Technical Specifications for West Campus Data Center HVAC System



Similar documents
Element D Services Heating, Ventilating, and Air Conditioning

Zone B: comprises of NOC room, reception area, Help Desk area, Call Centre, Testing/Monitoring room. This zone requires approximately 1500 sq. feet.

Managing Cooling Capacity & Redundancy In Data Centers Today

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

SECTION MORTUARY REFRIGERATORS

Data Center Energy Profiler Questions Checklist

Choosing Close-Coupled IT Cooling Solutions

HVAC Processes. Lecture 7

Data Centre Testing and Commissioning

HVAC Infrastructure Retrofit Solutions

ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems

HVAC Systems: Overview

Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina

Ductless Heat Pumps. Gary Nordeen January

Legacy Data Centres Upgrading the cooling capabilities What are the options?

JAWAHARLAL NEHRU UNIVERSITY

APC APPLICATION NOTE #112

CRAC Precision climate control units for data centres

Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise. A White Paper from the Experts in Business-Critical Continuity

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Glossary of Heating, Ventilation and Air Conditioning Terms

Integrated Building Management Systems in Data Centers

Environmental Data Center Management and Monitoring

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

OptiNet Applications. A Review of the Unique Requirements for a Facility Monitoring System. White Paper Series

Energy Efficient Server Room and Data Centre Cooling. Computer Room Evaporative Cooler. EcoCooling

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Why is my air conditioner dripping on my customers?

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Benefits of. Air Flow Management. Data Center

The New Data Center Cooling Paradigm The Tiered Approach

- White Paper - Data Centre Cooling. Best Practice

How and Why Mission- Critical Cooling Systems Differ From Common Air Conditioners

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Ammonia Detection System Codes and Design Specifications

CSE 265: System and Network Administration

ENHANCED LABORATORY HVAC SYSTEM

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: Uptime Racks:

AIR-SITE GROUP. White Paper. Green Equipment Room Practices

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Mechanical Rooftop Custom Capabilities

Bring the fresh in. Dedicated Outside Air Systems

CoolTeg Plus Chilled Water (CW) version: AC-TCW

KEY ELEMENTS IN PREVENTING AND MITIGATING MOLD CLAIMS

Old Dominion University Mold Management Plan

In Row Cooling Options for High Density IT Applications

DCIM Data Center Infrastructure Monitoring

IEQ-15 Air Distribution System

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

The Different Types of Air Conditioning Equipment for IT Environments

Five Strategies for Cutting Data Center Energy Costs Through Enhanced Cooling Efficiency

Element D Services Plumbing

Zertico Rack Monitoring Unit

Direct Fresh Air Free Cooling of Data Centres

Data Center Power Consumption

Improve competiveness of IDC and enterprise data centers with DCIM

How to Meet 24 by Forever Cooling Demands of your Data Center

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Data Center Cooling A guide from: Your partners in UPS Monitoring Systems

Venice Library Humidity Study. for Williams Building Diagnostics, LLC th Street West Bradenton, FL Report April 13, 2015

Best Practices for Wire-free Environmental Monitoring in the Data Center

Contractor Services for the Direct Installation of Heat Pump Water Heater and Ductless Mini-Split Heat Pumps in Income-Eligible Vermont Households

PRESENTATION BY: MIKE BURT AIR FILTER SOLUTIONS INC. DENVER, COLORADO

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

HVAC Basic Science - System Capacity

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

6 MECHANICAL HVAC SYSTEMS

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS

COOLSIDE box R410A. conditioned server - racks for direct installation into the room INVERTER E C

Recirculating Roof Fans Models ESRMD, ESRMDF and ERD

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Liabilities of Vented Crawl Spaces And Their Impacts on Indoor Air Quality in Southeastern U.S. Homes

Lesson 36 Selection Of Air Conditioning Systems

White Paper #10. Energy Efficiency in Computer Data Centers

National Archives and Records Administration (NARA) Facility Standards for Federal Records Storage Facilities

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

How to Build a Data Centre Cooling Budget. Ian Cathcart

Operation & Maintenance Manual. Electrochemical (EC) Gas Sensor Family

Project Close Out Summary

The Breather Box. High Performance Grade-D Breathing Air Filtration system. BB50-cO

Failure code manual. content

How To Perform A Mold And Indoor Air Quality Assessment

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

University of St Andrews. Energy Efficient Data Centre Cooling

Defining Quality. Building Comfort. Precision. Air Conditioning

Data Centers and Mission Critical Facilities Operations Procedures

SENSAPHONE 901 Tryens Road Aston, PA PH:

UC Berkeley Data Center Overview

Compliant Healthcare Technologies, LLC. NFPA 99, 2012 Changes" November 13, 2013!

SECTION 16002C CAMPUS CENTRAL METERING SYSTEM DESIGN CRITERIA 1. General

COMOC-V. Operational and Technical Overview

Technical Overview CM-16 Climate Monitor. Get yours direct at:

GTS. New! Plus: PR0DUCT CATALOG. Vapor-logic 4 controller with: and LonTalk. New models GTS-500 and GTS-700. Gas-to-Steam Humidification System

Calculating Total Cooling Requirements for Data Centers

SECTION TESTING, ADJUSTING, AND BALANCING

Transcription:

Technical Specifications for West Campus Data Center HVAC System I. Mechanical Systems Requirements A. HVAC Primary Data Centers, Automation HVAC is to be provided on a 24 hours per day, 365 days per year basis. The HVAC system will maintain critical space temperature and relative humidity at design conditions. Alternative resources of water storage are to be provided when evaporative systems are in place. Standby operation The HVAC system shall be supported by the building standby generator system but not tied into the UPS. Operational parameters The mechanical system shall be capable of achieving the following Data Center environmental parameters: Temperature: 20 o C (70 o F) to 23 o C (74 o F) Normal set point 72 F Control ± 2 F Relative Humidity: 45% to 55% Normal set point 50% RH Control ± 5% Humidification and dehumidification equipment may be required depending upon local environmental conditions. Coordinate cooling system design and equipment floor plans so that airflow from cooling equipment travels in a direction perpendicular to the rows of cabinets/ racks. The preferred flow for air movement is supply from the floor and return in the ceiling. The ambient temperature and humidity shall be measured in the room at 4 points per 1000 sq. ft. at a distance of 1.5 m (5 ft) above the floor level, after the equipment is in operation, at any point along an equipment cold aisle centerline. Monitoring and reporting of temperature and humidity shall be consistent with the Siemens MCCC Building Management System, or provided as a stand alone unit as part of this contract, to be accessible remotely via computer. Positive pressure A positive pressure differential with respect to surrounding areas shall be provided. A positive pressure level of.02 inches of water ±.01 shall be maintained.

Air Filtration The HVAC system shall incorporate an air filtration system that will provide a minimum filtration factor of 85%. Contaminants The Data Center shall be protected from contaminants and pollutants that could affect operation and material integrity of the installed equipment. The EPA Office of Air Quality Planning and Standards (OAQPS) has set National Ambient Air Quality Standards. When contaminants are present in concentrations greater than indicated in table 1, vapor barriers, positive room pressure, or absolute filters shall be provided. Table 1: Contamination limits Contaminant Chlorine Dust Hydrocarbons Hydrogen Sulfide Nitrogen Oxides Sulfur Dioxide Concentration 0.01 ppm 100 μg/m 3 /24 h 4 μg/m3/24 h 0.05 ppm 0.1 ppm 0.3 ppm Ventilation air The Data Center shall receive outside air ventilation for occupants. The ventilation air shall be introduced at the ceiling level, at a sufficient distance from the Data Center air conditioning units so as not to confuse the CRAC units into requiring heat. The Data Center shall receive supply air for ventilation and positive pressurization purposes. Leak detection system A leak detection system consisting of both distributed type cable sensors and point sensors shall be provided in all Data Center spaces. A framed plan indicating cable routing and periodically indicating cable lengths calibrated to the system shall be provided adjacent to the system alarm panel. Building management system (Add/Alternate #1 for Bid Price) The existing Building Management System (BMS) shall monitor all mechanical, electrical, and other facilities equipment and systems. The system shall be capable of local and remote monitoring and operation. Individual systems shall remain in operation upon failure of the central BMS or head end. Consideration shall be given for the capability of controlling (not just monitoring) the room environmental systems as well as historical trending and logging. 24 hour monitoring of the BMS system shall be provided by facilities personnel, security personnel, paging systems, or a combination of these. Emergency plans shall be developed to enable quick response to alarm conditions. These plans will

include a listing of factory certified vendors who maintain a parts inventory, have 24 hour emergency service, and have a response time of >1 calendar day. Communications capabilities Environmental system shall have an internal communications module from the factory. Multidirectional communications shall be capable of monitoring, changing, and commanding user adjustable points for the unit. The proposed system shall incorporate the SNMP protocol to achieve this monitoring. Management and Monitoring System: should support simultaneous Ethernet and serial communication should be SNMP v1, v2, and MIB II compliant should support web/administration interface with username and password authentication should support email communication should support telnet communication Plumbing systems No water or drain piping shall be routed through or above the Data Center that is not associated with Data Center equipment. Water or drain piping that must be routed within the Data Center shall be either encased or provided with a leak protection jacket. A leak detection system shall be provided to notify building operators in the event of a water leak. Drainage piping No floor drain(s) within the Data Center shall be installed due to the possibility of backups and flooding. Instead, open drainage or troughs using gravitational piping into adjacent support rooms should designed into the flooring. Floor drains in the support spaces shall receive the condensate drain water and humidifier flush water from the Data Center air conditioning units. All drain piping terminations shall be set in the sink, below floor grade, and be provided with a splash guard.

Equipment base specifications and installation Scope of Work: SH 168 Furnish and install one (1) 1 ½ Ton (+/ ), data room environmental control system. Minimum operating voltage: 208 v Multi directional diffuser. Scope of Work: SH 255 Furnish and install one (1) 6 Ton (+/ ), data room environmental control system. Minimum operating voltage: 208 v Floor mount, updraft console unit. Multi directional diffuser. System capacity should be staged or split to compensate for varying heat loads. II. Installation Requirements General installation requirements Design work to be performed by a licensed professional engineer in the state of Pennsylvania Floor penetrations will be professionally core drilled. If roof penetrations are required, work to be completed by Carslile Factory Authorized Roofing Company. Certificate to be provided at completion of job to certify that existing warrantee is intact. First year parts and labor factory warranty, and a 5 year compressor warranty on the compressor only. Start up by factory authorized representatives for each unit. Mandatory site visit Bidders must attend the mandatory site visit, to be held on, at pm/am, in room.

III. Bid tabulations Bid price for data room environmental control systems, South Hall Rooms 168 and 255: $ Add/Alternate #1 Integration with Siemens Building Energy Management System $ Project contacts Andrew Gulotta, Construction Manager agulotta@mc3.edu Michael Billetta, Director of Operations and Capital Projects mbillett@mc3.edu