1 Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and fee or deposit, please complete and submit this form to: [email protected] In response, you will receive detailed payment instructions within a Request for Advance Payment form that will greatly facilitate the tracking and processing of your request. The Request for Advance Payment form will contain mailing and wiring instructions along with a document number for SCE to track your payment. Please do not mail any checks along with your interconnection application, instead, please use the instructions provided. Absent extraordinary circumstances, instructions should be sent to you within 3 business days of receipt of this completed Request for Payment Instructions form. Once the payment confirmation and complete application package are received, your request will be forwarded for processing and review. INTERCONNECTION CUSTOMER INFORMATION Customer Name: Customer Address: Project Contact Name: Project Contact Phone Number: Project Name: New Project Generating Facility Gross Nameplate Rating (In MW): Select the one study processes listed below: INTERCONNECTION STUDY PROCESS Cluster Study Process Interconnection Study Deposit equal to $50,000 plus $1,000 per MW of electrical output of the Generating Facility, or the increase in electrical output of the existing Generating Facility, as applicable, rounded up to the nearest whole megawatt, up to a maximum of $250,000 * Site Exclusivity - Check here if you will be submitting a posting of a Site Exclusivity Deposit of $100,000* for a Small Generating Facility or $250,000* for a Large Generating Facility. (Refer to section of the WDAT Attachment I) Independent Study Process (ISP) Interconnection Study Deposit equal to $50,000 plus $1,000 per MW of electrical output of the Generating Facility, or the increase in electrical output of the existing Generating Facility, as applicable, rounded up to the nearest whole megawatt, up to a maximum of $250,000 * Fast Track Process The Interconnection Customer shall submit its Interconnection Request to the Distribution Provider, together with a non-refundable processing fee of $500 and a non-refundable study deposit of $1,000. * Other (specify) WHOLESALE DISTRIBUTION SERVICE REQUEST An Eligible Customer requesting service under the Tariff must submit an Application, with a deposit of $2.00 per anticipated average monthly kilowatts of Generation or Wholesale Distribution Load, to the Distribution Provider as far as possible in advance of the month in which service is to commence. (Section 15.2 of the Wholesale Distribution Access Tariff) Anticipated average monthly kilowatts of Generation or Wholesale Distribution Load for your proposed project: SCE GRID INTERCONNECTION CONTACT INFORMATION If you have any questions, please contact us: Via [email protected] The Grid Interconnection phone number is: *Fees and deposits are calculated using the Wholesale Distribution Access Tariff, section15.2, as well as Attachment I (also known as the GIP) Section 4 for the Cluster Study Process, Section 5 for the Independent Study Process, and section 6 for the Fast Track process. Please refer to the tariff for the most current fee and deposit information as well as refund guidelines. A copy of the Wholesale Distribution Access Tariff can be found on our Open Access site:
2 Southern California Edison Company as of 02/22/2013 Wholesale Distribution Access Tariff Effective Date: 12/08/2012 Status: Effective FERC Docket: ER FERC Order: BOL Order Date: 02/11/2013 APPENDIX 1 to GIP WHOLESALE DISTRIBUTION ACCESS TARIFF INTERCONNECTION REQUEST FOR A GENERATING FACILITY Provide two copies of this completed form pursuant to Section 7 of this GIP Appendix 1 below. 1. The undersigned Interconnection Customer submits this request to interconnect its Generating Facility with Distribution Provider's Distribution System pursuant to the following process under Appendix I of the Tariff (check only one): Cluster Study Process Independent Study Process Fast Track Process Other (specify) 2. This Interconnection Request is for (check only one): A proposed new Generating Facility. An increase in the generating capacity or a Material Modification of an existing Generating Facility. A change to Full Capacity Deliverability Status for a Generating Facility previously studied as Energy Only Deliverability Status in accordance with Section 4.7 of the GIP (Full Capacity Deliverability Study). 3. Deliverability Study is performed by the ISO. Requested Deliverability Status is for (check only one): Full Capacity Deliverability Status (this option applies to the Cluster Study Process and Independent Study Process only) Partial Capacity Deliverability Status for MW [specify requested MW to be evaluated for Deliverability. This MW amount should be less than the total MW of the Generating Facility) of electrical output (this option applies to the Cluster Study Process and Independent Study Process only) Energy Only Deliverability Status (this option applies to the Cluster Study Process, Independent Study Process, and Fast Track Process) 4. Interconnection Customer provides the following information: a. Address or location, including the county, of the proposed new Generating Facility site (to the extent known) or, in the case of an existing Generating Facility, the name and specific location, including the county, of the existing
3 Generating Facility; Project Name: Project Location: Street Address: City, State:, County: Zip Code: GPS Coordinates: b. Maximum net megawatt electrical output (as defined by section 2.c. of Attachment A to this appendix) of the proposed new Generating Facility or the amount of net megawatt increase in the generating capacity of an existing Generating Facility; Maximum net megawatt electrical output (MW): Net Megawatt increase (MW): or c. Type of project (i.e., gas turbine, hydro, wind, etc.) and general description of the equipment configuration (if more than one type is chosen, include net MW for each); Cogeneration MW Reciprocating Engine MW Biomass MW Steam Turbine MW Gas Turbine MW Wind MW Hydro MW Inverter Based: MW (e.g., Photovoltaic, Fuel Cell) If Fuel Cell, please describe primary fuel source: Combined Cycle MW Other: MW (Please describe): d. Proposed In-Service Date, and Other Key Dates (Month/Day/Year) (Dates must be sequential) Requested Back-Feed Date / / Proposed In-Service Date: / / Proposed Trial Operation Date: / / Proposed Commercial Operation Date: / /
4 Proposed Term of Service (years): e. Name, address, telephone number, and address of Interconnection Customer's contact person (primary person who will be contacted); Name: Title: Company Name: Street Address: City, State:, Zip Code: Phone Number: Fax Number: Address: Interconnection Customer s DUNS Number: f. Point of Interconnection: Distribution Substation (Name and voltage level):, or Distribution Feeder:, or Approximate location of the proposed Point of Interconnection: Distribution Facility Interconnection Point Name: Voltage Level Proposed Location of Interconnection: g. Interconnection Customer Data (set forth in Attachment A) The Interconnection Customer shall provide to the Distribution Provider the technical data called for in Attachment A. Two (2) copies are required. 5. Applicable Interconnection Study Deposit amount as specified in GIP Section or 4.7.1, as applicable, for the Cluster Study Process or GIP Section for the Independent Study Process, or $1,500 as provided in GIP Section 6.2 for the Fast Track Process made payable to Southern California Edison Company. Send check to Distribution Provider along with: 1. A completed Interconnection Request form for processing. 2. A completed Attachment A (Interconnection Request Generating Facility Data). 6. Evidence of Site Exclusivity as specified in GIP Sections 4.2.1, 5.2.1, or 6.3, as applicable, and name(s), address(es) and contact information of site owner(s). Check one. Is attached to this Interconnection Request If Interconnection Customer requests processing under the Cluster Study Process, then deposit in lieu of Site Exclusivity attached. Site
5 Exclusivity will be provided at a later date in accordance with this GIP. 7. This Interconnection Request shall be submitted to the representative indicated below: Southern California Edison Company Director of FERC Policy & Contracts P.O. Box 800 Rosemead, CA Overnight address: 2244 Walnut Grove Avenue, Rosemead, CA Representative of Interconnection Customer to contact: [To be completed by Interconnection Customer] Name: Title: Company Name: Street Address: City, State:, Zip Code: Phone Number: Fax Number: Address: 9. If the Interconnection Customer also requests Distribution Service, additional information and an additional deposit is required in accordance with Section 15.2 of the Tariff. 10. This Interconnection Request is submitted by: Legal name of Interconnection Customer: By (signature): Name (type or print): Title: Date:
6 WHOLESALE DISTRIBUTION ACCESS TARIFF GENERATING FACILITY DATA Attachment A to Interconnection Request Provide two copies of this completed form pursuant to Section 7 of Interconnection Request. Each Interconnection Customer will complete Sections 1 and 2 of this Attachment A. Each Interconnection Customer will complete the applicable data in Sections 3 through 6 of this Attachment A based on the type of generating facility(ies) requesting interconnection. (Section 3 for synchronous generators, Section 4 for induction generators, Section 5 for wind turbine generators, and Section 6 for inverter-based generators). Each Interconnection Customer will complete Sections 7 through 10, as applicable. At any time, Distribution Provider may require Interconnection Customer to provide additional technical data, or additional documentation supporting the technical data provided, as deemed necessary by the Distribution Provider to perform Interconnection Studies, other studies, or evaluations as set forth under the GIP. 1. Provide two original prints and one reproducible copy (no larger than 36 x 24 ) of the following: A. Site drawing showing generator location and Point of Interconnection with the Distribution Provider s Distribution System. B. Single-line diagram showing applicable equipment such as generating units, stepup transformers, auxiliary transformers, switches/disconnects of the proposed interconnection, including the required protection devices and circuit breakers. This one-line drawing must be signed and stamped by a licensed Professional Engineer if the Generating Facility is larger than 50 kw. 2. Generating Facility General Information: A. Total Generating Facility rated output (MW): B. Generating Facility auxiliary Load (MW): C. Project net capacity (MW): D. Standby Load when Generating Facility is off-line (MW): E. Number of Generating Units: (Please repeat the following items for each generator) F. Individual generator rated output (MW for each unit): G. Manufacturer of the Generating Facility: H. Year Manufactured: I. Nominal Terminal Voltage (kv): J. Rated Power Factor (%): K. Type (induction, synchronous, D.C. with inverter): L. Phase (3 phase or single phase):
7 M. Connection (Delta, Grounded WYE, Ungrounded WYE, impedance grounded): N. Generator Voltage Regulation Range (+/- %): O. Generator Power Factor Regulation Range: P. For combined cycle plants, specify the plant net output capacity (MW) for an outage of the steam turbine or an outage of a single combustion turbine 3. Synchronous Generator -Information: 3A Generator Information: (Please repeat the following for each generator) A. Rated Generator speed (rpm): B. Rated MVA: C. Rated Generator Power Factor: D. Generator Efficiency at Rated Load (%): E. Moment of Inertia (including prime mover): F. Inertia Time Constant (on machine base) H: sec or MJ/MVA G. SCR (Short-Circuit Ratio - the ratio of the field current required for rated open-circuit voltage to the field current required for rated short-circuit current): H. Please attach generator reactive capability curves. I. Rated Hydrogen Cooling Pressure in psig (Steam Units only): J. Please attach a plot of generator terminal voltage versus field current that shows the air gap line, the open-circuit saturation curve, and the saturation curve at full load and rated power factor. 3B Excitation System Information: (Please repeat the following for each generator) A. Indicate the Manufacturer and Type of excitation system used for the generator. For exciter type, please choose from 1 to 9 below or describe the specific excitation system. (1) Rotating DC commutator exciter with continuously acting regulator. The regulator power source is independent of the generator terminal voltage and current. (2) Rotating DC commentator exciter with continuously acting regulator. The regulator power source is bus fed from the generator terminal voltage. (3) Rotating DC commutator exciter with non-continuously acting regulator (i.e., regulator adjustments are made in discrete
8 increments). (4) Rotating AC Alternator Exciter with non-controlled (diode) rectifiers. The regulator power source is independent of the generator terminal voltage and current (not bus-fed). (5) Rotating AC Alternator Exciter with controlled (thyristor) rectifiers. The regulator power source is fed from the exciter output voltage. (6) Rotating AC Alternator Exciter with controlled (thyristor) rectifiers. (7) Static Exciter with controlled (thyristor) rectifiers. The regulator power source is bus-fed from the generator terminal voltage. (8) Static Exciter with controlled (thyristor) rectifiers. The regulator power source is bus-fed from a combination of generator terminal voltage and current (compound-source controlled rectifiers system. (9) Other (specify): B. Attach a copy of the block diagram of the excitation system from its instruction manual. The diagram should show the input, output, and all feedback loops of the excitation system. C. Excitation system response ratio (ASA): D. Full load rated exciter output voltage: _ E. Maximum exciter output voltage (ceiling voltage): _ F. Other comments regarding the excitation system? 3C Power System Stabilizer ( PSS ) Information: (Please repeat the following for each generator model. All new generators are required to install PSS unless an exemption has been obtained from WECC. Such an exemption can be obtained for units that do not have suitable excitation systems.) A. Manufacturer: B. Is the PSS digital or analog? C. Note the input signal source for the PSS? Bus frequency Shaft speed Bus Voltage _ Other (specify source) _ D. Please attach a copy of a block diagram of the PSS from the PSS Instruction Manual and the correspondence between dial settings and the time constants or PSS gain. E. Other comments regarding the PSS? 3D Turbine-Governor Information: (Please repeat the following for each generator model.)
9 Please complete Part A for steam, gas or combined-cycle turbines, Part B for hydro turbines, and Part C for both. A. Steam, gas or combined-cycle turbines: (1) List type of unit (Steam, Gas, or Combined-cycle): (2) If steam or combined-cycle, does the turbine system have a reheat process (i.e., both high and low pressure turbines)? (3) If steam with reheat process, or if combined-cycle, indicate in the space provided, the percent of full load power produced by each turbine: Low pressure turbine or gas turbine: % High pressure turbine or steam turbine: % (4) For combined cycle plants, specify the plant net output capacity (MW) for an outage of the steam turbine or an outage of a single combustion turbine: B. Hydro turbines: (1) Turbine efficiency at rated load: % (2) Length of penstock: ft (3) Average cross-sectional area of the penstock: ft2 (4) Typical maximum head (vertical distance from the bottom of the penstock, at the gate, to the water level): ft (5) Is the water supply run-of-the-river or reservoir: _ (6) Water flow rate at the typical maximum head: ft 3 /sec (7) Average energy rate: kw-hrs/acre-ft (8) Estimated yearly energy production: kw-hrs C. Complete this section for each machine, independent of the turbine type. (1) Turbine manufacturer: (2) Maximum turbine power output: MW (3) Minimum turbine power output (while on line): MW (4) Governor information: (a) (b) (c) Droop setting (speed regulation): Is the governor mechanical-hydraulic or electro-hydraulic (Electro-hydraulic governors have an electronic speed sensor and transducer.)? Other comments regarding the turbine governor system? 3E Short Circuit Duty Information: For each generator, provide the following reactances expressed in p.u. on the generator base:
10 Xd - Direct Axis Synchronous Reactance: p.u. X d - Direct Axis Transient Reactance: p.u. X d - Direct Axis Subtransient Reactance: p.u. X2 - Negative Sequence Reactance: p.u. X0 - Zero Sequence Reactance: p.u. Generator Grounding (select one for each model): A. Solidly grounded B. Grounded through an impedance (Impedance value in p.u. on generator base. R: p.u. X: p.u.) C. Ungrounded 4. Induction Generator Information: (Please repeat the following for each generator) A. Motoring Power (kw): B. I 2 2 t or K (Heating Time Constant): C. Rotor Resistance, Rr: D. Stator Resistance, Rs: E. Stator Reactance, Xs: F. Rotor Reactance, Xr: G. Magnetizing Reactance, Xm: H. Short Circuit Reactance, Xd'': I. Exciting Current: J. Temperature Rise: K. Frame Size: L. Design Letter: M. Reactive Power Required In Vars (No Load): N. Reactive Power Required In Vars (Full Load): O. Total Rotating Inertia, H: Per Unit on kva Base 5. Wind Turbine Generator (WTG) Information: (Proposed projects may include one or more WTG types. Please repeat the following for each type of WTG). A. Number of generators to be interconnected pursuant to this Interconnection Request: B. Average Site Elevation: Single Phase Three Phase C. Field Volts: D. Field Amperes: E. Motoring Power (MW):
11 F. Neutral Grounding Resistor (If Applicable): G. I22t or K (Heating Time Constant): H. Rotor Resistance: I. Stator Resistance: J. Stator Reactance: K. Rotor Reactance: L. Magnetizing Reactance: _ M. Short Circuit Reactance: _ N. Exciting Current: O. Temperature Rise: P. Frame Size: Q. Design Letter: R. Reactive Power Required In Vars (No Load): S. Reactive Power Required In Vars (Full Load): T. Total Rotating Inertia, H: Per Unit on 100 MVA Base Note: A completed General Electric Company Power Systems Load Flow (PSLF) data sheet must be supplied with the Interconnection Request. If other data sheets are more appropriate to the proposed device then they shall be provided and discussed at Scoping Meeting. Distribution Provider may require testing verification of voltage and harmonic performance during commissioning test of WTG based generation projects. 6. Inverter Based Generation Systems Information: (Proposed inverter based generation projects may include one or more types of inverters. Please repeat the following for each type of inverter). A. Inverter Manufacturer and Model: B. Number of Inverters: C. Nameplate Rating (AC, each inverter): / kw D. Nameplate Voltage Rating (AC): kv E. Maximum AC line current: Amps F. Nameplate Power Factor Rating (AC): G. Please attach capability curve describing reactive power or power factor range from no output to full rated output H. Inverter control mode (e.g. voltage, power factor, reactive power): I. Short Circuit Characteristics: Applicant to provide technical data related to the short circuit characteristics of proposed inverter based generation systems. For example, the applicant can provide a sinusoidal waveform test data showing faulted condition at the AC side of the inverter for a three phase and single-lineto-ground fault. J. Harmonics Characteristics: (1) Inverter switching frequency: (2) Harmonic characteristics for each unit up to switching frequency:
12 (3) Harmonic characteristics for aggregate generation facility: K. Inverter disconnection characteristics: Applicant to provide voltage sinusoidal waveform test data which shows the voltage characteristics during disconnection of inverter system from distribution system at 100% and at 50% of rated output. Distribution Provider may require testing verification of voltage and harmonic performance during commissioning test of the inverter based generation systems. 7. Step-Up Transformer Data: For each step-up transformer (e.g. main step-up transformers, padmount transformers), fill out the data form provided in Table Interconnection Facilities Line Data: For transmission lines that are to be planned by the generation developer, please provide the following information: Nominal Voltage: kv Line Length (miles): Line termination Points: Conductor Type: Size: If bundled. Number per phase:, Bundle spacing: in. Phase Configuration. Vertical:, Horizontal: Phase Spacing (ft): A-B:, B-C:, C-A: Distance of lowest conductor to Ground at full load and 40 C: ft Ground Wire Type: Size: Distance to Ground: ft Attach Tower Configuration Diagram Summer line ratings in amperes (normal and emergency) Positive Sequence Resistance ( R ): p.u.** (for entire line length) Positive Sequence Reactance: ( X ): p.u.** (for entire line length) Zero Sequence Resistance ( R0 ): p.u.** (for entire line length) Zero Sequence Reactance: ( X0 ): p.u.** (for entire line length) Line Charging (B/2): p.u.** ** On 100-MVA and nominal line voltage (kv) Base 9. Plant-Level Reactive Power Compensation Data: Provide the following information for plant-level reactive power compensation, if applicable: A. Number of individual shunt capacitor banks: B. Individual shunt capacitor bank rated voltage (kv): C. Individual shunt capacitor bank size (kvar at rated voltage):
13 D. Planned dynamic reactive control devices (SVC, STATCOM): E. Control range: kvar (lead) kvar (lag) F. Control mode (e.g. voltage, power factor, reactive power): G. Please provide the overall plant reactive power control strategy 10. Load Flow and Dynamic Models: The WECC Data Preparation Manual for Power Flow Base Cases and Dynamic Stability Data has established power flow and dynamic modeling requirements for generation projects in WECC base cases. In general, if the aggregate sum of generation on a bus exceeds 10 MVA, it should not be netted. Furthermore, the total netted generation in an area should not exceed five percent of the area s total generation. Based on current WECC modeling requirements, the following information will be required for all generation projects whose net capacity is greater than 10 MVA. The following information may also be required for generation projects less than 10 MVA on a case-by-case basis, based on the amount of generation in the area of the requested Point of Interconnection. A. Provide load flow model for the generating plant and its interconnection facilities in GE PSLF *.epc format, including new buses, generators, transformers, interconnection facilities. An equivalent model is required for the plant with generation collector systems. This data should reflect the technical data provided in this Attachment A. B. For each generator, governor, exciter, power system stabilizer, WTG, or inverter based generator, select the appropriate dynamic models from the General Electric PSLF Program Manual and provide the required input data. Include any user written *.p EPCL files to simulate inverter based plants dynamic responses (typically needed for inverter based PV/wind plants). Provide a completed *.dyd file that contains the information specified in this section. The GE PSLF manual is available upon request from GE. There are links within the GE PSLF User s Manual to detailed descriptions of specific models, a definition of each parameter, a list of the output channels, explanatory notes, and a control system block diagram. In addition, GE PSLF modeling information and various modeling guidelines documents have been prepared by the WECC Modeling and Validation Work Group. This information is available on the WECC website ( If you require assistance in developing the models, we suggest you contact General Electric. Accurate models are important to obtain accurate study results. Costs associated with any changes in facility requirements that are due to differences between model data provided by the generation developer and the actual generator test data, may be the responsibility of the generation developer.
14 TABLE 1 TRANSFORMER DATA (Provide for each level of transformation) UNIT* NUMBER OF TRANSFORMERS PHASE RATING H Winding X Winding Y Winding Rated MVA Connection (Delta, Wye, Gnd.) Cooling Type (OA,OA/FA, etc) : Temperature Rise Rating Rated Voltage BIL Available Taps (% of rating) Load Tap Changer? (Y or N) Tap Settings IMPEDANCE H-X H-Y X-Y H X Percent MVA Base Tested Taps WINDING RESISTANCE Ohms Y CURRENT TRANSFORMER RATIOS H X Y N PERCENT EXCITING CURRENT 100 % Voltage; 110% Voltage Supply copy of nameplate and manufacturer s test report when available. * For Generating Facilities with multiple step-up transformers, identify the transformer datasheet unit number with that of the single line.
PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP
PacifiCorp Original Sheet No. 476 APPENDIX 2 TO SGIP SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: Designated Contact Person: Address: Telephone Number: An Interconnection
Appendix N: GENERATOR DATA SHEET FOR SYNCHRONOUS GENERATORS CONNECTED TO PG&E ELECTRIC SYSTEM
Appendix N: GENERATOR DATA SHEET FOR SYNCHRONOUS GENERATORS CONNECTED TO PG&E ELECTRIC SYSTEM TECHNICAL DATA SHEET FOR SYNCHRONOUS MACHINES IN THE PG&E SYSTEM FOR POWER FLOW, TRANSIENT STABILITY, AND FAULT
Effective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6
Public Service Board Page 1 of 6 STANDARD APPLICATION FOR INTERCONNECTION OF GENERATION RESOURCES IN PARALLEL TO THE ELECTRIC SYSTEM OF: (Interconnecting Utility) Preamble and Instructions: An owner of
Physical Address: City: State: Zip Code:
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (For Small Generator Facilities with Electric Nameplate Capacities of 10 MW and less) Applicant Contact
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (See ARSD chapter 20:10:36 for the requirements for a Tier 2, Tier 3, or Tier 4 Interconnection.) Applicant/Interconnection
ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only
ATTACHMENT F CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category
FIT TIER 2 Application
FIT TIER 2 Application Application Information The below information Auto-Fills from your registration information: Building Permit Application Date: Project Completion Date: Name: Address: City: State:
Interconnection of Generators to EDI s Distribution System
Interconnection of Generators to EDI s Distribution System May 22, 2002 This document sets forth the guidelines for connecting a power producing facility to the Alberta Interconnected Electric System through
Basics of Electricity
Basics of Electricity Generator Theory PJM State & Member Training Dept. PJM 2014 8/6/2013 Objectives The student will be able to: Describe the process of electromagnetic induction Identify the major components
SYNCHRONOUS MACHINES
SYNCHRONOUS MACHINES The geometry of a synchronous machine is quite similar to that of the induction machine. The stator core and windings of a three-phase synchronous machine are practically identical
HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012
HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012 1. Introduction The objective of this Policy is to promote green technologies in the City of Holyoke by accommodating
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
TERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
VOLTAGE REGULATOR AND PARALLEL OPERATION
VOLTAGE REGULATOR AND PARALLEL OPERATION Generator sets are operated in parallel to improve fuel economy and reliability of the power supply. Economy is improved with multiple paralleled generators by
Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
Rule 5.500 Fast Track Analysis for National Life Insurance Co.
Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION
Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva
Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Issued: August 2009 SIZED UP TO 100 KVA TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Applicability... 1 1.2 Definitions...
4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
Advance Electronic Load Controller for Micro Hydro Power Plant
Journal of Energy and Power Engineering 8 (2014) 1802-1810 D DAVID PUBLISHING Advance Electronic Load Controller for Micro Hydro Power Plant Dipesh Shrestha, Ankit Babu Rajbanshi, Kushal Shrestha and Indraman
TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 PURPOSE... 2 1.2 DEVIATION... 2 4.0 INTERTIE PROTECTION REQUIREMENTS... 4
Page: 1 of 14 KEY BULLETIN POINTS: THIS GUIDE OUTLINES MINIMUM REQUIREMENTS FOR CONNECTION OF CUSTOMER-OWNED EMERGENCY AND STANDBY (ESG) TO THE GEORGIA POWER COMPANY (GPC) DISTRIBUTION SYSTEM. THESE ARE
UCI274C - Technical Data Sheet
- Technical Data Sheet SPECIFICATIONS & OPTIONS STANDARDS Newage Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section of other international standards such as BS000,
UCI274H - Technical Data Sheet
- Technical Data Sheet SPECIFICATIONS & OPTIONS STANDARDS Newage Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section of other international standards such as BS000,
Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.
By Darrell G. Broussard, P.E. Introduction: As engineers, we are aware that electrical power systems have grown. How much have they grown? When was the last time you specified a 2400-volt system, a 4160-volt
Principles of Adjustable Frequency Drives
What is an Adjustable Frequency Drive? An adjustable frequency drive is a system for controlling the speed of an AC motor by controlling the frequency of the power supplied to the motor. A basic adjustable
Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION
Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION Outline What is Reactive Power and where does it come from? Why is it important?
PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS
PI144K - Winding 311 Technical Data Sheet PI144K SPECIFICATIONS & OPTIONS STANDARDS TERMINALS & TERMINAL BOX Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section
PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet
PI044E - Winding 311 Technical Data Sheet PI044E SPECIFICATIONS & OPTIONS STANDARDS Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section of other international standards
PowerFlex Dynamic Braking Resistor Calculator
Application Technique PowerFlex Dynamic Braking Resistor Calculator Catalog Numbers 20A, 20B, 20F, 20G, 22A, 22B Important User Information Solid-state equipment has operational characteristics differing
Introduction. Harmonics and IEEE 519 Page 1 of 19
Introduction In an ideal power system, the voltage supplied to customer equipment, and the resulting load current are perfect sine waves. In practice, however, conditions are never ideal, so these waveforms
PI734D - Technical Data Sheet
PI734D - Technical Data Sheet PI734D SPECIFICATIONS & OPTIONS STANDARDS Newage Stamford industrial generators meet the requirements of BS EN 60034 and the relevant sections of other national and international
PI734B - Technical Data Sheet
PI734B - Technical Data Sheet PI734B SPECIFICATIONS & OPTIONS STANDARDS Newage Stamford industrial generators meet the requirements of BS EN 60034 and the relevant sections of other national and international
Chapter 3 AUTOMATIC VOLTAGE CONTROL
Chapter 3 AUTOMATIC VOLTAGE CONTROL . INTRODUCTION TO EXCITATION SYSTEM The basic function of an excitation system is to provide necessary direct current to the field winding of the synchronous generator.
BCI184E - Technical Data Sheet
BCI184E - Technical Data Sheet BCI184E SPECIFICATIONS & OPTIONS STANDARDS Newage Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section of other international standards
Solar Power Plant Design and Interconnection
Solar Power Plant Design and Interconnection Wind & Solar Super Session July 27, 2011 E.H. Camm, S.E. Williams S&C Electric Company Outline Introduction Utility-scale PV power plant Grounding Reactive
Cahier technique no. 196
Collection Technique... Cahier technique no. 196 Integration of local power generation in industrial sites and commercial buildings T. Hazel "Cahiers Techniques" is a collection of documents intended for
Power Plant Electrical Distribution Systems
PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com
GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta
GENERATOR SELECTION Generators must be sized to handle their load based on the continuous KW, kilowatt load, and KVA, kilovoltamp load, and the worst case starting load KW + KVA. They must be derated for
Step Voltage Regulators
Step Voltage Regulators Don Wareham Field Application Engineer Today s Agenda Introduction Voltage Regulator theory Voltage Regulator application considerations Installation and proper bypassing Wrap-up/questions
A Tariff for Reactive Power Christopher Tufon, Alan Isemonger, Brendan Kirby, Senior Member, John Kueck, Senior Member, and Fangxing Li, Senior Member
1 A Tariff for Reactive Power Christopher Tufon, Alan Isemonger, Brendan Kirby, Senior Member, John Kueck, Senior Member, and Fangxing Li, Senior Member Abstract-- This paper describes a suggested tariff
Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE
Understanding Power Factor and How it Affects Your Electric Bill Presented by Scott Peele PE Understanding Power Factor Definitions kva, kvar, kw, Apparent Power vs. True Power Calculations Measurements
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to
Transient analysis of integrated solar/diesel hybrid power system using MATLAB Simulink
Transient analysis of integrated solar/diesel hybrid power system using ATLAB Simulink Takyin Taky Chan School of Electrical Engineering Victoria University PO Box 14428 C, elbourne 81, Australia. [email protected]
FREQUENCY CONTROLLED AC MOTOR DRIVE
FREQUENCY CONTROLLED AC MOTOR DRIVE 1.0 Features of Standard AC Motors The squirrel cage induction motor is the electrical motor motor type most widely used in industry. This leading position results mainly
Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer
Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer A Short Circuit analysis is used to determine the magnitude of short
N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS
N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS 14:8-4.1 Scope This subchapter sets forth net metering requirements that apply to electric power suppliers, basic generation service providers
PM734F - Technical Data Sheet Winding 28
- Technical Data Sheet Winding 28 SPECIFICATIONS & OPTIONS STANDARDS STAMFORD AC generators are designed to meet the performance requirements of IEC EN 60034-1. Other international standards, including
Three phase circuits
Three phase circuits THREE PHASE CIRCUITS THREE-PHASE ADVANTAGES 1. The horsepower rating of three-phase motors and the kva rating of three-phase transformers are 150% greater than single-phase motors
Excitation. www.andritz.com/neptun
Excitation www.andritz.com/neptun 02 NEPTUN Excitation Excitation 3 x 150 MW, Kopswerke II, Austria Dynamics with brain power The excitation system of a synchronous generator makes it possible to supply
SPECIFICATION COG-2007
Cleco Power LLC SPECIFICATION COG-2007 FOR PARALLEL OPPERATION OF CUSTOMER-OWNED GENERATION ON CLECO S ELECTRICAL SYSTEM Revised: March 7, 2014 CONTENTS ITEM NO. TITLE PAGE NO. 1.0 Scope 3 2.0 Policy On
Guidelines for Large Photovoltaic System Integration
1 Guidelines for Large Photovoltaic System Integration Silviu Darie, PhD(EE), PE(EE) Abstract- The paper summarizes the result of a research project funded by the Department of Energy (DOE) in collaboration
Offshore Platform Powered With New Electrical Motor Drive System
Offshore Platform Powered With New Electrical Motor Drive System Authors: Jan O. Lamell, M.Sc E.E. ABB Automation Technologies Presenters: Thomas Johansson, M.Sc E.E. ABB Automation Technologies Timothy
Power System Analysis
PDHonline Course E194 (15 PDH) Power System Analysis Instructor: Timothy L. O'Hearn, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING
The stable way. Synchronous condenser solutions. siemens.com/energy/facts
The stable way Synchronous condenser solutions siemens.com/energy/facts Bringing grids in line with new requirements Global climate change poses new challenges for power generation and transmission. Innovative
HCM434F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet
HCM434F - Winding 311 Technical Data Sheet HCM434F SPECIFICATIONS & OPTIONS STANDARDS Marine generators may be certified to Lloyds, DnV, Bureau Veritas, ABS, Germanischer-Lloyd or RINA. Other standards
2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?
Extra Questions - 2 1. A straight length of wire moves through a uniform magnetic field. The e.m.f. produced across the ends of the wire will be maximum if it moves: a) along the lines of magnetic flux
CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE
CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE Closing date for submission of representations: 30 th Sep 2014, 5 pm 18 AUG 2014 ENERGY MARKET AUTHORITY 991G Alexandra Road #01-29
-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW 10-27-14
PSEG-Long Island Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA s Radial Distribution Systems -1- PSEG-LI Update of LIPA
DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2302 - ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR
1 DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING Constructional details Types of rotors EE2302 - ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR PART A 1.
Modeling and Testing of Unbalanced Loading and Voltage Regulation
National Renewable Energy Laboratory Innovation for Our Energy Future A national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Modeling and Testing of Unbalanced
Improvements of Reliability of Micro Hydro Power Plants in Sri Lanka
Improvements of Reliability of Micro Hydro Power Plants in Sri Lanka S S B Udugampala, V Vijayarajah, N T L W Vithanawasam, W M S C Weerasinghe, Supervised by: Eng J Karunanayake, Dr. K T M U Hemapala
POWER TRANSMISSION FROM OFFSHORE WIND FARMS
POWER TRNSMISSION FROM OFFSHORE WIND FRMS Thorsten Völker University of pplied Sciences Bremerhaven Germany BSTRCT The future for wind power generation in Germany is offshore wind energy. The preferred
Variable Frequency Drives - a Comparison of VSI versus LCI Systems
Variable Frequency Drives - a Comparison of VSI versus LCI Systems Introduction TMEIC is a leader in the innovative design and manufacture of large ac variable f requency drive systems. TMEIC has been
Science and Reactor Fundamentals Electrical CNSC Technical Training Group. Table of Contents
Electrical Science and Reactor Fundamentals Electrical i Table of Contents 1 Objectives... 1 1.1 BASIC ELECTRICAL THEORY... 1 1.2 TRANSFORMERS... 1 1.3 GENERATORS... 2 1.4 PROTECTION... 3 2 BASIC ELECTRICAL
Submit shop drawings for equipment provided under this section Shop drawings shall indicate:
Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,
Three-phase AC circuits
Three-phase AC circuits This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,
Radial Distribution Test Feeders
Radial Distribution Test Feeders Distribution System Analysis Subcommittee Report Abstract: Many computer programs are available for the analysis of radial distribution feeders. In 1992 a paper was published
HARMONIC DISTORTION IN THE ELECTRIC SUPPLY SYSTEM
Technical Note No.3 March 2000 HARMONIC DISTORTION IN THE ELECTRIC SUPPLY SYSTEM This Technical Note discusses harmonic distortion, its causes and adverse effects, what levels are unacceptable and how
Synchronous generators are built in large units, their rating ranging from tens to hundreds of megawatts.
II. Synchronous Generators Synchronous machines are principally used as alternating current (AC) generators. They supply the electric power used by all sectors of modern societies: industrial, commercial,
Current and Temperature Ratings
Document 361-1 Current and Temperature Ratings Introduction This application note describes: How to interpret Coilcraft inductor current and temperature ratings Our current ratings measurement method and
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission
TURBOtech srl. SED-635 Digital Excitation System. Industrial Electronics Sector FEATURES
SED-635 Digital Excitation System SED-635 is a complete excitation system capable of adapting to control synchronous generators of any size. The integration of the TOUCH SCREEN operator interface and a
Renewable Energy Laboratory for Engineering Students
dspace User Conference 2010 India Sept 24 th 10 Renewable Energy Laboratory for Engineering Students H.T Jadhav, S. D. Joshi Rajarambapu Institute Of Technology ABSTRACT Renewal Energy is now included
26 3213.13 Diesel Engine Driven Generators Page 1 of 6
Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at
Understanding Delta Conversion Online "Power Regulation" - Part 2
Application Note #40 Understanding Delta Conversion Online "Power Regulation" - Part 2 Introduction This application note is the second in a series on delta conversion theory of operation. For complete
Renewable Energy Applications: Photovoltaic and Wind Energy Conversion Systems (WECS)
Renewable Energy Applications: Photovoltaic and Wind Energy Conversion Systems (WECS) Josep Pou Antoni Arias Page 1 Outline 1. Renewable Energy Perspectives 2. Solar Photovoltaic (PV) 3. Wind Generation
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
Advanced Protection of Distribution Networks with Distributed Generators
Date:- 8 10 March 2011 Venue: University of Manchester EES-UETP Course title Advanced Protection of Distribution Networks with Distributed Generators Peter Crossley Director of the Joule Centre School
Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH
Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 21 December 2012 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT
Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58300-E Schedule TOU-8-RBU Sheet 1 APPLICABILITY Applicable to the additional
Chapter 24. Three-Phase Voltage Generation
Chapter 24 Three-Phase Systems Three-Phase Voltage Generation Three-phase generators Three sets of windings and produce three ac voltages Windings are placed 120 apart Voltages are three identical sinusoidal
WIND TURBINE TECHNOLOGY
Module 2.2-2 WIND TURBINE TECHNOLOGY Electrical System Gerhard J. Gerdes Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Contents Module 2.2 Types of generator systems
SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS
SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE S By Jack Farrow, May, 2004 WELDING TECHNOLOGY CORPORATION ABSTRACT Information on how to select the correct size of substation transformer and 480V bus to
Simulation of Ungrounded Shipboard Power Systems in PSpice
Simulation of Ungrounded Shipboard Power Systems in PSpice Haibo Zhang IEEE Student Member Karen L.Butler IEEE Member Power System Automation Lab Electrical Engineering Department Texas A&M University
The design and performance of Static Var Compensators for particle accelerators
CERN-ACC-2015-0104 [email protected] The design and performance of Static Var Compensators for particle accelerators Karsten Kahle, Francisco R. Blánquez, Charles-Mathieu Genton CERN, Geneva, Switzerland,
Module Title: Electrotechnology for Mech L7
CORK INSTITUTE OF TECHNOLOGY INSTITIÚID TEICNEOLAÍOCHTA CHORCAÍ Autumn Examinations 2012 Module Title: Electrotechnology for Mech L7 Module Code: ELEC7007 School: School of Mechanical, Electrical and Process
*ADVANCED ELECTRIC GENERATOR & CONTROL FOR HIGH SPEED MICRO/MINI TURBINE BASED POWER SYSTEMS
*ADVANCED ELECTRIC GENERATOR & CONTROL FOR HIGH SPEED MICRO/MINI TURBINE BASED POWER SYSTEMS Jay Vaidya, President Electrodynamics Associates, Inc. 409 Eastbridge Drive, Oviedo, FL 32765 and Earl Gregory,
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
INDUCTION MOTOR PERFORMANCE TESTING WITH AN INVERTER POWER SUPPLY, PART 2
INDUCTION MOTOR PERFORMANCE TESTING WITH AN INVERTER POWER SUPPLY, PART 2 By: R.C. Zowarka T.J. Hotz J.R. Uglum H.E. Jordan 13th Electromagnetic Launch Technology Symposium, Potsdam (Berlin), Germany,
Power Quality Standards for Electric Service
Power Quality Standards for Electric Service Effective June 1, 2008 A transition period will exist from June 1 through December 31, 2008 in which installations may be approved and connected as long as
Short Circuit Current Calculations
Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that
Basic Electrical Technology Dr. L. Umanand Department of Electrical Engineering Indian Institute of Science, Bangalore. Lecture - 33 3 phase System 4
Basic Electrical Technology Dr. L. Umanand Department of Electrical Engineering Indian Institute of Science, Bangalore Lecture - 33 3 phase System 4 Hello everybody. So, in the last class we have been
Chapter 9 Balanced Faults
Chapter 9 alanced Faults 9.1 Introduction The most common types of fault are (in order) single-line-to-ground fault, line-to-line fault, and double-line-to-ground fault. All of these are unbalanced faults.
SCE Experience with PV Integration
SCE Experience with PV Integration EPRI High Penetration PV Grid Integration Workshop April 19, 2012 Tucson, AZ Leading the Nation in Renewable Power Delivery Actual 2010 Renewable Resources 14.5 billion
HVDC-VSC: transmission technology of the future
A bi-pole ± 285 kv HVDC line sandwiched between 3-phase 400 kv HVAC lines. HVDC-VSC: transmission technology of the future A new hybrid HVDC circuit technology using voltage source converters is only half
GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY INADVERTENT-EXPORTING) FORM 14-743
Southern California Edison Revised Cal. PUC Sheet No. 50718-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 31122-E Sheet 1 GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY
Modelling, Simulation and Performance Analysis of A Variable Frequency Drive in Speed Control Of Induction Motor
International Journal of Engineering Inventions e-issn: 78-7461, p-issn: 319-6491 Volume 3, Issue 5 (December 013) PP: 36-41 Modelling, Simulation and Performance Analysis of A Variable Frequency Drive