WASHTENAW COUNTY ROAD COMMISSION

Similar documents
2012 Program Report. Agricultural Group Drainage Program

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Meeting Minutes Lodi Township Planning Commission. August 25, 2015 Lodi Township Hall 3755 Pleasant Lake Road Ann Arbor, MI 48103

Monitoring Highway Assets with Remote Technology

SKILLED NURSING FACILITIES Washtenaw & Western Wayne Counties WASHTENAW COUNTY

HUD APPROVED COUNSELING AGENCIES

2014 CONSTRUCTION PLAN

Asset Management Plan for Pavements PREPARED BY: MECOSTA COUNTY ROAD COMMISSION

Historic Barns Driving Tour of 19th and 20th Century Barns Washtenaw County, Michigan

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Informational Workshop Public Meeting Kanawha Falls Bridge Project

WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SUMMARY OF INVENTORY FINDINGS:

Small Dam Hazard Assessment Inventory

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

VILLAS OF TRADITIONS AT GREY OAKS

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

11 p.m. to. Tuesday, June. will remain open. 14. closed

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

Guidelines for Fiber Optic Cable Permits

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

CID STREET INFRASTRUCTURE ASSESSMENT

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS

Local Road Assessment and Improvement Drainage Manual

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Washtenaw Housing Education Partners (WHEP)

Virginia Department of Transportation Rural Rustic Road Program Manual

QUOTATIONS FOR SUPPLY AND DELIVERY OF RECURRING SERVICES

UNIT PRICE LIST January 2009

Pavement Management Program

CULTURAL HISTORY The United States Public Land Survey System The Rectangular Grid By Neal McLain

Homeowner s Guide to Drainage

Asphaltic Wedge Paving

Corridor Goals and Objectives

JEFFERSON COUNTY ROAD DEPARTMENT HIGHWAY PERMIT USE OF ROADS FOR HAUL ROUTE / EVENT ROUTE. Hereinafter referred to as County/Owner and Name

Contracts. Definitions. Guidelines for contractors and subcontractors

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

TYRONE TOWNSHIP REGULAR BOARD MEETING APPROVED MINUTES JUNE 16, 2015

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Valdosta Land Development Regulations. Table of Contents

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

General Obligation Bond Projects FYE

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

8.1 APPENDIX A. SUBDIVISION DATA REQUIREMENTS

CITY OF ST. ANN SEWER LATERAL REPAIR POLICY

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

The Trust for Public Land CREATING PARKS FOR PEOPLE CONNECTING CLEVELAND THROUGH PARKS AND TRAILS

Arkansas County. Baxter County

SECTION 5 DRAFTING STANDARDS

DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD

CAPITAL IMPROVEMENT PLAN


How To Improve Safety

Transportation Network Analysis. A. Overview

River Flood Assessment for northeast SC and southeast NC Saturday, October 17, AM EDT

Pavement Management Implementation: Success Stories for Maryland Counties

For Sale - $11,000,000 - Negotiable Excellent User Opportunity -

Request for Proposals July 13, 2015

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Exhibit A Scope of Work

Forrest Hills Annexation into Avondale Estates What Do You Need to Know?

Transportation Asset Management Program 2009 Federal Aid PASER Road Survey. August 2009

New Commercial Service Application

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

RESOLUTION R PASSED AT SYCAMORE, ILLINOIS, THIS 16th DAY OF JUNE 2004, A.D. Chairman, DeKalb County Board ATTEST: County Clerk

2015 Fire Calls (as of 12/23/15)

Transcription:

WASHTENAW COUNTY ROAD COMMISSION TO: FROM: Washtenaw County Board of Road Commissioners Roy D. Townsend, P.E. Managing Director SUBJECT: Staff Report 5-26-14 to 6-8-14 DATE: June 17, 2014 TOWNSHIP REPORTS A. Maintenance Scraping of soft surfaced roads and patching of paved roads took place throughout the County and dust control of both the primary and local roads has started. In addition, the following specific maintenance activities were performed in individual townships. ANN ARBOR TOWNSHIP Limestone Patch Warren Road: 30 tons Pick-up Fallen Trees Whitmore Lake Road Repair Washouts Warren Road (.5 ton limestone) AUGUSTA TOWNSHIP Limestone Patch Bunton Road, Tuttle Hill Road, Torrey Road, Hitchingham Road: 160 tons Cut Bleeders Bunton Road, Gooding Road, Hitchingham Road, Liss Road Roadside Trash Removal Gooding Road, Hitchingham Road BRIDGEWATER TOWNSHIP Limestone Patch McCollum Road: 55 tons Gravel Patch Sheridan Road, Burmeister Road, Kaiser Road, Hack Road: 100 tons Roadside Trash Removal Clinton Road Pick-up Fallen Trees Clinton Road DEXTER TOWNSHIP Repair Washouts N. Territorial Road (1 ton limestone) Boom Mow Colby Road, Dexter Townhall Road, Riker Road Limestone Patch Shoulders Dexter-Pinckney Road: 8 tons Ditching Dexter Townhall Road Clean Culverts Island Lake Road, Dexter Townhall Road FREEDOM TOWNSHIP Gravel Patch Bemis Road, Waters Road, Luckhardt Road: 44 tons Limestone Patch Waters Road: 10 tons Roadside Trash Removal Saline Waterworks Road

LIMA TOWNSHIP Limestone Patch Fletcher Road: 18 tons Gravel Patch Jerusalem Road: 16 tons Pick-up Fallen Trees Old US-12 East, Trinkle Road Repair Washout McKinley Road (5 tons limestone) Boom Mow Steinbach Road, Trinkle Road LODI TOWNSHIP Limestone Patch Zeeb Road: 14.5 tons Gravel Patch Alber Road, Bethel Church Road: 30 tons Ditching Dell Road Culvert Replacement - Ellsworth Road LYNDON TOWNSHIP Gravel Patch Clarks Lake Road, Island Lake Drive: 28 tons Repair Washout Island Lake Road (4 tons limestone) Pick-up Fallen Trees Guinan Drive, Roe Road Clean Drains Guinan Drive Limestone Patch Lingane Road, Island Lake Drive: 23 tons MANCHESTER TOWNSHIP Gravel Patch Burtless Road, English Road: 28 tons Pick-up Fallen Trees Van Tuyle Road NORTHFIELD TOWNSHIP Limestone Patch Hellner Road, Kearney Road, Six Mile Road, Nollar Road, Five Mile Road, Jennings Road, Earhart Road, Joy Road: 289 tons Pick-up Fallen Trees Kearney Road PITTSFIELD TOWNSHIP Limestone Patch Morgan Road, Textile Road, Bemis Road, Iris Lane, Payeur Road, Poppy Lane: 120 tons Road Repair Moon Road Pick-up Fallen Trees Morgan Road Limestone Patch Shoulders Moon Road: 15 tons Roadside Trash Removal Carpenter Road, Ellsworth Road, Lohr Road, Oak Valley Drive Clean Drains Ellsworth Road SALEM TOWNSHIP Limestone Patch Dixboro Road, Six Mile Road, Five Mile Road, Tower Road, Brookville Road: 126 tons 2

SALINE TOWNSHIP Scrape and grade Marion Road and Roehm Road Scrape and dust control Arkona Road, Case Road, Lindsley Road, Willow Road and Mooreville Road SCIO TOWNSHIP Gravel Patch E. Delhi Road: 12 tons Repair Washouts N. Delhi Road, E. Delhi Road Ditching E. Delhi Road Clean Drain Jackson Road Limestone Patch Shoulders Miller Road, Zeeb Road: 5 tons SHARON TOWNSHIP Gravel Patch Peckins Road, Hashley Road: 29 tons SUPERIOR TOWNSHIP Limestone Patch Warren Road, Harris Road, Gotfredson Road: 86 tons Pick-up Fallen Trees Prospect Road SYLVAN TOWNSHIP Gravel Patch Bush Road, Conway Road: 44 tons Limestone Patch Lingane Road: 17 tons Pick-up Fallen Trees Old US-12 Road WEBSTER TOWNSHIP Clean Culverts N. Territorial Road Limestone Patch Cobble Lane, Gregory Road: 20 tons Repair Washouts Farrell Road, Scully Road Limestone Patch Shoulders Joy Road, Mast Road: 5 tons Ditching N. Territorial Road, Walsh Road YORK TOWNSHIP Limestone Patch Willow Road, Fosdick Road: 120 tons Road Repair Platt Road Limestone Patch Shoulders Platt Road: 15 tons Boom Mow Crane Road YPSILANTI TOWNSHIP Limestone Patch Shoulders Clark Road, Textile Road, Rawsonville Road, McCartney Road: 25 tons Clean Catch Basins Studebaker Avenue Repair Drains Summerdale Court East, Woodruff Lane, Ellis Road, Valley View Drive, Midvale Avenue, Fox Avenue, Watson Avenue, Dover Drive Pick-up Fallen Trees Martz Road Clean Drains Emerson Avenue, Harris Road, Russell Street Roadside Trash Removal George Place, Clark Road, Morgan Road 3

STATE TRUNKLINE Patrol Patching I-94, US-23, M-17, US-12 Cable / Guardrail Maintenance/Repairs I-94, US-12, M-17, US-23 Limestone Patch Shoulders M-153, US-23: 110 tons Roadside Trash Removal I-94, US-23, M-14, M-52, US-12 Clean Culverts US-23 Pick-up Fallen Trees US-23 B. Project Development Staff attended a pre-construction meeting for the Textile Non-Motorized Path project in Ypsilanti Township and began preparing for construction staking. Staff continued the design survey on the Textile Intersections Improvement project in Ypsilanti Township. Staff has implemented a project to improve the documentation and mapping process related to the MS4 permit. Staff began witnessing centerline alignment monuments in preparation for the 2014 construction and overlay projects so that the monuments will be re-established or preserved after construction. Staff met with two property owners to explain the needs of the Island Lake Road at Wylie Road Improvement project. Staff completed the final review of the Verizon lease documents with counsel and Verizon representatives. Staff continues to monitor developments pertaining to the proposed modification of the south driveway access easement serving Yard 1. Staff developed WCRC parcel base framework for GIS application. Staff provided an update to the entity interested in pursuing a lease on the Austin Road property (Boelter pit) in Manchester Township. C. Permits & Construction Review & Permit Activities Staff received 35 new right-of-way permit applications and 12 plans during this period for review. At this time there are 182 pending right-of-way permits (applied for but not issued); 63 residential, 65 commercial, 37 utility, and 17 miscellaneous permits. Currently there are 642 active right-of-way permits (issued & awaiting completion); 286 residential, 55 commercial, 194 utility, and 107 miscellaneous permits. Staff issued 28 residential driveways, four commercial, nine utility, eight miscellaneous, and 39 transportation permits and receipted approximately $269,795 in permit fees and surety during this period. PITTSFIELD TOWNSHIP Ann Arbor-Saline Road: The Contractor has moved into Stage 2 and is working on removals and grading. Carpenter Road, Bemis Road to Merritt Road: The Contractor is working on the punch list. Carpenter Road, Packard Road to Washtenaw Avenue: The project was awarded to Angelo Iafrate Construction Co. who was the low bidder at $2,746,468.82. Work is scheduled to begin June 16th. Oak Valley Apartments: The Contractor is working on site utility work and building construction. 4

Versa Development (Meijer Outlots): The Contractor is working on site removals and earthwork. SALINE TOWNSHIP Feldkamp Rd Bridge over Saline River: The Contractor completed the bridge rails and paved the HMA approaches. YORK TOWNSHIP York Crest: The Contractor completed the aggregate base and is preparing to pave the HMA base course. YPSILANTI TOWNSHIP Ford Boulevard Bridge over MDOT/Amtrak Railroad: The Contractor is working to secure a permit time extension from the railroad in order to complete project work. 5