By Tom Brooke PE, CEM

Similar documents
85 F 80 F 50% 75 F 70 F 73.0/ F 10% Figure 1

Dr. Michael K. West, PE 1 Dr. Richard S. Combes, PE 2 Advantek Consulting / Melbourne, Florida

Moisture Control. It s The Dew Point. Stupid! Its not the humidity.

Measuring The Right Thing For Humidity Control It s the Dew Point Stupid!

Innovent LASER Packaged Fresh Air Conditioning Units

Hospital Application Guide. Cost-effective climate control for hospitals

Controlling Wrap-Around Heat Pipes for Systems with Strict Space Humidity Requirements. By Michael O. Davis, PE, November 2015

APPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application

APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems

HVAC Systems: Overview

Defining Quality. Building Comfort. Precision. Air Conditioning

3/29/2012 INTRODUCTION HVAC BASICS

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Glossary of Heating, Ventilation and Air Conditioning Terms

Optimization of Water - Cooled Chiller Cooling Tower Combinations

ENHANCED LABORATORY HVAC SYSTEM

Greenhouse Cooling. Why is Cooling Needed?

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Dehumidification Frequently Asked Questions

Theoretical Study on Separate Sensible and Latent Cooling Air-Conditioning System

Get the FACTS about SEER and Deliver Better Customer Value

Analysis of data centre cooling energy efficiency

Venice Library Humidity Study. for Williams Building Diagnostics, LLC th Street West Bradenton, FL Report April 13, 2015

Dedicated Outdoor Air-Dual Wheel System Control Requirements

Total Heat Versus Sensible Heat Evaporator Selection Methods & Application

Infrastructure & Cities Sector

Comparing Air Cooler Ratings Part 1: Not All Rating Methods are Created Equal

Legacy Data Centres Upgrading the cooling capabilities What are the options?

Pool Dehumidification Basics

HVAC Calculations and Duct Sizing

THE PSYCHROMETRIC CHART AND ITS USE

Green Building Handbook for South Africa Chapter: Heating, Ventilation and Cooling Luke Osburn CSIR Built Environment

Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions

How To Design A Building In New Delhi

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

HVAC Efficiency Definitions

Energy Efficient Building Design College of Architecture Illinois Institute of Technology, Chicago. Relative Humidities RH%

Bring the fresh in. Dedicated Outside Air Systems

Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE

Using Wet-Bulb Economizers. Data Center Cooling

Energy Recovery Ventilation Equipment

Troubleshooting an Air Conditioning system. R D Holder Eng. Roger D Holder MSME

Lesson 36 Selection Of Air Conditioning Systems

Environmental Data Center Management and Monitoring

Characteristics of Evaporators

CRITICAL COOLING FOR DATA CENTERS

FLORIDA SOLAR ENERGY CENTER

Tom Brooke, PE, MBA, CEM


Matching the Sensible Heat Ratio of Air Conditioning Equipment with the Building Load SHR

FIRST RADIANT COOLED COMMERCIAL BUILDING IN INDIA CRITICAL ANALYSIS OF ENERGY, COMFORT AND COST

TODAY S PARADIGM FOR AIR TO AIR HEAT RECOVERY

Preliminary Final Proposal

LIQUID DESICCANT AIR CONDITIONING Saves energy, Controls humidity, Cleans air. Trevor Wende Vice President, Marketing Advantix Systems, Inc.

Wet Bulb Temperature and Its Impact on Building Performance

EnergyPro Building Energy Analysis. Assisted Living Building

Flexibility, Efficiency In San Antonio Arena

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates

HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Improving Data Center Energy Efficiency Through Environmental Optimization

Creating Efficient HVAC Systems

HVAC Processes. Lecture 7

Heating, Ventilation & Air Conditioning Equipment

Energy Efficiency. Energy Efficient Home Cooling:

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Energy Efficiency in Industrial HVAC Systems

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Analysis of HVAC Control Strategies

TODAY S PARADIGM FOR HEAT RECOVERY - PART 2

Tech Byte 27: Small Computer Room and IT Closet Cooling

AIR SYSTEMS ENERGY SERIES Energy Recovery Wheels

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

What is LEED? Why pursue LEED accreditation? How does LEED accomplish these goals? Sustainable sites Water efficiency Energy and Atmosphere

Whole House Dehumidification for Occupant Comfort and Energy Savings

ASHRAE Rocky Mountain Chapter. RickPhillips Phillips, P.E., PE LEED AP Senior Mechanical Engineer The RMH Group, Inc.

AC System Equipment Specification, Installation and Operational Options for Improved Indoor Humidity Control

Chilled Water HVAC Systems

DEVELOPMENT OF AN OPEN SOURCE HOURLY BUILDING ENERGY MODELING SOFTWARE TOOL

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

Lower Energy Costs with Rooftop Air-Conditioning Package Units

Answers to Your Questions from the Webinar

ASHRAE Climatic Data Activities. Dru Crawley Didier Thevenard

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.

Data Center Heat Rejection

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Dedicated Outdoor Air Systems (D.O.A.S.)

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

MEETING AGENDA. Project Administrator:

NADCA White Paper: Restoring Energy Efficiency Through HVAC Air Distribution System Cleaning

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

How To Buy A Lennox Power System

Engineering White Paper UTILIZING ECONOMIZERS EFFECTIVELY IN THE DATA CENTER

Element D Services Heating, Ventilating, and Air Conditioning

Sustainable Preservation Practices for Managing Storage Environments Webinar: April 3, 2013

Variable Air Volume - VAV

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

Transcription:

Air conditioning applications can be broadly categorized as either standard or critical. The former, often called comfort cooling, traditionally just controlled to maintain a zone setpoint dry bulb temperature and the zone relative humidity was allowed to vary over a wide range. However, the relevant ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality, has recently been tightening acceptable design practices to specifically limit the relative humidity. Paragraph 5.9.1 in the 2010 edition requires a maximum of 65% relative humidity with the: a) outdoor air at design dew point and mean coincident dry bulb temperature, b) sensible and latent zone loads at design values, and c) solar load at zero. These conditions define a very low load Sensible Heat Ratio (SHR) for the equipment to meet and force the system designer to now consider relative humidity even for comfort cooling applications. Critical applications, often called process cooling, require both temperature and relative humidity to be actively controlled, with the humidity typically specified within a maximum range of plus or minus 10%. In a tropical location, often just the maximum relative humidity is specified. Examples include medical applications, laboratories, and the manufacturing of such products as pharmaceuticals. In all cases, the humidity is specified because it has been proven that a relative humidity outside the specified range causes health, test result, or product problems respectively. It s noteworthy that the air conditioning systems (and their accompanying psychrometrics) for both standard and critical applications are very similar, down to a required zone dew point of about 38ºF. Therefore, the Green Solution discussed later may be applied on both systems to save significant energy and other operational costs while meeting all code requirements. Figure 1 Tropical locations are defined as being within 23.5º of the equator (Figure 1). While globally there are some arid areas within this category, there are obviously a huge number of controlled humidity applications in this region. When designing a controlled humidity air conditioning system for those locales, the designer must recognize two important differences between, say, Raleigh (often called a Southern city), and San Juan (a true tropical location): 1

Cumulative Annual Hours By Tom Brooke PE, CEM 1. The higher tropical absolute ambient design moisture level, whether defined by the traditional Design Dry Bulb and Mean Coincident Wet Bulb, or the newer Design Dew Point and Mean Coincident Dry Bulb, as shown by Figure 2. City, State San Juan, P.R. Design Dry Bulb ASHRAE 1% Design Condition Mean Coincident Wet Bulb Dew Point Design Dew Point Mean Coincident Dry Bulb Grains Moisture per Lb of Dry Air 90 78 73.7 78 84 146.08 Raleigh, N.C. 90 75 69.0 74 81 127.34 Figure 2 The higher design dew point carries nearly 15% more moisture per lb of air, with similar increases at other BIN conditions. 2. The higher tropical hours at all the higher ambient moisture levels, as shown in Figure 3. 8,000 Cumulative Hours at Dewpoint 6,000 4,000 San Juan Raleigh 2,000 0 66 69 72 74 76 78 80 Dewpoint ⁰F Figure 3 Additionally, if there are higher than normal internal latent loads, or lower sensible loads due to cool roofing, high R-value walls, etc., the system design must be especially thoughtful. To summarize, while the traditional tropical design dry bulb temperatures may be similar to those of mainland US, a closer scrutiny technically confirms what one would suspect, namely that installations in tropical locations do, in fact, have a considerably higher moisture load annually with which to contend. Further, with the dry bulb temperatures being similar (a measure of the sensible load), necessarily the moisture load (latent 3load) percentage of the total load will be higher in the tropics. This would also be 2

expressed that the SHR of the load, and therefore of the equipment, is reduced at a tropical location. Even a slight reduction in the SHR has huge implications for the equipment design and selection. Further, a controlled humidity application traditionally meant an overcool and reheat system. While it does produce the required space conditions, it does so with a huge energy penalty (see following discussion). But amazingly, later we ll discuss a system that actually reduces the outside energy required compared to a non-critical application. Our task is to examine the energy usage of both a traditional and a green air conditioning system for a tropical, controlled humidity application. A brief look at relative first cost and maintenance costs is also given, so together the reader may be provided a good overview of the relative total system life cycle costs to the owner. Figure 4 shows the essence of the traditional psychrometric process used in commercial/industrial applications to control humidity. The primary components are the chilled water coil which reduces the air to the dew point required to meet the latent load, and the (typically) hot water coil in the reheat position that then raises the air s dry bulb temperature to meet the sensible load. Figure 4 This overcool and reheat psychrometric process is generally disallowed by ASHRAE Standard 90.1-2010, Para 6.5.2.3, but provision (d) does allow this type of system for process applications. It s a little lower in first cost, has been around for many years, and since it does produce the required set point zone temperature and humidity, some system designers stop further investigation. However, this system 3

requires huge energy outlays, causing a very costly life cycle burden to the building owner, or more precisely, to whomever pays the energy bills. Why will be seen shortly! These systems are typically run 24/7. Although a mixed air system is shown, 100% outside air systems are also very common in critical applications and, in fact, the energy use of the traditional brute force system is even higher in tropical locations. However and to some peoples surprise, because the weighted average (by hours) enthalpy of mixed air systems is higher in non-tropical locations than 100% outside air systems, the reverse is generally true in non-tropical locations! The annual energy cost of such a typical mixed air system of 10,000 CFM in San Juan supplying constant 62ºF dry bulb and 53ºF dew point air is about $53,900 (24/7, 50% OA, 75ºF DB/50%RH Return Air,.70 Kw/ton cooling and 70% heating system efficiencies, $.15/Kwh, $1.50/therm). Figure 5 shows today s green solution, devised and applied since the eighties, with heat pipes wrapped around the cooling coil. Figure 5 Referring to Figure 6 representing design conditions in the previously mentioned system, since the air is cooled by the cooling coil, the upstream precool heat pipe is exposed to a higher dry bulb temperature (point MA) than the downstream reheat heat pipe (point LA). Heat from the air (BTUs) is absorbed by evaporation of the critically charged refrigerant in the precool heat pipe, transported to the downstream reheat heat pipe through connecting tubes, and released to the airstream by condensation of the 4

refrigerant (points LA to SA). Thus free reheat is provided, and very importantly, free precooling is also provided, doubling the system savings! Figure 6 Interestingly, provision (e) of the previously mentioned ASHRAE Standard 90.1 specifically allows the use of such systems that make use of site-recovered heat, including heat from the precooling effect in the case of wrap around heat pipes. At less than design ambient conditions, both heat pipes will have a decreased temperature change across them, so (typically) a hot water reheat coil is designed to make up the difference from the reduced reheated air dry bulb for systems designed for a constant supply air temperature. While sometimes an air handling unit (AHU) serves a single zone, often zones with similar absolute dew point (humidity) but different temperature requirements are served by a single AHU. This application moves the hot water reheat coil from inside the AHU to inside one, some, or all of the ductwork branches serving the different zones, but the basic psychrometrics are the same. When designing a multiple zone AHU with heat pipes, there are two approaches, and both start from the idea that to save maximum energy, the heat pipes should be sized for as large a delta T in the reheat heat pipes as possible: 5

1. Size the heat pipes to carry the minimum reheat temperature change in all the zones, and let the duct mounted hot water reheat coils trim to maintain its zone dry bulb set point. 2. Install a small sensible load only air conditioner (fan coil unit) in one or two of the small (or zero) zones that are forcing a downsizing of the heat pipes. While some energy savings are lost in those zones, all the other zones save additional energy on both the precool and reheat sides, for even more overall energy savings. 60,000 Annual System Energy Cost ($) 40,000 20,000 0 Without Heat Pipes Figure 7 With Heat Pipes Here s the payoff: while the Brute Force solution has an annual energy cost of $53,900 (Figure 7), the Green solution costs only $34,400, for a 36% annual savings. But that s not all The heat pipes also: 1. Have no moving parts so no additional maintenance beyond normal coil cleaning. 2. Have exactly the same materials and methods of construction as the cooling coils for time-proven duty. 3. Allow either downsizing of the cooling and heating central plants when heat pipes are installed in new AHUs, or postponing capital expenditures of growing plants when heat pipes are installed in existing AHUs. 4. Are used on both chilled water and Direct Expansion systems. 5. Use the same control sequence as the Brute Force method. Further, with today s Building Management Systems, it s easy to add some sensors and a few simple formulae to show and document real time and trending energy savings. Heat pipes are also the most economical solution (a specific example is given in the next section) to fix an existing humidity problem. Perhaps the outside air amount has increased, more people are being served, or lighting retrofits and/or solar film has been added to the windows reducing the sensible load 6

but increasing the latent percentage. In any event, most AHUs can be site custom fitted with wrap around heat pipes for the most cost effective solution to a high humidity problem. If reheat coils are not used to control humidity, the heat pipes will reduce the Sensible Heat Ratio (SHR) so that the AHU does additional latent cooling, less sensible cooling and about the same total cooling. Life cycle costs are the first cost and operating costs, and the latter includes the maintenance and utilities cost. With today s pricing (February 2011), the incremental first cost of furnishing and installing wrap around heat pipes into a new 10,000 CFM AHU is about $13K total, or about $21K for a site retrofit. There are no moving parts associated with the heat pipes, and the materials of construction are the same as the other coil surfaces in the AHU. Therefore, the only additional maintenance would be cleaning the heat pipe coil surfaces at the same frequency as the other coil surfaces in the AHU, and with the same procedures. Based on $80 for one man-hour fully burdened twice a year and an estimate of $50 for materials used, we find an incremental annual maintenance cost of $210. The annual reduced utilities cost has already been determined to be $19,500. Please note that this figure already accounts for the slightly increased fan motor BHP needed for the heat pipes static pressure loss. So, the paybacks are 9 and 13 months for heat pipes installed in new or existing equipment respectively, surely a welcome return on investment! Wrap around heat pipes have been used for decades in the most demanding and critical applications where humidity is of concern. They provide exactly the same psychrometrics as when reheat is used to control humidity, are nearly maintenance free, need no special controls or attention, and offer exceptional economics. There is even an Air Conditioning Heating Refrigeration Institute (AHRI) task force developing a rating standard (AHRI Standard 930P), which will set the stage for a certification program. What more could one ask for? Heat Pipe Technology pioneered the use of heat pipes for dehumidification over a quarter century ago, and since then has continually led the HVAC industry in heat pipe science with thousands of installations in critical applications. Heat pipes are also available for HVAC and process heat recovery in side-by-side and split versions. 7