Pad and Pour Flooring System

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

BITUMEN-POLYMER WATERPROOFING MEMBRANE, MADE FROM SELECT APP AND DISTILLED BITUMEN, REINFORCED WITH SPUNBOND POLYESTER FABRIC.

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

Asphalt Shingle Application Requirements

Commercial Roof Management

238T Standing Seam Metal Roof System (SSMRS)

GSI. Geosynthetic Institute GRI. 475 Kedron Avenue Folsom, PA USA TEL (610) FAX (610) GII GAI GCI. GRI Test Method GM21

JM s Commitment to Meeting Your Single Ply Roofing Needs. JM PVC with DuPont Elvaloy KEE (Ketone Ethylene Ester) Single Ply Systems

CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL ROOFING PERMIT APPLICATION

Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

INSTRUCTION BOOK FOR. Lace And Grommet Theater-Type Screens

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

DENVER MODEL 30 X 30 SPECIFICATIONS

FIRESTOPPING & SMOKE SEALS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Jm Tpo systems Single Ply Roofing

THERMOPLASTIC MEMBRANE (PVC) ROOFING Added 11/ Thermal and Moisture Protection

Laboratory Report P Simulated Wind Uplift Testing of Adhered Single-Ply Roofing Systems in accordance with FM Standard 4470, Appendix C

APPENDIX 1: ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE

Transcription:

1. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Housing. Federal Housing Commissioner Series and Series Number: MATERIALS RELEASE NO: 1321 TO: DIRECTORS, SINGLE FAMIL!I HOCs DIRECTORS, MUL TIF AMIL vi HUBs ISSUE DATE June 20, 2006 REVTEWDATE June 20,2009 SUBJECT: Product 2. Name and address of Manufactnrer C3 Membrane Roofing System (C3 Illusions, C3 Evolution, C3, C3 Plus, and C3 Fleece Back) I Cooley, mc. 50 Esten Avenue Pawtucket, RI 02860 ~: Roofing system for nominally flat to vertical slopes. DESCRIPTION: C3 Membrane Roofing System consists of a membrane, mechanical fasteners, insulation board, and, where required, vapor retarder. The membrane is a polyvinyl chloride (PVC) and Elvaloy@ coated, polyester laminated fabric extrusion with a minimum thicknesss of 40 mils. Mechanical fasteners are utilized to secure the membrane to the deck. The membrane is welded together with a heat welding machine. No seam sealer is recommended on the seams by Cooley Building Products. (Cooley). MATERIALS: All roofing system materials shall be supplied by Cooley or its licensed roofing contractor. If the contractor supplies any material, such as nailer, these materials must be approved in writing by, Cooley. Data on physical properties of the membrane (tensile strength, elongation, ckep, brittleness, etc.) are on file at HUD Headquarters and Cooley Headquarters. l-

2. 3. -2- SINGLE PLY ROOFING INSTITUTE WIND DESIGN GUIDE FIRE AND WIND CLASSIFICATION: Mechanically fastened and fully adhered roofing systems shall be designed to resist wind uplift forces as determined in the Wind Design Guide for Mechanically Fastened Single- Ply Roofing Systems published by the Single Ply Roofing Institute (SPRI). Fire Classification shall be in accordance with Underwriters Laboratories, Inc. (UL), or Factory Mutual Engineering Corporation (FM) construction details. To qualify for fire rating and uplift resistance, the system shall be in the current UL or PM Listing. INST ALLAITON: 1 General: All C3 Membrane roofing materials shall be installed by Cooley approved roofing contractors. Installation procedures shall be in accordance with the manufacturer's specifications and details. Substrate Pre~aration: Preparation of the substrate shall comply with the latest edition of the Cooley Specifications. Design of the roof deck is the responsibility of the owner or the owner's architect/engineer. Insulation: Use only the insulation types indicated in the Cooley (Cooley) Insulation Guide or as approved by Cooley. Place the insulation board over the prepared substrate with all joints butted tight, and mechanically fasten with CEM fasteners using a minimum of five (5) plates and screws per 4' x 8' board. Adhere to insulation manufacturer fastening requirements if more stringent then CEM. Make sure the insulation fasteners are tight. 4. Membrane Installation: All C3 Membrane Roofing Systems, including insulation shall be installed by a Cooley approved applicator or original equipment manufacturer. Membrane installation, including CEM placing, bonding, lap splicing, perimeter attachment, flashing, construction closure, walkways and other work to provide a watertight roofing system, shall comply with CEM Specifications, dated April 1993.

-3- INSPECTION: A designated representative of Cooley shall make inspections of the installation at the following intervals: (1 prior to delivery of materials -to accept or reject the roof deck to which the roofing syst m is to be applied; (2) during the installation -to inspect and approve the installatio techniques and methods; and (3) upon completion -to give final approval to the installation. MANUFACTURING LOCAIION~: The product covered u*der this MR will be produced at the following plant(s): Cooley Incorporated 50 Esten A ventlle Pawtucket, RI 02860 Cooley Incorporated 861 Quality Drive Lancaster, SC 19720 CERTIFICATION: 0' Sullivan Films 1944 Valley A tenue Winchester, V ~ 22601 Cooley /'au (Iding Products WHERE CHEMISTRY MAKES THE DIFFERENCE C3TM PIC 60 Mil- White PVC Thermoplastic Roofing ME!mbrane Ro.J. Dimensions: R9834 ~ 78"Wx100't Roll Weight: 260 Ibs Cooley Building Products. 50 EstenAvenue.Pa\vtucket, RI 02860.800-444-4023' WW\v.cooleygroup.com.

-4- WARRANTY: A ten-year wauanty shall be given to the owner by Cooley to read as follows: Cooley Engineered Membranes, Inc. (Cooley) hereby warrants to the owner of its roofing system, installed by an applicator approved by Cooley, that the system will remain in a waterti.ght co~dition ~d reta~n at least 80 percent of its speci~ed age~ thermal resistance value, If applicable, ~~t a period to ten years from the date of mstallatlon. In the event of failure of the aforesaid system to function as the warranted above, whether on account of normal processes of wear and aging, Cooley will make, or cause to be made, such repairs and maintenance necessary to enable the system to perform as warranted above. The repair obligations of this warranty are limited to the owner's original cost of installation of the C3 Membrane RJoofing System. Cooley's obligations tojrepair or maintain the system under this warranty shall not be in force or effect unless: 1) Cooley is notified of any failure of the system covered by the warranty within thirty ( 0) days following such failure; (2) the system is installed by an applicator approved by Cooley; and (3) no alternations or repairs to the system are made without the prior written approval of Cooley as to the extent, methods and materials used. Cooley assumes no lia~ility for any failure of the systems resulting from winds, which exceed the design win~, Acts of God, including without limitation, lightning or earthquake; nor for any failure of t& systems resulting from fire of any origin or cause, nor for any failure of the product caused by structural defects of the buildings on which the system is applied nor from deliberate misuse of the product; nor for any failure of the systems caused by leakage or any other cause from an adjacent structure. MANUFACTURER I S RES p~ S m ILITIES : Issuance of this Materials Release (MR) commits the manufacturer to fulfill, as a minimum, the following: 1 Produce, label and ~ertify the material, product or system in strict accordance with the terms of this MR.,I 2. Provide necessary corrective action, in a timely manner for all cases of justified complaint, poor pe11formance failure reported by RUD. 3 When requested, pl1ovide the FHA Standards, Office of Manufactured Housing Programs, HUD H1adquarters, with a representative list of properties in which the material, product 0 system has been used, including complete addresses or descriptions of locations and da es of installation.

4. 2. -5- Inform HUD in advance of changes in production facilities, methods, design of the product, company flame, ownership or mailing address. BY ALUATION: This MR shall be valid Ifor a period of three years from the date of initial issuance or most recent renewal or revision, whichever is later. The holder of this MR shall apply for a renewal or revision 90 days prior to the Review Date printed on this MR. Submittals for renewal or revision shall be sent to: U. S. Department of Housing and Urban Development FHA Standards, Office of Manufactured Housing Programs 451 7th Street, SW, Room 9168 Washington, DC 20410-8000 Appropriate User Fee shall be sent to: U. S. Department of Housing and Urban Development Miscellaneous Income -Technical Suitability of Products Fees Bank of America P. o. Bqx 198762 Atlanta;IGA 30384-8762 The holder of this MR may apply for revision at any time prior to the Review Date. Minor revisions may be in the I form of a supplement to the MR. If the Department detennines that a proposed renewal or supplement constitutes a revision, the appropriate User Fee for a revision will need to be submitted in accordance with Code of Federal Regulations 24 CPR 200.934, "User Fee System for the Technical Suitability of Products Program," and current User Fee Schedule.. CANCELLATION: Failure to apply for a renewal or revision shall constitute a basis for cancellation of the MR. HUD will notify the manufacturer that the MR may be canceled when: conditions under which the document was issued have changed so as to affect production of, or to compromise the integrity of the accepted material, product, or I system, 1111,11 the manufactur,r has changed its organizational form without notifying HUD, or 3 the manufacturtr has not complied with responsibilities it assumed as a condition of RUD's acceptamce.

-6- However, before cancellation, HUD will give the manufacturer a written notice, of the specific reasons and the opportunity to present views on why the MR should not be canceled. No refund of fees will be made on a canceled document. ************************************************************************** This Materials Release is issued solely for the captioned fiffil and is not transferable to any person or successor entity. ****************************************,~*********************************