30 Years of Smart Growth



Similar documents
Light Rail Transit in Phoenix

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

Owner s Procurement Forum

City of Rockville Regional Development Impacts: Transportation Capacity Analysis. June, 2013

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

HOW WILL PROGRESS BE MONITORED? POLICY AREA. 1. Implement the 2040 Growth Concept and local adopted land use and transportation plans

Overview of the Travel Demand Forecasting Methodology

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

Executive Summary. Does a Streetcar Make Sense in Anaheim

Attachment B Policy Audit Template

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

U.S. Department of Homeland Security Nebraska Avenue Complex Master Plan DRAFT ENVIRONMENTAL IMPACT STATEMENT APPENDIX C

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

Introduction to Station Area Planning The Charlotte Story

Transit Service Assessment

CITY OF EL PASO: SUN METRO Legislative Update Briefing

Alewife Working Group June 14, 2016

A Connected Region for Our Future. Tampa Bay Area Regional Transportation Authority Regional Transportation Master Plan

For more information, visit: rethinkingstreets.com

Arlington County Fiscal Year 2014 Summary Report on Capital Bikeshare

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Scenario Planning Report. Austin South Shore Central


A Bicycle Accident Study Using GIS Mapping and Analysis

The LYNX Transit Master Plan. METROPLAN Orlando Presentation

Corridor Goals and Objectives

d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a

College of Southern Maryland. Hughesville Transportation Study

Traffic Information in NYC

Transportation Alternatives

Chapter 9: Transportation

South Waterfront Area Dave Unsworth

EPA Technical Assistance for Sustainable Communities Building Blocks

Schenk-Atwood Neighborhood Business District Master Plan

University Pointe Opportunity Summary. Remaining in Phase I. University Pointe. Hwy. 29 & Brookside Lane Charlotte, NC.

Where Do We Want to Go? How Can We Get There?

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

HUDSON YARDS PROJECT. G r e g K e l l y P r e s i d e n t a n d C E O, U. S., C e n t r a l a n d S o u t h A m e r i c a

Questions and Answers about the Orange Bus/Rail Investment Plan

Presentation to Knox County Commission Monday, February 23, 2015

STOP CONSOLIDATION TRANSIT STRATEGIES

Narrative Response/Attachment 1 (WisDOT TAP- Second Round Application ID-SWBP22)

Downtown Tampa Transportation Vision

FAIRFAX CUE TRANSIT DEVELOPMENT PLAN: FISCAL YEARS

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

Calgary Transit Environmental Stewardship

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination Attachment A

Los Angeles Metro Rapid

Downtown South Salt Lake Redevelopment City of South Salt Lake

Environmental Impact Statement for the Washington Union Station Expansion Project

When is BRT the Best Option? 1:30 2:40 p.m.

Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015)

Protected Bicycle Lanes in NYC

Health Atlas and the Community Health and Equity Index:

2013 Capital Bikeshare Member Survey Report

Lincoln Downtown Master Plan Update

Courtney J. Menjivar PRINCIPAL

SOUTHWEST-TO-NORTHEAST TRANSPORTATION CORRIDOR STUDY

2010 METROBUS FLEET MANAGEMENT PLAN

Comprehensive Plan Policies that support Infill and Mixed Use

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Traffic Impact Study for the North Broadway Mixed-Use Development Chicago, Illinois. Prepared by

A Framework for Monitoring the Performance of Travel Demand Management and Vehicle Miles Traveled (VMT) Reduction Activities

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

Electronic Survey Round 1 Survey Results

Transcription:

30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning, Housing and Development, Planning Division 7-08

PRESENTATION OVERVIEW Review of Arlington s efforts to use transit to both redevelop an older commercial corridor and ensure future riders for the system How we planned and some of the tools we used Identify some of the successes and lessons learned

TRANSIT ORIENTED DEVELOPMENT TOD and smart growth are current buzz words representing the desire for another form of growth Arlington has been in the forefront of this trend for over 30 years

SETTING THE STAGE Arlington is a 26 square mile, urban county which was a part of the original District of Columbia Population 204,800 Jobs 201,400 Housing units 100,614 Located in the core of a rapidly growing Washington region (over 5 million residents, 3 million jobs and 1,200 sq. miles of urbanized area)

SETTING THE STAGE 1960-7.5 million sq. Ft. Office Declining retail corridors Emerging market for government office space Strong single family neighborhoods Large number of garden apartments, some of which were beginning to decline 97,505 jobs 71,230 housing units

ROSSLYN

COURT HOUSE

CLARENDON

CLARENDON - ARLINGTON S OLD DOWNTOWN

CLARENDON 1970s

VIRGINIA SQUARE

VIRGINIA SQUARE - THEN

PARKINGTON (BALLSTON)

SETTING THE STAGE Beginning of the planning for a regional transit system Embarked on an ambitious community planning effort Had already debated the impacts of development vs the benefits of growth and decided we wanted to encourage growth as well as encourage riders

PLANNING HISTORY Arlington lobbied strongly for an underground route along the old commercial corridor vs along the median of future highway ORIGINAL PLANNED ROUTE

Development Concepts Concentrate high and middensity redevelopment around transit stations (highly targeted) and taper down to existing neighborhoods Encourage a mix of uses and services in station areas Create high quality pedestrian environments and enhanced open space Preserve and reinvest in established residential neighborhoods

SECTOR PLANS Adopted a corridor-wide GLUP based on agreed-to development goals Then focused on developing sector plans to create distinctive urban villages Overall vision for each station area Desired public improvements Location for retail Urban design standards

SECTOR PLANS Public infrastructure needs Open space, streetscape standards Each focused on an area of approximately 1/4 mile from the metro station

KEY TO SUCCESS When the planning started for metro: 89% of county planned low residential, garden apartment/th or retail 11 % of county (2 rail corridors) were re-planned to encourage mixed-use, high density development Zoning in the 89 % was primarily low density so little unplanned development can happen

TWO METRO CORRIDORS

HOW WE DID IT Incentive Zoning - GLUP for metro corridors indicated the county s willingness to rezone for higher density but land remained zoned for fairly low density In response to development proposals, county would rezone for higher density use shown on GLUP A special exception, site plan is used to approve the development

HOW WE DID IT Site Plan allows only the specifically approved uses and design Property owner always maintains underlying by-right zoning until they implement approved site plan By-right development is at a much lower density with a more limited array of uses allowed

HOW WE DID IT

HOW WE DID IT The site plan allows significantly higher density & height than underlying zoning By-right Site Plan 1.5 FAR 3.8 10 FAR 35-45 FT 100-300 FT 4 spaces 2 spaces per per 1,000 SF per 1,000 SF

HOW WE DID IT Site plan is approved only if: It complies with the standards of the zoning ordinance, Is in compliance with the mix required by the GLUP Provides the features called for in the sector plan for the area - including public improvements

SITE PLAN Increased density in return for - Building the development we want - Where we want it - And building significant amount of the required and desired public improvements

HOW WE DID IT Some of the zoning tools we ve created include Mixed use - C-0-A: 50/50 res/off mix up to 6.0 FAR can be 100 % residential - R-C: 1.24 FAR office, 2.0 FAR residential - residential must proceed first or concurrent with office Redevelopment - C-O Rosslyn: 10.0 FAR

ROSSLYN TODAY C-O Rosslyn Development: 10 FAR

ROSSLYN TODAY

ROSSLYN TODAY

ROSSLYN TODAY

AERIAL - COURTHOUSE TODAY Rosslyn Arlington County Offices

COURTHOUSE TODAY

CLARENDON TODAY

CLARENDON TODAY

VIRGINIA SQUARE TODAY

VIRGINIA SQUARE TODAY

BALLSTON TODAY

BALLSTON TODAY

Ballston in 1980 Station Entrance

Ballston in 2001 Station Entrance Hotel Commercial office & retail Residential rental Commercial office & retail Park Senior living Planned Entrance Commercial office Planned Residential condo

View of Rosslyn-Ballston Metro Corridor Development Patterns

MEASURING SUCCESS 1970 22,000 jobs 5.5 million sf office 7,000 housing units 2008 90,000 jobs 20.8 million sf office 26,572 housing units

METRO CORRIDORS TOTAL Both Metro Corridors 33,675,000 sq. ft. office w/ 680,000 under construction 39,600 housing units w/ another 1,946 under construction Retail 5,356,000 Jobs 126,100

MEASURING SUCCESS METRO RIDERSHIP (Average daily entries and exits) 1991 ROSSLYN 13,637 COURT HOUSE 5,561 CLARENDON 2,964 BALLSTON 9,482 2006 ROSSLYN 31,662 COURT HOUSE 14,199 CLARENDON 8,190 BALLSTON 24,150

MEASURING SUCCESS ARLINGTON METRO RIDERSHIP Metrorail Weekday Boardings/Alightings 250,000 200,000 150,000 100,000 50,000 0 1980 1990 2000 2006

MEASURING SUCCESS BALANCED DEVELOPMENT = BALANCED RIDERSHIP (2006) 35 30 Arlington Metrorail Stations Ridership by Time Period Passengers Thousands 25 20 15 10 5 Entries Exits 0 AM Peak AM Off PM Peak PM Off Time Periods

PEDESTRIAN ACCESS 73% WALK TO STATION 7.5% 3.6% 5 R-B Corridor Stations 12.9% 2.0% 1.0% Walk Metrobus Other Bus/Vanpool Auto (incl. Dropoff) Other 73.0% No Response

Metrorail Access at 4 Suburban Orange Line Stations 12.0% 14.6% 1.7% Walk Metrobus 9.3% 4.8% Other Bus/Vanpool Auto (incl. drop-off) Other 57.6% No Response/Unknown (Courtesy of Dennis Leach)

MEASURING SUCCESS R-B CORRIDOR DEVELOPMENT: 1970 OFFICE 5,568,600 SF 2007 OFFICE 20,822,000 SF RESIDENTIAL 7,000 UNITS RESIDENTIAL 26,572 UNITS RETAIL 865,507 RETAIL 2,842,169

MEASURING SUCCESS Car ownership (vehicles per household) Nationally, almost 90% have a car; 55% have 2 or more In Fairfax, 96% have at least one; two-thirds have 2 or more Arlington: 12% have zero cars; less than 40% have 2 or more

MEASURING SUCCESS Numbers are more dramatic in Arlington s Metro corridors Car ownership: 17.9% have zero cars, while less than 25% have 2 or more Getting to work: Less than half drive 39.3% use transit 10.5% walk or bike 2.3 work at home

MEASURING SUCCESS Getting to work transit use National avg: 4.7 % Fairfax County: 7.3 % Arlington: 23.3% And, those who walk to work are double the national avg, 5 times Fairfax

Commuting Trends by Mode of Travel Work Trips Drive Alone Train (subway/commuter rail) 2000 55% 2006 47% 2000 18% 2006 27%

Travel Mode to Work Percentage of weekly trips made by each mode Compared to the region, Arlington s Drive Alone rate is 1/3 lower, transit use is double, biking is triple, and walking is six times higher. CP/VP 5% 5% 6% Walk 3% 1% 6% 2006 Resident Survey Bike 3% 1% 1% Arl Residents - 04 SOC Regional Ave - 04 SOC Bus 7% 5% 12% Train Drive alone 13% 27% 26% 47% 58% 74% 0% 10% 20% 30% 40% 50% 60% 70% 80%

Non-Work Travel Mode Drive-alone trips are less than half. 33% Walk 14% CP/VP One-third are made by walking, and one in eight are made by riding or driving with another person. 45% Drive alone 6% 5% 2% 4% Drive alone Walk CP/VP Train Bus Bike Other Q J-7, J-8, J-13 What type or types of transportation did you use for <these trips>?

MEASURING SUCCESS- Transit Ridership Trends Arlington-Related Trips FY1996 Actual FY 2001 Actual FY 2006 Estimate % Growth Metrorail Arlington Stations 45,335,000 56,278,412 64,864,200 43.0% Metrobus Arlington Routes 12,049,000 11,614,599 13,221,100 2.9% VRE Crystal City Station 567,000 586,069 992,600 75.1% Arlington Transit (ART) 105,000 147,813 926,600 882.5% Total Annual Ridership 58,076,000 68,626,893 80,004,474 37.5%

MEASURING SUCCESS

MEASURING SUCCESS Street Segment Traffic Trends on Arterial Streets Street Type 1996 2001 2006 % Change 1996-2006 Lee Hwy - Rosslyn EW 6-lane arterial 37,770 33,632 32,428-14.1% Wash. Blvd VA Sq. EW 4-lane arterial 20,469 19,478 18,069-11.8% Clarendon Blvd. EW 2-lane 1- way arterial 13,980 14,199 14,539 4% Wilson Blvd. - Clarendon EW 2-lane 1- way arterial 16,368 16,265 13,797-15.8% Arlington Blvd. EW 6-lane arterial 55,865 63,272 60,223 7.8% Glebe Road - Ballston NS 6-lane arterial 35,230 39,409 35,900 1.2% G. Mason Drive west of Ballston NS 4-lane arterial 20,002 22,578 23,386 16.9%

MEASURING SUCCESS Traffic Trends Regional & Local Facilities 200,000 175,000 150,000 125,000 100,000 75,000 50,000 25,000 0 50,000 40,000 30,000 20,000 10,000 0 GW Pkwy Rt. 1 Wash. Blvd. Lee Hwy Arl. Blvd Col. Pk. Carlin Sp. I-66 I-395 G. Mason 1980 1990 1996 2002 1980 1991 1996 Present Substantial growth in traffic volumes on regional limited access highways, with most of the growth between 1980 and 1990 Modest growth in traffic on arterial and local streets which has flattened out in the last 10 years (averaging less than ½% per year on many streets)

MEASURING SUCCESS $12.7 billion of total $27 billion in assessed land value in the county is in the metro corridors which is 11% of total land Today Arlington has more office space than downtown Dallas Pittsburgh Denver

MEASURING SUCCESS County has maintained low property tax rate ($.973 per $100 fmv) and maintains amongst the highest levels of services County consistently maintains AAA bond rating from all rating agencies

EPA SMART GROWTH AWARD

OTHER AWARDS League of American Bicyclists -- Bicycle Friendly Community designation APTA -- Outstanding Public Transportation System Award (for ART) American Podiatric Association -- Best Walking City in America

LESSONS LEARNED Transit investments can be used as a catalyst to reshape communities Multimodal transportation strategies can result in substantial benefits allowing continued growth with less reliance on autos Establish the vision, design supportive public policies/plans and tools and be patient Build community consensus

LESSON LEARNED Ensure that transit is integrated with development not secondary An attractive and functional pedestrian environment is important Develop public-private partnerships to continue consensus building and assist in the implementation Integrity of plan be consistent Do the detailed planning at the sector area to avoid the battles at development review time

LESSON LEARNED Station areas must be able to satisfy the daily needs of users if they are to really to leave their cars behind (mixed use) Reduce parking requirements Provide multiple transit options

CONTACT INFORMATION Robert Brosnan Planning Director Department of Community Planning and Development 703-228-3516 rbrosnan@arlingtonva.us www.arlingtonva.us