Some Say It Can t Be Done - We Think Different



Similar documents
d e n v e r a r t m u s e u m

Tekla Software in practice Steel industry

Turner Innovation Series BIM Conference Istanbul May Brian Krause, Dan Gramer, Turner Construction Company

PS.12. 4D Scheduling A Case Study

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Tekla Structures More than a detailing tool. Precast concrete

BIM and Digital Fabrication

Mortenson Construction Virtual Mockups A Collaborative Solution

TEKLA SOFTWARE IN PRACTICE: SPEEDING UP THE STEEL JOIST DELIVERY PROCESS

Tesla Outsourcing Services An Architectural & Engineering Company

Coordinating and Sharing Information with Revit Architecture and Revit Structure Best Practices!

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

How To Work At Propak

THE EMPLOYMENT SOLUTION

progressive excellence

Steel construction. Miscellaneous steel. Industrial structures.

How To Design A Bim Project

Food Industry/Cold Storage NEXT GENERATION DESIGN & CONSTRUCT

ERP project secures jobs at make-to-order manufacturer

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

The Regional Municipality of Halton

FABRICATION DRAWINGS A Paradigm Shift

Vertex BD. Leading Software Solution for Cold Formed Steel Construction

SHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E.

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

Nationwide BIM project experience Industry-leading Dynamic Joist design software Expert steel joist modeling and process management

Project Document Manager. For Subcontractors

IPD, Lean and BIM: Hype or the Real Deal?

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT Timo Hartmann

The SMART Visual Collaboration Solution

We Connect. We are proud of what we re doing at AFL. Let us show you how we can make a difference.

Opportunity Profile. Vice President, Information Technology

MULTI-RESIDENTIAL BUILDING SOLUTIONS

Execution Plan Template Design Modeling

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com

Leadership through innovative & responsible solutions.

BIM keeps on trucking:

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

Olilo's AEC Design Services. SrinSoft Inc, Partners of

New Zealand BIM Handbook Appendix D - BIM Uses definitions July A guide to enabling BIM on building projects

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Proceedings of Meetings on Acoustics

Brock Commons Phase 1 University of British Columbia, Vancouver, Canada

Using Autodesk Fabrication Software from TSI


Company Profile. Introduction. Contents. Orbitcad.com since 2009 Providing AutoCAD & Revit Support to Clients Globally

BIM and Lean Construction Can BIM remove waste from construction processes?

e Brochure of Caliber Tech Solutions Pvt. Ltd.

Best Practices in adopting a Shared Services Model August YYYY

Ironworkers. An employment guide for newcomers to British Columbia

A Methodological Shift in Building Design through Development of Collaborative Design Platforms

Seminar s Title: EPC (Engineering-Procurement-Construction) Project Management

The ACR : Advanced Design Features for a Short Construction Schedule

Project Brief Emily Carr University of Art + Design Campus Redevelopment Project

Art Gallery Ontario Toronto, Ontario, Canada

Construction automation and productivity - Industry perspective

EDI Partnerships for Accounting and ERP Software Resellers

Marketing Analytics Market - Outlook ( ) for Marketing

IVCi AUDIO VISUAL OVERVIEW

BIM Department. BIM Modeling Using Faro Focus3D Laser Scanner

Version 6.1 SYSPRO Wor SYSPRO W kflo kf w lo Services

A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY

A Collaboration of Senior Design Projects with Industry

BUILDING A STRATEGY FOR BIM

THE PHILIPPINE AMERICAN LIFE AND GENERAL INSURANCE COMPANY 3/F PHILAMLIFE BLDG., UN AVENUE, ERMITA, MANILA TEL. NO:

Unified Communication as a Service Market - Outlook ( ) for Collaboration Services

CONSTRUCTION SKILLS REGISTER HANDBOOK

Business Developments in the Americas

Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center

Enhancing Building Quality With 6D BIM

PAC-ATLANTIC Group of Companies

C&D Waste Diversion in Other Jurisdictions. Maria Kelleher 20 th July, 2006

BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son

Building Information Modeling Management To Facility Management

MovinUp Franchise Prospectus. Estate & Letting Agents Ireland Introduced by Mike O Regan

CAD Techniques Helping To Enhance NDT Workflow

Milestone helps Nissan UK identify production issues and increase efficiencies at its state-of-the-art Sunderland Plant

3Dcities INDIA. Architecture and Engineering Outsourcing Company since 1999

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

Version 6.1. Using SYSPRO. Microsoft Office

More details >>> HERE <<<

moog Integrated Support Solutions

Corporate Real Estate Service Delivery Model at Prudential Financial

HISTORY OF Sun Life Financial

Grant Thorton Case Study

SYSPRO Process Modeling (SPM)

SOFTWARE LOCALIZATION FOR AGILE, WATERFALL, AND HYBRID DEVELOPMENT

Fourth Generation Modular Construction

Transcription:

Some Say It Can t Be Done - We Think Different In just under 44 years, Dowco has grown from a three-person operation to become one of the largest fully automated 3D Modeling and Virtual Construction Service providers in the world. Established in Burnaby, British Columbia, Canada in 1970, the company today employs more than 140 staff across five offices and four countries. Mission Statement To be leaders in the worldwide building and construction industry by being early adopters of new business processes and technology. Relying on our company s longevity and experience, we strive for operational and production excellence for the benefit of our customers. We engage and challenge our employees to uphold sustainable business practices. Our Promise Dowco s 44 years of history, heritage, and ongoing success can be explained simply: At Dowco we believe in our service and products. We work hard to get to know our customers, to develop a connection and to understand them and their needs. Above all else, Dowco is dedicated to bringing integrity and trust back to the design and construction industry. We strive to make every part of your experience working with us as simple and professional as possible. We are committed to clear and unambiguous consistent language at every point of customer contact. We demonstrate our commitment daily by providing a superior quality service that our customers and partners can expect and depend on. Dowco Office, Burnaby BC.

Services we provide: Modeling Services Structural Model Creation Fabrication Model Creation Structural Steel (Complete with Steel Shop Drawings) Cast in Place concrete 4D and 5D Model Creation Model Management Steel Connection Design BIM Construction Management BIM Workflow Consulting Defining who is responsible for what Providing a secure common upload and download area hosted by Dowco Defining milestones for project detail Outlining the key people and defining roles Hosting BIM Coordination meetings BIM Implementation Consulting Assessment of your current office procedure Adapting your current procedure to incorporate Building Information Modeling Training employees in BIM workflow and software Construction Reviews Reviewing Site Layouts using 3D models Reviewing Construction Plans using the 4D model Training Online Training, Certification Dowco Online Connection Design Course Dowco Structural Detailer Training Online Course BIM training Freedom Tower, NY. Our Clients Alstom Power Systems GmbH (pic) Bechtel Power Corporation Black and Veatch Gehry Partners LLP Hatch International Hoffman Construction LPR Construction Co. Magnusson Klemencic Associates JV Driver Mortenson P.T. Freeeport Indonesia Tishman Construction Tishman Speyer Thornton Tomesetti Turner Construction WSP Cantor Seinuk Schuff Steel Fluor

BIM Early Involvement Dowco Group of Companies (Dowco) have been members of Integrated Project Delivery (IPD) teams at the early stages of many design build BIM projects. With our specialized construction knowledge, effective collaboration methods and applications we have achieved and delivered added value, through true integration between design and construction. Employing our 3D application Tekla Structures, our Project Managers, Engineers, and Drafting Division can offer design/engineering, component integration, and 4D/5D modeling/construction services, all of which are essential for an efficient building model. An additional advantage to working with Dowco is the leveraging of the as-built model. At the end of the project construction phase our customers are left with a complete as-built virtual model. This model can be utilized for up-grades, maintenance and facility management, as well as a design reference for future projects. There are effective benefits that can be gained by all parties with a collaborative virtual model. This is made possible with the early involvement of Dowco and their BIM technologists and technologies. The following table summarizes the benefits of each of the virtual areas: 3D virtual model using Tekla Structures 4D Sibyl and Tekla Structures 5DSibyl and Tekla Structures Managed by our project managers, engineers, steel detailing technicians and project coordinators 3D model available to all enabling visualization of what will actually be built on site Conflict detection, hard and soft clash (access, safety issues) Integrating all construction components into one model Quantity takeoff Elimination of field interferences Less rework Fewer request for information Fewer change orders Less cost growth Establishes a 4D time dimension to the model environment Managed through our project management, engineering and construction department Visualizations communicate the construction process Construction and planning sequence analysis Site logistics Schedule analysis Integration with cost and schedule control Shorter construction period Improved communication Improved coordination (trades, designers, site logistics) Greater offsite prefabrication opportunities Verification, guidance, and tracking of construction activities 5D environment brings cost into the virtual model Managed through our project management, engineering, estimating, procurement and construction departments Accurate cost estimating Cost evaluation Design and construction status (track and validate the progress of components) Value engineering Dowco has chosen best in industry applications such as Tekla because of their Industry Foundation Classes (IFC) capability. The IFC is a vendor neutral open data exchange specification that facilitates collaboration and sharing of information. Dowco also employs in-house computer technicians/programmers who continuously develop our proprietary applications ensuring uninterrupted support and collaboration with any and all customer information exchange systems. All of the above criteria guarantee an accurate building model and impress a direct benefit to all members of the project TEAM. TEAM Together Everyone Achieves More

Examples of Past Projects: Vancouver Convention Centre Expansion Project As one of Dowco s recent BIM projects, the Vancouver Convention Centre is now one of Canada s largest convention centres. Working on the west building, Dowco helped arrange several processes that improved the workflow between the trades such as interchanging models between the Structural Engineer and our steel detailing department including a virtual shop drawing checking process that involved the Contractor, Engineer, Architect and Fabricator. Dowco also used BIM to track RFIs while providing visual representations to the owner. Working with 3D models allowed the connection designer to also visualize joints for connection design and allowed project team participants to quickly resolve any design problems before they appeared on site. Model zones were also exported that had assisted the Contractor for specific erection sequences. The west building was certified LEED Platinum by the Canada Green Building Council in 2010. Walt Disney Concert Hall Chicago Millennium Park The Chicago Millennium Park has been hailed the city s most important project since the World s Columbian exposition of 1893. Officially opened in 2004, this Frank Gehry project (Guggenheim Museum Bilbao) has many unique features. Dowco participate in this project setting up a method of importing and exporting 3D models between the Structural Engineer and the Steel Detailer. Due to the complex structure (park s bandshell structure shown on left) Dowco helped set up a way of importing laser survey points into the 3D model because of the modification required with the framing of the building and the structure of the exterior cladding. Custom software macros were developed and structural connections adapted to meet the as-built requirements of the park s structures. Considered as one of the world s most sophisticated concert halls in the world, the Walt Disney Concert Hall in Los Angeles, California provides for both an aural and visual experience. Another one of Frank Gehry s complicated designs, Dowco worked with the Architect on this highly complex geometric building in the late 90s. Interoperability between construction tools was still in its early stages and importing the Architect s Catia model into Tekla Structures proved to be challenging but demonstrated our company s capability as an early adaptor of BIM solutions. The contractor, Mortenson Construction, describes how they were literally forced to use 3D/4D technology in this difficult project by receiving 3D models as contract documents. Their early experience evolved to be fruitful as they then embraced 3D/4D/BIM technology in their succeeding Denver Art Museum Expansion project. Panama Museum of Biodiversity Denver Art Museum A signature landmark for the city is Denver s Frederic C. Hamilton Building, or otherwise called the Denver Art Museum expansion. Consisting of 2,700 tons of steel in an awesome angle, this project was proud to be one of Dowco s pioneer projects using advanced BIM solutions to accurately detail this incredibly complex structure. Aside from keeping all the other team members (M.A. Mortenson Construction, ARUP, L.P.R. and Zimmerman Metals Inc.) in the loop using BIM, a building schedule was drawn up beforehand and integrated into the 3D model to create the move that showed every step of construction. The degree of the collaboration using BIM is what made the project successful which also resulted in a completion that was 3 month s ahead of schedule. Reference models of Cranes were also inserted into the 3D model to visualize staging plans done at the erector s office before going into the field. This project was recognized by the American Institute of Architects as a successful Building Information Modeling project. Another interesting Frank Gehry design, the Museum of Biodiversity, also called the Bridge of Life Museum, is currently being erected in Panama City. Situated at the Pacific entrance to Panama Canal, visitors will soon marvel at this construction wonder. Working with BIM solutions, Dowco was tasked to detail its complicated roof framework as well as the supports for the 15 buildings. A preconstruction model and partially complete general arrangement and fabrication drawings were also provided to the contractor that was used to provide information to potential bidders. Obtaining the true size, location and geometry of the main members in the structure was done by importing the Architect s 3D model into Tekla structures, resulting in huge cost and time savings to the owner.

BIM Experts Ewen Dobbie Nick Osmond Ewen Dobbie is the President and Chief Executive Officer for The Dowco Group of Companies. Ewen graduated from the University of British Columbia in 1990, beginning his full time business career with Dowco Consultants Ltd soon after. Over the past 23 years he has managed both the technology and software sales divisions, and the 3D modeling & detailing services business. Dowco being North America s first Tekla Structures user and Reseller, he was instrumental in the development of North America s 3D Modeling and emerging Building Information Modeling market. Currently, as President, Chief Executive Officer, Ewen is responsible for the global expansion of the Dowco Group s business interests. Seen by many in the industry as a business strategist, he has worked to position the Dowco Group of Companies as a global provider of end-to end solutions for the Design and Construction Industry. He is a regular presenting speaker and active member of several construction industry associations, particularly in the implementation of Building Information Modeling and changing design and construction workflows, and considered to be one of the leading BIM visionaries in the construction industry. Nick Osmond is the Business Development Manager at Dowco Consultants Ltd. After immigrating to Canada in 1981, Nick began his career as a junior piping designer at Fluor Corporation. This experience saw him work for several of the big EPC companies on major Oil & Gas/Mining projects all over North America, Asia and Europe as a design lead, checker and latterly as a field engineer where he had up to 700 fitters and welders working for him. Brian Pyper Brian Pyper is the Executive President of Dowco Consultants Ltd. He began his career in the structural steel industry in 1987 as an iron worker in Scotland. In 1994 Brian immigrated to Canada and completed 18 months of college to receive his diploma in structural steel detailing. He has dedicated the last 18 years to the steel detailing industry, continuously increasing his knowledge in drafting, engineering and business. He earned his MBA and is a registered Project Management Professional. Brian started his steel detailing career with Dowco but went on to successfully establish a BC branch for a prominent Alberta steel detailing company. Brian has now rejoined Dowco, bringing with him a wealth of knowledge and experience to become another key member of the management team. Peter Neill Peter is the Lead Project Manager for Dowco Consultants Ltd. He began his detailing career in Northern Ireland 20 years ago as a Junior Detailer, advancing through varying roles and levels of responsibility to a Senior Detailer, Checker, Project Coordinator, Project Manager and on up to his current position as Lead Project Manager position at Dowco Consultants. Peter takes pride and satisfaction in running successful projects and establishing solid customer relationships. Dedication to his own personal development and training can attribute directly to many of Peter s successes throughout his career. By attaining his Project Management Professional (PMP) designation, Peter brings an abundance of knowledge to Dowco s Project Processes and Project Management strategies. Peter s high standards and expectations of his team allow Dowco to maintain strong working relationships and exceed customer expectations. In 1996 Nick decided to go out on his own and formed Detailed Design Drafting Services Ltd. Under Nick s leadship the company grew to become one of the larger detailing firms in the world, peaking at 98 fulltime staff and working for a number of the larger fabricators in North America. In 2009 a large Canadian Fabricator bought the business and Nick decided to move back to the UK. After a short retirement, Nick joined Dowco, a company he had respected and modeled his own organizations after for many years. Sanjay Prasad Sanjay joined Dowco Consultants Ltd. as a Structural Steel Detailer in 1987. In those 27 years he has worked as a Structural Steel detailer, Checker, Project Manager, Software Sales Rep, Software Developer, R&D Manager, Technical Support and Trainer. A major career change for Sanjay came in 1995 when he became heavily involved with the customization of macros for Tekla Structures (formerly Xsteel) for the North American Market. With this early involvement with Tekla Structures Sanjay become one of the real power users and Tekla developers worldwide. Working in a development and support position he works closely with Dowco s production team to refine our technical environment and production processes. Sanjay also leads Dowco s R&D efforts. Sanjay s exposure to both the production and the technical side of the business has lead him to implement various BIM processes for Dowco s detailing operations. In 2012, Sanjay also took on the role of managing Dowco s largest global office.

THE DOWCO GROUP OF COMPANIES Phone: + 1-604-606-5800 www.dowco.com info@dowco.com LOCATIONS Dowco Consultants Ltd. (Head Office) 201-5660-192nd Street, Surrey B.C. V3S 2V7, Canada Dowco Consultants Ltd. 2433 Holdom Avenue, Burnaby B.C. V5B 5A1, Canada Tel.: 604-606-5800 ; Fax: 604-606-5818 Dowco Consultants Ltd. Unit 401-1450 Meyerside Drive, Mississauga ON. L5T 2N5, Canada Tel.: 905-565-9030 ; Fax: 905-565-9034 Dowco SDE Steel Detailing and Consulting Services Philippines Unit C 14th Floor Robinsons Cyberscape Beta Building Topaz & Ruby Road Ortigas Center Pasig City, Metro Manila Philippines Risa Technologies Private Limited INFINITY, TOWER II, 5th Floor, Block-GP, Sector-V Salt Lake, Kolkata, 700091 West Bengal, India Copyright Dowco Group of Companies 2016