LogisticsCentre IV Distribution Center



Similar documents
LogisticsCentre IV Distribution Center

AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available

INVESTMENT OFFERING QUALITY MULTI-TENANT FLEX BUILDING N. CORRINGTON AVENUE KANSAS CITY, MO 38,954 TOTAL SF ASKING PRICE: $2,700,000

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

164,491 SF Food Production Facility Situated on 10 Acres Available in

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

KIEWIT CM/GC Enabling/Utilities

Data Center Due Diligence List

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Property Condition Assessment

A59 A29 A16 A17 A58 Roosendaal

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Element D Services Plumbing

Single Family Residential Building Permit Questions & Answers

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home!

INDUSTRIAL FACILITY FOR SALE SUBLEASE 400 INDUSTRIAL DRIVE BIRMINGHAM, AL

Inspecting to a higher standard.

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

REFLEC TIONS I & II AT CIRCLEPORT

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY

Denver Fire Department Idle Pallet Storage Guidelines Per NFPA 13_Chpt 12

Two (2) Single Tenant NNN Office / Flex Buildings 6217 & 6221 WEST SAM HOUSTON PARKWAY NORTH Houston, Texas 77041

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

How To Plan A Building

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

BUNKER HILL ELEMENTARY SCHOOL

Certification: Building Plans Examiner. Exam ID: B3

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

CHAPTER 7: Building Systems ROOFING SYSTEMS

Current as of 11/10/08 1 of 1

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

EAST LYME HIGH SCHOOL

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

9314 JEFFERSON BLVD DALLAS, TEXAS DALLASGLOBAL.COM

Office Space for Lease th St, DeWitt

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

Data Center:Build-to-Suit

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Self-Home Inspection Checklist

PROPERTY INSPECTION REPORT

Building Code Clarifications - 7. Fire Resistance

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

City of St. Charles Basement Finish or Remodel

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

Building Condition Assessment Report

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Structure Survey Findings:

New River Valley Commerce Park Virtual Shell Building

MRI RF SHIELDING DESIGN

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

2015 Every Building Conference & Expo

FORT WORTH, TEXAS AS A LOCATION FOR: Project Lincoln

Analysis II Façade Redesign: Architectural Precast Panels

9,940 SF Office Building

Mobile Home Pre-Inspection Checklist

2009 IECC Update. Scope. Content. International Energy Conservation Code

Special Use Commercial Properties

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

800 Communications Circuits

WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204

American Safety Insurance Company

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Additions and Alterations

BUILDING SAFETY UNIT

Name Of Occupancy Date. Yes No Describe

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Convoy Court. Amenities Aerial HOME. Contact SAN DIEGO, CA. ± 48,611 SF Divisible to ± 25,000 SF

EcoTouch Insulation with PureFiber Technology

Saint Cloud Business Center

MEGAHUB LOGISTICS CENTER Center of Consumers. Hämeenlinna Lahti Turku Tampere

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

483/503 GARRETTS GREEN LANE GARRETTS GREEN BIRMINGHAM B33 0TL

Project: PSFA PROJECT NO: P Parkview Early Literacy Center Expansion and Modernization - Roswell Independent School District and NM PSFA

Building Condition Assessment Report

Elevating Your House. Introduction CHAPTER 5

Transcription:

KCI Intermodal BusinessCentre LogisticsCentre IV LogisticsCentre IV Distribution Center Modern Warehouse/Distribution Space Ranging From 108,000± SF to 432,000± SF 10221 NW Transcon Drive 112th Street & I-29, Kansas City, MO a development project by:

LOGISTICSCENTRE IV DISTRIBUTION CENTER SUMMARY OF BUILDING SPECIFICATIONS Land Area: Building Type: Office Area: Building Size: Building Dimension: Column Spacing: Clear Height: Roof System: Floor Slab: Loading: 26.135 Acres on Lot D2 of the KCI Intermodal BusinessCentre, Kansas City, MO LogisticsCentre IV ( LC4 ) is designed as a multi-tenant, cross-dock, modern bulk warehouse / distribution center that incorporates sustainable design and construction features. Up to three separate tenant entries are available with the office area to be built to a tenant s specific requirements under a Tenant Improvement Allowance ( TI Allowance ) 432,640± SF. Minimum suite size is 108,160± SF. 520 depth x 832 length. 52' x 50' (typical) with 52 x 60 at the perimeter bays along the dock loading walls. Columns are structural steel tubes 10 x 10 x ¼. 32' minimum clear height from the finished floor to the lowest structural member of the roof frame, except at the perimeter bays along the loading dock walls. The ceiling deck is painted white. Single-ply, mechanically fastened, 45-mil white TPO roof membrane with R-17.2 insulation including 15-year manufacturer s warranty. 7" thick, reinforced concrete floor slab over a 4" crushed stone base with compressive strength of 4,000 psi in (28) days finished to a specified overall value FF 50/FL 35 and a minimum local value FF 35/FL 24. Saw-cut joints within the 60 loading dock bays are caulked with MM-80 joint sealant. In order to minimize moisture transfer from the subgrade a 15-mil vapor barrier has been installed under the entire building floor slab. LC4 offers (89) dock positions (1:4,860± SF) with 9 wide x 10 high manually operated doors. The base shell building includes (20) docks with the dock equipment package described below. Additional docks can be equipped with dock equipment via the TI Allowance. LC4 offers (4) 12 wide x 14 high drive-in doors, one at each corner, with electric operators. Dock Equipment: The base building dock equipment package includes a 35,000# capacity 7 x 8 mechanical leveler, rigid frame dock shelter, dock bumpers and Z-guards. Light packages, dock-locks and other upgrades are available via the TI Allowance. Trailer Storage: Loading Apron and Truck Drive Lanes: LC4 offers (119) 12.5 wide x 60 deep x 7 thick, non-reinforced concrete paved trailer parking positions (1:3,600± SF). Trailer parking areas include a 15 wide continuous concrete dolly pad. 7 thick, non-reinforced concrete pavement over 6 crushed stone base. Loading apron extending 70 from the building loading walls. Concrete drive lanes are 55 wide. July 30, 2015 (TT)

LOGISTICSCENTRE IV DISTRIBUTION CENTER SUMMARY OF BUILDING SPECIFICATIONS Exterior Walls: Windows: Fire Sprinklers: Parking: Interior Lighting: Warehouse HVAC: Electrical: Gas: Water: Telecom / Internet / Cable: Other Improvements: The building walls are painted concrete tilt-wall panels with clerestory windows for natural light. The interior sides of the walls are painted white. All windows are 1" thick insulated tinted glass. LC4 is equipped with an ESFR wet sprinkler system with an 8 underground fire loop and four 8 lead-ins, an electric fire pump and K-17 heads capable of 16.8 GPM/PSI flow. The ESFR system has been designed in accordance with NFPA 13 chapters 14 and 15 requirements. As such it is designed to protect Class IV commodities which includes Group B and C plastics and some Group A plastics. Quantities of such materials will depend on method of storage (palletized, high pile, bulk) and final product type being stored. The system was designed to accommodate modifications to allow for in-rack and higher zone densities if required by tenants. LC4 offers (206) car parking spaces provided for use by tenant(s) on a pro-rata basis. Additional car parking is available via the TI Allowance. T5HO high-bay, fluorescent light fixtures with motion sensors, 10 tail whips providing average 25-footcandles of light at 36 above the finished floor in the warehouse area. Wall-mounted, make-up air units designed to provide 49 F inside temperature at 0 F outside temperature with programmable control system. Ventilation fans in conjunction with louvered intakes provide summer ventilation rates up to 1.5 air exchanges per hour. The house panel is 277/480-volt, 600-amp, 3-phase, 4-wire service. The base shell building includes spare conduits roughed-in for each tenant to have 277/480-volt, 1200-amp, 3-phase, 4-wire service. Upgrades to the electrical service are available via the TI Allowance. KCP&L is the service provider. Natural gas lines at 5psig serve the building with separate meters to the individual tenant suites from a common manifold. Laclede Gas (formerly MGE) is the service provider. A 16 city water main at the street is reduced to 8 for the fire service loop. A 2 line is provided for domestic water service to the individual tenant suites. KCMO is the service provider. 100-pair telecom/fiber is available at the demarcation panel inside the building s sprinkler/utility room. AT&T is the service provider for telecom (telephone and data). Fiber optic service is available for an additional charge to AT&T. Internet and cable service is available from various service providers as selected by tenants in the park. Guard house, fencing, other security features, forklift charging stations and other Tenant Improvements are available as may be required via the TI Allowance. July 30, 2015 (TT)

LogisticsCentre IV For more information please contact: David C. Hinchman, SIOR 816.968.5812 david.hinchman@cbre.com Joe Orscheln, SIOR, CCIM 816.968.5861 joe.orscheln@cbre.com 2015 CBRE, Inc. This information has been obtained from sources believed reliable. CBRE, its agents and employees make no guarantee, warranty or representation regarding the information contained herein. This information is intended for advertising purposes only and is subject to change without notice.

LogisticsCentre IV Kansas City International Airport For more information please contact: David C. Hinchman, SIOR 816.968.5812 david.hinchman@cbre.com Joe Orscheln, SIOR, CCIM 816.968.5861 joe.orscheln@cbre.com 2015 CBRE, Inc. This information has been obtained from sources believed reliable. CBRE, its agents and employees make no guarantee, warranty or representation regarding the information contained herein. This information is intended for advertising purposes only and is subject to change without notice.