2001 MIP switched from DOS based with dbf backend to windows based with SQL Server backend called Sage Accounting.



Similar documents
Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program

Standard Seven: Library and Other Information Resources

Labnet Services Summary

Office of Information Technology Service Catalog FY2015

NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT DISTRICT INFORMATION SERVICES TECHNOLOGY PLAN

Office of Information Technology Service Catalog FY2015

North Florida Community College

Citrus College. Technology Master Plan Adopted 2011

CIS GOALS. CIS Mission Provide high quality, responsive computing and information services to the Texas A&M University Galveston community.

Infrastructure Systems and Support Annual Report

RAS Associates, Inc. Systems Development Proposal. Scott Klarman. March 15, 2009

FACULTY HANDBOOK. Effective July, 1999 With 2013 Updates MEMBER THE TEXAS STATE UNIVERSITY SYSTEM

Faculty technology Reference Guide

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

TECHNOLOGY ASSESSMENT Sylvester Elementary School

DEPARTMENT OF INFORMATION TECHNOLOGY Tim Calderone, Director

Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems Improve Processes...

Introduction to WSU

Information Technology Services technology immersion for new employees

High-speed (OC-3) connection to the Illinois Century Network and the Internet, one of the fastest connections of any community college.

Bond Technology Update

$ 250,000 - Instructional Block grants and District general funds Completed 2 AET and 1 Music computerized classrooms replacement,

Configuring the Redundancy Feature in a Polycom KIRK Wireless Server 6000

4/13/2015 Integrated Technologies Services Strategic Plan

AGENDA ITEM BACKGROUND TO: GOVERNING BOARD ITEM NUMBER

Yale School of Art Digital Technology Office Information

PROGRESS REPORT of TECHNOLOGY MASTER PLAN 2016 INITIATIVES AS OF SEPTEMBER 30, 2011

Borough President and City Council Capital Funding Requests FY 2009

Cisco Network Switches Juniper Firewall Clusters

BUSINESS CONTINUITY OF INFORMATION TECHNOLOGY SERVICES ACROSS THE ENTERPRISE UTILIZING ACTIVE-ACTIVE DATA CENTER S

UW Oshkosh IT Plan Submission January, 2014

Improving Shaw University Network Infrastructure

COAS TECHNOLOGY PLAN

UNIFIED COMMUNICATIONS NETWORK INFRASTRUCTURE AND SERVICES STATEMENT OF WORK (SOW) [PLACEHOLDER DATE] [PLACEHOLDER DEPARTMENT] [PLACEHOLDER BUILDING]

Administrative Services Operational Guidelines

ITS Technology Infrastructure Plan 3/7/2013

Information Technology Strategic Plan and Review Colorado State University Pueblo

Course Agenda: Managing Active Directory with NetIQ Directory and Resource Administrator and NetIQ Exchange Administrator

Technology Strategic Plan Middlesex Community College 2013_2018

Instructional and Information Technology Cluster Group Ranking of Master Plan Initiative Objectives and Initiative Summaries

Revised RFP submission schedule October 15 th 3:00 PM EST Last Day to Submit Questions October 30 th 3:00 PM EST Proposals Due

AUXILIARY SERVICES DIVISION UGACARD SUPPORT SERVICES

Application Support (Appdev) Team had a very busy year for

City of Coral Gables

Appendix E Florida Gulf Coast University Technology Resources - CAPABILITIES, KSAs and SERVICES FY Educause Domain (Service)

RAISING THE BAR. Voice Over IP Technology for: COMPLETE NETWORK-BASED SCHOOL COMMUNICATIONS SOLUTION

INFORMATION TECHNOLOGY

Millikin University Student Tech Training

Technology for Employees at South Central College

Configuring the Redundancy Feature in a KIRK Wireless Server Application Note

Course 20533B: Implementing Microsoft Azure Infrastructure Solutions

Information Technology Services

Three Areas of Focus. * Infrastructure * Systems * Processes

Campus Network Upgrades: Guidelines for the President July 2003

Campus-wide Firewall Project. Anne Oribello, Brown University

Appendix 3H A/V and Video Conferencing Standard

Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems...

Associate in Science Degree in Computer Network Systems Engineering

Technology Services Strategic Direction

Technology Services Road Map. Tech Day 2012 September 28, 2012

Administrative Services Annual Program Review Report 2008

Texas-Sized Access Control System Design Provides Significant Savings.

Implementing Microsoft Azure Infrastructure Solutions

Spring 2010 (Updated May 4, 2010)

Administrative Services Annual Program Review Report 2007

DCADLEC RFP Clarifications

FortiWeb 5.0, Web Application Firewall Course #251

INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES June 2012

Customized Cloud Solution

Information Technology Strategic Plan

Program Review Annual Update

Excelsior Springs School District Technology Department Service Level Agreement

Instructional Technology Cost Analysis

Course 20533: Implementing Microsoft Azure Infrastructure Solutions

VMware vsphere-6.0 Administration Training

How To Build An B Wireless Local Area Network At Texas A&M

UCLA Information Technology Services

Information Technology Services

VVC Technology & Information Resources Catalog of Services

Law College Computer and Technology Information

Overview of Divisions, Recent and Approaching Milestones. Office of the Vice President for Information Technology

The primary goals of the technology plan are to support the goals of the district strategic plan:

Minnetonka Public Schools Technology Plan

Elearning Support For The University of College - Faculty Tab

1). Rebuild the existing 5 year old server with a new computer and server operating system.

Plan for Excellence Goal 4: Using Technology to Advance All Aspects of University Life. Advancing the Nine Initiatives of the Technology Plan

Make your business EXCEL with technology solutions provided by Excel Communications Worldwide, Inc.

Annual Report: Talking Points and Institutional Effectiveness Statements

Cosumnes River College Planning

Avaya IP Office 500 Combo Card with 4 Analog Trunks, 6 digital extensions, 2 analog extensions

District IT Service Catalog

Configuring the Redundancy Feature in a Spectralink IP-DECT Server 6500

933 COMPUTER NETWORK/SERVER SECURITY POLICY

District Annual Unit Review

The Bizfon is sold direct through the web site, through our telephone sales division and through our dealer network.

Technology Services Division Infrastructure Major Deliverables by Calendar Year

Learning Resources/Learning Centers/Institutes

Building a Highly Reliable, Multi-Vendor Network Through a Co-Location Facility, Multiple ISPs, and Data Center Upgrade

OSU INSTITUTE OF TECHNOLOGY POLICY & PROCEDURES

10. Librarian Training

Transcription:

RANDOM Held 2 weeks per summer of Faculty development for 5 years to advance the use of technology in the classroom using the train-the-trainor model. Joan Stirling may have the numbers of faculty and names if needed. History of website changes: http://web.archive.org/web/*/http://www.ozarka.edu 2001 MIP switched from DOS based with dbf backend to windows based with SQL Server backend called Sage Accounting. Sonis was foxpro based and unavailable from off-campus. Billing reports would take up to 8 hours to create. Locally we created WebTools for Sonis allowing some online access to student records. Began beta testing of SonisWeb in 2001 - went live January 2002. We worked together with RJM to develop/contribute code for Sonisweb/Web Tools for Sonis. The product was released by RJM Systems in July of 2002. The two software changes were to new products and both took months of planning and testing to allow a smooth transition. Added news system to the website that allows publishing of news articles. http://web.archive.org/web/20001020034858/http://www.ozarka.edu/ This isn't mentioned for inclusion in the self-study, just important part of history. Ozarka College was among the top 10 in Yahoo Internet Life magazines most wired two year colleges in 2001. The survey was given by Peterson's and included criteria such as wireless coverage, portal access, online registration. I've heard a couple of national speakers refer to this as a survey of how many miles of cable a college had but it wasn't about that. http://www.ozarka.edu/files/pdf/2000_wired.pdf 2002 Moved IT department into a renovated location in 2002. Prior IT was located in single and very cramped 14x20 office. 100% new cabling ran in Administration building. We selected a room isolated from traffic for new data center. Developed myozarka in 2002 - launched in 2003. Were using WebCT with some scripts to automate user and course creation. Had a completely random design where students were required to learn different tools for each course. Well meaning instructors had confusing backgrounds and naming conventions for courses. Disorganized and lacked a clear single image for the campus. Very low acceptance/usage. Used myozarka discussions, roundtable meetings, and informal conversations with faculty as guide for development of features in myozarka. Worked closely with the VPAA. When Adult Ed/Nursing building was built, we replaced buried telephone cables between buildings (all) on Melbourne campus to provide increased capacity and future expansion. Added additional fiber optic cables to Adult Education building to allow expansion of network on that side of the campus land.

Replaced non-managed network switches with managed switches. Developed POS/Inventory software for the bookstore. Integrated the bookstore with SonisWeb for both book assignments and accounting. Installed new phone system adding voicemail, 4 digit extensions, a T1 line for incoming/ outgoing calls, and call routing over data lines between sites eliminating long-distance calls between sites. Identical phone systems installed in Ash Flat, Mt View, and Melbourne. Setup technology for classrooms in the shopping center that housed the site at Ash Flat. Ozarka College was among the top 15 in Yahoo Internet Life magazines most wired two year colleges in 2002. http://www.ozarka.edu/files/pdf/2001_wired.pdf 2003 Launched myozarka Installed new Polycom compressed video system in H113 along with new tables and custom built cabinets. Added realtime budget access for departmental budgets online. Added yearly budget requests online. Installed a natural gas generator to service the data center during extended power outages. Replaced AC unit installed in data center with a larger on that could better handle the demands. 2004 Students and faculty are authenticated using single sign-on with replicated LDAP. Expanded internet access to bonded 3M connection from MCI. Financial Aid began using Sonisweb for limited award processing in 2004. Complete award processing in 2005. Created processes for printing all financial aid disbursements - were being typing with typewriter. Developed software to automate the process of archiving all compressed video classes. Installed SQL server based student ID system. In march of 2009 (?) added webcam support for SonisWeb to allow student services and off-campus locations to take student pictures and have them directly recorded into the ID card system. myozarka, SonisWeb, Sage Accounting, OpenBibilio, and AssureID all share the same images. Expanded to multiple T1 lines at Ash Flat. Added 12 computers upstairs in the library converting a seldom used location into a computer lab and study area. Moved and upgraded all technology to the new permanent facilities in Ash Flat.

2005 Added online workorders for Physical Plant and Information Systems. Added direct deposit for employee payroll in July 2005 (?) Renovated the H101 (business lab), changed the orientation and installed new desks, projector, a custom built instructor station, and fresh carpet/paint. Replaced expensive and proprietary automated library system that wasn't available from off-campus sites to an open source ILS - OpenBiblio. Allows reduced administration functions such as replication of student/faculty records. Added new computers along with new custom built cabinets for classrooms in Mt View new building. Completed 100% of the wiring on the new building at Mt View. Expanded to multiple T1 lines at Mt View. 2006 Expanded the number of workstations in the Nursing building lab to 8. Changed from MCI to CenturyTel for 3M internet connection. Developed check-in/out system for the fitness center. Virtualized campus servers such as the SAGE accounting SQL server, OpenBiblio, an LDAP server, myozarka instances, and an Active Directory server. 100% of classrooms have both wired and wireless network connections. Added scanned checks/invoices/purchase orders online for departmental budgets. Added executive summary for budgets to give clear picture of the overall health on budgets. 2007

Labs have standardized (same) equipment. Labs are swapped out as a unit instead of a machine or two at a time. We have worked it to a lab/campus per year on a 3-5 year cycle. 100% wireless on-campus with a centralized managed wireless network replacing mismatched non-managed access points strewn around. Moved to iscsi EMC SAN for mission critical databases, file storage (myozarka documents, videos, archived lectures, user files, shared network drives). Worked with grounds to bury phone/network cables to provide connectivity for new physical plant building. The building was wired directly into the Adult Education building using the expansion planning the was part of the building when it was built in 2001/2002. All classrooms have computer, dvd/vcr, projector and access to the network/internet. prior self study we used a cart per building model. In Linked EdExpress and SonisWeb importing student ISIR records. Created processes for PELL awards to reduce administrative functions required by Financial aid. Created processes to import loan records for students daily without user intervention. Created processes to check the billing (student accounts) daily for errors/miscalculations. Replaced shared drive access over WAN with local copy of user files on the Ash Flat site. User files are replicated in near realtime to provide redundancy and efficiency. Added card swipe to fitness center check in process. Added computers in the new student center on the Melbourne campus. Changed archived lectures from windows media to flash media format and changed the player to embedded in myozarka. 2008 Replaced shared drive access over WAN with local copy of user files on the Mt View site. User files are replicated in near realtime to provide redundancy and efficiency. Replaced campus firewalls with open source Untangle boxes all sites. Added the CenturyTel cybercafé in the new student center at the Ash Flat site. Replaced all technology on the Ash Flat site to include the new building. Replaced all existing technology on the Mt View site. Completed 100% of the wiring on the new bookstore/career pathway building. Worked with grounds to bury cables to provide phone/networking connectivity to the Bookstore/Career Pathways building. Added 10 computers and tables in the resource room at the Mt View site. Added an off-campus dedicated server in a data center in Dallas, Texas. Financial and student records are replicated to Dallas.

Added direct deposit for student refunds. Added carpet squares to labs in Mt View and Melbourne. Designed and had custom made steel computer mounting brackets built for the Learning Lab on the Melbourne campus. Installed data center monitors to include temperature, smoke/fire, motion, power, device monitoring. Added classroom technology to 3 classrooms at the LPN center on the Mt View high school campus which was acquired after the tornado forced relocation of the nursing program lab. Setup connectivity and phones in the location. In July of 2008 we installed Metro-Ethernet provided by CenturyTel increasing our capacity to 10M between Ash Flat and Melbourne. Also replaced our bonded 3M connection from MCI to a symmetrical 10M. Metro-Ethernet quotes from CenturyTel: http://www.ozarka.edu/images/campus_connection/5-27-08.pdf 2009 Due to the problems with the amount of items running off of the natural gas feed in the Administration building, we changed the generator to a 250 gallon propane tank servicing only the generator. Developed and launched Blackbox module for myozarka adding committee scheduling and document management. Replaced miscellaneous network switches with a core switch with increased capacity. see the svn log for list of changes to myozarka