Lincoln Downtown Master Plan Update



Similar documents

Downtown Tampa Transportation Vision

N Street Protected Bikeway

Topic 2 11/28/2012 Blocks & Street Network

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

OVERVIEW PROJECT SUMMARY

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Goals & Objectives. Chapter 9. Transportation

Florida Avenue Multimodal Transportation Study. June 19, 2013

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

Citizen Advisory Group Meeting #1 December 8, :00 p.m.

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Light Rail Transit in Phoenix

DESIGN ASSISTANCE APPLICATION

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

Corridor Goals and Objectives

Proposed Service Design Guidelines

Introduction to Station Area Planning The Charlotte Story

Safety Evidence for Bicycling

GOALS, OBJECTIVES, AND EVALUATION MEASURES

In 2005, the City of Pasadena, CA, USA, with the support of consultants,

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY John Cock, Principal/Planner Alta Planning + Design

Chapter 9: Transportation

BACKGROUND REPORT for the Peoria-Smith Station Area Plan

Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings

Advantages and Disadvantages of One Way Streets October 30, 2007

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

CITY COUNCIL PACKET MEMORANDUM

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Examples of Transportation Plan Goals, Objectives and Performance Measures

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

Oregon City Clackamas County Red Soils Campus

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

Schenk-Atwood Neighborhood Business District Master Plan

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition

For more information, visit: rethinkingstreets.com

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Downtown Community Planning Council Meeting offebruary 18, 2015

Revised January Bicycle Policy & Design Guidelines Maryland State Highway Administration

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

Harlem River Bridges Access Plan

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

Downtown Core Sub-district

TEST ON Driving Safely Among Bicyclists and Pedestrians

Mount Royal College Transit Service Plan

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

Tier 1 Strategies. WV Route 14 Corridor Management Plan

How To Design A Bicycle Path In California

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

Implementation Strategy

Overview of Transportation Planning

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Narrative Response/Attachment 1 (WisDOT TAP- Second Round Application ID-SWBP22)

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

Addendum to the Arterial Transitway Corridors Study

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

Pedestrian & Bicycle Plan

Executive Director s Recommendation Commission Meeting: July 11, 2013

Background and Goals for the Project

Comprehensive Plan Policies that support Infill and Mixed Use

SMALL BUSINESS COMMISSION AND OFFICE OF SMALL BUSINESS

Measuring the Street:

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

3.1 Historical Considerations

EPA Technical Assistance for Sustainable Communities Building Blocks

Task 1 Project Management and Project Organization Work Plan

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

I-90 ALLSTON INTERCHANGE PLACEMAKING STUDY Boston Redevelopment Authority

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Protected Bicycle Lanes in NYC

chapter 3 Community Outreach

Transcription:

Lincoln Downtown Master Plan Update

Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating Safe and Convenient Pedestrian and Bicyclist Links..... 4 N Street Promenade and Last Mile Protected Bikeway Connecting West Haymarket with Antelope Valley.......................................... 5 14 th Street Promenade and Protected Bikeway............................. 6 11 th Street Promenade and Protected Bikeway.............................. 8 Retail Focus on P Street and North 14 th Street................................ 9 Revised Streetcar Framework........................................... 12 Phasing of Preferred Alternatives and Streetscape Enhancements.... 13 Priority Projects...................................................... 13 Key Projects........................................................ 13

Executive Summary The Lincoln Downtown Master Plan was adopted in 2005. Since then, a number of projects have been built and more are currently underway. These projects have changed the downtown context and affect three main components of the Public Realm Framework identified within the 2005 Downtown Lincoln Downtown Master Plan the east-west link between Antelope Valley and West Haymarket, identified as M Street in 2005; the pedestrian Promenade system on Centennial Mall, R, 11th, M Streets; and the emphasis on P Street as the primary retail street Downtown. In response to these changes, the City of Lincoln in conjunction with the Downtown Lincoln Association have requested that Crandall Arambula, the contractor which worked with the City and other stakeholders in preparing the 2005 Plan, revisit those specific plan elements and offer an assessment and update. The recently adopted Lincoln/Lancaster County 2040 Comprehensive Plan (LPlan 2040) includes a strategy to support multiple means of mobility, including transit, walking, biking, and vehicular modes. Designing and operating the public right-of-way to support all modes of mobility is described as a Complete Streets Policy and that concept is applied throughout this update to the Downtown Master Plan. LPlan 2040 also emphasizes the important role Downtown Lincoln plays contributing to the vitality of the community. The Plan states the community continues its commitment to a strong Downtown. A strong, vital Downtown provides a common center for all of Lincoln and Lancaster County and will be a catalyst for future growth. LPlan 2040 acknowledges Downtown s unique role and will guide decisions that will maintain Downtown s vitality and enhance its contribution to the quality of life of all Lincoln and Lancaster County. This emphasis on Downtown s role in the community today and in the future is a guiding tenet of the update of the Downtown Master Plan. Public Realm Framework from 2005 Downtown Master Plan, Identifying elements reviewed in 2012 1

This Update to the Lincoln Downtown Master Plan is intended to be used in conjunction with the adopted Plan of 2005, rather than completely replacing or supplanting that Plan. Where specific elements are described in this Update, they supersede elements of the 2005 Plan. Where this Update is silent on items in the 2005 Plan, those remain current. In brief, this Update replaces the proposed Park Blocks, Promenade, and one-way bike lane concept on M Street with improvements to N Street, from 7 th to 21 st Street, including a two-way protected bicycling facility in place of one vehicular lane and a one-way bike lane; modifies the Promenade concept to focus on N (not M) Street, 14 th (not Centennial Mall), R Street and 11 th Street, including proposed two-way protected bicycling facilities on 14 th and 11 th Streets; and refines the Primary Retail Corridor to focus on P Street from 11 th Street to Centennial Mall, and to encompass N. 14 th Street from O to Q Streets. In addition, this Update refines the streetcar concept as well as providing a revised Public Realm Framework map to reflect Downtown developments that have occurred or are under construction since 2005, such as West Haymarket. Concepts Composite from 2012 Update 2

Complete Streets Framework This Downtown Master Plan Update builds on the Complete Streets strategy of LPlan 2040 and strengthens that emphasis from the 2005 Downtown Master Plan, including the following elements: Promenade: A safe, convenient and highly identifiable pedestrian and protected bikeway system within the downtown core, connecting the Centennial Mall, University and downtown retail uses and serving as an amenity for development. N Street Last Mile Protected Bikeway: The last mile missing link to Lincoln s nationally acclaimed trail system providing a safe, direct, convenient, and highly recognizable pedestrian and protected bikeway connection linking Antelope Valley to the West Haymarket and serving as an amenity for development. Retail T Streetscape Enhancements: A consistent arrangement of sidewalks, intersection materials, and street furnishings enhancing and strengthening the business and investment environment and ensuring that the P Street and 14 th Street Retail T is a destination and central gathering space for the community. Promenade and Bikeway Concept 3

Promenade Creating Safe and Convenient Pedestrian and Bicyclist Links Shift the Centennial Mall segment to 14 th Street; 14 th Street will accommodate, and is a preferred location for landscaping, sidewalk improvements, and a bi-directional protected bikeway that are consistent with the Promenade concept. While 11 th Street remains a preferred segment of the Promenade, the design needs further refinement and review from City staff and Downtown stakeholders, but could accommodate improved landscaping, sidewalk improvements, and a bi-directional protected bikeway on the east side of the street that maintains the existing segment identified in the original Promenade concept. Q Street is not suitable for the northern east-west protected bikeway and landscape improvements, with the exception of one block of enhanced pedestrian streetscape from 11 th Street to 12 th Street to complete the link, due to parking impacts and anticipated lane reductions with a protected bikeway. R Street remains a high pedestrian and bike use area along the southern border of the University (with 12 th & Q Streets adjacent to Lied Center) and completes the Promenade within the downtown. The City should further engage the University in discussion of bicycle and pedestrian improvements along R Street to determine the type of facility agreeable to the University that serves both pedestrians and cyclists. Extend the protected bikeway on 11 th and 14 th Streets to K Street; study improvements to provide continuous north/south bicycle and pedestrian connections linking residential neighborhoods to downtown. Promenade Concept 4

N Street Promenade and Last Mile Protected Bikeway Connecting West Haymarket with Antelope Valley M Street is not supported as a preferred location for the pedestrian improvements and protected bikeway as it does not provide full connections to Arena Drive on the west and to Antelope Valley (and beyond) to the east. One-way bike lanes on M and N Streets as depicted in the 2005 Downtown Master Plan will not meet the needs of all bicyclists; a bi-directional protected bikeway on N Street is preferred. N Street can accommodate, and is a preferred location for a bi-directional protected bikeway; the bikeway is proposed adjacent to the southside sidewalk and should include pedestrian landscape improvements consistent with the promenade concept. Ensure visibility and minimize conflicts for bicyclists, pedestrians and motorists at intersections. Coordinate with West Haymarket improvements on N Street between Arena Drive and 9 th Street. Further analysis is required to mitigate on-street parking impacts. Design of bikeway should emphasize safety for motorists and bicyclists; retention of on-street parking, and sustainable streetscape improvements. Protected Bikeway- Vancouver, B.C. Typical N Street Condition 5

14 th Street Promenade and Protected Bikeway A continuous bi-directional protected bike facility should run from R Street to K Street with bicycle facilities continuing further south as needed and feasible. A protected bikeway along the west side of the street separated from parking or travel lanes and landscape median Bicycle signals for bikes travelling each direction at intersections as needed The preferred alternative for the 14 th Street promenade is located between R Street and N Street and should include streetscape enhancements such as: A scored concrete sidewalk with landscape planters or tree wells located between the sidewalk and the curb Landscaped curb extensions at intersections Parallel parking, where feasible, along the west side of the street Angled parking, where feasible, on the east side of the street Reduced corner radii at intersections where feasible (10-ft max. preferred) Lay-down corner curbs with continuous truncated dome warning devices wrapping the corners to the outer edge of the crosswalks Scored concrete crosswalks at P and O Street intersections Highly visible crosswalks except at P Street which will be designed in conjunction with planned street improvements Tinted concrete at intersections between crosswalks Bus stops located at curb extensions at P and O Streets 14 th Street Existing 14 th Street Illustration 6

Q St. Maintain Two Travel Lanes Louie s P St. Bus Stop at Curb Extension Parallel Parking West Side Angled Parking East Side O St. Bus Stop at Curb Extenstion N St. Preferred 14 th Street Promenade Plan 7

11 th Street Promenade and Protected Bikeway A continuous bi-directional protected bike facility should run from Q Street to K Street with bicycle facilities continuing further south as needed and feasible. The design of 11 th Street would be similar to the preferred alternative identified on 14 th Street; further design refinement should determine the ability to provide: Landscape enhancements including continuous landscape planters and street trees on both sides of the street Landscaped curb extensions at intersections Parking at corners set back 30-ft. from the edge of the crosswalk to improve visibility of cyclists in the protected bikeway Reduced corner radii at intersections where feasible (10-ft max. preferred) Lay-down corner curbs Highly visible crosswalks, except at P Street which will be designed in conjunction with planned P Street improvements A continuous bi-directional protected bikeway along the east side of the street separated from parking or travel lanes by a raised curb with landscaping Bicycle signals for bikes travelling each direction at intersections as needed 11 th Street Existing-North of P Street Looking South 11 th Street Illustration-North of P Street Looking South 8

Retail Focus on P Street and North 14 th Street Review of the general retail concepts of the 2005 Downtown Master Plan found them still current and valid. The following amendments adjust, not supplant, the 2005 Plan. Reconfigure the Primary Retail designation to include the concentration of P Street Retail between 11 th Street and Centennial Mall and include 14 th Street from O Street to Q Street, forming a Primary Retail T. Change the Primary Retail segment between 11 th and 9 th Streets to Secondary Retail Develop a design for streetscape enhancements that addresses the issues that persist along P Street. Issues to address include worn and inconsistent paving materials, landscape areas, and lighting fixtures, numerous obstacles within the sidewalk areas, and auto and pedestrian conflicts at driveway entries to parking structures. Recommended improvements include: A scored concrete sidewalk that includes square concrete paver tree wells and street furniture landings on both sides of the street New street trees New signal and pedestrian street lighting Landscaped curb extensions at intersections Reduced corner radii at intersections where feasible (10- ft. max. preferred) Primary Retail T Designation 9

Lay-down corner curbs Scored concrete crosswalks at intersections Tinted concrete at intersections between crosswalks Maximize on-street parking opportunities with angled parking on both sides of the street where feasible. Maintain the existing one-way circulation. Ensure a streetscape design that is integrated with the planned Civic Plaza. Accommodate a future streetcar concept Accommodate on-street bicycle parking adjacent to the sidewalk at intersections Secondary and entertainment retail areas in downtown, including portions of O Street, Q Street, and Haymarket, would benefit from similar improvements. Existing P Street P Street Sidewalk at Driveway Illustration P Street Illustration 10

Maintain Three Travel Lanes Accommodate Transit Stops Increase Curbside Angled Parking Preferred P Street Plan- 11 th St to Centennial Mall Increase Plaza Area & Visibility Improve Landscaping Improve Corners & Crosswalks Louie s Curbside Parallel Parking Improve Sidewalks Curb Extenstions Preferred Typical P Street Block Plan- Between 13 th and 14 th Streets 11

Revised Streetcar Framework The 2005 Downtown Master Plan included a streetcar concept for a rail circulator in the long term. This concept is re-emphasized in the Update with a revised and simplified initial route that incorporates updated physical realities. The benefits of a streetcar include: A premium form of transit that attract patrons who will not ride buses. A fixed infrastructure and public commitment that attracts private sector development. Improved access among West Haymarket, Downtown, and Antelope Valley. These districts span beyond a convenient and safe walking distance. Support of off-peak use of outlying parking garages for Arena events & University Park&Ride, with over a dozen existing or programmed public garage structures within three blocks of route. It is recommended that the City undertake a study of a streetcar along P and Q Streets and consider the following adjustments to the streetcar alignment to maximize use of downtown parking structures and ensure safe and convenient access between districts. Further recommendations include: Locate streetcar stops to maximize access to key destinations such as the Lied Center, Civic Plaza, the Amtrak Station, Union Plaza, and parking structures. Integrate the design of the streetcar alignment within existing curbside travel lanes and coordinate the design of the streetcar stops within curb extensions to maintain direct and convenient sidewalk access. Streetcar Recommendations 12

Phasing of Preferred Alternatives and Streetscape Enhancements Not all of the Master Plan Update streetscape enhancements can occur at once. The following are recommendations for phasing preferred design alternatives and streetscape enhancements for the N Street Last Mile Protected Bikeway, Promenade, and Retail T Streetscape. Priority Projects Priority projects implement the most critical elements of the Master Plan Update and represent the priorities for implementing the first phase of the Master Plan Update. These projects are essential for establishing public support and commitment for protected bikeways in Lincoln beginning with the N Street Last Mile segment and coordinating the design and construction of the Retail T Streetscape along P Street in conjunction with Civic Plaza. The priority projects include the following: Design and construct the N Street Last Mile Protected Bikeway to provide a continuous pedestrian promenade and protected bikeway from the Billy Wolff Trail in Antelope Valley to the Jamaica Trail in West Haymarket. Design and construct the P Street streetscape enhancements from 11 th Street to Centennial Mall and integrate the design with the Civic Plaza. Key Projects Key projects represent subsequent phases of the Master Plan Update that complete the 14 th Street and 11 th Street Promenade segments. The key projects include the following: Priority should be given to the design and construction of the 14 th Street streetscape enhancements that would follow the build-out of the P Street improvements and fully implement the Retail T Streetscape enhancements and provide an opportunity to test public support for additional segments of the protected bikeway along this key bicycle connection from downtown to the university. Design and construct the 11 th Street streetscape following 14 th Street as the final implementing element of the Master Plan Update and formal completion of the Promenade. Design and construct the secondary retail streetscape enhancements. Note: Development opportunities for improvements may alter the ultimate phasing of projects. In-Progress Arena Project Completed Arbor Day Project In-Progress Block 38 Project 13