COMMERCIAL AND GENERAL AVIATION



Similar documents
COMMERCIAL AND GENERAL AVIATION

Current and Forecast Demand

Existing Facilities. Current and Forecast Demand

AIRPORTS ARE FOR PEOPLE WHO DON T FLY

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary

MASTER PLAN PREPARATION

10 Aviation Element Introduction Purpose of Chapter

2006 Report Card for Pennsylvania s Infrastructure

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010

LONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN

OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES

Greater Orlando Aviation Authority Buildings. Orlando International Airport Orlando, Florida, USA

Strategic Business Plan

Walt Disney World Walt Disney World Walt Disney World Walt Disney World Walt Disney World Walt Disney World Walt Disney World

MASTER PLAN DRAFT RECOMMENDED PLAN

HILLSBOROUGH COUNTY AVIATION AUTHORITY FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS

Economic Impact of The Charleston International Airport Complex

Construction Management Association of America San Diego Chapter

Operations at Coulter Airfield

Regional Rail Briefing. March 24, 2010

The Airport. A D K p a g e 2

FLORIDA SPACEPORT IMPROVEMENT PROGRAM

The business of Gatwick Airport Limited

OKLAHOMA SPACE INDUSTRY DEVELOPMENT AUTHORITY

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue PEMBERTON REGIONAL AIRPORT

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

Airport Master Plan Demand/Capacity Analysis and Facility Requirements Summary

years in the community

2.34 Economic Development Immokalee Regional Airport

Transportation. McKinley County Map of Roads. Trucking. Federal Express RAC Transport United Parcel Service Yellow Freight Line

FINAL TECHNICAL REPORT South Texas Regional Airport at Hondo Business Plan

Corporate Address 215 East Freeman, Suite 105 Duncanville, Texas (972) phone (972) fax

Titusville, Florida. Summary. Housing Market Area. Market Details. Economy. Rental Market. Sales Market

News from the Florida Department of Transportation Aviation and Spaceports Office Florida Flyer

> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?

PUBLIC TRANSPORTATION

The Economic Impacts of the Pullman Moscow Airport and Realignment Project

LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN

Charlotte County Airport

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

goals and objectives objectives for the SCASP were:

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport

China General Aviation Promising Future

Master Plan Update. Public Information Meeting George Bush Intercontinental Airport. February 17, 2015

Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY

Airport Performance Measurement

Charter Services. Frequently Asked Questions

SCHEDULE OF CHARGES FOR AIR TERMINALS John F. Kennedy International Airport. Revised December 2014

AGENCY: Federal Aviation Administration (FAA), Department of Transportation.

C HAPTER B USINESS AVIATION. Business Aviation

BAKER COUNTY FREIGHT & LOGISTICS OVERVIEW FLORIDA DEPARTMENT OF TRANSPORTATION

Aviation Infrastructure Costs

MIAMI INTERNATIONAL AIRPORT MIAMI-DADE AVIATION DEPARTMENT

5703 South Sossaman Road Aviation Center

3.0 FACILITY REQUIREMENTS

TRANSPORTATION. Georgia s Strength in Transportation 4 TRANPORTATION SYSTEMS IN GEORGIA. Highways 2 Airport 3 Railroads 4 Ports 5. Inside this issue:

Adams County, CO. Plans to Explode Airport Management

Under Section: II Required Services: Under Section: III Leased Premises:

Town of Beaufort, NC US Highway 70 Commercial Project

SECTION 3 COMMUNITY PROFILE. Geography and the Environment

FLORIDA S STRATEGIC INTERMODAL SYSTEM THE

TRANSPORTATION & COMMUNICATIONS NETWORK

Los Angeles International Airport North Airfield Assessment

Taking wing in Brunswick

Taoyuan Aerotropolis Infrastructure Project and. Taoyuan International Airport Terminal 3 Project TAIWAN

FLORIDA DEPARTMENT OF TRANSPORTATION Florida Redevelopment Association Annual Conference October 24-26, 2012

THE ECONOMIC IMPACT OF THE RUSS BEACH SMITHS FALLS / MONTAGUE AIRPORT

Glossary of Hospitality/Tourism Terms

Technical Chris Denich Types of LID Techniques for New Development Types of LID Retrofits

COMPANY PROFILE FAKHRI TRAVEL & TOURISM CENTRE (FTTC) KINGDOM OF BAHRAIN. Leaders in global travel services. Fakhri Travel & Tourism Centre

Bozeman Yellowstone International Airport Media Guide

ECONOMIC IMPACT OF THE SAN ANTONIO AIRPORT SYSTEM

AIRPORT DEVELOPMENT for ASEAN OPEN SKY

KATHIE CANNING EXECUTIVE DIRECTOR

Accommodating ggrowth and hub development: experiences from Amsterdam and India

CHAPTER 8 - FINANCIAL PLAN

makingspecialplaceshappen

9314 JEFFERSON BLVD DALLAS, TEXAS DALLASGLOBAL.COM

AIRCRAFT MANAGEMENT PROPOSAL

How To Know The History Of The Airport

Mary C. Frederick, RCE PMP Division Chief. Caltrans Division of Aeronautics 1

COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO)

Universal's SuperStar Shuttle

Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) (Ottawa, Canada 3-6 December 2013)

Planned Procurement Opportunities Report. August 2014

How To Plan For A New Airport In Charlotte

Delaware Airpark Airport Business Plan

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals.

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

2040 Southeast Florida Regional Freight Plan

MEETING MINUTES PANAMA CITY BAY COUNTY AIRPORT AND INDUSTRIAL DISTRICT

Emerging Challenges in the Master Planning Process Airport Master Plans: Standing the Test of Time. Doug Trezise Ricondo & Associates, Inc.

B312 Hospitality and Tourism Management. Module Synopsis

THE AIRPORTS The Capital Region Airport Authority Capital Region International Airport Mason Jewett Field

June 1, 2016 LAGUARDIA CENTRAL FACT SHEET About the Project

DAYTONA BEACH ATCT 1

Examples of Eligible Projects. Project Category Description Examples

Academy teachers and Industry Partner staff jointly developed and facilitate the programme.

Transcription:

Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway 09L/27R (6,000 feet long by 150 feet wide), and Runway 09R/27L (10,181 feet long by 150 feet wide). All runways are asphalt and are in good condition and all are served by fulllength parallel taxiways. The airport has a 200,000 square foot passenger terminal building with seven aircraft loading bridges. The airport also has two FBO s to serve general aviation pilots and passengers. There are currently 80 tie-downs for the airport s general aviation aircraft, and between the airport s T-hangars and conventional hangars, there are 177 covered parking spaces for aircraft. Current and Forecast Demand COMMERCIAL AND GENERAL AVIATION Melbourne International focuses primarily on serving commercial airline activity, air cargo, and general aviation. Four airlines currently provide service at Melbourne: Delta, Atlantic Southeast Airlines (ASA), Comair, and Vintage. The average number of daily flights is 12 inbound and 12 outbound. Since 1996, annual passenger enplanements have ranged from around 520,000 to 635,000 and the airport processed 656,000 pounds of cargo in 2005. Flight training is a large component of this airport s general aviation activity. Roughly 11 percent of the airport s annual operations are related to flight training. There is only one flight training school on the airport operated by Florida Tech (FIT). FIT employs approximately 60 instructors and has 34 aircraft dedicated to flight training. General aviation operations by corporate and business users are also common at the airport. Airport management estimates that there are 56 business-related aircraft based at the field. Local companies that use the airport s general aviation facilities include Harris Corporation, Rockwell Collins, Northrop Grumman, JDS Uniphase, GE Transportation System, Nokia, and Titan Industries. The airport also attracts a number of transient or visiting general aviation aircraft. Transient activity accounts for 44 percent of the airport s total operations of which approximately 30 percent are business related. Visiting companies that use Melbourne International include Net Jet, Rockwell Collins, Executive Jet, Flight Works California, JDS Uniphase, Northport Health Alabama, Applebee's, and Wal-Mart. The airport could support Very Light Jet (VLJ) related air taxi operations. The airport s future role may be limited somewhat by competition from other larger commercial airports and by manmade, environmental, community and financial factors. However, despite these factors, the airport sees itself experiencing significant growth in the coming years. 1

Melbourne International Airport 2008 2013 2018 2028 Based Aircraft 247 269 293 347 General Aviation Operations 140,039 154,614 170,707 208,091 Commercial Operations 6,618 7,747 9,068 12,426 Enplanements 145,117 194,199 259,882 465,410 Source: Airport records and FDOT Aviation Office. COMMUNITY SERVICES The airport s vision is to continue building a first-class airport facility with an emphasis on improved usability and intermodal applications. The most important consideration for improving the airport's usability will be to construct an expressway from I-95 to the airport. Melbourne is one of the only airports in Florida without an expressway connection. Additionally, the airport is actively seeking community support to construct a 100,000-square foot seminar/exhibits convention center in front of the terminal building. It has also received a letter of intent from a large hotel developer to build a 300 room hotel beside the convention center. To accommodate the increased number of guest/passengers, the Authority plans to construct a 1,100-space decked parking facility with a people mover connecting the terminal to parking garage and the hotel/convention center. Other plans include the straightening of NASA Boulevard in front of the airport and construction of flyovers to accommodate increased passenger demand arriving at and departing from the airport, and to construct a rail station on airport property with a shuttle service to the terminal for further connections or car rentals. Consideration is also being given to connect with a hovercraft operation for arriving passengers to travel to Port Canaveral, Kennedy Space Center, and Disney s Vero Beach Resort by water. Other Airport Characteristics The airport supports a Foreign Trade Zone (Port Canaveral FTZ #136) on-site. Of the 4,160 acres within FTZ No. 136, 1,856 acres are located on Melbourne Airport Authority property. The FTZ industrial area is a 520 acre site located on the east side of the airport, and it is presently 46 percent occupied. While the airport does not have any based military aircraft, it does accommodate some transient military operations. The airport reports that slightly more than one percent of its total annual activity is attributable to military operations. These military operations are preformed by a number of military branches using jet transport type aircraft. Of the based aircraft, approximately two percent of the aircraft are stored on paved tie-downs, and 98 percent are in T-hangars or conventional hangars. The airport presently reports a waiting list for hangars to store 33 aircraft. The current FDOT work plan for Melbourne International Airport shows plans to develop an additional covered storage spaces. 2

CURRENT AND FUTURE SYSTEM SERVICE REQUIREMENTS / RECOMMENDATIONS As part of its process to plan for near term and long term development needs, the airport has identified the following three initiatives as being needed in the near term: 1. Public Aprons and Taxiway Extensions Capital Project 2. General Aviation Drive Extension Capital Project 3. Interior Road Phase II Capital Project The airport s most recent approved master plan was completed in 1996 and is presently in the process of being updating. The master plan update was completed in 2004. Other projects planned in the future include: Design and Construction of Express Road to I-95 Capital Project Decked Parking / People Mover Construction Capital Project Design and Construction of Convention Center Capital Project Hotel Construction (Private Ownership) Railroad Station Capital Project Expansion of Federal Inspection Station Capital Project Cargo Building Expansion Capital Project Domestic Terminal Building Expansion Capital Project Among the services the Melbourne International Airport currently provides are Flight Training, Corporate, Recreational/Sport, Tourism (CS), Air Cargo, and Business/Recreational (sightseeing, real estate tours, charter, military, coastal patrol/rescue, medical flights) services. The airport plans to increase its flight training, recreational, corporate and charter operations. It would also like to increase its scheduled service to include more domestic destinations and international destinations. Analysis indicates that the airport is best suited for providing Recreational/Sport, Flight Training, Tourism (CA), and Business/Recreational, and Corporate services as well as Tourism (CS) and Business services in a Commercial Service role. The airport in the past has provided some air cargo service for high value, space-related cargo being shipped to the Cape Canaveral spaceport complex. Melbourne International has an impressive infrastructure to support a growing industrial base, and increased levels of air carrier flights, but suffers approximately 78% leakage to other commercial service airports, primarily Orlando International. 3

Based on the infrastructure planning analysis for Melbourne International Airport, the following depicts the airport s current levels of service, as well as, the types and levels of service that the airport will likely be required to accommodate by the year 2030: Current Service Future Service COMMERCIAL SERVICE ROLE Tourism X X Business X X Air Cargo X X International X X GENERAL AVIATION AIRPORT ROLE Flight Training X X Corporate X X Tourism X Recreational / Sport X X Business / Recreational X X 4