Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual



Similar documents
SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

Design Development Quality Management Phase Checklist Project Phase Checklist Series

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

WELDING LAB FSCJ DOWNTOWN CAMPUS - BUILDING B

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Construction Technologies Career Field Pathways and Course Structure

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

OCAD UNIVERSITY 7th FLOOR

DRAPER ELEMENTARY SCHOOL

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

BUILDING SAFETY UNIT

Lake Charles Ward 3 Recreation Improvements To University Park

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Requirements for Building Application Submission

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Exhibit C: Scope of Work and Schedule of Deliverables

PLAN FOR LOCAL INFRASTRUCTURE PROGRAM- IMPROVEMENT OF MULTI-PURPOSE BUILDING BRGY. SULPA, SIRUMA, CAMARINES SUR 4TH LEGISLATIVE DISTRICT

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Think Of Us First! When It s Time to Distribute Your Plans

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Commercial Building Valuation Report

Every Student I Every Day I Every Possibility

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

PATTERSON ELEMENTARY SCHOOL

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

PLUMMER ELEMENTARY SCHOOL

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

MURCH ELEMENTARY SCHOOL

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Newtown and Holland Middle Schools Construction Project Bid Review

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Schedule B to By-law

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

PLAN SUBMITTAL INFORMATION

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Project Close Out Summary

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

Building Condition Assessment Report

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

Building Condition Assessment Report

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

City and County of San Francisco Department of Public Works TABULATION OF BIDS

Commercial Building Permit Application & Submittal Guidelines

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

NAPCS Product List for NAICS 54134: Drafting Services

Architectural Drafting

BUNKER HILL ELEMENTARY SCHOOL

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

HOUSTON ELEMENTARY SCHOOL

CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Design and Construction Design Phase Deliverables

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

DRAFT Document valid at the date shown on the page header. DETE Facilities Design Standards and Guidelines. General Index. Planning Guidelines

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

SWAN POINT YACHT & COUNTRY CLUB

TD AMERITRADE Park Omaha

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

MIAMI DADE COUNTY DOCUMENTS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN PROFESSIONAL FLORIDA BUILDING CODE)

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

GENERAL AND SPECIFIC OBJECTIVES

A Guide for the Homeowner/Builder

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

ELIGIBLE REPAIR PROJECT PARAMETERS

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

Commercial Building Valuation Report

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

KIEWIT CM/GC Enabling/Utilities

Residential Building Permits

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

Schedule B to By-law Part A Fees Payable for Permits

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

Print Shop/Mail Room

Facility Assessment for East Main Street, Huntley, IL

Transcription:

15 Attachments (separately bound) 15.1 Project Manual - Table of Contents - Outline Specifi cations 15.2 Drawings (half size) - Drawing List

Section 15.3 15.1 Project Manual Separately bound and being submitted in conjunction with this Binder is the Project Manual. On the following pages is the Table of Contents for the Project Manual, which includes the Outline Specifications for the Lincoln Public School project.

Section 15.4 omr architects inc. JUNE 7, 2012 LINCOLN PUBLIC SCHOOLS LINCOLN, MA DOCUMENT 000110 TABLE OF CONTENTS PART 1 - GENERAL DOCUMENTS 000110 Table of Contents Pages: 1-2 000120 Outline Specification Pages: 1-9 DIVISION 11: EQUIPMENT Foodservice Equipment Narrative Pages: 1-2 PART 2 - ENGINEERING AND LANDSCAPE DOCUMENTS DIVISION 03: CONCRETE, AND DIVISION 05: METALS Structural Outline Specifications Pages: 1-10 DIVISION 21: FIRE SUPPRESSION Schematic Outline Specification: Section 21 00 00 - Fire Protection Pages: 1-3 DIVISION 22: PLUMBING Schematic Outline Specification: Section 22 00 00 - Plumbing Pages: 1-4 DIVISION 23: HEATING VENTILATING AND AIR CONDITIONING Schematic Outline Specification: Section 23 00 00 - HVAC Pages: 1-7 DIVISION 26: ELECTRICAL Schematic Outline Specification: Section 26 00 00 - Electrical Pages: 1-22 DIVISION 27: TECHNOLOGY Schematic Outline Specification: Section 27 00 00 - Telecommunications Pages: 1-9 TABLE OF CONTENTS 000110-1

Section 15.5 omr architects inc. JUNE 7, 2012 LINCOLN PUBLIC SCHOOLS LINCOLN, MA DIVISIONS 31, 32, AND 33: SITEWORK Sitework Specifications Section 310125 Landscape Maintenance Section 311320 Existing Plants Section 312219 Finish Grading Section 312500 Sedimentation and Erosion Control Section 321313 Site Concrete Section 321800 Bituminous Concrete Paving Section 321819 Playground Safety Surfacing Section 321823 Infield Surfacing Section 323000 Misc Site Improvements Section 329000 Planting Section 329200 Lawns and Grasses Section 329400 Bioretention Section 321000 Water Utilities Section 333000 Sanitary Sewerage Utilities Section 333600 Utility Septic tanks Section 334000 Storm Drainage Utilities Section 334610 Landscape Subdrainage END OF TABLE OF CONTENTS TABLE OF CONTENTS 000110-2

Section 15.6 15.2 Drawings Below is the list of schematic design drawings for the Lincoln Public Schools project, which has been submitted along with this binder in a bound, half size set. List of Drawings: Sheet # Drawing Title General G0.0 Cover Sheet G0.1 List of Drawings Civil EX1.0 EX1.1 Existing Conditions Plan Existing Conditions Plan C1.0 Schematic Utility Plan C1.1 Schematic Utility Plan and Notes C2.0 Schematic Utility Demolition Plan C2.1 Schematic Utility Demolition Plan and Notes C3.0 Schematic Utility Details C3.1 Schematic Utility Details C4.0 Erosion Control Details C4.1 Erosion Control Details Landscape L1.0 Sheet Layout and Context Plan L1.1A Materials Plan L1.1B Materials Plan L1.2A Grading Plan L1.2B Grading Plan L1.4A Planting Plan L1.4B Planting Plan Architectural D1.1 First Floor Orientation Demolition Plan, Notes, and Legend D1.1A First Floor Selective Demolition Plan Part A D1.1B First Floor Selective Demolition Plan Part B D2.1A Second Floor Selective Demolition Plan Part A D2.1B Second Floor Selective Demolition Plan Part B A0.0 Notes, Abbreviations, Legends A2.1 First Floor Orientation Plan A2.1A First Floor Plan Part A A2.1A.1 First Floor Plan Part A.1 A2.1A.2 First Floor Plan Part A.2

Section 15.7 A2.1B First Floor Plan Part B A2.1B.1 First Floor Plan Part B.1 A2.1B.2 First Floor Plan Part B.2 A2.1C First Floor Plan Part C A2.1C.1 First Floor Plan Part C.1 A2.1C.2 First Floor Plan Part C.2 A2.2 Second Floor Orientation Plan A2.2A Second Floor Plan Part A A2.2B Second Floor Plan Part B A2.2C Second Floor Plan Part C A2.11 First Floor Refl ected Ceiling Orientation Plan A2.11A.1 First Floor Refl ected Ceiling Plan Part A.1 A2.11A.2 First Floor Refl ected Ceiling Plan Part A.2 A2.11B.1 First Floor Refl ected Ceiling Plan Part B.1 A2.11B.2 First Floor Refl ected Ceiling Plan Part B.2 A2.11C.1 First Floor Refl ected Ceiling Plan Part C.1 A2.11C.2 First Floor Refl ected Ceiling Plan Part C.2 A2.12 Second Floor Orientation Refl ected Ceiling Plan A2.20 Partition Types and Details A2.30 Room Finish Schedule - Building A and B A2.31 Room Finish Schedule - Building C A3.1 Roof Plan A4.0 Orientation Elevations A4.1 North Elevations A4.2 East Elevations A4.3 South Elevations A4.4 South Elevation & Partial North Elevations A4.5 West Elevations A4.6 Courtyard Elevations A4.8 Building Sections A11.1 Typical Kindergarten Classroom Plan and Elevations A11.2 Typical Classroom Plan and Elevations A11.3 Typical Science Classroom Plan and Elevation Foodservice K1.1 Foodservice Equipment Plan Structural S0.0 Structural Framing Diagram S2.1B.2 First Floor Plan Part B.2 S2.1C.1 First Floor Plan Part C.1 S2.1C.2 First Floor Plan Part C.2

Section 15.8 S2.2B.2 Roof Framing Plan Part B.2 S2.2C.1 Roof Framing Plan Part C.1 S2.2C.2 Roof Framing Plan Part C.2 S2.3B.2 Clerestory Roof Framing Plan Part B.1 S2.3C.1 Clerestory Roof Framing Plan Part C.1 S2.3C.2 Clerestory Roof Framing Plan Part C.2 S2.4B.2 New Gym Roof Framing Plan S4.1 Wall Elevations Fire Protection FP0.1 FP1.1A FP1.1B Legend, Notes, and Details Fire Protection Partial First Floor Plan Fire Protection Partial First Floor Plan Fire Protection Plumbing P0.0 Legend, Schedules, Notes, and Details Plumbing P0.1A Partial First Floor Demolition Plan Plumbing P0.1B Partial First Floor Demolition Plan Plumbing P0.1C Partial First Floor Demolition Plan Plumbing P1.1A Partial First Floor Plan Plumbing P1.1B Partial First Floor Plan Plumbing Mechanical M1.1A.1 First Floor Plan Part A.1 HVAC M1.1A.2 First Floor Plan Part A.2 HVAC M1.1B.1 First Floor Plan Part B.1 HVAC M1.1B.2 First Floor Plan Part B.2 HVAC M1.1C.1 First Floor Plan Part C.1 HVAC M1.1C.2 First Floor Plan Part C.2 HVAC M2.01 Legends and Details I HVAC M2.02 Details II HVAC Electrical E0.01 Electrical Symbol List E0.02 Lighting Fixture Schedule and Notes E0.03 Electrical Site Plan E0.04 Electrical Site Details E0.05 Electrical Site Details E1.1A.1 E1.1A.2 E1.1B.1 E1.1B.2 E1.1C.1 E1.1C.2 E1.2A.1 First Floor Plan Part A.1 Power First Floor Plan Part A.2 Power First Floor Plan Part B.1 Power First Floor Plan Part B.2 Power First Floor Plan Part C.1 Power First Floor Plan Part C.2 Power Second Floor Plan Part A.1 Power

Section 15.9 E2.1A.1 E2.1A.2 E2.1B.1 E2.1B.2 E2.1C.1 E2.1C.2 E2.2A.1 E3.1A.1 E3.1A.2 E3.1B.1 E3.1B.2 E3.1C.1 E3.1C.2 E3.2A.1 First Floor Plan Part A.1 Lighting First Floor Plan Part A.2 Lighting First Floor Plan Part B.1 Lighting First Floor Plan Part B.2 Lighting First Floor Plan Part C.1 Lighting First Floor Plan Part C.2 Lighting Second Floor Plan Parts A.1 and B.1 Lighting First Floor Plan Part A.1 Fire Alarm First Floor Plan Part A.2 Fire Alarm First Floor Plan Part B.1 Fire Alarm First Floor Plan Part B.2 Fire Alarm First Floor Plan Part C.1 Fire Alarm First Floor Plan Part C.2 Fire Alarm Second Floor Plan Part A.1 Fire Alarm E4.01 One Line Riser Diagram E4.02 Panel Schedules E4.03 Fire Alarm Riser Diagram E4.04 Electrical Details E5.01 Security Symbol List Technology T0.01 Technology Symbol List & Details T1.1A.1 First Floor Plan Part A.1 Technology T1.1A.2 First Floor Plan Part A.2 Technology T1.1B.1 First Floor Plan Part B.1 Technology T1.1B.2 First Floor Plan Part B.2 Technology T1.1C.1 First Floor Plan Part C.1 Technology T1.1C.2 First Floor Plan Part C.2 Technology T2.01 Technology Riser Diagram T2.1A.1 Second Floor Plan Part A.1 Technology T3.00 Technology Details