Rule 5.500 Fast Track Analysis for National Life Insurance Co.



Similar documents
TERMS AND CONDITIONS

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

FIT TIER 2 Application

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Short Circuit Current Calculations

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION. Micro Generation & Small Generation, 3-phase, less than 30 kw

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection

Physical Address: City: State: Zip Code:

Chapter 24. Three-Phase Voltage Generation

Radial Distribution Test Feeders

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

SPECIFICATION COG-2007

Figure. 1 - Split Phase 240/120V circuit (180 phase shift)

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

4.5 Transformer Connections

Step Voltage Regulators

Guidelines on the Short Circuit Current Rating for Industrial Control Panels

Hyperlinks are Inactive

PSEG-LONG ISLAND SMART GRID SMALL GENERATOR INTERCONNECTION SCREENING CRITERIA FOR OPERATING IN PARALLEL WITH LIPA S DISTRIBUTION SYSTEM

REQUIREMENTS FOR CUSTOMER-OWNED PRIMARY SERVICES SUPPLIED AT 4 kv TO 35 kv PRIMARY GUIDE

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

Three-Phase Electric Power Distribution for Computer Data Centers

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

Motor Protection Voltage Unbalance and Single-Phasing

DISTRIBUTION SYSTEMS INDEX NOV 06 SECTION 2. Detroit Ann Arbor Mt. Clemens Port Huron

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Distributed Generation: Feeder Hosting Capacity. Dean E. Philips, P.E. FirstEnergy Service Corp Manager, Distribution Planning & Protection

WESTFIELD GAS AND ELECTRIC Interconnection Standards and Procedures for Distributed Generation

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE DEVIATION INTERTIE PROTECTION REQUIREMENTS... 4

Modeling and Testing of Unbalanced Loading and Voltage Regulation

101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer

Lecture Notes ELE A6

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity

How To Wire A Three Phase, Single Phase, Wye Transformer

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

Three phase circuits

Interconnection of Generators to EDI s Distribution System

How To Choose A Transformer

Application of Four-Pole Circuit Breakers within Data Centers

Overcurrent Protection for the IEEE 34 Node Radial Test Feeder

Electric Power Distribution Systems Operations

HPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80

The following table shows approximate percentage wise the

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS

ELECTRONIC POWER SYSTEMS

Primary-Side Transformer Protection

Electricity for the Entertainment Electrician Ef Technician

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

Connection of micro-generation to the electricity distribution network

Distributed Generation Interconnection Manual

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants. Installation instructions ESP M1/M1R mains protectors

Corner-Grounded Delta (Grounded B Phase) Systems

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

Grounding of AC generators and switching the neutral in emergency and standby power systems

Three-phase AC circuits

ASK THE EXPERTS. Resistance Grounding Q&A. with industry experts

Services. Three Phase Service

JEFFERSON ELECTRIC, INC. Buck-Boost Transformer Application Manual

Impact of electric vehicles on the IEEE 34 node distribution infrastructure

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Chapter 9 Balanced Faults

3-Phase AC Calculations Revisited

SECTION DVD01: VOLTAGE DROP/VOLTAGE FLICKER AND TRANSFORMER SIZING GUIDELINES

Low Voltage Transformer Through-Fault Protection: A System Approach

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems Success Stories

Server Technology, Inc.

Power Quality Standards for Electric Service

Ground Fault Protection on Ungrounded and High Resistance Grounded Systems

Secondary Network Distribution Systems Background and Issues Related to the Interconnection of Distributed Resources

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS...

THREE PHASE CIRCUITS

1. The type of service available at any particular location should be determined by inquiry at PG&E's local office.

Installation instructions for mains wire-in protectors ESP D1, D1R, D1/LCD and D1R/LCD variants

Applications. Remote Display Mounting Kits

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS

Power Distribution Considerations for Data Center Racks

Current and voltage measuring relays

MODELING AND TESTING OF UNBALANCED LOADING AND VOLTAGE REGULATION. Prepared For: California Energy Commission Public Interest Energy Research Program

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

STANDARDS AND RATINGS FOR THE APPLICATION OF MOLDED CASE, INSULATED CASE, AND POWER CIRCUIT BREAKERS

Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems

Transcription:

Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION 1 Project Description, Rule 5.500 Notes, Fast Track Scope SECTION 2 Fast Track Analysis SECTION 3 Fast Track Summary

SECTION 1 Project Description, Rule 5.500 Notes, Fast Track Scope Project Description: National Life Insurance Co. is proposing a 500 kw AC Solar net metering project (the Project ) to be located off of a feed to be taken at approximately taglet 117508 Pole 34 Northfield Street in Montpelier, Vermont. This will be fed by Green Mountain Power s ( GMP ) 27G7 distribution circuit which is fed by the #27 Mountain View Substation. The 27G7 is a 7.2/12.47 kv Grounded Wye circuit with approximately 276 kw of other distributed generation projects installed and proposed which will be included in the analysis as part of the aggregate Distributed Generation. The proposed project is at a location that currently does not have any power available. Are there any existing relevant studies? No. Are there any other existing materials? No. Modeling Assumptions: The generator step up transformer will be grounded wye-grounded wye. The inverter s isolation transformer is connected grounded wye on the utility side and delta on the solar side, it is assumed at this point that the ground connection on the utility side is high impedance and thus is ineffectively grounded to the GMP system neutral. It looks like the engineering for the Project anticipated this issue and has provided a grounding bank design, which consists of a three phase 22.5 kva total (7.5 kva per a phase) zig-zag grounding transformer with a 3.89% impedance. The effect of the grounding bank will be a crucial part of the analysis from here on in. If this design changes it is imperative that the Project owners contact GMP with the changes. It is assumed that the transformer would have a 5% impedance based on the transformer kva which is 500. The 400 foot line extension will be built to GMP s efficiency standard and have 1/0AAAC conductor. Fast Track Scope : The Fast Track Analysis is meant to be a coarse screen that allows easily connectible projects to proceed to an Interconnection Agreement without having to do any additional Studies. If future studies are required this Analysis can be used to pin point areas of additional study.

SECTION 2 Fast Track Review Criteria that are not passed will be colored in red. 1) The Interconnection Requester s proposed Generation Resource meets the applicable codes and standards of Section 5.510 or is certified equipment package under Section 5.511. The Inverter proposed for the project is a SGI-500. This inverter possesses UL1741 and IEEE 1547 certification. 2) The proposed interconnection point is not at transmission voltage (i.e. not over 23 kv line to line or 13.28 line to neutral). The generation resource is connecting to the 27G7 which has a voltage level of 7.2/12.47 kv grounded wye; this is not a transmission line. 3) For interconnection to a Radial Feeder, the aggregated generation, including the proposed Generation Resource, on the circuit will not exceed 15% of the line section annual peak load as most recently measured at the substation. A line section is that portion of a distribution system connected to a customer bounded by Automatic Disconnect Devices or the end of the distribution line. The closest in line protective device to this Project is a set of three phase 40K fuses located at taglet 111622 Pole 21. This set of fuses will see approximately 700 kva of load at peak. The total aggregate installed and proposed generation downstream of the fuses is about 700 kw of generation. This is a 100% match and exceeds the criteria. The next upstream protective device is the circuit recloser which has a peak load of approximately 3,100 kva, the total aggregate and proposed generation on this circuit is approximately 775 kw, this is 25% of the line section annual peak load and exceeds the criteria. 4) The aggregated generation, including the proposed Generation Resource, on a distribution circuit will not contribute more than 10% to the distribution circuit s maximum fault current at the point on the high voltage (primary) level nearest the proposed interconnection point. The maximum available line to ground fault current without any generation contribution taken into account at the end of the proposed line extension is estimated to be 3,002 Amps three phase ( LLL ) and 2,577 Amps Line-to-Ground ( LG ). With all generation existing and proposed taken into account the fault current at the end of the proposed line extension increases to 3,002 Amps LLL and 2,590 LG, this is an increase of about 0.5%.

5) The aggregated generation, including the proposed Generation Resources, on a distribution circuit will not cause any distribution protective devices and equipment (including, but not limited to, substation breakers, fuse cutouts, and line reclosers), or customer equipment on the system to exceed 85% of the short-circuit interrupting capability; nor is the Generation Resource proposed for a circuit that already exceeds 85% of the short-circuit interrupting capability. The closest in line protective device to this Project is a set of 40K fuses located at taglet 111622 Pole 21. The aggregated generation at this point will be approximately 700 kw which works out to about 32.4 Amps of running current, this is about 81% of the rating of the fuses, so no problem here. The fuse holder/cutout has a short circuit interrupting capability of 10,000 Amps, the max fault current here post Project is less than 3,800 Amps, so this is also not an issue. 6) For interconnection of a proposed single-phase or effectively-grounded three-phase Generation Resource where the primary distribution System is three-phase, four-wire, the Generation Resource will be connected line-to-neutral. For interconnection of a proposed single-phase or three-phase Generation Resource where the primary distribution system is three-phase, three-wire, the Generation Resource will be connected line-to-line. The 27G7 is a three phase, four wire, system, otherwise known as grounded wye. The proposed Project will be connected to GMP via a grounded wye-grounded wye transformer. However, the Project s inverters will not have a continuous low impedance bond to the system neutral, this means that essentially this Project is connecting three phase three wire to GMP, this creates an ineffectively grounded source with respect to GMP. However, the Project has also added a grounding transformer design to the Project which could create an effectively grounded source with respect to the utility, the design specs are listed above in the Assumptions. The system impedances at the proposed Point of Interconnection would be changed to the following values with the addition of the grounding transformer: R1 = 0.3970 Ohms X1 = 2.3655 Ohms R0 = 0.7630 Ohms X0 =3.4603 Ohms It is recommended by IEEE 1547.2-2008 section 8.1.2.3.1 that X1>R0 and that X0<3X1 for the system to be considered effectively grounded. For this system with the Project in place both of these cases are true and the Project can be assumed to be effectively grounded with respect to the utility system. While this Project is connected effectively grounded and this criteria is considered passed it should be noted that relaying will need to be put in place to prevent the Project from back feeding onto the line when one of the upstream fuses are opened. The Project shall provide a relaying

scheme to prevent this condition prior to preparation of the Interconnection Agreement. The specific grounding bank transformer % impedance and X/R shall be provided once it s ordered it should be very close to the values already provided, specifics will be necessary to make sure we accurately model the Project in the future. 7) Voltage drop due to starting the proposed generator is within acceptable limits, meaning that inrush current, due to starting the proposed Generation Resource up to once per hour, is not greater than 3% of the available fault current. Voltage drop due to starting the proposed Generation Resource more than once per hour meets a tighter inrush-current tolerance, to be determined by the Interconnecting Utility. Inrush current for a solar facility is not going to be as significant an indicator of voltage flicker as it would be for a rotating generator. A simple test monitoring the voltage before and after startup will be used instead. At the Point of Interconnection ( POI ), prior to any generation being on-line at peak the voltages are approximately 123.8, 122.6, 122.9 volts. With all generation on including the proposed project, and the regulator taps locked, the voltages are estimated to be 124, 122.5, and 123.1 volts. The worst case out of all of these shows a voltage flicker of 0.16%, this is a minuscule change and not a concern for GMP. 8) For any single Generation Resource, the available utility short circuit current at the Point of Interconnection divided by the rated output current of the Generation Resource is no less than: a) 50 for Generation Resource of less than 100 kw; b) 40 for Generation Resources from 100 kw to less than 500 kw; and c) 20 for Generation Resources equal to or greater than 500 kw. The line-to-ground fault current at the POI on the primary side is 2,577. The per phase amps of the project are 500 kw/(3*7.2 kv) = 23.1 2,577/23.1 = 111.56 9) Aggregate generation, including the Generation Resource, on a circuit will not exceed 2 MVA in an area where there are known or posted transient stability limitations to generating units located in the general electrical vicinity (e.g. three or four busses from the point of interconnection). There are no transient stability limitations that GMP is aware of. 10) No System Upgrades, in excess of limited preparation that do not necessitate a Facilities Study, are required to facilitate the interconnection of the Generation Resource. No Facilities Study is seen as being needed for this Project at this time.

11) For interconnection of the proposed Generation Resource to the load side of spot network protectors, the proposed Generation Resource utilizes inverter-based equipment and aggregate generation, including proposed Generation Resource, will not exceed the smaller of 5% of a spot network s maximum load or 50 kw. Synchronous generators cannot be connected to a secondary network. There are no spot networks on the GMP system. 12) If the Generation Resource is to be connected on a shared, single-phase secondary, aggregate generation capacity on the shared secondary, including the proposed generation, will not exceed 20 kva. Not Applicable. This project is three phase. 13) If the Generation Resource is single-phased and is to be interconnected on a center tap neutral of a 240 volts service, its addition will not create an imbalance between the two side of the 240 volt service of more than 20% of the service transformer nameplate. Not Applicable. This project is three phase.

SECTION 3 Fast Track Summary The project has not passed some criteria 3 in the Fast Track Review. However GMP feels that with protective relaying setup at the Project to prevent back feeding of the Project onto the GMP system in the event of an upstream fuse blowing that we feel comfortable enough with the impact of the Project to proceed to an Interconnection Agreement without a System Impact Study. The protective relaying scheme shall be provided to GMP prior to preparation of the Interconnection Agreement. The specific %impedance and X/R of the grounding transformer purchased for the Project shall also be provided to GMP prior to interconnection and shall not deviate excessively from those values provided in the Application.