15 Attachments (separately bound) 15.1 Project Manual - Table of Contents - Outline Specifi cations 15.2 Drawings (half size) - Drawing List
Section 15.3 15.1 Project Manual Separately bound and being submitted in conjunction with this Binder is the Project Manual. On the following pages is the Table of Contents for the Project Manual, which includes the Outline Specifications for the Lincoln Public School project.
Section 15.4 omr architects inc. JUNE 7, 2012 LINCOLN PUBLIC SCHOOLS LINCOLN, MA DOCUMENT 000110 TABLE OF CONTENTS PART 1 - GENERAL DOCUMENTS 000110 Table of Contents Pages: 1-2 000120 Outline Specification Pages: 1-9 DIVISION 11: EQUIPMENT Foodservice Equipment Narrative Pages: 1-2 PART 2 - ENGINEERING AND LANDSCAPE DOCUMENTS DIVISION 03: CONCRETE, AND DIVISION 05: METALS Structural Outline Specifications Pages: 1-10 DIVISION 21: FIRE SUPPRESSION Schematic Outline Specification: Section 21 00 00 - Fire Protection Pages: 1-3 DIVISION 22: PLUMBING Schematic Outline Specification: Section 22 00 00 - Plumbing Pages: 1-4 DIVISION 23: HEATING VENTILATING AND AIR CONDITIONING Schematic Outline Specification: Section 23 00 00 - HVAC Pages: 1-7 DIVISION 26: ELECTRICAL Schematic Outline Specification: Section 26 00 00 - Electrical Pages: 1-22 DIVISION 27: TECHNOLOGY Schematic Outline Specification: Section 27 00 00 - Telecommunications Pages: 1-9 TABLE OF CONTENTS 000110-1
Section 15.5 omr architects inc. JUNE 7, 2012 LINCOLN PUBLIC SCHOOLS LINCOLN, MA DIVISIONS 31, 32, AND 33: SITEWORK Sitework Specifications Section 310125 Landscape Maintenance Section 311320 Existing Plants Section 312219 Finish Grading Section 312500 Sedimentation and Erosion Control Section 321313 Site Concrete Section 321800 Bituminous Concrete Paving Section 321819 Playground Safety Surfacing Section 321823 Infield Surfacing Section 323000 Misc Site Improvements Section 329000 Planting Section 329200 Lawns and Grasses Section 329400 Bioretention Section 321000 Water Utilities Section 333000 Sanitary Sewerage Utilities Section 333600 Utility Septic tanks Section 334000 Storm Drainage Utilities Section 334610 Landscape Subdrainage END OF TABLE OF CONTENTS TABLE OF CONTENTS 000110-2
Section 15.6 15.2 Drawings Below is the list of schematic design drawings for the Lincoln Public Schools project, which has been submitted along with this binder in a bound, half size set. List of Drawings: Sheet # Drawing Title General G0.0 Cover Sheet G0.1 List of Drawings Civil EX1.0 EX1.1 Existing Conditions Plan Existing Conditions Plan C1.0 Schematic Utility Plan C1.1 Schematic Utility Plan and Notes C2.0 Schematic Utility Demolition Plan C2.1 Schematic Utility Demolition Plan and Notes C3.0 Schematic Utility Details C3.1 Schematic Utility Details C4.0 Erosion Control Details C4.1 Erosion Control Details Landscape L1.0 Sheet Layout and Context Plan L1.1A Materials Plan L1.1B Materials Plan L1.2A Grading Plan L1.2B Grading Plan L1.4A Planting Plan L1.4B Planting Plan Architectural D1.1 First Floor Orientation Demolition Plan, Notes, and Legend D1.1A First Floor Selective Demolition Plan Part A D1.1B First Floor Selective Demolition Plan Part B D2.1A Second Floor Selective Demolition Plan Part A D2.1B Second Floor Selective Demolition Plan Part B A0.0 Notes, Abbreviations, Legends A2.1 First Floor Orientation Plan A2.1A First Floor Plan Part A A2.1A.1 First Floor Plan Part A.1 A2.1A.2 First Floor Plan Part A.2
Section 15.7 A2.1B First Floor Plan Part B A2.1B.1 First Floor Plan Part B.1 A2.1B.2 First Floor Plan Part B.2 A2.1C First Floor Plan Part C A2.1C.1 First Floor Plan Part C.1 A2.1C.2 First Floor Plan Part C.2 A2.2 Second Floor Orientation Plan A2.2A Second Floor Plan Part A A2.2B Second Floor Plan Part B A2.2C Second Floor Plan Part C A2.11 First Floor Refl ected Ceiling Orientation Plan A2.11A.1 First Floor Refl ected Ceiling Plan Part A.1 A2.11A.2 First Floor Refl ected Ceiling Plan Part A.2 A2.11B.1 First Floor Refl ected Ceiling Plan Part B.1 A2.11B.2 First Floor Refl ected Ceiling Plan Part B.2 A2.11C.1 First Floor Refl ected Ceiling Plan Part C.1 A2.11C.2 First Floor Refl ected Ceiling Plan Part C.2 A2.12 Second Floor Orientation Refl ected Ceiling Plan A2.20 Partition Types and Details A2.30 Room Finish Schedule - Building A and B A2.31 Room Finish Schedule - Building C A3.1 Roof Plan A4.0 Orientation Elevations A4.1 North Elevations A4.2 East Elevations A4.3 South Elevations A4.4 South Elevation & Partial North Elevations A4.5 West Elevations A4.6 Courtyard Elevations A4.8 Building Sections A11.1 Typical Kindergarten Classroom Plan and Elevations A11.2 Typical Classroom Plan and Elevations A11.3 Typical Science Classroom Plan and Elevation Foodservice K1.1 Foodservice Equipment Plan Structural S0.0 Structural Framing Diagram S2.1B.2 First Floor Plan Part B.2 S2.1C.1 First Floor Plan Part C.1 S2.1C.2 First Floor Plan Part C.2
Section 15.8 S2.2B.2 Roof Framing Plan Part B.2 S2.2C.1 Roof Framing Plan Part C.1 S2.2C.2 Roof Framing Plan Part C.2 S2.3B.2 Clerestory Roof Framing Plan Part B.1 S2.3C.1 Clerestory Roof Framing Plan Part C.1 S2.3C.2 Clerestory Roof Framing Plan Part C.2 S2.4B.2 New Gym Roof Framing Plan S4.1 Wall Elevations Fire Protection FP0.1 FP1.1A FP1.1B Legend, Notes, and Details Fire Protection Partial First Floor Plan Fire Protection Partial First Floor Plan Fire Protection Plumbing P0.0 Legend, Schedules, Notes, and Details Plumbing P0.1A Partial First Floor Demolition Plan Plumbing P0.1B Partial First Floor Demolition Plan Plumbing P0.1C Partial First Floor Demolition Plan Plumbing P1.1A Partial First Floor Plan Plumbing P1.1B Partial First Floor Plan Plumbing Mechanical M1.1A.1 First Floor Plan Part A.1 HVAC M1.1A.2 First Floor Plan Part A.2 HVAC M1.1B.1 First Floor Plan Part B.1 HVAC M1.1B.2 First Floor Plan Part B.2 HVAC M1.1C.1 First Floor Plan Part C.1 HVAC M1.1C.2 First Floor Plan Part C.2 HVAC M2.01 Legends and Details I HVAC M2.02 Details II HVAC Electrical E0.01 Electrical Symbol List E0.02 Lighting Fixture Schedule and Notes E0.03 Electrical Site Plan E0.04 Electrical Site Details E0.05 Electrical Site Details E1.1A.1 E1.1A.2 E1.1B.1 E1.1B.2 E1.1C.1 E1.1C.2 E1.2A.1 First Floor Plan Part A.1 Power First Floor Plan Part A.2 Power First Floor Plan Part B.1 Power First Floor Plan Part B.2 Power First Floor Plan Part C.1 Power First Floor Plan Part C.2 Power Second Floor Plan Part A.1 Power
Section 15.9 E2.1A.1 E2.1A.2 E2.1B.1 E2.1B.2 E2.1C.1 E2.1C.2 E2.2A.1 E3.1A.1 E3.1A.2 E3.1B.1 E3.1B.2 E3.1C.1 E3.1C.2 E3.2A.1 First Floor Plan Part A.1 Lighting First Floor Plan Part A.2 Lighting First Floor Plan Part B.1 Lighting First Floor Plan Part B.2 Lighting First Floor Plan Part C.1 Lighting First Floor Plan Part C.2 Lighting Second Floor Plan Parts A.1 and B.1 Lighting First Floor Plan Part A.1 Fire Alarm First Floor Plan Part A.2 Fire Alarm First Floor Plan Part B.1 Fire Alarm First Floor Plan Part B.2 Fire Alarm First Floor Plan Part C.1 Fire Alarm First Floor Plan Part C.2 Fire Alarm Second Floor Plan Part A.1 Fire Alarm E4.01 One Line Riser Diagram E4.02 Panel Schedules E4.03 Fire Alarm Riser Diagram E4.04 Electrical Details E5.01 Security Symbol List Technology T0.01 Technology Symbol List & Details T1.1A.1 First Floor Plan Part A.1 Technology T1.1A.2 First Floor Plan Part A.2 Technology T1.1B.1 First Floor Plan Part B.1 Technology T1.1B.2 First Floor Plan Part B.2 Technology T1.1C.1 First Floor Plan Part C.1 Technology T1.1C.2 First Floor Plan Part C.2 Technology T2.01 Technology Riser Diagram T2.1A.1 Second Floor Plan Part A.1 Technology T3.00 Technology Details