Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by



Similar documents
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

Downtown Tampa Transportation Vision

1500 Hamilton Avenue Primrose Daycare Center Project

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Appendix E Traffic Impact Analysis

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Chicago Neighborhoods 2015: Assets, Plans and Trends A project of The Chicago Community Trust

Aerial View E Looking West

Topic 2 11/28/2012 Blocks & Street Network


Improving Access in Florida International University Biscayne Bay Campus Executive Summary

8+ %!0"% 8+1!%"'$%,$"$

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision

City of Kamloops Notre Dame Corridor Access Plan

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

Lincoln Downtown Master Plan Update

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Route Development Plan

Goals & Objectives. Chapter 9. Transportation

PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic...

Florida Avenue Multimodal Transportation Study. June 19, 2013

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Transportation Impact Assessment Guidelines

Addendum to the Arterial Transitway Corridors Study

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months.

Disputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S.

Elwood and Joliet, Illinois. June Village of Elwood. Prepared for:

Downtown Louisville Two-Way Street Study

Lawson Outline Plan External Traffic Analysis Working Paper

3.1 Historical Considerations

N Street Protected Bikeway

U.S. Department of Homeland Security Nebraska Avenue Complex Master Plan DRAFT ENVIRONMENTAL IMPACT STATEMENT APPENDIX C

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment

30 Years of Smart Growth

3150 N. LAKE SHORE DRIVE

PREFERRED ALTERNATIVE RECOMMENDATION FOR THE COLLEGE AVENUE SAFETY ENHANCEMENT (CASE) PROJECT COLUMBIA, MISSOURI

Light Rail Transit in Phoenix

Schenk-Atwood Neighborhood Business District Master Plan

Mount Royal College Transit Service Plan

HIGHLANDS NEIGHBORHOOD STUDY AREA PARKING ANALYSIS

Traffic Volume Counts

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

Measuring the Street:

3 Tappan Zee Bridge Rehabilitation Options

TRAFFIC IMPACT ANALYSIS

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Broderick Architects Mundaring Christian College, Parkerville Project Transport Assessment Report

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

How To Improve Safety

TABLE OF CONTENTS TABLES FIGURES

Attachment B Policy Audit Template

Mobility Management Plan Study of the Busch Boulevard Corridor

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS

For more information, visit: rethinkingstreets.com

GLEN ISLE MIXED USE DEVELOPMENT GLEN COVE, NEW YORK

Corridor Goals and Objectives

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

Examples of Transportation Plan Goals, Objectives and Performance Measures

TRANSPORTATION IMPACT ANALYSIS (TIA) Guidelines

Protected Bicycle Lanes in NYC

ORDINANCE CODES FOR PARKING TICKETS

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Alterna ves Development & Evalua on

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana

Transcription:

Traffic Impact Study for the Chicago, Illinois repared by March 30, 2015

1. Introduction This report summarizes the methodologies, results and findings of a traffic impact study conducted by Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) for a proposed mixed-use development to be located In Chicago, Illinois. The site is located on the east side of North Broadway south of Sheridan Road and currently contains five one-to-three-story buildings. Overall the existing buildings provide approximately 58,500 square feet of commercial, office and residential space. The current plans call for 93 apartment units located above 32,732 square feet of office space on floors two and three and 19,600 square feet of ground floor retail space. In addition, the development is proposed to provide a below grade parking garage with 93 spaces that will be reserved for the residents of the proposed development. Access to the parking garage is to be provided from Grace Street via the existing public alley and a proposed right-in/right-out access drive on North Broadway. The following sections of this report present the following. Existing street conditions including vehicle, pedestrian, and bicycle traffic volumes for the weekday morning, weekday evening and Saturday midday peak hours A detailed description of the proposed development Vehicle trip generation for the proposed development Directional distribution of development-generated traffic Future transportation conditions including access to and from the development. The purpose of this study is three-fold: 1. To examine existing vehicle, pedestrian, and bicycle traffic conditions to establish a base condition. 2. Determine the vehicle trips to be generated by the proposed development and then determine its impact on the surrounding street network. 3. Evaluate the impact of the development and, if necessary, recommend improvements to effectively mitigate and accommodate the development traffic volumes. Chicago, Illinois 2

2. Existing Conditions Transportation conditions in the vicinity of the site were inventoried to obtain a basis for projecting future conditions. Four components of existing conditions were considered: 1. The geographic location of the site. 2. The characteristics of the adjacent street system, including lane geometry, traffic orientation (e.g. one-way street pairings) and intersection traffic controls. 3. The weekday morning, evening, and Saturday midday peak-hour vehicle, bicycle, and pedestrian traffic volumes at the study intersections. 4. The locations and availability of alternative modes of transportation, including public transportation, bicycle lanes, and pedestrian amenities. Site Location The development site is located on the east side of North Broadway south of Sheridan Road and currently contains five one-to-three-story buildings, totaling 58,500 square-feet of space. Currently, the first floors of the buildings consist of various commercial and office space including Starbucks, Remax, Sun Cleaners, Lakeview antry, Tutto Fresco and Spritz Burger. The second floors of the buildings include residential units, office space and Strawdog Theatre Company. The third floors of the buildings consist primarily of residential units. The site is primarily surrounded by residential and retail/commercial land uses. The Anshe Emet Synagogue and the Bernard Zell Anshe Emet Day School are located south of the site in the southeast quadrant of the North Broadway/Halsted Street/Grace Street intersection. Figure 1 shows the site location with respect to the surrounding street system. Figure 2 shows an aerial view of the site area. Chicago, Illinois 3

N SITE Site Location Figure 1 Chicago, Illinois 4

^ N Aerial View of Site Area Figure 2 Chicago, Illinois 5

Existing Street System Characteristics The characteristics of the existing streets that surround the proposed development are illustrated in Figure 3 and described below. All of the streets are under the jurisdiction of the Chicago Department of Transportation (CDOT), unless otherwise stated. North Broadway is a southeast-to-northwest street that generally provides one travel lane in each direction within the vicinity of the site. ay-box parking is provided on both sides of the street. At its signalized intersection with Sheridan Road, North Broadway provides a shared leftturn/through/right-turn lane on both approaches. At its signalized, five-legged intersection with Grace Street and Halsted Street, North Broadway provides an exclusive left-turn and a shared through/right-turn lane on the southbound approach and a shared left-turn/through lane on the northwest bound approach. North Broadway has an average daily traffic (ADT) volume of 14,900 and 7,800 north and south of Grace Street, respectively. Halsted Street is a north-south street that provides one travel lane in each direction. A designated bike lane and pay box parking is provided on both sides of the street. Between Grace Street and just north of Sheridan Road, Halsted Street merges with North Broadway and extends as one street. At its signalized, five-legged intersection with North Broadway and Grace Street, Halsted Street provides an exclusive left-turn lane and a shared through/right-turn lane on the northbound approach. Sheridan Road is an east-west street that provides one lane in each direction. At its signalized intersection with North Broadway, Sheridan Road provides an exclusive left-turn and a shared through/right-turn lane on both approaches. On-street parking is generally allowed on both sides of the street that is free parking east of North Broadway and is regulated pay-box parking west of North Broadway. Grace Street is generally an east-west street. East of North Broadway, Grace Street is a one-way westbound street that provides a single travel lane. West of North Broadway, Grace Street is a two-way street that provides one travel lane in each direction. At its signalized, five-legged intersection with North Broadway and Halsted Street, Grace Street provides a shared leftturn/through/right-turn lane on its westbound approach and a shared left-turn/right-turn lane on its eastbound approach. On-street parking is generally allowed on both sides of the street and is free parking on the north side of the street and on the south side of the street east of North Broadway. arking on the south side of Grace Street west of North Broadway is regulated paybox parking. Chicago, Illinois 6

NORTH BROADW AY N NOT TO SCALE SHERIDAN ROAD 20 DIVVY SITE ONE-WAY W GRACE STREET GRACE STREET 20 SCHOOL DAYS 3-4 MON-THURS 2:15-3:15 FRIDAY NORTH BROADW AY HALSTED STREET ROJECT: 3817 N. Broadway Chicago, Illinois TITLE: Existing Street Characteristics Job No: 15-056 Figure: 3 7

Alternative Modes of Transportation Accessibility to and from the area is enhanced by the various alternative modes of transportation. The area is served by the CTA Red Line rapid transit line which provides 24-hour train service between the Howard Station on the North Side of Chicago and the 95th/Dan Ryan Station on the South Side of Chicago. The nearest station is on Sheridan Road approximately 215 feet south of Irving ark Road and is located approximately 1,500 feet west of the site. In addition, the following bus routes serve the immediate area and all have stops within walking distance of the development. Route Number 36 Broadway generally runs along Broadway and Clark Street providing service to the Red Line Wilson Station, Lincoln ark Zoo, and the LaSalle Street Metra Station. Service is provided seven days a week, including holidays. Route Number 80 Irving ark primarily runs along Irving ark Road between Cumberland Avenue and Lake Shore Drive. The bus route provides connections to the CTA Blue, Brown, and Red Lines and the Irving ark Union acific Northwest Metra Rail line. Service is provided seven days a week, including holidays. Route Number 135 Clarendon/LaSalle Express generally provides service along LaSalle Street and Clarendon Avenue from the Weiss Memorial Hospital to Jackson Boulevard. Service is only provided on the weekdays, with southbound service provided in the morning (approximately 5:45 A.M. to 10:00 A.M.) and northbound service provided in the evening (approximately 3:00.M. to 7:40.M.). Route Number 151 Sheridan generally runs along Sheridan Road and Lake Shore Drive providing service to Loyola University, Howard Station (Red, urple and Yellow lines), Red Line Sheridan Station, Lincoln ark Zoo, Millennium ark, and Union Station. Service is seven days a week, including holidays. Route Number 148 Clarendon/Michigan Express runs in a north-south orientation between Foster Avenue/Marine Drive and State Street/Harrison Street with express travel along Lake Shore Drive. This route provides service to Weiss Memorial Hospital, North Michigan Avenue, Illinois Center, Grant ark, and the Downtown area. Service is only provided on weekdays, with southbound service provided in the morning (approximately 6:00 A.M. to 9:20 A.M.) and northbound service provided in the evening (approximately (3:00.M. to 6:30.M.). Figure 4 shows a map of the public transportation in the area. Chicago, Illinois 8

SITE CTA Transit Map Figure 4 Chicago, Illinois 9

edestrian Facilities. All of the streets within the immediate area have sidewalks on both sides of the street with crosswalks provided at all of the area intersections. Continental style crosswalks are provided at the intersection of North Broadway and Sheridan Road. In addition, pedestrian countdown signals are provided at the intersection of North Broadway with Grace Street and Halsted Avenue. Mode-sharing Facilities. A Divvy Bike Sharing Station is located in the northwest corner of North Broadway and Sheridan Road located across the street from the proposed development. Further, there is a Zipcar car sharing station and an Enterprise car sharing station in proximity to the subject site both located approximately 280 feet north of Sheridan Road on the east side of North Broadway, Bernard Zell Anshe Emet Day School Operations The Bernard Zell Anshe Emet Day School is located in the southeast corner of North Broadway and Grace Street and is a private Jewish school that has an enrollment of approximately 544 students. Student drop-off and pick-up activity occurs within the parking lot located in the southeast corner of North Broadway and Grace Street. Inbound access to the parking lot is provided via an access drive on North Broadway approximately 260 feet south of Grace Street. Outbound access from the parking lot is provided via an access drive on Grace Street located 160 feet east of North Broadway aligned opposite the public alley that serves the existing buildings located within the proposed development site. The results of the traffic counts and field observations show that the peak drop-off and pick-up activity occurs for a 15 to 30 minute period in both the morning and afternoon. It should be noted that during the peak drop-off and pick-up activity, the school typically provides a traffic aid at the intersection of Grace Street with the access drive and public alley to help manage and control traffic at this intersection. Existing Vehicle, edestrian, and Bicycle Traffic Volumes In order to determine the current transportation conditions near the proposed development and on the surrounding streets, KLOA, Inc. conducted traffic, pedestrian, and bicycle counts during the weekday morning (7:00 to 9:00 A.M.), weekday evening (4:00 to 6:00.M.), and Saturday midday (12:00 to 2:00.M.) peak periods on Saturday, February 28, 2015, Tuesday, March 3, 2015 and Wednesday, March 4, 2015 at the following three intersections: North Broadway with Sheridan Road North Broadway with Grace Street/Halsted Street Grace Street with the ublic Alley From the turning movement count data, it was determined that the weekday morning peak hour generally occurs between 8:00 and 9:00 A.M., the weekday evening peak hour generally occurs between 5:00 and 6:00.M., and the Saturday midday peak hour generally occurs between 1:00 and 2:00.M. These respective peak hours will be used for the traffic capacity analyses and are presented later in this report. The existing peak hour vehicle traffic volumes are shown in Figure 5. The existing peak hour pedestrian and bicycle traffic volumes are shown in Figure 6. Chicago, Illinois 10

35 (46) [44] 708 (460) [510] 16 (34) [41] NORTH BROADW AY 76 (52) [69] N NOT TO SCALE 90 (125) [73] SHERIDAN ROAD 81 (75) [68] 46 (25) [27] 133 (35) [35] 95 (18) [45] 43 (30) [48] 396 (475) [555] 105 (66) [104] SITE 37 (35) [41] 462 (309) [370] 370 (202) [225] 39 (25) [46] 43 (53) [31] 66 (39) [43] 45 (39) [21] 1 (3) [5] 5 (2) [8] 56 (129) [91] 126 (29) [49] ONE-WAY W GRACE STREET GRACE STREET 109 (48) [69] 125 (44) [44] 64 (14) [44] 146 (197) [280] 1 (14) [39] 5 (0) [0] 00 LEGEND - AM EAK HOUR (8:00-9:00 AM) HALSTED STREET 21 (31) [38] 245 (300) [300] 0 (14) [43] NORTH BROADW AY (00) - M EAK HOUR (5:00-6:00 M) [00] - SATURDAY MIDDAY EAK HOUR (1:00-2:00 M) ROJECT: 3817 N. Broadway Chicago, Illinois TITLE: Existing Traffic Volumes Job No: 15-056 Figure: 5 11

7 (6) [5] NORTH BROADW AY N NOT TO SCALE SHERIDAN ROAD 0 (0) [0] 64 (95) [98] 81 (72) [75] 79 (78) [58] 1 (121) [136] 1 (2) [2] 0 (12) [8] SITE 7 (5) [9] 18 (30) [70] 0 (1) [5] ONE-WAY W GRACE STREET GRACE STREET 48 (63) [124] 83 (130) [197] 7 (3) [28] 43 (67) [97] 10 (10) [7] 30 (22) [66] 1 (9) [7] 1 (0) [2] 1 (0) [1] 0 (0) [3] 0 (3) [2] 31 (66) [87] LEGEND 00 (00) - EDESTRIAN VOLUME 00 (00) - BICYCLE VOLUME HALSTED STREET 0 (6) [2] NORTH BROADW AY 00 - AM EAK HOUR (8:00-9:00 AM) (00) - M EAK HOUR (5:00-6:00 M) [00] - SATURDAY MIDDAY EAK HOUR (1:00-2:00 M) ROJECT: 3817 N. Broadway Chicago, Illinois TITLE: Existing edestrian and Bicycle Traffic Volumes Job No: 15-056 Figure: 6 12

3. Traffic Characteristics of the roposed Development To evaluate the impact of the subject development on the area street system, it was necessary to quantify the number of vehicle trips the overall development will generate during the weekday morning, weekday evening and Saturday Midday peak hours and then determine the directions from which this traffic will approach and depart the site. roposed Site and Development lan As proposed, the mixed-use development is to contain 93 apartment units located above 32,732 square feet of office space on floors two and three and 19,605 square feet of ground floor retail space. A parking garage with approximately 93 spaces will provide off-street parking for future residents of the proposed development. No parking will be provided for the retail or office space within the development. Vehicle Site Access Access to the parking garage will be provided via the following. A proposed right-in/right-out access drive on North Broadway located approximately 200 feet north of Grace Street. This access drive will provide one inbound lane and one outbound lane. Appropriate signage and pavement markings should be provided along the access drive indicating that left-turns are prohibited Access will also be provided via the public alley that extends along the east side of the site. The public alley intersects Grace Street approximately 150 feet northeast of North Broadway and is aligned opposite the outbound access drive for the Anshe Emet Synagogue parking lot. edestrian Access to the Development The primary pedestrian entrance for the residential lobby will be located on Sheridan Road approximately 60 feet east of North Broadway. The office lobby will be located on North Broadway approximately 135 feet south of Sheridan Road. The primary pedestrian entry for the retail stores will be located at various locations along North Broadway and Sheridan Road. Directional Distribution of Development Traffic The directional distribution of how traffic will approach and depart the site was estimated based on a combination of existing travel patterns and the orientation and physical restrictions of the surrounding street system. The estimated directional distribution for the proposed development was established and is illustrated in Figure 7. Chicago, Illinois 13

30% NORTH BROADW AY (30%) N NOT TO SCALE SHERIDAN ROAD (15%) 10% 15% (15%) SITE 5% ONE-WAY W GRACE STREET GRACE STREET (5%) 5% LEGEND 00% - ERCENT INBOUND (20%) HALSTED STREET 20% (15%) 15% NORTH BROADW AY (00%) - ERCENT OUTBOUND ROJECT: 3817 N. Broadway Chicago, Illinois TITLE: Estimated Directional Distribution Job No: 15-056 Figure: 7 14

Development Traffic Generation The volume of traffic to be generated by the development was estimated based on trip rates published in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9 th Edition. However, the ITE trip rates are based on suburban rates where the primary mode of transportation is the automobile. Given the dense urban nature of the neighborhood, it contains a large population of people who live and work within walking distance of the site. In addition, the site is located within walking distance of the CTA Red Line Sheridan Station, several CTA bus line stops, and bike and car sharing facilities. Furthermore, Halsted Street provides designated bike lanes. As such, the number of vehicle trips to be generated by the development will be reduced due to the mixed-use nature of the development, the location of the site within a dense, urban neighborhood and the available public and non-motorized transportation (walking and biking) serving the area. Based on census data and previous studies the estimated traffic to be generated by the residential use was reduced by 65 percent and the traffic to be generated by the office and retail use was reduced by 50 percent. Table 1 shows the estimated number of peak hour trips to be generated by the proposed development. It should be noted that the site of the development currently contains several commercial buildings that contain residential units, office space, and commercial uses including a Starbucks, Remax, Sun Cleaners, Lakeview antry, Tutto Fresco and Spritz Burger. These developments are currently generating traffic that will be eliminated with the redevelopment of the site. However, to provide a conservative (worst case) analyses, no reductions were assumed in the trip generation estimates for the traffic currently generated by the existing uses. Development Traffic Assignment The peak hour traffic volumes projected to be generated by the proposed development (refer to Table 1) were assigned to the area streets based on the directional distribution analysis (Figure 7). Figure 8 shows the assignment of the development-generated traffic volumes for the residential units which will be parking in the building. Figure 9 shows the assignment of the development-generated traffic volumes for the office and commercial uses which will be parking along the area streets. To provide a conservative (worst-case) analysis, it was assumed that all of the parking will occur on North Broadway between Sheridan Road and Grace Street. Chicago, Illinois 15

Table 1 ESTIMATED SITE TRAFFIC VOLUMES Weekday Morning eak Hour Weekday Evening eak Hour Saturday Midday eak Hour Land Use LUC# Density In Out In Out In Out Apartment 220 93 Units 10 39 45 24 29 28 65% Reduction (-7) (-25) (-29) (-16) (-19) (-18) Apartment Subtotal 3 14 16 8 10 10 Office 710 32,732 sq-ft. 45 6 8 41 8 6 50% Reduction (-23) (-3) (-4) (-21) (-4) (-3) Office Subtotal 22 3 4 20 8 3 Retail 820 19,605 sq-ft. 12 7 35 38 49 45 50% Reduction (-6) (-4) (-18) (-19) (-25) (-23) Retail Subtotal 9 3 17 19 24 22 Development Total 34 20 37 47 42 35 Chicago, Illinois 16

1 (5) [3] NORTH BROADW AY N NOT TO SCALE SHERIDAN ROAD 1 (2) [1] 1 (6) [5] 8 (5) [6] 6 (3) [4] 2 (10) [5] ONE-WAY W GRACE STREET GRACE STREET 0 (1) [1] 0 (3) [2] 2 (1) [1] 4 (3) [3] 2 (1) [2] SITE 1 (0) [0] 3 (2) [2] 2 (1) [2] 1 (2) [2] 00 LEGEND - AM EAK HOUR (8:00-9:00 AM) HALSTED STREET NORTH BROADW AY (00) - M EAK HOUR (5:00-6:00 M) [00] - SATURDAY MIDDAY EAK HOUR (1:00-2:00 M) ROJECT: TITLE: 3817 N. Broadway Chicago, Illinois Residential Site Traffic Assignment Job No: 15-056 Figure: 8 17

9 (6) [10] NORTH BROADW AY N NOT TO SCALE SHERIDAN ROAD 3 (2) [3] 5 (3) [5] ONE-WAY W GRACE STREET GRACE STREET 5 (3) [5] 6 (4) [6] 0 (1) [0] 1 (8) [5] 1 (6) [4] 1 (6) [4] 2 (12) [8] 1 (6) [4] SITE 1 (1) [1] 2 (2) [2] NORTH BROADW AY 00 LEGEND - AM EAK HOUR (8:00-9:00 AM) HALSTED STREET (00) - M EAK HOUR (5:00-6:00 M) [00] - SATURDAY MIDDAY EAK HOUR (1:00-2:00 M) ROJECT: TITLE: 3817 N. Broadway Chicago, Illinois Office/Retail Site Traffic Assignment Job No: 15-056 Figure: 9 18

4. Total rojected Traffic Conditions The total projected traffic volumes include the existing traffic volumes increase by a regional growth factor to account for ambient traffic growth and other future developments in the area and the traffic estimated to be generated by the proposed subject development. Background Development Traffic To account for the increase in existing traffic related to regional growth in the area (i.e., not attributable to any particular planned development), the existing traffic volumes (Figure 4) were increased by two percent. Total rojected Traffic Volumes Total projected traffic volumes include the existing traffic volumes, background growth, and the traffic estimated to be generated by the proposed subject development (refer to Figures 7 and 8). Figure 10 shows the total projected traffic volumes. Chicago, Illinois 19

36 (47) [45] 731 (475) [530] 19 (40) [45] NORTH BROADW AY 78 (53) [70] N NOT TO SCALE 92 (128) [74] SHERIDAN ROAD 86 (79) [72] 47 (26) [28] 137 (38) [37] 102 (21) [51] 47 (38) [54] 410 (500) [577] 10 (74) [12] 8 (5) [6] SITE 564 (592) [723] 1 (6) [5] 38 (37) [42] 472 (323) [382] 378 (212) [234] 41 (27) [48] 45 (54) [32] 70 (42) [46] 48 (41) [23] 17 (6) [9] 8 (13) [14] 57 (132) [93] 129 (30) [50] ONE-WAY W GRACE STREET GRACE STREET 113 (52) [73] 128 (45) [45] 65 (14) [45] 155 (206) [293] 1 (14) [39] 5 (0) [0] 00 LEGEND - AM EAK HOUR (8:00-9:00 AM) HALSTED STREET 21 (32) [39] 256 (313) [314] 0 (14) [44] NORTH BROADW AY (00) - M EAK HOUR (5:00-6:00 M) [00] - SATURDAY MIDDAY EAK HOUR (1:00-2:00 M) ROJECT: 3817 N. Broadway Chicago, Illinois TITLE: Total rojected Traffic Volumes Job No: 15-056 Figure: 10 20

5. Traffic Analysis and Recommendations Capacity analyses were performed for the key intersections included in the study area to determine the ability of the existing street system to accommodate existing and future traffic demands. Analyses were performed for the existing and total projected peak hour traffic conditions. The traffic analyses were performed using the methodologies outlined in the Transportation Research Board s Highway Capacity Manual (HCM), 2010 and using Synchro/SimTraffic version 8 software. The analyses for the unsignalized intersections determine the average control delay to vehicles at an intersection. Control delay is the elapsed time from a vehicle joining the queue at a stop sign (includes the time required to decelerate to a stop) until its departure from the stop sign and resumption of free flow speed. The methodology analyzes each intersection approach controlled by a stop sign and considers traffic volumes on all approaches and lane characteristics. The ability of an intersection to accommodate traffic flow is expressed in terms of level of service, which is assigned a letter grade from A to F based on the average control delay experienced by vehicles passing through the intersection. Control delay is that portion of the total delay attributed to the traffic signal or stop sign control operation, and includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Level of Service A is the highest grade (best traffic flow and least delay), Level of Service E represents saturated or at-capacity conditions, and Level of Service F is the lowest grade (oversaturated conditions, extensive delays). The Highway Capacity Manual definitions for levels of service and the corresponding control delay for signalized and unsignalized intersections is included in the Appendix. The results of the capacity analyses explained in terms of level of service and delay are shown in Table 2 and Table 3 for the existing and future conditions, respectively. Chicago, Illinois 21

Table 2 CAACITY ANALYSES RESULTS EXISTING CONDITIONS Weekday Morning eak Hour Weekday Evening eak Hour Saturday Midday eak Hour Intersection LOS Delay LOS Delay LOS Delay North Broadway with Sheridan Road 1 Overall B 17.4 B 13.1 B 13.7 Northbound Approach B 10.3 B 10.6 B 14.1 Southbound Approach B 17.3 A 9.9 B 11.1 Eastbound Approach C 26.8 B 18.3 B 15.3 Westbound Approach C 22.8 C 24.1 B 19.1 North Broadway with Grace Street/Halsted Street 1 Overall C 28.0 C 25.5 C 26.8 Northbound Approach D 38.6 D 40.3 D 37.0 Northwestbound Approach C 28.0 C 29.6 D 38.7 Southbound Approach C 26.1 B 16.5 B 18.8 Eastbound Approach C 24.1 B 14.6 B 16.2 Westbound Approach C 28.4 C 26.1 C 20.7 Grace Street with ublic Alley/Exit-only Access Drive 2 Southbound Approach A 8.9 A 9.3 A 9.6 Northbound Approach B 10.3 A 9.8 B 10.1 LOS = Level of Service Delay is measured in seconds. 1 - Signalized Intersection 2 - Unsignalized Intersection Chicago, Illinois 22

Table 3 CAACITY ANALYSES RESULTS FUTURE CONDITIONS Weekday Morning eak Hour Weekday Evening eak Hour Saturday Midday eak Hour Intersection LOS Delay LOS Delay LOS Delay North Broadway with Sheridan Road 1 Overall B 18.5 B 13.5 B 14.5 Northbound Approach B 10.8 B 11.3 B 15.4 Southbound Approach B 18.7 B 10.2 B 11.6 Eastbound Approach C 27.9 C 24.4 B 15.1 Westbound Approach C 23.9 B 18.2 B 19.4 North Broadway with Grace Street/Halsted Street 1 Overall C 28.9 C 26.3 C 27.9 Northbound Approach D 40.2 D 42.4 D 38.9 Northwestbound Approach C 28.5 C 30.2 D 40.5 Southbound Approach C 26.8 B 16.8 B 19.2 Eastbound Approach C 24.7 B 15.1 B 16.6 Westbound Approach C 29.4 C 26.7 C 21.4 Grace Street with ublic Alley/Exit-only Access Drive 2 Southbound Approach A 9.0 A 9.4 A 9.8 Northbound Approach B 10.6 A 9.9 B 10.3 North Broadway with Right-in/Right-out Access Drive 2 Westbound Approach B 11.7 B 12.1 B 13.8 LOS = Level of Service Delay is measured in seconds. 1 - Signalized Intersection 2 - Unsignalized Intersection Chicago, Illinois 23

Discussion and Recommendations The following summarizes how the intersections are projected to operate and identify any roadway and traffic control improvements to accommodate the development traffic. North Broadway with Sheridan Road The results of the capacity analysis and field observations indicate that intersection and each of the approaches currently operate at good levels of service during the morning, evening, and Saturday midday peak hours. With the addition of development traffic and area growth, this intersection and each of the approaches are projected to continue operating at good levels of service with minimal increases in delay and limited queueing during all three peak hours. As such, this intersection has sufficient reserve capacity to accommodate the development traffic and no street or traffic control improvements are required. North Broadway with Grace Street/Halsted Street The results of the capacity analysis and field observations indicate that the intersection and each of the approaches currently operate at good levels of service during the morning, evening, and Saturday midday peak hours. With the addition of development traffic and area growth, the intersection and each of the approaches are projected to continue operating at good levels of service with minimal increases in delay and limited queueing during all three peak hours. As such, this intersection has sufficient reserve capacity to accommodate the development traffic and no street or traffic control improvements are required. North Broadway with Right-In/Right-Out Access Drive This access drive will provide one inbound lane and one outbound lane and will be restricted to right-in/right-out movements via pavement marking and proper signage. The results of the capacity analysis indicate that this access drive is projected to operate at good levels of service during the morning, evening, and Saturday midday peak hours. As such, this access drive will provide efficient and adequate access to the parking garage and will also provide access flexibility to and from the development. Grace Street with ublic Alley/Exit-only Access Drive The results of the capacity analysis indicate that the northbound and southbound approaches at Grace Street currently operate at good levels of service during the morning, evening and Saturday midday peak hours. With the addition of development traffic and area growth these approaches are projected to continue operating at good levels of service with minimal increases in delay during all three peak hours. During the peak drop-off and pick-up activity at the Bernard Zell Anshe Emet Day School, this intersection does experience some localized queueing and delay. However, this only occurs for a 15 to 30-minute period during the morning and afternoon and is reduced by the school traffic aid that helps control and manage the flow of traffic through the intersection. Finally, the impact of the development traffic on this intersection will be very limited given the low volume of traffic projected to access the development via the alley. Chicago, Illinois 24

Transportation Sustainability Recommendations The following summarizes measures to be implemented by the development and/or recommendations to further minimize the impact of the development, foster alternative modes of transportation other than the automobile and to enhance pedestrian/bicycle safety. Bike racks should be provided as part of the development. One to two parking spaces within the parking garage should be reserved for car-sharing services and electric vehicle charging stations. Continental style crosswalks should be installed at the intersection of North Broadway with Grace Street and Halsted Street. edestrian countdown signals should be installed at the intersection of North Broadway with Sheridan Road Chicago, Illinois 25

6. Conclusion Based on the preceding analyses and recommendations, the following conclusions have been made. Accessibility to and from the development and surrounding area is enhanced by the various alternative modes of transportation serving the area, including bus, rapid transit train service and mode sharing facilities. The amount of traffic generated by the proposed development will be reduced due to the alternative modes of transportation serving the area, the dense urban nature of the neighborhood, the mixed-use nature of the development and the elimination of trips generated by the existing land uses. The development-generated traffic can be accommodated efficiently with limited impact to the external street system. All of the intersections within the study limits are generally projected to continue to operate at good levels of service with the addition of development-generated traffic. As such, all of the study area intersections have sufficient reserve capacity and will not require intersection modifications. The Bernard Zell Anshe Emet Day School experiences localized queueing and delay during the drop-off and pick-up activities. However, the queueing and delay experienced only occurs for a 15 to 30-minute period during the morning and afternoon. Furthermore, the impact at the development will be limited due to the low volume of development traffic projected to use Grace Street and the public alley. Continental style crosswalks should be installed at the intersection of North Broadway with Grace Street and Halsted Street. edestrian countdown signals should be installed at the intersection of North Broadway with Sheridan Road Chicago, Illinois 26