Wet Area Construction. Carpentry - Residential Construction. Product Code: 5603



Similar documents
Melbourne balcony Assessments

IMPACT DAMAGE RESISTANT WALL SYSTEMS

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

The WANZ Guide to Window Installation

Water Resistant Plasterboard

FC:533 CONSTRUCTAFLOOR WET AREA FLOORING CEMINTEL RESIDENTIAL INTERNAL WET AREA FLOORING SYSTEM

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

How to build a Pizza Oven in 4 days

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

Installation Guide. Bath and Wall Surrounds SERIES B

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

Residential Inspection Guidelines

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Built to Last. Built for Beauty. Good. Solid. Logix. TM

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

PB301 July Lightweight Building Solutions. Bushfire Protection.

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

The WANZ Guide to Window Installation

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Clad Direct Glaze Window Installation Instructions

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Saferand easierinstallation

How To Build A Gambrel Roof And A Gable End Roof

Installation Window Building In Details

Connex. Mortarless Masonry Block System

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

12.1 Schlüter -KERDI-BOARD

Rockwool Flexi Insulation Application Guide

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: Purpose

INSTALLATION OF A BAY WINDOW

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

FC:121 EXTERNAL CLADDING & EAVES LINING CSR CEMINTEL

PART 1 GENERAL 1.1 SECTION INCLUDES

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

(02) Peel Street TAMWORTH STANDARD INCLUSIONS (Residential)

Foundation. Foundation

AQUATEC WET AREA FLOORING AUSTRALIA AUGUST 2005 INSTALLATION MANUAL

Shower Walls and Tub Surrounds

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders

How to Install GoBoard:

Superform Products Ltd.

Measure Guideline: Water Management at Tub and Shower Assemblies

Installation An Industry Guide to the Correct Installation of Windows and Doors

Window Installation Instructions

BELL ASSOCIATES ARCHITECTURE PLANNING

LAYING BLOCK AND BRICK

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Accessible planning and construction

Schluter -Shower System Installation Handbook Bonded Waterproofing System for Tiled Showers, Steam Showers, Steam Rooms, and Bathtub Surrounds

How To Repair A Boat Landing Deck With A Boat Bed

What you need to know about concrete block basement construction.

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CASINO VILLAGE R.V RESORT (HOMES) 01/01/2012

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

March 14, Installation of Bay, Bow and Garden Windows

Sports Buildings: budget costs for the Flood Relief Fund

DE Frame with C Series Sidelight

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

Installation Instructions and Ordering Information

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

Steel-framed Walls. Insulation

Energy Company Obligation (ECO): Technical Monitoring Questions

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

GreenGuard Housewrap Installation Guide

Can you design a frameless shower enclosure that doesn't leak?

INSTALLATION INSTRUCTIONS

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

Electrical Wiring Technical Bulletin

City of San Diego, CWP Guidelines

Site Inspection Report

RRIO Checklist. Use of checklist: Definitions: Limitations

WATERPROOFING OF WET ROOMS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Transcription:

E PL SA M Wet Area Construction Carpentry - Residential Construction Product Code: 5603

Publishing details: Second Edition 2012 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville 68 South Street Granville NSW 2142 Telephone: (02) 9846 8101 NSW TAFE Commission/DEC Acknowledgements Contributors: David Moran Mike Leahy Brian Moran Paslode Australia and Dom Samperi Rob Young Mark Mottley and Norman Hunter for revision Masterbuilt Homes Pty Ltd for use of the Cover Photo Sue Linsen, Can Do Management for desktop publishing Disclaimer- Copyright Every effort has been made to trace and acknowledge copyright. However, should any infringement have occurred, TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville extends an apology and invites copyright owners to contact them. Throughout this book, registered trademarks are indicated by an initial capital letter. ISBN 0 7348 1012 1 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville, 2012 Copyright of this material is reserved to TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville. Reproduction or transmittal in whole or part, other than for the purposes and subject to the provision of the Copyright Act, is prohibited without the written authority of TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville. 2 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville

Contents WET AREA CONSTRUCTION OVERVIEW 4 Wall Frame Preparation 5 Waterproofing and Sealants 6 Wet Area Lining Materials 11 BATH INSTALLATIon 15 SHOWER BASE INSTALLATIon 23 INSTALLATION of SINK/ VANITY UNIts 25 Installing Laundry Cabinets/ tubs 31 Water Damage 32 GLOSSARY OF TERms 33 FURTHER READIng 34 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville 3

Wall Frame Preparation Wall framing to wet areas may be of a steel or timber construction. Ideally where timber framing is selected, it is preferable to use well seasoned materials with section sizes as small as possible to reduce the effects of shrinkage. One of the most common problems encountered in wet areas is as a result of material shrinkage or movement. Stud spacings should not exceed 600 mm with a row of noggings placed in-line, not staggered, behind all horizontal sheet joins for full edge support. The studs may need to be checked out to a maximum depth of 20 mm to accept and support the lip of a bath or spa. This allows for wall linings to run down over the lip to provide adequate flashing. Refer to AS1684 - Timber Framing Code for notching of wall studs. The assembled frame should be rigid and not rely on the wall sheet lining fixing for strength. All internal and external wall stud connections should have a nest of three studs, which are well fixed and blocked at 600 mm vertical centres. Additional nogging fixing should be included in the following areas: 150 mm up from the floor around the base of a shower recess to provide sheet fixing and/or tray edge support Additional stud/s for shower screen fixing Trimmer on flat for shower head support and shower tap bridle-piece mounting Trimmers on flat for toilet cistern fixing and toilet control cock fixing Additional trimming/noggings, as required, for other fittings and fixtures such as a vanity cabinet, towel rails, wall mounted heaters/dryers, shaving cabinets, paper holders, etc. Framing up of niche to shower recess Common studs 600 c/c Max. Trimming stud where required for shower screen fixing Top wall plate Additional trimmer to support shower head, where required Corner or end stud Noggings Trimmer on flat to allow for fixing of cistern Additional trimmers on flat to support hot and cold water bridle piece Bottom wall plate Trimming on flat to allow for support of WC control cock, where required Additional trimmers to support shower tray/flashing, as required Fig. 2 Preparing the wall frames TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville 5

PREPARATION FOR FOLLOW ON TRADES The carpenter is responsible for preparation of subgrade surfaces for plasterer, waterproofer and tiler to work over. Any discrepancies in the framework will be reflected in the overall quality of finish and aesthetics of the finished room. The carpenter shall provide the wet area framework which is plumb, floor sheeting if used installed as per manufacturer s specification and walls straightened along length of wall as well as studs straight in length. Additional trimming should be installed for any fixtures as this will provide strength to fastenings as fixings will have integrity with the framework and not just into the lining. Wall niche framing within the shower wall requires the sill trimmer to have fall into the shower recess which allows any water to drain away from framework, preventing ponding. Care needs to be observed when housing of wall studs that are a maximum of 20 mm for recessing the bath/spa or shower base that AS1684 requirements for stud notching are not exceeded. With minimum tolerances allowed the wall framing may fail the frame inspection by structural weakness. It is also mandatory that no metal angle or strap wall bracing is cut in the installation of bath/spa or shower base unit. If this occurs alternative bracing requirements will need to be implemented and could involve sheet bracing within the cavity or strap bracing on the other side of wall due to notching regulations. Waterproofing and Sealants Waterproofing Waterproofing requirements vary depending on the material substrate for floor and walls as outlined in the BCA waterproofing requirements for building elements in wet areas. These requirements deal with identification of the area, floors and horizontal surfaces, walls, wall junctions and joints and penetrations, defining specific requirements for each application. In general the following is an overview: Shower Areas floor membrane to whole floor and upturn a minimum of 150 mm above floor or 25 mm above maximum retained water level (eg above enclosed shower screen) Wall waterproof vertical joints to moisture resistant wall sheet and other joints that may exist in wall lining. The waterproofing of whole shower wall exceeds the AS3740, however is generally undertaken as best practice. Penetrations - all penetrations shall be waterproof, this is taps or mixer and shower rose outlet sealed to wall lining Areas outside of shower recess are treated to the extent of: 1. Exposure and concentration of water to area 2. Substrate material to the area 6 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville

Requirements within AS3740 require that surfaces, joints or penetrations will require either a water resistant or waterproof classification to identified wet area location. Some materials such as 6mm fibre cement sheet wet area wall lining already has a water resistant classification on the material, however a rendered brick wall will require the application of a waterproofing membrane applied to reach the same classification. There are three classifications of waterproofing membrane installed within the appropriate bond breaker which is determined by elongation to break, these are classified as: Class 1 - < 60% Class 2-60% - 300% Class 3 - > 300% Each bond breaker functions differently from each other and must be installed to the specification of the membrane. The following is an overall guide to general wet area installation requirements that may need to be undertaken: Water stops (Door angles/ shower angles) Height of door angle installed is referenced to the Australian Standard for tiling. Concrete slabs have minimal movement/deflection and the tile bed or screed does not require extensive structural integrity to function correctly and can be bonded to the substrate and hence 25 mm minimum height is required. Sheet Floor systems over floor joists will experience deflection within the members and the floor screed cannot be bonded to the floor. This is called an unbonded screed and requires a separation layer, generally a sheet of 200 micron plastic sheet to prevent the flexure of the floor cracking the tile bed placed over it. To resist the cracking of the bed the depth is increased to provide the structural integrity of the bed to prevent floor tiles from becoming loose due to failure of the tile bed. The height of door angle is increased to 40-50 mm for unbonded floor systems. Door angles may need to be increased over large areas due to fall in tile requirements. Water stops to shower recess are classified as either an enclosed or unenclosed shower. An enclosed shower keeps all water within the shower recess and will have sliding doors or a door which opens into the shower recess. The water stop will finish a minimum of 5 mm above the finished floor tiles, and an aluminium sill section sits over the top. This prevents any egress of water outside of the shower recess. An unenclosed shower has the water stop finishing at floor level. This includes all frameless shower/semi frameless/shower curtain or disabled bathroom installations. Water is not contained within the shower recess. Where a shower hob is installed it should be constructed from brick, concrete or hebel, however timber must NOT be used. AS3740 requires that when installing a shower screen on an upstanding hob it is installed to ensure that it is: (a) Flush with the shower area side of the hob (b) Overhanging into the shower area (c) Inside the hob TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville 7

INSERT BATH An insert bath is where the bath lip is installed onto a horizontal plinth or surface. The frame can be of brick, hebel or framed in timber, lined with 6 mm fibre cement sheet. When this installation is required for a bath or spa a water stop extending 5 mm minimum above finished tile height must be installed under the lip around the periphery of the unit. Fig. 3 Bath/Shelf Junction Waterproofing installation must be inspected and passed prior to being covered over by other trades. Good industry practice also allows sufficient time to flood test installation prior to tiling, identifying any defects if present and repair, saving major disruption and cost later. If the membrane is damaged during work, notify contractor to come back and repair. This will save major cost later. Perimeter flashings must be used at the floor/wall junction in all general wet areas and must extend a minimum of 25 mm above the finished floor surface. 8 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville

Door jamb Architrave Waterproof material a min of 25mm above the finished floor surface Bathroom Water stop with base sealed to floor and upstand flush with the finished floor surface (a) Prior to installation of architrave Door jamb Architrave Waterproof material a min of 25mm above the finished floor surface Bathroom Water stop with base sealed to floor and upstand flush with the finished floor surface (b) After installation of architrave Fig. 4 Typical Bathroom door detail for whole bathroom waterproofing TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville 9

Wet Area Lining Materials Typically, wet area linings are either water-resistant plasterboard or fibre-cement sheeting in residential construction. Brick rendered brick and besser block are also methods of wet area construction Plasterboard Boral Wet Area Plasterboard is manufactured with recessed edges for water resistant jointing in tiled areas and normal jointing beyond tiled areas. The board has face and back liners, which are resistant to moisture penetration as well as a moisture resistant gypsum core. The board is available in both 10 mm and 13 mm thicknesses. Sheet lengths range from 2400 mm to 4200 mm. The board is a distinctive green colour. CSR Aquachek is a gypsum plasterboard with the core, face and back treated during manufacture to make it resistant to moisture and humidity. Available in both 10 mm and 13 mm thickness, with 1200 mm wide sheets available in 2400 mm to 4200 mm lengths and 1350 mm wide sheets available in 3600 mm and 4800 mm. The board is a blue-grey colour. Lafarge Watershield plasterboard. Conforms to ASTM C630. Has a water resistant gypsum core and a specially treated heavy duty linerboard. The board is a bluish colour. Fibre-cement Sheet Hardies Villaboard is manufactured to conform to Australian Standard AS2908.2 - Cellulose - Cement Products. Villaboard is composed of Portland cement, ground sand, cellulose fibre and water and manufactured in three thicknesses, e.g. 6 mm, 9 mm and 12 mm. The 6 mm board is commonly used as a tile substrate for internal walls. The thicker sheets are recommended where there is a requirement for impact resistance. The 6 mm board is available in the following sizes: Width mm 900 2400, 3600, 4200 Lengths mm 1200 1800, 2100, 2400, 2700, 3000, 3600, 4200 1350 2400, 3000, 3600 Mass: 6 mm Villaboard has an approx. mass of 8.5 kg/m 2 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville 11

CSR Fibre-cement Wallboard is an autoclaved, cellulose fibre reinforced cement sheet, which is immune to water damage and will not rot. It conforms to the requirements of AS2908.2, Cellulose-Cement Products Part 2: Flat Sheets. It is manufactured in 900 mm, 1200 mm and 1350 mm widths with lengths ranging from 1800 mm to 4200 mm. The sheet thickness is 6 mm and the mass is approximately 9 kg/m 2. Fibre-cement sheeting The following details provide a broad overview of cutting and installation methods. Cutting Cutting fibre-cement sheeting can be achieved in four different ways. The most traditional method is to use the Hand Guillotine, as shown below. The guillotine produces clean, straight edges, while cutting on the off-cut side of the line to allow for thickness of the blade. Hand guillotine Fig. 6 Cutting along the line with a hand guillotine ( Fibro cutters ) 12 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville