LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6 $6.99 102.1 OBLITERATING ABANDONED STREET ( > 25,000 S.Y.) S.Y. 12 $3.41 103.1 REMOVE CONCRETE CURB (< 700 L.F.) L.F. 24 $3.29 103.1 REMOVE CONCRETE CURB (700 L.F.< X < 10,000 L.F.) L.F. 21 $4.07 103.1 REMOVE CONCRETE CURB ( > 10,000 L.F.) L.F. 7 $2.88 103.2 REMOVE CONCRETE TRAFFIC BARRIER L.F. 17 $13.93 103.3 REMOVE CONCRETE SIDEWALKS & DRIVEWAYS ( < 1,000 S.F.) S.F. 15 $2.39 103.3 REMOVE CONCRETE SIDEWALKS & DRIVEWAYS (1,000 S.F. < X < 3,000 S.F.) S.F. 16 $1.70 103.3 REMOVE CONCRETE SIDEWALKS & DRIVEWAYS (3,000 S.F. < X < 10,000 S.F.) S.F. 8-103.3 REMOVE CONCRETE SIDEWALKS & DRIVEWAYS ( > 10,000 S.F.) S.F. 7 $1.26 103.4 REMOVE MISCELLANEOUS CONCRETE S.F. 16 $2.39 104.1 STREET EXCAVATION ( < 1,000 C.Y.) C.Y. 45 $19.46 104.1 STREET EXCAVATION (1,000 C.Y. < X < 10,000 C.Y.) C.Y. 48 $17.43 104.1 STREET EXCAVATION ( > 10,000 C.Y.) C.Y. 7 $23.66 105.1 CHANNEL EXCAVATION ( < 150 C.Y.) C.Y. 0 $21.47 105.1 CHANNEL EXCAVATION (150 C.Y.< X < 5,000 C.Y.) C.Y. 32 $19.05 105.1 CHANNEL EXCAVATION(5,000 C.Y.< X < 70,000 C.Y.) C.Y. 24 $12.29 105.1 CHANNEL EXCAVATION ( > 70,000 C.Y.) C.Y. 0 $7.01 106.1 BOX CULVERT EXCAVATION & BACKFILL (< 600 C.Y.) C.Y. 7 $24.93 106.1 BOX CULVERT EXCAVATION & BACKFILL (600 < X < 10,000 C.Y.) C.Y. 32 $10.68 106.1 BOX CULVERT EXCAVATION & BACKFILL (> 10,000 C.Y.) C.Y. 6 $10.07 107.1 EMBANKMENT (FINAL)(ORD COMP)(TY A) C.Y. 23 $17.40 107.1 EMBANKMENT (FINAL)(ORD COMP)(TY B) C.Y. 32 $11.68 107.1 EMBANKMENT (FINAL)(ORD COMP)(TY C) C.Y. 0 $10.00 107.1 EMBANKMENT (FINAL)(ORD COMP)(TY D) C.Y. 0 $18.67 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY A) C.Y. 5 $51.60 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) C.Y. 30 $16.05 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY C) C.Y. 2 $14.26 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY D) C.Y. 14 $18.79 107.2 EMBANKMENT (ORIGINAL)(ORD COMP)(TY A) C.Y. 0 $16.04 107.2 EMBANKMENT (ORIGINAL)(ORD COMP)(TY B) C.Y. 0 #DIV/0! 107.2 EMBANKMENT (ORIGINAL)(ORD COMP)(TY C) C.Y. 0-107.2 EMBANKMENT (ORIGINAL)(ORD COMP)(TY D) C.Y. 0-107.2 EMBANKMENT (ORIGINAL)(DENS CONT)(TY A) C.Y. 0 $8.46 107.2 EMBANKMENT (ORIGINAL)(DENS CONT)(TY B) C.Y. 0 #DIV/0! 107.2 EMBANKMENT (ORIGINAL)(DENS CONT)(TY C) C.Y. 0-107.2 EMBANKMENT (ORIGINAL)(DENS CONT)(TY D) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(ORD COMP)(TY A) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(ORD COMP)(TY D) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(DENS CONT)(TY A) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(DENS CONT)(TY B) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(DENS CONT)(TY C) C.Y. 0-107.3 EMBANKMENT (VEHICLE)(DENS CONT)(TY D) C.Y. 0-108.1 LIME TREATED SUBGRADE (6" COMPACTED DEPTH) S.Y. 77 $4.88 108.1 LIME TREATED SUBGRADE (12" COMPACTED DEPTH) S.Y. 0 #DIV/0! 108.2 LIME ( < 100 TON.) TON. 50 $171.63 108.2 LIME ( > 100 TON.) TON. 20 $166.04 109.1 CEMENT TREATED SUBGRADE (6" INCHES COMP. DEPTH) S.Y. 8 $8.24 109.2 CEMENT TON 8 $189.79 DIVISION II - BASE & SURFACE COURSES 200.1 FLEXIBLE BASE (6" COMPACTED DEPTH) S.Y. 12 $5.76 200.1 FLEXIBLE BASE (7.5" COMPACTED DEPTH) S.Y. 0 $9.40 200.1 FLEXIBLE BASE (8" COMPACTED DEPTH) S.Y. 0 $9.44 200.1 FLEXIBLE BASE (10" COMPACTED DEPTH) S.Y. 0 #DIV/0! 200.1 FLEXIBLE BASE (13" COMPACTED DEPTH) S.Y. 7 $7.62 200.1 FLEXIBLE BASE (17" COMPACTED DEPTH) S.Y. 6 $10.36 201.1 CEMENT TREATMENT (EXISTING MATERIAL)(5" COMPACTED DEPTH) S.Y. 0 $7.25 201.1 CEMENT TREATMENT (EXISTING MATERIAL)(6" COMPACTED DEPTH) S.Y. 0 $7.66 201.1 CEMENT TREATMENT (EXISTING MATERIAL)(7" COMPACTED DEPTH) S.Y. 0 $8.22 201.1 CEMENT TREATMENT (EXISTING MATERIAL)(8" COMPACTED DEPTH) S.Y. 0 $8.74 201.2 CEMENT TREATMENT (NEW BASE)(5" COMPACTED DEPTH) S.Y. 0 $7.25 201.2 CEMENT TREATMENT (NEW BASE)(6" COMPACTED DEPTH) S.Y. 0 $7.66 201.2 CEMENT TREATMENT (NEW BASE)(7" COMPACTED DEPTH) S.Y. 0 $8.22 201.2 CEMENT TREATMENT (NEW BASE)(8" COMPACTED DEPTH) S.Y. 0 $10.46 CEMENT TREATMENT (MIXING EXISTING MATERIAL AND NEW BASE)(5" COMPACTED DEPTH) S.Y. 0 $7.25 CEMENT TREATMENT (MIXING EXISTING MATERIAL AND NEW BASE)(6" COMPACTED DEPTH) S.Y. 0 $7.66 CEMENT TREATMENT (MIXING EXISTING MATERIAL AND NEW BASE)(7" COMPACTED DEPTH) S.Y. 0 $8.22 CEMENT TREATMENT (MIXING EXISTING MATERIAL AND NEW BASE)(8" COMPACTED DEPTH) S.Y. 0 $8.74 201.4 CEMENT TON 0 $150.00 202.1 PRIME COAT GAL. 31 $3.78 202.2 PRIME COAT AND BLOTTER GAL. 0 $8.00 203.1 TACK COAT GAL. 81 $5.78 204.1 ONE COURSE SURFACE TREATMENT S.Y. 0 $3.30 204.2 TWO COURSE SURFACE TREATMENT S.Y. 0 $4.78 205.1 HOT MIX ASPHALTIC PAVEMENT, TYPE A (6" COMP. DEPTH) S.Y. 7 $20.45 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (2.5" COMP. DEPTH) S.Y. 0 $12.15 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (3" COMP. DEPTH) S.Y. 0 #DIV/0! 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (4" COMP. DEPTH) S.Y. 2 $15.76 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (5" COMP. DEPTH) S.Y. 15 $26.35 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (6" COMP. DEPTH) S.Y. 44 $28.35 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (8" COMP. DEPTH) S.Y. 14 $33.93 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (9" COMP. DEPTH) S.Y. 2 $51.50 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (10" COMP. DEPTH) S.Y. 11 $34.42 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (11" COMP. DEPTH) S.Y. 8 $36.12 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (12" COMP. DEPTH) S.Y. 27 $47.06 205.3 HOT MIX ASPHALTIC PAVEMENT, TYPE C (2" COMP. DEPTH) S.Y. 37 $11.61 205.3 HOT MIX ASPHALTIC PAVEMENT, TYPE C (2.5" COMP. DEPTH) S.Y. 0 #DIV/0! 205.3 HOT MIX ASPHALTIC PAVEMENT, TYPE C (3" COMP. DEPTH) S.Y. 10 $11.60 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (1.5" COMP. DEPTH) ( < 1000 S.Y.) S.Y. 8 $13.01 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (1.5" COMP. DEPTH) (1000 S.Y. < X < 5000 S.Y.) S.Y. 0 $7.09 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (1.5" COMP. DEPTH) ( > 5000 S.Y.) S.Y. 8 $7.00 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (2" COMP. DEPTH) ( < 5000 S.Y.) S.Y. 12 $9.32 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (2" COMP. DEPTH) ( > 5000 S.Y.) S.Y. 37 $9.42 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (2.5" COMP. DEPTH) S.Y. 21 $15.30 206.1 ASPHALT TREATED BASE (4" THICK) S.Y. 0 $20.26 206.1 ASPHALT TREATED BASE (5" THICK)( < 1000) S.Y. 0 $22.86 206.1 ASPHALT TREATED BASE (5" THICK)( > 1000) S.Y. 0 $20.14 206.1 ASPHALT TREATED BASE (6" THICK)( < 1000) S.Y. 0 $33.49 206.1 ASPHALT TREATED BASE (6" THICK)( > 1000) S.Y. 0 $22.49 206.1 ASPHALT TREATED BASE (8" THICK) S.Y. 0 $28.39 206.1 ASPHALT TREATED BASE (10" THICK) S.Y. 0 $43.30 206.1 ASPHALT TREATED BASE (12" THICK)( < 10000) S.Y. 0 $45.00
207.1 SINGLE COURSE BITUMINOUS SLURRY SEAL S.Y. 0 $9.91 207.2 SINGLE COURSE BITUMINOUS SLURRY SEAL TON 0 $40.03 208.1 SALVAGING, HAULING & STOCKPILING RECLAIMABLE ASPHALTIC PAVENENT (1.5" DEPTH) S.Y. 4 $6.50 208.1 SALVAGING, HAULING & STOCKPILING RECLAIMABLE ASPHALTIC PAVEMENT(2" DEPTH) S.Y. 14 $5.94 208.1 SALVAGING, HAULING & STOCKPILING RECLAIMABLE ASPHALTIC PAVEMENT(3" DEPTH) S.Y. 5 $6.18 208.2 SALVAGING, HAULING & STOCKPILING RECLAIMABLE ASPHALTIC PAVM'T (LOOSE VEHICLE MEASUREMENT) C.Y. 0 $158.71 209.1 CONCRETE PAVEMENT (10" DEEP)(BUS PAD) S.Y. 36 $71.74 209.1 CONCRETE PAVEMENT (15" DEEP) S.Y. 0 $160.81 209.2 BUS STOP CONCRETE PAD SY 3 $69.00 230.1 FLEXIBLE PAVEMENT STRUCTURE REPAIR (1.5" COMP. DEPTH) S.Y. 0 $14.75 230.1 FLEXIBLE PAVEMENT STRUCTURE REPAIR (4.5" COMP. DEPTH) S.Y. 0 $26.00 230.1 FLEXIBLE PAVEMENT STRUCTURE REPAIR (8" COMP. DEPTH) S.Y. 0 $38.50 230.1 FLEXIBLE PAVEMENT STRUCTURE REPAIR (10.5" COMP. DEPTH) S.Y. 0 #DIV/0! 230.2 CONCRETE PAVEMENT FULL-DEPTH REPAIR (6" COMP.DEPTH) S.Y. 10 $77.50 234.1 BASE REINFORCEMENT S.Y. 9 $3.52 234.1 BASE REINFORCEMENT (TX 5) S.Y. 10 $4.28 234.1 BASE REINFORCEMENT (TX 140) S.Y. 0 #DIV/0! 234.1 BASE REINFORCEMENT(BX1100) S.Y. 0-234.1 BASE REINFORCEMENT(BX1200) S.Y. 0-236.1 EMULSION PER GALLON GAL. 0-236.2 EMULSION TREATMENT(EXISTING BASE)(X" COMP. DEPTH) S.Y. 0-236.3 EMULSION TREATMENT(MIXING EXISTING MATERIAL AND NEW BASE)(X" COMP. DEPTH) S.Y. 0-237.1 POTHOLE REPAIR S.Y. 7 $70.85 237.2 EMERGENCY MOBILIZATION EA 0-238.1 RUBBERIZED EMULSION AGGREGATE SLURRY WITH POLYMER (REAS) S.Y. 0-239.1 MICRO-SURFACING S.Y. 0-239.2 MICRO SURFACING TON 0-240.1 WARM MIX ASPHALTIC CONCRETE TYPE "A" (X" COMP. DEPTH) S.Y. 0-204.1 WARM MIX ASPHALTIC CONCRETE TYPE "B" (X" COMP. DEPTH) S.Y. 0-240.1 WARM MIX ASPHALTIC CONCRETE TYPE "C" (X" COMP. DEPTH) S.Y. 0-204.1 WARM MIX ASPHALTIC CONCRETE TYPE "D" (X" COMP. DEPTH) S.Y. 0-240.1 WARM MIX ASPHALTIC CONCRETE TYPE "F" (X" COMP. DEPTH) S.Y. 0 - ITEM DIVISION III - CONCRETE & CONCRETE STRUCTURES DESCRIPTION UNIT 302.1 METAL FOR STRUCTURES ( < 500 LBS.) LBS. 0 $4.88 302.1 METAL FOR STRUCTURES ( > 500 LBS.) LBS. 3 $3.30 306.1 STRUCTURAL EXCAVATION ( < 100 C.Y.) C.Y. 13 $31.69 306.1 STRUCTURAL EXCAVATION (100 < X < 500 C.Y.) C.Y. 2 $22.27 306.1 STRUCTURAL EXCAVATION (500 < X < 2000 C.Y.) C.Y. 14 $20.83 306.1 STRUCTURAL EXCAVATION ( > 2000 C.Y.) C.Y. 2 $15.87 307.1 CONCRETE STRUCTURE (APPROACH SLABS) C.Y. 0 $521.81 307.1 CONCRETE STRUCTURE (BRIDGE DECKS) C.Y. 0 $601.99 307.1 CONCRETE STRUCTURE (BRIDGE COLUMNS & PIERS ) C.Y. 0 $853.88 307.1 CONCRETE STRUCTURE (BRIDGE CAPS) C.Y. 0 $942.76 307.1 CONCRETE STRUCTURE (ABUTMENTS & WINGWALLS) C.Y. 23 $1,134.15 307.1 CONCRETE STRUCTURE(RETAINING WALLS) (< 10 C.Y.) C.Y. 8 $892.89 307.1 CONCRETE STRUCTURE (RETAINING WALLS) (10 < X < 100 C.Y.) C.Y. 0 $638.83 307.1 CONCRETE STRUCTURE (RETAINING WALLS) ( > 100 C.Y.) C.Y. 9 $643.33 307.1 CONCRETE STRUCTURE (HEADWALLS OR OUTFALL STRUCTURES) C.Y. 16 $735.05 307.1 CONCRETE STRUCTURE (DRIVEWAY RETAINING WALLS) (< 10 C.Y.) C.Y. 8 $852.37 307.1 CONCRETE STRUCTURE (DRIVEWAY RETAINING WALLS) (> 10 C.Y.) C.Y. 0 #DIV/0! 307.1 CONCRETE STRUCTURE (ELEVATED SIDEWALKS) ( < 10 C.Y.) C.Y. 8 $1,586.11 307.1 CONCRETE STRUCTURE (ELEVATED SIDEWALKS) ( > 10 C.Y.) C.Y. 2 $525.00 307.1 CONCRETE STRUCTURE (MISCELLANEOUS) C.Y. 2-307.2 CONCRETE STRUCTURE (MISCELLANEOUS) S.Y. 0-307.3 CONCRETE STRUCTURE (MISCELLANEOUS) L.F. 0-307.4 CONCRETE STRUCTURE (MISCELLANEOUS) S.F. 0-307.5 CONCRETE STRUCTURE (MISCELLANEOUS) EA 0-308.1 DRILLED SHAFTS (18") L.F. 0-308.1 DRILLED SHAFTS (24") L.F. 30 $114.99 308.1 DRILLED SHAFTS (30") L.F. 30 $149.03 308.1 DRILLED SHAFTS (36") L.F. 33 $173.83 308.1 DRILLED SHAFTS (42") L.F. 0 $232.38 308.2 BELL FOOTINGS C.Y. 0 $240.21 309.1 PRECAST REINFORCED CONCRETE CULVERT (3' x 2') L.F. 0 #DIV/0! 309.1 PRECAST REINFORCED CONCRETE CULVERT (3' x 3') L.F. 5-309.1 PRECAST REINFORCED CONCRETE CULVERT (4' x 2') L.F. 0 #DIV/0! 309.1 PRECAST REINFORCED CONCRETE CULVERT (4' x 3') L.F. 5 $238.00 309.1 PRECAST REINFORCED CONCRETE CULVERT (4' x 4') L.F. 0 $212.35 309.1 PRECAST REINFORCED CONCRETE CULVERT (5' x 2') L.F. 0 $26.39 309.1 PRECAST REINFORCED CONCRETE CULVERT (5' x 3') L.F. 7 $187.46 309.1 PRECAST REINFORCED CONCRETE CULVERT (5' x 4') L.F. 0 $257.97 309.1 PRECAST REINFORCED CONCRETE CULVERT (5' x 5') L.F. 8 $268.06 309.1 PRECAST REINFORCED CONCRETE CULVERT (6' x 4') L.F. 12 $298.99 309.1 PRECAST REINFORCED CONCRETE CULVERT (6' x 5') L.F. 12 $305.94 309.1 PRECAST REINFORCED CONCRETE CULVERT (6' x 6') L.F. 0 $355.00 309.1. PRECAST REINFORCED CONCRETE CULVERT (7' x 4') L.F. 15 $372.70 309.1 PRECAST REINFORCED CONCRETE CULVERT (8' x 4') L.F. 7 $295.15 309.1 PRECAST REINFORCED CONCRETE CULVERT (8' x 5') L.F. 8 $397.87 309.1 PRECAST REINFORCED CONCRETE CULVERT (11' x 4') L.F. 0 $539.87 309.1 PRECAST REINFORCED CONCRETE CULVERT (11' x 5') L.F. 0 $576.38 309.1 PRECAST REINFORCED CONCRETE CULVERT (10' x 5') L.F. 15 $582.47 309.1 PRECAST REINFORCED CONCRETE CULVERT (10' x 6') L.F. 7 $666.71 309.1 PRECAST REINFORCED CONCRETE CULVERT (10' x 8') L.F. 8 $666.56 309.1 PRECAST REINFORCED CONCRETE CULVERT (12' x 8') L.F. 0 $767.79 309.2 REINFORCED CONCRETE PRCAST BOX TRANSITION (5'X3' TO 5'X5') L.F. 8 $390.00 309.2 REINFORCED CONCRETE PRCAST BOX TRANSITION (5'X5' TO 8'X5') L.F. 8 $494.98 309.2 REINFORCED CONCRETE PRCAST BOX TRANSITION (8'X5' TO 10'X5') L.F. 8 $602.72 310.1 PRECAST, PRESTRESSED BRIDGE BEAMS L.F. 0 $125.42 310.1 PRECAST, PRESTRESSED BRIDGE BEAMS(BOX) L.F. 0 $176.07 310.1 PRECAST, PRESTRESSED BRIDGE BEAMS (DOUBLE TEES) L.F. 0 $334.56 311.1 CONCRETE SURFACE FINISH - ADHESIVE GROUT FINISH S.Y. 0-311.2 CONCRETE SURFACE FINISH - CONCRETE PAINT FINISH S.Y. 0-311.3 CONCRETE SURFACE FINISH - OPAQUE SEALER FINISH S.Y. 0-311.4 CONCRETE SURFACE FINISH - 742 APPEARANCE COATING FINISH S.Y. 0-311.5 CONCRETE SURFACE FINISH - EPOXY PAINT FINISH S.Y. 0-311.6 CONCRETE SURFACE FINISH - BLAST FINISH S.Y. 0-311.7 CONCRETE SURFACE FINISH - RUB FINISH S.Y. 0 - DIVISION IV - STORM SEWERS 401.1 REINFORCED CONCRETE PIPE (CLASS III)(18" DIA) L.F. 0 $58.00 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(18" DIA) L.F. 0 $70.00 401.1 REINFORCED CONCRETE PIPE (CLASS V)(18" DIA) L.F. 0 $78.00 401.1 REINFORCED CONCRETE PIPE (CLASS III)(24" DIA) L.F. 59 $83.55 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(24" DIA) L.F. 0 #DIV/0! 401.1 REINFORCED CONCRETE PIPE (CLASS V)(24" DIA) L.F. 0-401.1 REINFORCED CONCRETE PIPE (CLASS III)(30" DIA) L.F. 33 $97.39 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(30" DIA) L.F. 0 #DIV/0! 401.1 REINFORCED CONCRETE PIPE (CLASS V)(30" DIA) L.F. 5 $123.61 401.1 REINFORCED CONCRETE PIPE (CLASS III)(36" DIA) L.F. 31 $126.61 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(36" DIA) L.F. 0 #DIV/0!
401.1 REINFORCED CONCRETE PIPE (CLASS V)(36" DIA) L.F. 0 $220.00 401.1 REINFORCED CONCRETE PIPE (CLASS II)(42" DIA) L.F. 0-401.1 REINFORCED CONCRETE PIPE (CLASS III)(42" DIA) L.F. 29 $156.98 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(42" DIA) L.F. 0 $161.00 401.1 REINFORCED CONCRETE PIPE (CLASS III)(48" DIA) L.F. 16 $226.24 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(48" DIA) L.F. 0-401.1 REINFORCED CONCRETE PIPE (CLASS III)(54" DIA) L.F. 9 $236.17 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(54" DIA) L.F. 0 $220.00 401.1 REINFORCED CONCRETE PIPE (CLASS III)(60" DIA) L.F. 12 $265.60 401.1 REINFORCED CONCRETE PIPE (CLASS III)(66" DIA) L.F. 9 $327.46 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(66" DIA) L.F. 0 $335.05 401.1 REINFORCED CONCRETE PIPE (CLASS III)(72" DIA) L.F. 7 $480.47 401.1 REINFORCED CONCRETE PIPE (CLASS IV)(72" DIA) L.F. 0 $396.73 401.1 REINFORCED CONCRETE PIPE (PLUG) EA 5 $381.94 401.2 REINFORCED CONCRETE PIPE (ARCH)(18" X 28 1/2" CLASS II) L.F. 0 #DIV/0! 401.2 REINFORCED CONCRETE PIPE (ARCH)(18" X 28 1/2" CLASS III) L.F. 0 #DIV/0! 401.2 REINFORCED CONCRETE PIPE (ARCH)(22 1/2" X 36 1/4" CLASS II) L.F. 0 #DIV/0! 401.2 REINFORCED CONCRETE PIPE (ARCH)(26 5/8" X 43 3/4" CLASS II) L.F. 0 #DIV/0! 401.2 REINFORCED CONCRETE PIPE (ARCH)(31 5/16" X 51 1/8" CLASS II) L.F. 0 #DIV/0! 401.3 REINFORCED CONCRETE PIPE (ELLIPTICAL)(DESIGN SIZE 19"x30") L.F. 0 $167.53 401.4 SAFETY END TREATMENT (TYPE I)(24" DIA) EA 8 $1,167.17 401.4 SAFETY END TREATMENT (TYPE I)(36" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE I)(48" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE I)(60" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE II)(18" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE II)(24" DIA) EA 0 #DIV/0! 401.4 SAFETY END TREATMENT (TYPE II)(30" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE II)(36" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE II)(42" DIA) EA 0-401.4 SAFETY END TREATMENT (TYPE II)(DESIGN SIZE 1) EA 0 $2,500.00 401.4 SAFETY END TREATMENT (TYPE II)(DESIGN SIZE 2) EA 0 $1,003.34 401.4 SAFETY END TREATMENT (TYPE II)(DESIGN SIZE 3) EA 0 $1,524.59 402.1 CORRUGATED POLYETHYLENE PIPE L.F. 0-403.1 JUNCTION BOX 4'X4'X4' EA 30 $3,816.68 403.2 JUNCTION BOX 5'X5'X5' EA 20 $4,426.80 403.3 JUNCTION BOX 6'X6'X6' EA 19 $5,858.65 403.4 JUNCTION BOX 7'X7'X7' EA 10 $8,737.22 403.5 JUNCTION BOX 8'X8'X8' EA 10 $11,364.38 403.6 SPECIAL JUNCTION BOXES (COMPLETE) EA 0-403.7 INLET TYPE I (COMPLETE)(10FT) EA 18 $7,522.26 403.8 INLET TYPE II (COMPETE)(10 FT) EA 27 $5,705.91 403.9 INLET EXTENSIONS (10 FT) EA 2 $4,350.00 403.10 INLET (COMPLETE)(5 FT)(TXDOT) EA 0 $3,748.37 403.11 INLET (EXTENSION)(5 FT)(TXDOT) EA 0 $2,783.11 403.12 SPECIAL INLET (COMPLETE) EA 0-403.12 SPECIAL INLET (2-WAY)(8'x8'x6') EA 0 $7,722.25 403.12 SPECIAL INLET (4-WAY) EA 0 #DIV/0! 404.1 CORRUGATED METAL PIPE (X" DIA) L.F. 0-404.2 CORRUGATED METAL PIPE (ARCHED)(DESIGN "X") L.F. 0-404.3 SPIRAL RIB CORRUGATED METAL PIPE (X" DIA) L.F. 0-404.4 SPIRAL RIB CORRUGATED METAL PIPE ARCH (GALVANIZED STEEL)(DESIGN "X") L.F. 0-404.4 SPIRAL RIB CORRUGATED METAL PIPE ARCH (GALVANIZED STEEL)(DESIGN 2) L.F. 0 $102.97 405.1 FIBER REINFORCED CONCRETE PIPE (CLASS X)(X" DIA)(TYPE X) L.F. 0-406.1 JACKING,BORING OR TUNNELING PIPE (8") L.F. 0 $145.23 406.1 JACKING,BORING OR TUNNELING PIPE (15") L.F. 0 $176.98 406.1 JACKING,BORING OR TUNNELING PIPE (24") L.F. 0 $622.00 406.1 JACKING,BORING OR TUNNELING PIPE (36") L.F. 0 $796.00 406.1 JACKING,BORING OR TUNNELING PIPE (54") L.F. 0 $1,040.00 406.1 JACKING,BORING OR TUNNELING PIPE (60") L.F. 0 $1,144.00 406.1 JACKING,BORING OR TUNNELING PIPE (66") L.F. 0 $1,196.00 406.1 JACKING,BORING OR TUNNELING PIPE (78") L.F. 0 $1,300.00 406.2 JACKING OR TUNNELING BOX CULVERT (X' x X') L.F. 5-407.1 CONCRETE ENCASEMENT C.Y. 14 $147.75 407.2 CONCRETE CRADLES C.Y. 0 $195.20 407.3 CONCRETE SADDLES C.Y. 7 $198.18 407.4 CONCRETE COLLARS C.Y. 0 $329.07 409.1 GRATE EA 8 $2,455.00 409.2 FRAME EA 0-409.3 GRATE AND FRAME EA 0-409.4 FRAME AND COVER EA 0-409.5 RING AND COVER EA 0-410.1 CONCRETE SUBGRADE FILLER C.Y. 7 $14.78 410.2 GRAVEL SUBGRADE FILLER ( X < 1OO C.Y.) C.Y. 37 $31.71 410.2 GRAVEL SUBGRADE FILLER (100 CY< X < 1,000 C.Y.) C.Y. 7 $30.00 410.2 GRAVEL SUBGRADE FILLER (1000 CY< X < 3,000 C.Y.) C.Y. 0 $21.21 410.2 GRAVEL SUBGRADE FILLER (MORE THAN 3,000 C.Y.) C.Y. 0-411.1 GLASS CULLET USE FOR UNTILITY BEDDING AND BACKFILL C.Y. 0-412.1 CEMENT STABILIZED SAND C.Y. 2 $97.60 413.1 FLOWABLE BACKFILL (LOW STRENGTH) C.Y. 14 $109.43 413.2 FLOWABLE BACKFILL (HIGH STRENGTH) C.Y. 0-413.3 FLOWABLE BACKFILL (HIGH STRENGTH EMERGENCY REPAIR) C.Y. 0 $130.00 DIVISION V - MISCELLANEOUS CONSTRUCTION 500.1 CONCRETE CURBING ( < 1,000 L.F.) L.F. 30 $14.06 500.1 CONCRETE CURBING ( > 1,000 L.F.) L.F. 68 $11.01 500.3 CONCRETE GUTTER L.F. 0 $12.47 500.4 CONCRETE CURB & GUTTER ( < 1,000 L.F.) L.F. 10 $14.07 500.4 CONCRETE CURB & GUTTER ( > 1,000 L.F.) L.F. 8-502.1 CONCRETE SIDEWALKS ( < 150 S.Y.) S.Y. 21 $53.56 502.1 CONCRETE SIDEWALKS (150 S.Y. < X < 1,000 S.Y.) S.Y. 21 $40.85 502.1 CONCRETE SIDEWALKS(1,000 S.Y.< X <10,000S.Y.) S.Y. 30 $37.34 502.1 CONCRETE SIDEWALKS ( > 10,000 S.Y.) S.Y. 7 $28.99 502.2 CONCRETE SIDEWALKS - MACHINE LAID S.Y. 0-502.3 SIDEWALK DRAIN EA 6 $877.07 503.1 PORTLAND CEMENT CONCRETE DRIVEWAYS ( < 100 S.Y.) S.Y. 26 $54.56 503.1 PORTLAND CEMENT CONCRETE DRIVEWAYS (100 S.Y. < X < 10,000 S.Y.) S.Y. 15 $57.36 503.1 PORTLAND CEMENT CONCRETE DRIVEWAYS ( > 10,000 S.Y.) S.Y. 6 $44.01 503.2 PORTLAND CEMENT CONCRETE DRIVEWAYS - COMMERCIAL S.Y. 60 $55.27 503.3 EXPOSED AGGREGATE DRIVEWAYS S.Y. 0 $79.79 503.4 ASPHALT CONCRETE DRIVEWAY( < 100 S.Y.) S.Y. 15 $27.05 503.4 ASPHALT CONCRETE DRIVEWAY (100 <X< 1000 S.Y.) S.Y. 20 $30.65 503.4 ASPHALT CONCRETE DRIVEWAY( > 1000 S.Y.) S.Y. 5 $25.09 503.5 GRAVEL DRIVEWAY( < 100 S.Y.) S.Y. 13 $52.04 503.5 GRAVEL DRIVEWAY(100 S.Y.< X < 750 S.Y.) S.Y. 5 $20.65 503.5 GRAVEL DRIVEWAY( > 750 S.Y.) S.Y. 0-504.1 CONCRETE MEDIAN S.Y. 5 $48.56 504.2 CONCRETE DIRECTIONAL ISLAND S.Y. 20 $59.49 505.1 CONCRETE RIPRAP (4" THICK) S.Y. 13 $76.57 505.1 CONCRETE RIPRAP (5" THICK) (< 100 S.Y.) S.Y. 15 $74.42 505.1 CONCRETE RIPRAP (5" THICK) (100 < X < 4000 S.Y.) S.Y. 6 $48.51 505.1 CONCRETE RIPRAP (5" THICK) (4000 < X < 10000 S.Y.) S.Y. 8 $44.83 505.1 CONCRETE RIPRAP (5" THICK) (> 10000 S.Y.) S.Y. 0-505.1 CONCRETE RIPRAP (6" THICK) (< 4000 S.Y.) S.Y. 33 $70.23 505.1 CONCRETE RIPRAP (6" THICK)( > 4000 S.Y.) S.Y. 7 $58.64 505.1 CONCRETE RIPRAP (8" THICK) S.Y. 2-505.1 CONCRETE RIPRAP (STONE EMBEDDED) S.Y. 0 #DIV/0!
506.1 CONCRETE RETAINING WALLS-COMB. TYPE (< 20 C.Y.) C.Y. 23 $785.88 506.1 CONCRETE RETAINING WALLS-COMB. TYPE (20 <X< 50 C.Y.) C.Y. 19 $832.41 506.1 CONCRETE RETAINING WALLS-COMB. TYPE ( > 50 C.Y.) C.Y. 0 #DIV/0! 507.1 CHAIN LINK WIRE FENCE (4' HIGH) L.F. 24 $18.78 507.2 CHAIN LINK WIRE FENCE (6' HIGH) L.F. 45 $20.10 507.2A TEMPORARY CHAIN LINK WIRE FENCE (6' HIGH) L.F. 7 $4.33 507.3 CHAIN LINK WIRE FENCE (8' HIGH) L.F. 5 $34.81 507.4 GATES-PEDESTRIAN EA. 15 $376.75 507.5 GATES- VEHICULAR OPEN 24 $871.02 508.1 RELOCATING WIRE FENCE L.F. 7 $13.70 509.1 METAL BEAM GUARD RAIL ( < 200 L.F.) L.F. 19 $49.37 509.1 METAL BEAM GUARD RAIL ( > 200 L.F.) L.F. 2-510.1 TIMBER GUARD POSTS (< 50 UNITS) EA. 18 $124.79 510.1 TIMBER GUARD POSTS ( > 50 UNITS) EA. 0 #DIV/0! 511.1 REPLACING WITH FLEXIBLE BASE & PAVEMENT (8"COMPACTED DEPTH) S.Y. 0 $24.20 511.1 REPLACING WITH FLEXIBLE BASE & PAVEMENT (12"COMPACTED DEPTH) S.Y. 0 $27.85 511.1 REPLACING WITH FLEXIBLE BASE & PAVEMENT (14"COMPACTED DEPTH) S.Y. 0 $29.64 511.2 REPLACING WITH CEMENT STABILIZED BASE & PAVEMENT (9.5" DEPTH) S.Y. 0 $26.51 511.2 REPLACING WITH CEMENT STABILIZED BASE & PAVEMENT (10" DEPTH) S.Y. 0 $28.22 511.2 REPLACING WITH CEMENT STABILIZED BASE & PAVEMENT (11" DEPTH) S.Y. 0 $36.30 511.2 REPLACING WITH CEMENT STABILIZED BASE & PAVEMENT (20" DEPTH) S.Y. 0 $60.50 REPLACING WITH HOT MIX ASPHALTIC CONCRETE PAVEMENT TYPE B (6" COMPACTED DEPTH) S.Y. 8 $38.72 REPLACING WITH HOT MIX ASPHALTIC CONCRETE PAVEMENT TYPE B (7" COMPACTED DEPTH) S.Y. 0 $43.37 REPLACING WITH HOT MIX ASPHALTIC CONCRETE PAVEMENT TYPE B (8" COMPACTED DEPTH) S.Y. 0 $58.66 REPLACING WITH HOT MIX ASPHALTIC CONCRETE PAVEMENT (10" COMPACTED DEPTH) S.Y. 0 $52.41 511.4 REPLACING WITH PORTLAND CEMENT CONCRETE PAVEMENT (X" DEEP) S.Y. 0-511.5 REPLACING WITH FLEXIBLE BASE AND SURFACE TREATMENT (X" COMP DEPTH) S.Y. 0-512.1 ADJUSTING EXISTING MANHOLES EA. 12 $1,312.75 512.2 RECONSTRUCTING EXISTING MANHOLES EA. 8 $555.60 512.3 VALVE BOX ADJUSTMENTS EA. 5 $187.20 513.1 REMOVING AND RELOCATING MAIL BOXES ( < 50 UNITS) EA. 4 $338.00 513.1 REMOVING AND RELOCATING MAIL BOXES ( > 50 UNITS) EA. 7 $109.04 513.2 COMMUNITY MAIL BOX SLAB S.Y. 7 $142.99 515.1 TOPSOIL (< 500 C.Y.) C.Y. 65 $26.19 515.1 TOPSOIL ( > 500 C.Y.) C.Y. 21 $21.51 516.1 BERMUDA SODDING ( < 2,000 S.Y.) S.Y. 32 $4.47 516.1 BERMUDA SODDING ( > 2,000 S.Y.) S.Y. 40 $4.21 516.2 ST. AUGUSTINE SODDING ( < 2,000 S.Y.) S.Y. 18 $4.52 516.2 ST. AUGUSTINE SODDING ( > 2,000 S.Y.) S.Y. 2 $3.88 516.3 BUFFALO 609 SODDING S.Y. 0 #DIV/0! 517.1 BRIDGE RAILING L.F. 0 $100.62 517.1 BRIDGE RAILING (COMB. RAIL TYPE C201) L.F. 0-520.1 HYDROMULCHING (RESIDENTIAL OR COMMERCIAL) S.Y. 31 $0.82 522.1 SIDEWALK PIPE RAILING L.F. 15 $92.06 523.1 ADJUSTING CHAIN LINK VEHICULAR GATES ( < 50 UNITS) EA 26 $648.19 523.1 ADJUSTING CHAIN LINK VEHICULAR GATES ( > 50 UNITS) EA 0 $425.18 523.2 ADJUSTING CHAIN LINK VEHICULAR GATE (MOTORIZED) EA 0-523.3 ADJUSTING CHAIN LINK PEDESTRIAN GATE EA 14 $332.73 523.4 ADJUSTING WROUGHT IRON VEHICULAR GATE EA 2 $612.50 523.5 ADJUSTING WROUGHT IRON VEHICULAR GATE (MOTORIZED) EA 8 $1,712.75 523.6 ADJUSTING WROUGHT IRON PEDESTRIAN GATE EA 2 $367.50 524.1 CONCRETE STEPS ( < 10 C.Y.) C.Y. 15 $1,045.65 524.1 CONCRETE STEPS ( > 10 C.Y.) C.Y. 0 $790.10 525.1 CONCRETE TRAFFIC BARRIER (PORTABLE)(TY I) L.F. 37 $28.98 525.1 CONCRETE TRAFFIC BARRIER (PORTABLE)(TY II) L.F. 0 #DIV/0! 525.1 CONCRETE TRAFFIC BARRIER (PORTABLE) L.F. 18 $31.41 525.2 CONCRETE TRAFFIC BARRIER (PORT) (LPCB) (TY II) L.F. 16 $32.68 530.1 BARRICADES, SIGNS & TRAFFIC HANDLING L.S. - - 531.1 METRO STREET NAME, BLOCK NUMBERS (HIGH DENSITY)(VARIES x 15") EA 3 $255.32 531.2 METRO STREET NAME, BLOCK NUMBERS (HIGH DENSITY)(VARIES x 18") EA. 7 $216.75 531.3 R1-1 STOP (30")(HIGH DENSITY) EA. 62 $212.61 531.4 R1-2 YIELD (36")(HIGH DENSITY) EA. 38 $217.91 531.5 R1-4 ALL WAY PLATE (18"x6")(HIGH DENSITY) EA. 8 $90.70 531.6 R2-1 SPEED LIMIT (24"x30")(HIGH DENSITY) EA. 41 $189.41 531.7 R3-1 NO RIGHT TURN (24"x24")(HIGH DENSITY) EA. 7 $202.47 531.8 R3-2 NO LEFT TURN (24"x24")(HIGH DENSITY) EA. 7 $180.23 531.9 R3-3 NO TURNS (24"x24")(HIGH DENSITY) EA. 0 #DIV/0! 531.10 R3-4 NO U-TURNS (24"x24")(HIGH DENSITY) EA. 3 $162.00 531.11 R3-5 LEFT OR RIGHT ONLY (30"x36")(HIGH DENSITY) EA. 14 $217.40 531.12 R3-6 LANE-USE CONTROL (30"x36")(HIGH DENSITY) EA. 7 $235.96 531.13 R3-7 LEFT LANE MUST TURN LEFT OR RIGHT LANE MUST TURN RIGHT (30"x30")(HIGH DENSITY) EA. 16 $201.80 531.14 R3-8 LANE-USE CONTROL (30"x30")(HIGH DENSITY) EA. 15 $223.72 531.15 R3-8 U-TURN ONLY (24"x30")(HIGH DENSITY) EA. 0 #DIV/0! 531.16 R3-9 TWO WAY LEFT TURN ONLY (30"x36")(HIGH DENSITY) EA. 0 #DIV/0! 531.17 R4-7 KEEP RIGHT (24"x30")(HIGH DENSITY) EA. 3 $185.00 531.18 R5-1 DO NOT ENTER (30"x30")(HIGH DENSITY) EA. 11 $204.25 531.19 R6-1 ONE WAY (36"x12")(HIGH DENSITY) EA. 8 $186.35 531.20 R6-2 ONE WAY (18"x24")(HIGH DENSITY) EA. 8 $183.11 531.21 R7-1 NO PARKING ANYTIME (18"x24")(HIGH DENSITY) EA. 8 $148.07 531.22 R7-18 NO PARKING THIS SIDE / THIS BLOCK (18"x24")(HIGH DENSITY) EA. 13 $171.42 531.23 R1-1 STOP (18"x18")(HIGH DENSITY) EA. 0 #DIV/0! 531.24 R9-3A PEDESTRIAN CROSSING PROHIBITED (18"x18")(HIGH DENSITY) EA. 5-531.25 R10-11 NO TURN ON RED 7-9 AM AND 2-4 PM, SCHOOL DAYS ONLY (HIGH DENSITY) EA. 0-531.26 R10-11A NO TURN ON RIGHT (24"x30")(HIGH DENSITY) EA. 0-531.27 R10-12 LEFT TURN YIELD ON "GREEN BALL" (HIGH DENSITY) EA. 0-531.28 R10-5 LEFT ON ARROW ONLY (24"x30")(HIGH DENSITY) EA. 0-531.29 R10-6 STOP HERE ON RED (24"x36")(HIGH DENSITY) EA. 0-531.30 R10-7 DO NOT BLOCK INTERSECTION (24"x30")(HIGH DENSITY) EA. 3 $168.00 531.31 S-25 NO PARKING 7-9 AM AND 2-4 PM, SCHOOL DAYS ONLY (18"x24")(HIGH DENSITY) EA. 0 $192.09 531.32 S-26 NO PARKING 7-9 AM AND 2-4 PM, STUDENT LOADING, SCHOOL DAYS ONLY (18"x24")(HIGH DENSITY) EA. 0 $192.09 531.33 S-27 NO PARKING 7-9 AM AND 2-4 PM SCHOOL BUS ZONE (18"x24")(HIGH DENSITY) EA. 0-531.34 S1-1 ADVANCE SCHOOL CROSSING AND SCHOOL CROSSING(36"x36") EA. 31 $252.79 531.35 W16-7 DIAGONAL ARROW SIGN (DIAMOND GRADE)(FLUORESCENT YELLOW GREEN))(30"x18") EA. 7 $143.24 531.36 S4-1 1/20 MPH SCHOOL SIGN (DIAMOND GRADE (FLUORESCENT YELLOW GREEN) WITH HIGH INTENSITY WHITE BACKGROUND)(24"x48") EA. 11 $226.93 531.37 W1-1 TURN (30"x30")(HIGH DENSITY) EA. 0 $216.29 531.38 W1-2 CURVE (30"x30")(HIGH DENSITY) EA. 0 #DIV/0! 531.39 W1-3 REVERSE TURN (30"x30")(HIGH DENSITY) EA. 0 #DIV/0! 531.40 W1-4 REVERSE CURVE (30"x30")(HIGH DENSITY) EA. 0 $230.33 531.41 W1-5 WINDING ROAD (30"x30")(HIGH DENSITY) EA. 0-531.42 W1-6 LARGE ARROW (48"x24")(HIGH DENSITY) EA. 0 $345.07 531.43 W1-7 LARGE ARROW (48"x24")(HIGH DENSITY) EA. 0 #DIV/0! 531.44 W16-7 DIAGONAL ARROW SIGN (30"x18")(HIGH DENSITY) EA. 3 $66.33 531.45 W1-8 CHEVRON ALIGNMENT (18"x24")(HIGH DENSITY) EA. 0 $181.13 531.46 W3-3 SIGNAL AHEAD (36"x36")(HIGH DENSITY) EA. 16 $240.88 531.47 W8-1 BUMP (30"x30")(HIGH DENSITY) EA. 8-531.48 W8-2 DIP (30"x30")(HIGH DENSITY) EA. 0 $184.53 531.49 W9-2 LANE ENDS MERGE LEFT (30"x30")(HIGH DENSITY) EA. 3 $201.00
531.50 W10-1 RAILROAD ADVANCE WARNING (36" DIA.)(HIGH DENSITY) EA. 2 $200.00 531.51 W11A-2 PED CROSSING (30"x30")(HIGH DENSITY) EA. 2 $197.50 531.52 W13-1 ADVISORY SPEED (18"x18")(HIGH DENSITY) EA. 0 #DIV/0! 531.53 W14-1 DEAD END (30"x30")(HIGH DENSITY) EA. 0 $199.12 531.54 W14-2 NO OUTLET (30"x30")(HIGH DENSITY) EA. 8 $186.39 531.55 OM-3 TYPE 3 OBJECT MARKER (12"x36")(HIGH DENSITY) EA. 0 #DIV/0! 531.56 OM-4P END OF ROAD MARKER (18"x18")(HIGH DENSITY) EA. 0-531.57 9 INCH [229mm] STREET NAME, BLOCK NUMBER (VARIES x9")(high DENSITY) EA. 41 $159.47 531.58 W14-1P DEAD END STREET MARKER (36"x9")(HIGH DENSITY) EA. 16 $147.57 531.59 SPECIAL SIGN (HIGH DENSITY) EA. 24 $243.55 531.60 W14-2P NO OUTLET STREET MARKER (HIGH DENSITY) EA. 0-531.61 S5-1 SCHOOL SPEED LIMIT WHEN FLASHING (24"x38")(DIAMOND GRADE (FLUORESCENT YELLOW GREEN) WITH HIGH INTENSITY WHITE BACKGROUND) EA. 8 $222.32 531.62 W16-9P AHEAD (36"x20")(HIGH DENSITY) EA. 10 $93.15 531.63 W16-2 XXX FT (DIAMOND GRADE (30"x18")(FLUORESCENT YELLOW GREEN)) EA. 0 $256.74 531.64 W13-1 30 MPH ADVISORY (18"x18")(DIAMOND GRADE (FLUORESCENT YELLOW GREEN)) EA. 3 $97.67 531.65 S4-3A SCHOOL ZONE ARROWS (24"x18")(HIGH DENSITY) EA. 0-531.66 S5-2A (24"x9") (HIGH DENSITY) EA. 5 $92.75 531.67 R9-6 (YIELD TO PEDS)(12"x18")(HIGH DENSITY) EA. 0 #DIV/0! 531.68 R3-17 (BIKE LANE)(30"x24")(HIGH DENSITY) EA. 10 $190.29 531.69 R3-17a (AHEAD)(30"x12")(HIGH DENSITY) EA. 17 $101.76 531.70 R3-17b (ENDS)(30"x12")(HIGH DENSITY) EA. 17 $101.76 531.71 R4-4 (BEGIN RIGHT TURN LANE YIELD TO BIKES)(36"x30")(HIGH DENSITY) EA. 2 $215.00 531.72 R1-1 (YIELD)(18"x18"x18")(HIGH DENSITY) EA. 3 $188.33 531.73 W11-1 (BICYCLE WARNING)(30"x30")(HIGH DENSITY) EA. 8 $214.25 531.74 R5-1 (NO MOTOR VEHICLES)(24"x24")(HIGH DENSITY) EA. 8 $119.98 531.75 D11-1 (BIKE ROUTE)(24"x18")(HIGH DENSITY) EA. 7 $169.71 531.76 M4-11(BEGIN)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x4")(HIGH DENSITY) EA. 0-531.77 M4-12 (END)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x4")(HIGH DENSITY) EA. 0-531.78 M4-13 (TO)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x4")(HIGH DENSITY) EA. 0-531.79 M7-1 (ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0 #DIV/0! 531.80 M7-2(ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0-531.81 M7-3(ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0-531.82 M7-3(ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0-531.83 M7-3(ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0-531.84 M7-3(ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0-531.85 M7-3(ARROW)(BICYCLE ROUTE SUPPLEMENTAL PLAQUES)(12"x9")(HIGH DENSITY) EA. 0-535.1 4 INCH WIDE YELLOW LINE (< 100,000 LF) L.F. 48 $0.98 535.1 4 INCH WIDE YELLOW LINE (> 100,000 LF) L.F. 13 $0.90 535.2 4 INCH WIDE WHITE LINE (< 30,000 LF) L.F. 58 $3.14 535.2 4 INCH WIDE WHITE LINE (> 30,000 LF) L.F. 8 $0.81 535.3 8 INCH WIDE YELLOW LINE L.F. 3 $1.91 535.4 8 INCH WIDE WHITE LINE L.F. 35 $1.32 535.5 12 INCH WIDE WHITE LINE L.F. 0 #DIV/0! 535.6 16 INCH WIDE WHITE LINE (< 1,500) L.F. 0 #DIV/0! 535.6 16 INCH WIDE WHITE LINE (> 1,500) L.F. 0-535.7 24 INCH WIDE WHITE LINE (< 1,500) L.F. 54 $7.55 535.7 24 INCH WIDE WHITE LINE (> 1,500) L.F. 22 $6.61 535.8 RIGHT WHITE ARROW EA 35 $119.90 535.9 LEFT WHITE ARROW EA 45 $111.69 535.10 COMBINATION THRU/RIGHT WHITE ARROW EA 0 #DIV/0! 535.11 COMBINATION THRU/LEFT WHITE ARROW EA 8 $162.54 535.12 WORD "ONLY" WORD 28 $148.95 535.13 STRAIGHT WHITE ARROW EA 0 #DIV/0! 535.14 RAILROAD CROSSING SYMBOL, INCLUDING TWO R'S, CROSS BUCK & 3 TRANSVERSE BARS EA 0-535.15 WHITE DIAMOND EA 7 $129.52 535.16 STRAIGHT WHITE ARROW BICYCLE FACILITY EA 10 $141.75 535.17 BICYCLE RIDER SYMBOL EA 17 $259.68 535.18 SOLID WHITE YIELD LINES(6"x9") EA 0-535.19 WORD "STOP" WORD 0 #DIV/0! 535.20 WORD "YIELD" WORD 0-535.21 WORD "BUS" WORD 0-535.50 MEDIAN NOSE YELLOW EA. 13 $306.50 536.1 4 INCH WIDE YELLOW LINE L.F. 7 $0.56 536.2 4 INCH WIDE WHITE LINE L.F. 7 $0.56 536.3 8 INCH WIDE YELLOW LINE L.F. 0-536.4 8 INCH WIDE WHITE LINE L.F. 7 $1.72 536.5 12 INCH WIDE WHITE LINE L.F. 0-536.6 16 INCH WIDE WHITE LINE L.F. 0-536.7 24 INCH WIDE WHITE LINE L.F. 0-536.8 RIGHT WHITE ARROW EA 0-536.9 LEFT WHITE ARROW EA 0-536.10 COMBINATION THRU/RIGHT WHITE ARROW EA 0-536.11 COMBINATION THRU/LEFT WHITE ARROW EA 0-536.12 WORD "ONLY" WORD 0-536.13 STRAIGHT WHITE ARROW EA 0-536.14 RAILROAD CROSSING SYMBOL, INCLUDING TWO R'S, CROSS BUCK & 3 TRANSVERSE BARS EA 0-536.15 WHITE DIAMOND EA 0-536.16 STRAIGHT WHITE ARROW BICYCLE FACILITY EA 0-536.17 SOLID WHITE YIELD LINES(6"x9") EA 0-536.18 WORD "STOP" WORD 0-536.19 WORD "YIELD" WORD 0-536.20 WORD "BUS" WORD 0-537.1 TRAFFIC BUTTON (TYPE W) EA 10-537.2 TRAFFIC BUTTON (TYPE Y) EA 10 $1.63 537.3 JIGGLE BAR (TYPE W) EA 0-537.4 JIGGLE BAR (TYPE Y) EA 0-537.5 PAVEMENT MARKER (TYPE I-A) EA 8 $8.24 537.6 TRAFFIC BUTTON (TYPE I-C) EA 53 $8.41 537.7 TRAFFIC BUTTON (TYPE I-R) EA 5 $12.60 537.8 TRAFFIC BUTTON (TYPE II A-A) EA 52 $8.31 537.9 TRAFFIC BUTTON (TYPE II C-R) EA 10 $7.37 538.10 4 INCH WIDE YELLOW LINE (SLD)(TEMPORARY) L.F. 8 $0.81 538.20 4 INCH WIDE WHITE LINE (SLD )(TEMPORARY) L.F. 8 $0.81 539.1 4 INCH WIDE YELLOW LINE L.F. 0-539.2 4 INCH WIDE WHITE LINE L.F. 0-539.3 8 INCH WIDE YELLOW LINE L.F. 0-539.4 8 INCH WIDE WHITE LINE L.F. 0-539.5 12 INCH WIDE WHITE LINE L.F. 0-539.6 16 INCH WIDE WHITE LINE L.F. 0-539.7 24 INCH WIDE WHITE LINE L.F. 0-539.8 RIGHT WHITE ARROW EA 0-539.9 LEFT WHITE ARROW EA 0-539.10 COMBINATION THRU/RIGHT WHITE ARROW EA 0-539.11 COMBINATION THRU/LEFT WHITE ARROW EA 0-539.12 WORD "ONLY" WORD 0-539.13 STRAIGHT WHITE ARROW EA 0 -
539.14 RAILROAD CROSSING SYMBOL, INCLUDING TWO R'S, CROSS BUCK & 3 TRANSVERSE BARS EA 0-539.15 WHITE DIAMOND EA 0-539.16 STRAIGHT WHITE ARROW BICYCLE FACILITY EA 0-539.17 BICYCLE RIDER SYMBOL EA 0-539.18 SOLID WHITE YIELD LINES(6"x9") EA 0-539.19 WORD "STOP" WORD 0-539.20 WORD "YIELD" WORD 0-539.21 WORD "BUS" WORD 0-540.1 ROCK FILTER DAMS (INSTALL/REMOVE) (TYPE 1) L.F. 17 $30.08 540.1 ROCK FILTER DAMS (INSTALL/REMOVE) (TYPE 2) L.F. 22 $24.07 540.1 ROCK FILTER DAMS (INSTALL/REMOVE) (TYPE 3) L.F. 32 $108.26 540.1 ROCK FILTER DAMS (INSTALL/REMOVE) (TYPE 4) L.F. 12 $37.35 540.2 ROCK FILTER DAMS (INSTALL/REMOVE) (TYPE X) C.Y. 7 $29.53 540.3 TEMPORARY PIPE SLOPE DRAINS (X" DIAMETER) L.F. 0-540.4 BALED HAY BALE 0-540.5 TEMPORARY PAVED FLUME (INSTALL/REMOVE) S.Y. 0-540.6 CONSTRUCTION EXITS (INSTALL/REMOVE) S.Y. 76 $45.23 540.7 CONSTRUCTION PERIMETER FENCE L.F. 28 $2.74 540.8 SANDBAGS FOR EROSION CONTROL FENCE (6") L.F. 15 $11.42 540.9 TEMPORARY SEDIMENT CONTROL FENCE L.F. 71 $2.44 540.10 CURB INLET GRAVEL FILTERS L.F. 55 $7.39 550.1 TRENCH EXCAVATION SAFETY PROTECTION L.F. 54 $2.83 551.1 TEMPORARY SPECIAL SHORING S.F. 12 $18.68 552.1 REMOVING AND RELOCATING IRRIGATION SYSTEM L.F. 18 $25.29 554.1 EROSION CONTROL MATTING S.Y. 12 $7.84 DIVISION VI- TRAFFIC SIGNALS 609.1 OPTIC PROGRAMMABLE HEAD TYPE 1 EA 0 $398.19 609.2 OPTIC PROGRAMMABLE HEAD TYPE 2 EA 0 $445.81 609.3 OPTIC PROGRAMMABLE HEAD TYPE 3 EA 0 $452.94 609.4 OPTIC PROGRAMMABLE HEAD TYPE 4 EA 0 $498.24 609.5 OPTIC PROGRAMMABLE HEAD TYPE 5 EA 0 $475.59 609.6 OPTIC PROGRAMMABLE HEAD TYPE 6 EA 0 $607.20 609.7 OPTIC PROGRAMMABLE HEAD TYPE 8 EA 0 $592.25 615.1 TRAFFIC SIGNAL CONTROLLER ASSEMBLY (TYPE 332 CABINET) EA 22 $11,551.61 615.2 TRAFFIC SIGNAL CONTROLLER ASSEMBLY (TYPE 303 CABINET) EA 8 $12,031.90 615.3 TRAFFIC SIGNAL CONTROLLER ASSEMBLY (TYPE 337 CABINET) EA 0-615.4 TRAFFIC SIGNAL CONTROLLER ASSEMBLY (TYPE 336 CABINET) EA 0 $6,239.35 618.1 CONDUIT (2 INCH/PVC SCHEDULE 40) L.F. 36 $7.81 618.2 CONDUIT (3 INCH/PVC SCHEDULE 40) L.F. 28 $11.82 618.3 CONDUIT (4 INCH/PVC SCHEDULE 40) L.F. 18 $16.45 618.4 CONDUIT (2 INCH/PVC SCHEDULE 40)(BORE) L.F. 0 $18.68 618.5 CONDUIT (3 INCH/PVC SCHEDULE 40)(BORE) L.F. 0 #DIV/0! 618.6 CONDUIT (4 INCH/PVC SCHEDULE 40)(BORE) L.F. 0 $29.00 618.7 CONDUIT (2 INCH/PVC SCHEDULE 40)(BORE ROCK) L.F. 0-618.8 CONDUIT (3 INCH/PVC SCHEDULE 40)(BORE ROCK) L.F. 0 $49.50 618.9 CONDUIT (4 INCH/PVC SCHEDULE 40)(BORE ROCK) L.F. 0-620.1 ELECTRICAL CONDUCTORS (NO. 6)(BARE) L.F. 32 $1.44 620.2 ELECTRICAL CONDUCTORS (NO. 8)(BARE) L.F. 23 $1.12 620.3 ELECTRICAL CONDUCTORS (NO. 6)(INSULATED) L.F. 28 $1.50 622.1 DUCT CABLE (TYPE/SIZE) L.F. 0-624.1 GROUND BOXES TYPE A (122311) EA 0 $500.00 624.2 GROUND BOXES TYPE B (122322) EA 0-624.3 GROUND BOXES TYPE C (162911) EA 0 #DIV/0! 624.4 GROUND BOXES TYPE D (162922) EA 0 $566.54 624.5 GROUND BOXES TYPE A (122311) W/ APRON EA 4 $533.47 624.6 GROUND BOXES TYPE B (122322) W/ APRON EA 0-624.7 GROUND BOXES TYPE C (162911) W/ APRON EA 3 $512.68 624.8 GROUND BOXES TYPE D (162922) W/ APRON EA 27 $679.07 628.1 ELECTRICAL SERVICES (PER INSTALLATION) EA 30 $3,687.30 628.2 REMOVE ELECTRICAL SERVICES (PER REMOVAL) EA 3 $227.86 633.1 BATTERY BACKUP SYSTEM EA 23 $7,290.70 636.1 ALUMINUM SIGNS [TYPE A] S.F. 2 $21.54 636.1 ALUMINUM SIGNS [TYPE G] S.F. 0 $20.11 636.1 ALUMINUM SIGNS [TYPE O ] S.F. 0 $16.75 636.2 REPLACING EXISTING ALUMINUM SIGNS [TYPE] S.F. 0-636.3 REFURBISHING ALUMINUM SIGNS [TYPE] EA 0-655.1 TYPE 332 CONTROLLER FOUNDATION EA 30 $3,331.34 655.2 CONTROLLER PEDESTAL POST EA 0 $825.00 680.1 INSTALLATION OF HIGHWAY TRAFFIC SIGNALS (SYSTEM) EA 35 $8,483.15 681.1 TEMPORARY TRAFFIC SIGNALS (PER INTERSECTION) EA 45 $21,876.23 682.1 INSTALL VEHICLE SIGNAL SECTION WITH BACK PLATE (3 SECONDS) EA 30 $767.40 682.2 INSTALL VEHICLE SIGNAL SECTION WITH BACK PLATE (4 SECONDS) EA 30 $933.09 682.3 INSTALL VEHICLE SIGNAL SECTION WITH BACK PLATE (5 SECONDS) EA 8 $624.77 682.4 INSTSALL PEDESTRIAN SIGNAL SECTION (12 INCH) LED (2 IND) EA 22 $561.43 682.5 LOUVER (12 INCH)(ADJUSTABLE) EA 0 #DIV/0! 683.1 LED COUNTDOWN PEDESTRIAN MODULE EA 9 $547.54 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(12 AWG)(CONDUCTOR NO. 2) EA 8 $1.90 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(12 AWG)(CONDUCTOR NO. 4) EA 18 $1.27 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(12 AWG)(CONDUCTOR NO. 7) EA 0 $1.42 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(14 AWG)(CONDUCTOR NO. 2) EA 0 $1.59 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(14 AWG)(CONDUCTOR NO. 4) EA 12 $1.13 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(14 AWG)(CONDUCTOR NO. 7) EA 0 $1.19 684.1 TRAFFIC SIGNAL CABLES (TYPE A)(14 AWG)(CONDUCTOR NO. 9) EA 24 $1.88 684.1 TRAFFIC SIGNAL CABLES (TYPE C)(14 AWG)(CONDUCTOR NO. 2) EA 0 $1.07 685.1 INSTALL ROADSIDE FLASHING BEACON ASSEMBLIES EA 5 $14,773.91 685.2 RELOCATE ROADSIDE FLASHING BEACON ASSEMBLIES EA 0 #DIV/0! 685.3 REMOVE ROADSIDE FLASHING BEACON ASSEMBLIES EA 0 #DIV/0! 685.4 SOLAR-POWERED (PHOTOVOLTAIC) SCHOOL ZONE FLASHER ASSEMBLIES EA 5 $5,820.15 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(STR TYB) EA 0 $3,136.25 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(STR TY B)(LUM) EA 0 $4,087.70 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 24') EA 0 #DIV/0! 687.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 24')(LUM) EA 2 $5,450.00 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 28') EA 13 $4,024.31 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 28')(LUM) EA 7 $4,861.92 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 32') EA 10 $4,628.20 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 32')(LUM) EA 5 $5,224.50 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 36') EA 12 $4,761.85 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 36')(LUM) EA 15 $5,822.18 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 40') EA 10 $5,076.61 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 40')(LUM) EA 12 $5,599.89 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 44') EA 18 $5,622.02 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 44')(LUM) EA 2 $5,826.00 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 48') EA 15 $5,992.86 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 48')(LUM) EA 0 #DIV/0! 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 55')(LUM) EA 2 $20,000.00 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(1 ARM 60')(LUM) EA 8 $15,792.83 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 32-28') EA 0 $7,251.70 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 36-32') EA 0 $7,689.50 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 40-32') EA 0 $9,207.84 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 40-36') EA 0 $9,427.82 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 44-36') EA 0 #DIV/0! 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 44-36')(LUM) EA 0 $9,412.06 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 50-28') EA 0 $15,811.60 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(2 ARM 55-44') EA 0 $16,300.00 686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(LUM ARM 10') EA 0 $1,477.00
686.1 INSTALL TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)(STR C)(30')(LUM) EA 0 $4,500.00 686.2 RELOCATE TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)[TYPE] EA 8 $1,378.66 687.1 PEDESTAL POLE ASSEMBLY EA 22 $874.36 688.1 VEHICLE LOOP DETECTORS SAW-CUT] L.F. 2 $250.00 688.2 PEDESTRIAN DETECTORS [2 INCH PUSH BUTTON] EA 27 $227.21 688.3 AUDIBLE PEDESTRIAN SIGNAL UNITS [TYPE] EA 3 $810.60 691.1 SPREAD SPECTRUM RADIO EA 0 $2,710.06 691.2 ANTENNA [OMNI DIRECTIONAL] EA 0 $579.17 691.3 COAXIAL CABLE EA 0 $2.78 691.4 HELIAX CABLE EA 0 $2.95 692.1 COMMUNICATION CABLE [22 AWG/6 PAIR] L.F. 0 $1.63 692.1 COMMUNICATION CABLE [22 AWG/12 PAIR] L.F. 0 $1.60 692.1 COMMUNICATION CABLE [22 AWG/25 PAIR] L.F. 0 $2.05 692.1 COMMUNICATION CABLE [18 AWG/6 PAIR] L.F. 0 $4.42 693.1 INTERNALLY LIGHTED STREET NAME SIGNS [ILSN SIGN 6' S] L.F. 20 $2,818.83 693.1 INTERNALLY LIGHTED STREET NAME SIGNS [ILSN SIGN 8' S] L.F. 17 $3,186.86 694.1 VIVDS PROCESSOR UNIT EA 36 $4,436.78 694.2 VIVDS CAMERA ASSEMBLY EA 36 $1,435.09 694.3 VIVDS CENTRAL CONTROL EA 0 $1,727.15 694.4 VIVDS SET-UP SYSTEM EA 36 $391.91 694.5 VIVDS TEMPORARY EA 2 14.378.58 694.6 VIVDS COMMUNICATION CABLE (COAXIAL) L.F. 32 $2.07 694.7 VIVDS COMMUNICATION CABLE (FIBER OPTIC) L.F. 0 $378.00 694.8 VIVDS VIDEO RECORDING EA 0-695.1 EMERGENCY PREEMPTION EMITTER EA 0 $1,396.72 695.2 EMERGENCY PREEMPTION PHASE SELECTOR EA 20 $2,557.48 695.3 EMERGENCY PREEMPTION DETECTOR EA 30 $1,119.48 695.4 EMERGENCY PREEMPTION DETECTOR CABLE EA 30 $1.68