Ark Data Centre Information Pack
Our Commitment Welcome to Ark Data Centre s information pack. As the CEO of Ark I welcome the opportunity to work with you either full of the details you need to support your decision. If you do need any further information please don t hesitate to ask. Our new, modular data centre solutions, based on dedicated campuses, lead the market and offer best in class facilities for our customers. Ark don t shoehorn data centre infrastructure into an security options to be included. year. sector. desire to work with you to continuously and responsibly deliver that underpins our modern economy and public services. Contents Our Commitment 3 Our Data Centre Our Data Centre Data Centre Solutions 6 Ark Product Portfolio 7 Ark Product Portfolio Modular 8 Ark Product Portfolio Security 10 Sustainability 11 Operational Excellence 13 Credentials 18 Ark Continuity Limited Hartham Park Corsham Wiltshire SN13 0RP 0845 389 3355 www.arkcontinuity.co.uk Huw Owen Our Commitment 3
with advanced power and network infrastructure. c1,001,043 ft Always On Always Connected Always On Always Connected Diversely fed Primary and Secondary PoP rooms Diversely fed Primary and Secondary PoP rooms Our Data Centre Campus Cody Park 36 acre, secure campus Freehold, low risk site Data Centre A9 module 1 operational, second phase under construction 38 acre, secure campus Freehold, low risk site Data Centre SQ17 module 1 operational, second phase under construction Advanced security to JSP440 controls standard Our Data Centre Campus Spring Park 4 5
Data Centre Solutions Ark Product Portfolio in a fraction of the time it takes for a traditional build. Modular: Tailored: requirements. Bespoke: Low proven PUE: Small, medium and large data centres: losses taken into account. Consistently low PUE across variable loads: data centres of thousands of racks over hundreds of thousands of square feet. Our Solutions Low, medium and high rack kw densities: space. Resilience: tolerance if required. Financial: be kept as low as possible on day one with maximum return on investment achieved Ark Product Portfolio 6 7
Spring Park - P1 Spring Park - SQ17 P1 is located within its own secure 86,700 ft SQ17 is located within its own secure 375,660 ft Ark Product Portfolio - Modular 8 sequence of phased construction in 3 phases that does not impact upon the initial occupants in any way. and incorporates its own dedicated M&E power and Once fully developed, P1 will consist of: Each data room is provided with a maximum of is due in May 13. Cody Park - A101 A101 is located within its own secure 86,700 ft compound at Cody Park. of phased construction in 3 modules that does not impact upon the initial occupants in any way. Each infrastructure Once fully developed, A101 will consist of: Each data room is provided with a maximum of within an IL3 security environment. further modules rolled out to meet customer demand. Once fully developed, SQ17 will consist of: Suites Each suite incorporates 1,679 ft of white space Secure maintenance service corridors contain IL4 and above. SQ17 module 1 is operational and development of the next phase for subsequent modules currently underway. Cody Park - A9 A9 is located within QinetiQs secure headquarters at Once fully developed, A9 will consist of: Suites can incorporate either 1,345 ft or 1,614 ft separately. and above. Ark Product Portfolio - Tailored 9
Security Sustainability needs. Security at each campus includes: the Campus forms of transport. Sustainability Security 10 11
Operational Excellence Planned Preventative Maintenance enable the rapid delivery of Best In Class data centre solutions. manufactured solution. Reduced time to market Lower obsolescence Continuous improvement Modular Deployment Innovative Best Practice Maintenance Providers Mechanical Systems Example Maintenance Reports Agility Build - Operate - Maintain Our proposals to customers include: Operational Excellence 13
Jeffrey Thomas, Non - Executive Chairman Ian Perryment, Director, Finance & Compliance In addition to Finance, Ian also has responsibility for the Compliance team who Ark s business critical standards and compliance. services to the British armed forces. services at an 800 year old estate in Wiltshire Senior Leadership Team recapitalisation in July. Huw will move the business to the next level and ensure it is Professional Examination and then Law Society s Final Examination in 1990. He was admitted to the Law Society Steve Hall, Executive Sales & Marketing Director full P&L, of over 400M, responsibility. Senior Leadership Team 14 15
Simon Burrage, Commercial Director Philip (Pip) Squire, Director, Design & Build Richard Borton, Director, Live Services Senior Leadership Team Company where he was responsible for operations in Europe, South Africa and Japan. Italy. it was acquired by Cendant Corporation. procedure development and optimisation. portfolio value in excess of 650 million. Kevin Bone, Director, Business Programmes & Client Change positions in both the public & private sectors, where he was responsible for multi Senior Leadership Team 16 17
Credentials professional in the Ark approach to data centre delivery. Credentials 18