How Façade Ordinances Affect Your Historic Building



Similar documents
Building Condition Assessment: West Lexington Street Baltimore, Maryland

PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007

EAST LYME HIGH SCHOOL

Building Condition Assessment: North Howard Street Baltimore, Maryland

Masonry and Concrete Repair and Restoration

BTC. Building Technology Consultants, PC 1845 E. Rand Road, Suite L-100 Arlington Heights, Illinois Main: (847) , Fax: (847)

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

Building Foundation and Structure

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

Garver Feed Mill Condition Evaluation

Exterior Elevated Elements Inspection Guidelines

Water Damage & Repair

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

Structural Assessment Report

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, (68 pages)

STRUCTURAL ASSESSMENT

1 RCNY CHAPTER 100. (b) References. See Administrative Code sections , , item 6 and

Reference: BRM A0 July 18 th, Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Slavic Village Building Condition Review

423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

Block Lofts Condominiums

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Commercial Roof Inspection Form

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

10DBMC International Conference On Durability of Building Materials and Components LYON [France] April 2005

Assessing Curtain Walls

Comment Form on Proposed Gut Rehabilitation Alternatives

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

Repair of Spalling and Leaking Clay Brick Building Walls

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Exterior Repair Project. By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek. Building Technology Consultants, PC BTC

2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration

The Building Group First Tuesdays First Saint Paul s Lutheran Church 1301 North LaSalle Street, Chicago, Illinois

Superform Products Ltd.

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Our built environment more

StuccoSpec Moisture Testing Inspection

LAYING BLOCK AND BRICK

Certification: Building Plans Examiner. Exam ID: B3

OTTAWA CIVIC CENTRE & NORTH SIDE STANDS LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007

Stucco Moisture Inspection Report

PART E SPECIFICATIONS

FAÇADE CONDITIONS. An Illustrated Glossary of Visual Symptoms. Edited by Dan Eschenasy, PE Chief Structural Engineer NYC Department of Buildings

Facility Assessment for East Main Street, Huntley, IL

Architectural Condition Survey

Ceramic Glazed Brick Exterior Walls

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Inspecting to a higher standard.

Roof Inspection. Summary Report

When dealing with a potential moisture problem, time is of the essence. Taking a proactive approach will save you money and headaches down the road.

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

Common Problems with Walls

Roof Inspection. Summary Report

Page & Turnbull imagining change in historic environments through design, research, and technology

3 Masonry and Manufactured Stone (Interior and Exterior)

Cost Comparisons for Common Commercial Wall Systems

Basement Window Installation Guide Hopper and Sliding

Non Invasive Roof Leak Detection Using Infrared Thermography

CZAR Engineering, L.L.C.

COMMONLY USED RESIDENTIAL BUILDING CODES

PRE INSTALLATION MANUAL

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

Ver. 2. Guide to. Inspecting Residential Brick Veneer

EXISTING MASONRY WALL TO REMAIN (TYP.). EXISTING PARTITION TO REMAIN PROVIDE 3'-3" W. X 8'-0"H. NEW PELLA WINDOWS AS INDICATED ON PLANS. (TYP.

WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

G. Common Defects in Buildings - Leakage

March 14, Installation of Bay, Bow and Garden Windows

Chapter. Restoration of Damaged Structures

Photos showing the change in condition from 2006 to 2012 are located in Appendix A.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

School Construction Authority Architecture & Engineering

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

Chapter 5. In-depth Building Analyses and Recommendations. Planning Study for Downtown Revitalization City of Martinsville

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

RDH Building Sciences Inc.

BUNKER HILL ELEMENTARY SCHOOL

Guidelines for Earthquake Bracing Residential Water Heaters

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

Self-Home Inspection Checklist

DESIGN GUIDELINES FOR COMMERCIAL, INDUSTRIAL AND MIXED-USE BUILDINGS

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

Presentation: Proposed Plan Amendments

Avoiding Air Barrier Pitfalls

Memorandum. July 16, To: Plan Commission City of Madison

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Engineers, Civil Structural Survey

Precast Concrete Parking Structures

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

Transcription:

How Façade Ordinances Affect Your Historic Building Carolyn L. Searls Simpson Gumpertz & Heger 12 May 2015 www.sgh.com

Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited.

Learning Objectives Understand the requirements of different city facade ordinances including San Francisco s. List the steps involved in a successful building enclosure inspection program. List inspection techniques and different technologies. List common indicators of building enclosure degradation.

Presentation Outline Reasons for a building enclosure survey City Facade Inspection Ordinances Safety Prepurchase survey Capital project planning Identify maintenance needs Description of an inspection program Inspection techniques and technologies Common indications of facade problems

Who s Attending Today (Poll)? Profession Architect Engineer Planner Historian Other Employer Government employee Private consultant Building owner/manager

Presentation Outline Reasons for a building enclosure survey City Facade Inspection Ordinances Safety Prepurchase survey Capital project planning Description of an inspection program Inspection techniques and technologies Common indications of facade problems

City Ordinances Forces building owners to take responsibility for the condition of the building facade Most city ordinances do not require a comprehensive hands-on survey of all elevations Most cities do not have any requirements for shorter buildings Depending on condition and facade type, the components of the facade can deteriorate more quickly than 5 or 10 years Do not require inspection of roofs or other non-facade components Often represent minimum requirements!

Cities with Facade Ordinances in US Boston, MA Chicago, IL Columbus, OH Detroit, MI Milwaukee, WI New York, NY Philadelphia, PA Pittsburgh, PA St. Louis, MO San Francisco, SF (in progress not yet active) Affects over 13,000 buildings in these cities! Typically required at 5 year intervals (SF=10 years) Typically required for buildings over 5-6 stories tall (SF=5 stories) Typically require at least one representative scaffold drop or similar hands-on inspection (=SF) Typically require licensed architect or engineer to perform inspection (=SF)

Poll: Does your city have a Facade Ordinance? Yes No

San Francisco Proposed Ordinance Under development since 2013 still not finalized Purpose To assure building facades are maintained To improve public safety by reducing falling hazards Clarifies requirements already in Ch. 34 of SF Building Code Side benefit Fewer facades falling in an earthquake The ordinance does not: Require upgrading of facades to meet current seismic or structural standards

Why Does San Francisco Need a Façade Ordinance? Facade Hazards Building Owner s responsibility to keep public safe and mitigate potential falling hazards.

San Francisco Proposed Ordinance Covered Buildings Buildings Covered by Façade Ordinance Over 5 stories Not wood-framed construction Facades facing publiclyaccessed areas Privately and city-owned Exceptions Buildings with comprehensive façade repairs in the last 10 years Buildings permitted after 1998 start inspections 30 years after construction Schedule Initial inspections phased in over 10 years, based on age of building, starting in 2018 Subsequent inspections every 10 years, or if visible façade distress

San Francisco Proposed Ordinance Façade Inspection Scope Similar to ASTM E2770 Standard Practice for Periodic Inspection of Building Facades for Unsafe Conditions Re-inspection at 10 year intervals not 5 No mandatory inspection openings Inspection done by licensed architect or engineer Includes up-close, hands-on inspection (25% of each façade) Report to owner and DBI (City Department of Building Inspection) Maintenance and repair must return building to its permitted condition: vertical and lateral load carrying capacity and general waterproofing

Classification and Repair of Façade Condition Façade condition classified as: Unsafe: Imminent hazard to persons and property Requires repair/stabilization: Actions needed to prevent deterioration to an Unsafe condition before the next required inspection Requires ordinary maintenance: Ongoing maintenance, but no immediate or urgent action required Reporting of unsafe conditions: Report to DBI immediately Describe repair or stabilization required Submit plan and schedule of work w/in 72 hours Planning Dept. Preservation staff must review actions on historic resources

San Francisco Proposed Ordinance Historic Buildings Inspector must be experienced in historic buildings Inspection methods least intrusive Refer to California State Historic Building Code or best practices Resulting maintenance/repairs to be approved by Preservation Planning Staff Maintenance and repair to be in accordance with The Secretary of the Interior s Standards for the Treatment of Historic Buildings

San Francisco Proposed Ordinance For more information or to join the working group: City & County of San Francisco Earthquake Safety Implementation Program, click on Façade Maintenance http://sfgsa.org/index.aspx?page=6202

Presentation Outline Reasons for a building enclosure survey City ordinances Safety Prepurchase survey Capital project planning Description of an inspection program Inspection techniques and technologies Common indications of facade problems

Facades - Safety Chicago

Facades - Safety

Facade Hazards Building Owner s responsibility to keep public safe and mitigate potential falling hazards. Cracked terra cotta + corroding steel lintel = incipient spall

Facade Hazards Cracked and hollow sounding plaster was a large incipient spall at main entrance of a assembly building

Hazard Mitigation Options What to do if you find a falling hazard 1. Canopy: Erect protection sidewalk canopy Canopy will protect public from falling pieces Canopy can be designed to support scaffolding for the eventual repair 2. Temporary stabilization: pick and clean 3. Permanent repairs 4. Do nothing (not recommended).

Protection Examples Canopy: Erected sidewalk canopy after investigation and left in place thru design and construction of facade repairs Sidewalk canopy in place during terra cotta and brick repairs. Repairs from swing stage.

Protection Examples Terra cotta repairs done using combination of sidewalk canopy, swing stages and fixed scaffold Temporary stabilization: removed loose stone once during the middle of multi-year repair program, so that sidewalk canopy could be removed from that area until complete repairs done.

Presentation Outline Reasons for a building enclosure survey City ordinances Safety Prepurchase survey Capital project planning Description of an inspection program Inspection techniques and technologies Common indications of facade problems

Prepurchase Survey Identify building enclosure systems through drawing review Exterior survey of facade, roofs, and other exterior components Interior survey Understand construction interior and exterior sample openings if necessary Goals: Identify safety issues Identify immediate needs to maintain building performance and prevent costly rehabilitation projects Identify future maintenance or capital needs

Prepurchase Survey Commonly survey done from ground with binoculars and set-back roofs and balconies We obtain better information when we can get close-up to the building

Prepurchase Survey Example Cost Spreadsheet 4.3 WALLS AND WINDOWS Quantity Unit Unit Cost Repair Cost Walls 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 Clean entire building exterior by powerwashing Repoint deteriorated mortar joints at brick cladding (assume 10% total brick mortar joints) Repoint deteriorated mortar joints at roof parapet and cast stone joints Install a deck coating such as Kemperol 2K-PUR membrane over the repainted masonry roof parapet at the Main Street and Capitol Street elevations Repair the cracked brick corner of the penthouse at the west side of the roof by removing displaced brick and rebuilding corner Repair the vertical crack at the east corner of the Capitol Street elevation. Remove brick on both sides of corner to expose column. Clean and paint steel. Reinstall brick, including shelf angles, bed joint reinforcement and brick ties. Replace all window lintels at the north, south, and east elevations. Remove brick at lintels, remove exist. lintel, replace w/ new s.s. lintel, install stainless steel flashing, replace brick, install new sealant joint with weeps. 47,000 sf $ 3.00 $ 141,000 12,688 lf $ 15.00 $ 190,320 350 lf $ 15.00 $ 5,250 405 sf $ 25 $ 10,125 1 ea $ 15,000.00 $ 15,000 1 ea $ 20,000.00 $ 20,000 138 ea $ 1,400.00 $ 193,200 Repair costs usually projected by year over 10 years

Presentation Outline Reasons for a building enclosure survey City ordinances Safety Prepurchase survey Capital project planning Description of an inspection program Inspection techniques and technologies Common indications of facade problems

Capital Project Planning Similar to pre-purchase, but for an existing Owner Can be a single building or campus Goals: Identify building enclosure condition Identify future maintenance or capital needs List all items and remaining service life and cost for repair or replacement

Capital Project Planning Inspection Inspect all roofs, balconies & ledges where water can get in Inspect all projecting elements & balustrades Inspect interiors for water leakage Binocular survey Close-up survey if possible

Identify Maintenance Needs Failed joints, plant growth, and cames with failed joints at bandcourses

Identify Maintenance Needs Leakage into attic and corroding steel framing Water weeping from joints and efflorescence

Preventative Maintenance Limit water infiltration to prevent accelerated deterioration of underlying structure Point failed mortar joints; included water repellant admixture in pointing mix Provide flashing at projecting masonry surfaces

Capital Project Planning Example Prioritization High Priority Repairs Moderate Priority Repairs Condition Cracks and spalls at terra cotta lintels w/corroding steel (0 5 years) Localized cracks and previous repairs (not a falling hazard) Repair Inspect and stabilize lintels or erect sidewalk canopy. Remove and replace corroding steel lintels and terra cotta Fill cracks with mortar Low Priority Repairs (5 10 years) Localized sealant failure Remove and replace failed sealant

Capital Planning Project Phasing & Budgeting Phase Cost Duration Phasing starts with area with high priority needs life safety or causing further deterioration Complete all work in each area because cost of access is high

Presentation Outline Reasons for a building enclosure survey City ordinances Safety Prepurchase survey Capital project planning Description of an inspection program Inspection techniques and technologies Common indications of facade problems

Poll Have you performed a building inspection? Yes No Have you commissioned a building inspection? Yes No

Setting Up a Successful Building Envelope Inspection Program Typical process guided by ASTM E2270 - Standard Practice for Periodic Inspection of Building Facades for Unsafe Conditions 1. Document review 2. Preparation of inspection documents 3. Review service history history of leakage, previous repairs, etc. 4. Interior visual inspection 5. Exterior visual inspection a. General inspection b. Detailed inspection c. Nondestructive evaluation d. Destructive evaluation 6. Report of unsafe conditions 7. Report of findings

Additional ASTM E2270 Recommendations Recommends both General and Detailed Inspection General inspection (visual) survey from a distance greater than 6 ft Detailed inspection (hands-on) survey from a distance less than 6 ft, non-destructive testing and making openings Recommends inspection once every 5 years Report by a qualified professional ASTM E2270 is for facades, but roof or comprehensive envelope inspection program should follow similar steps

ASTM E2270 Continued Recommends inspection level for each type of façade material. Masonry, Concrete, Terracotta, GFRC, Stucco, Barrier EIFS 100% general inspection 25% detailed inspection of each façade type 3 sample openings per façade type Pull tests on adhesive attached components

Inspection Reports Report and drawing content/detail are dependent on intent of inspection and Owner s future needs Minimal report or drawings needed to satisfy most ordinances Report typically lists observations and includes recommendations for: Any urgent remedial repair work for unsafe conditions Any areas requiring future repair or stabilization Any additional investigation needs Any future monitoring requirements Report typically include annotated drawings identifying observations/repair locations or further investigation locations

Hand Annotated Drawings

Electronically Annotated Drawings

Electronically Annotated Drawings

Presentation Outline Reasons for a building enclosure survey City ordinances Safety Prepurchase survey Capital project planning Identify maintenance needs Description of an inspection program Inspection techniques and technologies Case studies

Inspection Methods - Facades Visual Survey From ground and adjacent buildings, typically with binoculars Interior survey for damaged interior finishes and water leakage Technology is rapidly changing and new methods of visual survey are developing Gigapan (high definition photography) Drones Pros: Lowest cost Cons: Areas of deterioration and potential hazards may go un-noticed

Exterior Facade Survey

Facade Hazards

Interior Survey Water Leakage

Inspection Methods - Facades Hands-on Survey Requires equipment to access upper levels Extent of survey (i.e. number of drops ) depends on Owner. Most City Facade Ordinances only require one drop per elevation; ASTM requires 25% Pros: Better, more reliable method to identify deterioration and hazards (though dependent extent of survey) Falling hazards can frequently be accessed; smaller hazards can be removed during the survey Cons: More expensive

Facade Inspection Determining Access Method Site Traffic Police Details Cordoning Requirements Permits Adjacent Properties Building Geometry Height Cornices Facade Setbacks and Projections

Facade Access Methods - Lifts Pros Simple setup; easy to move Can perform repair work Cons Height limitations (typically 150 ft max) Site must have adequate grade-level access for machine

Facade Access Methods Swing Stage Pros No height limitations Can perform repair work Cons Requires contractor setup at each drop Cannot easily navigate around projections, atypical facades, etc.

Access Methods Industrial Rope Access Pros No height restrictions Quickly remobilize to new drop locations Cons Only limited repair work can be performed Requires special training

Hands-On Facade Inspection Document existing conditions Remove small spalls or deteriorated facade Non-Destructive Investigation Crack gauges Hammer sound concrete and masonry Pachometer or GPR to locate steel IR scan for air leakage

Hands-On Inspection Document Conditions

Hands-On Inspection Identify Deterioration

Remove Delaminated Spalls

Exterior Window Gaskets and Sealant Joints

Measuring Cracks and Crack Movement

Hammer Sounding

Pachometer or GPR to Locate Steel

IR Scan for Thermal Anomalies

Destructive Testing Take samples of concrete, masonry, or other components for further lab testing Sample openings to observe hidden conditions Sampling or openings typically require contractor assistance for removal and repairs Or small holes or openings to review hidden conditions with boroscope

Samples for Material Testing Concrete Depth of carbonation Total chloride content Petrography Masonry Freeze/thaw durability Mortar analysis Petrography Hazardous Material Testing Coating or Sealant Identification

Exploratory Openings - Rust Staining Rust stains help locate deteriorated anchors or framing hidden in wall system

Exploratory Openings Masonry Distress

Exploratory Openings - Borescope

Presentation Outline Reasons for a building enclosure survey City Facade Inspection Ordinances Safety Prepurchase survey Capital project planning Identify maintenance needs Description of an inspection program Inspection techniques and technologies Common signs of facade problems Top 10

10. Deteriorating Sky-facing Surfaces (=Roof) Look for Concrete or masonry parapets without metal copings Horizontal ledges without waterproofing Any horizontal surface with deteriorated joints, waterproofing or paint

9. Efflorescence and Water Stains Look for white powdery stain; indicates water movement

8. Rust Stains Look for orange rust stains the source of the stains (the steel) the source of the water Expansion of rust product can cause spalls

7. Cracks Look for these normal shrinkage cracks

7. Cracks Look for these cracks indicative of problems Marble expansion Corrosion Thermal and moisture expansion; lack of support

7. Cracks Look for these cracks indicative of problems Corrosion of window lintels

7. Cracks Look for these cracks indicative of problems Seismic

6. Paint Failures Look for blistered, cracked or peeling paint

5. Deteriorated Mortar Joints Look for Missing mortar, holes in mortar joints Cracks in mortar joints Separations between mortar and masonry units

4. Deteriorated Sealant Joints Look for Reversion Cohesion Failure Adhesion Failure

3. Deterioration of Window Systems Look for Gaps at gasket corners Hardened or failed sealants or gaskets Water streaks down interior vertical mullions Wet finishes below window sill Wet finishes above window (from floor above) Wood deterioration Steel window corrosion

2. Mold Look for Red, black or green mold Pink spots visible through vinyl wallpaper

1. Pieces Falling Off And we re back to where we started, with facade inspections and the reasons for facade ordinances

Thank you. Questions? Carolyn Searls clsearls@sgh.com 415-495-3700