Operations at Coulter Airfield
|
|
|
- Jeffery Burke
- 9 years ago
- Views:
Transcription
1 Operations at Coulter Airfield
2 Outline Background Assets Budget Options Questions/Direction
3 Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue Growth: Enhance Opportunities at Coulter Field. 2. Establish a Structure to Manage All Affairs of the Airport 3. Develop New Business Plan for Coulter Field Capitalizing on our Market Niche and Using Best Practices From Other GA Airports in the Nation 4. Establish Solid Networks and Relationships with TxDOT, FAA, and other State and Federal Entities
4 Vision (January 2010) 5. Incorporate New Customer Service Approach, with Emphasis on Coulter Field as a Gateway for Tourism and Economic Development for Bryan 6. Tap in to Other Sources of Funding from Other Aviation Entities and Partners for Major Improvements to Coulter Field 7. Provide Support for Small Businesses and Aviation Enthusiasts to Utilize Coulter Airfield
5 Coulter Airfield Background May 1938 W.J. Coulter Family Donated 120 acres City purchased an additional 130 acres July 2003 Annexation June 2006 City Purchased an additional 60 acres Control development south of airport Protect runway area July 2009 Adopted Zoning
6 Coulter Airfield Property W.J. Coulter City of Bryan City of Bryan WALLIS RD
7 Assets Terminal Bldg Constructed in 1998 at $356K 3,500 sf FBO Office and Work Area Conference Room Pilot s Lounge Flight Planning Area 4 Tenant Offices (600 sf) Accessible Restrooms 2012 Const. Costs: $700,000 Good Condition / Preventative Maintenance
8 Assets - Hangars T-Hangars 4 Rows of T-Hangars (late 1950s thru 2007) All City Owned 36 Tenant Spaces Deferred Maintenance Work drainage, structure, doors, etc Const. Costs: $600-$800K each
9 Assets - Hangars Box Hangars 5 City Maintained/ Privately Built 3 City / BBC Owned (One Under Construction) 1 Privately Owned 2012 Const. Costs: $200-$300K each PHI Air Medical Dorm Facility 2012 Const. Costs: $30,000
10 Assets - Hangars
11 Assets Fuel Farm 100 Low Lead (LL) Fuel 4,000 & 6,000 Gallon Tanks (underground) 15 years old Good Condition (regular pump maintenance) 2012 Const. Costs: $100,000
12 Assets Fuel Farm Jet A Fuel Two (2) 5,000 Gallon Tanks (above ground) Tank Years (needs replacing soon, $50,000) Tank 2 5 Years (excellent condition) Need Water Defense System: $15, Const. Costs: $100,000 Fuel Hoses Replaced FY 2011 ($3,000) Self Serve Fuel Terminal (New, $50,000)
13 Assets Jet A Tanks Jet A Tank 1 Jet A Tank 2
14 Assets - Pavements Runway x 4,000 feet Rehab in 2007 with 90/10 TxDOT Grant ($616K) Excellent Condition 2012 Const. Costs: $6 million
15 Assets - Pavements Taxiway 35 x 3,650 feet Original Runway until 1990s Overlay in 1998 Crack Seal in 2010 Fair to Poor Condition 2012 Const. Costs: $2 million Rehab Costs: $500,000
16 Assets Other Access Road, Parking, Apron/Ramp, 18-Tie Down Deferred Maintenance 2012 Const. Costs: $4 million Rehab. Cost: $370,000 Helipad and Lighting Replace Lighting in FY 2012 ($3,000) 2012 Const. Costs: $20,000 Lighted Wind Sock 20+ years Old Replacement in the next 5 years 2012 Const. Costs: $30,000
17 Assets Other Rotating Beacon Tower 60 ft High WW II Era Tower Replace Beacon (FY 2012 Decision Package, $15,000) 2012 Const. Costs: $50,000 Runway Lighting Systems Runway / Taxiway Lights Routinely Maintain Runway End ID Lights (REIL) Needs Replacement Precision Approach (PAPI) Repaired in FY Const. Costs: $325,000
18 Summary of Assets Landside 2012 Construction Cost Airside 2012 Construction Cost Land(City and gifted) 2,750,000 Runway 6,000,000 Terminal Building 700,000 Taxiway 2,000,000 Parking Lot 100,000 Ramp / Apron / Tie-Down 4,000,000 Access Road 200,000 Helipad and Lighting 20,000 T-Hangars 2,800,000 Ramp / Apron / Tie-Down 50,000 Box Hangars 2,250,000 Lighting Systems 325,000 PHI Dorm Facility 30,000 Lighted Wind Cone 30,000 Fuel Farm Jet A 100,000 Beacon Tower 50,000 Fuel Farm 100LL 100,000 Self-Serve Terminal 50,000 Total Landside $ 9,080,000 Total Airside $ 12,475,000 TOTAL : $ 21,555,000
19 Recent / On-Going Projects Fiscal Year Type Project TxDOT Funds Local / Other Funds RAMP Landscaping $ 7,305 $ 7,305 RAMP SuddenLink Fiber to Terminal Bldg $ 4,214 $ 4,214 RAMP Fuel Farm Maintenance $ 1,153 $ 1,153 RAMP Terminal Bldg. Furnishings $ 1,806 $ 1,806 RAMP T-Hangar Maintenance $ 568 $ 568 RAMP Fuel Farm Maintenance $ 3,932 $ 3,932 RAMP Taxiway Repairs $ 2,125 $ 2,125 RAMP Airport Lighting System $ 430 $ 430 NPE AWOS (Weather Observation System) $ 105,000/131,250 $ 35,000/43,750* NPE New Maintenance Hangar $ 284,000 $ 94,000 RAMP Self-Serve Fuel System $ 25,333 $25,333 * BBC Funds
20 Coulter Airfield Management April 1, City Staff Began Managing 2 Full-Time Staff / 3-Part Time Staff Open 7 Days / 12 Hours per Day FY 2012 (Self Serve Installed) 1 Full-Time Manager / 3 Part-Time Staff FY 2012 Hours of Operation M-F, 8am-5pm, Sat, 8am-1pm, Sun, 10am-2pm
21 Revenue FY2012 FY2012 Coulter Budget FY2010 FY2011 FY2011 FY2011 FY2012 Actual Adopted Amended Actual Proposed Revenues: Operating Revenues: Rent $ 65,718 $ 105,000 $ 105,000 $ 118,123 $ 142,300 Fuel Revenue 129, , , , ,000 Total Operating Revenues $ 194,770 $ 365,000 $ 365,000 $ 465,666 $ 465,300 Non-Operating Revenues: Grants $ 14,478 $ 1,000 $ 29,335 $ 7,996 $ 4,235 Interest Income Misc. Revenues 1,419 1,000 70,067 54,792 15,300 Total Non-Operating Revenues $ 15,971 $ 2,225 $ 99,627 $ 62,882 $ 19,535 Total Revenues $ 210,741 $ 367,225 $ 464,627 $ 528,548 $ 484,835
22 Airport Leases T-Hangar Leases (updated in 2010) $ 80,000 Tie-Down Leases (2011) $ 2,000 Ground Leases (2011) $ 2,850 Office Leases $ 9,400 Cattle Leases $ 500 Community Hangar Leases $ 31,600 TOTAL $ 126,350
23 Expenses Expenditures: FY2010 FY2011 FY2011 FY2011 FY2012 Operating Expenses: Actual Adopted Amended Actual Proposed Salaries and Benefits $ 63,274 $ 131,849 $ 187,691 $ 128,799 $ 132,162 Supplies 122, , , , ,800 Maintenance 57,625 32,660 97,550 54,409 47,876 Other Services and Charges 34,879 14,750 14,807 16,646 34,410 Total Operating Expenses $ 277,867 $ 389,859 $ 535,648 $ 475,016 $ 479,248 Non-Operating Expenses: Debt Service $ 1,798 $ 2,850 $ 2,850 $ 3,704 $ 4,257 Annual Capital ,000 64,724 - Allocation from City Depts 35,309 43,681 43,681 43,681 - Bldg & Facility Mtnce 11,126 10,810 10,810 10,810 - Transfer to Other Funds - Transfers In - (40,000) (183,330) (183,330) - Total Non-Operating Expenses $ 48,233 $ 17,341 $ (50,989) $ (60,411) $ 4,257 Total Expenditures $ 326,100 $ 407,200 $ 484,659 $ 414,605 $ 483,505 Net Increase /(Decrease) $ (115,359) $ (39,975) $ (20,032) $ 113,943 $ 1,330
24 Future Airport Options Option A Continued Development of Coulter Field with Emphasis on Services for Corporate Aircraft Owners / Customers / Tenants Option B Limited Staffing / Limited Services. Focus on Aviation Enthusiasts. Option C Sell the Airport (FAA Permission)
25 Deferred Maintenance Projects Options A and B Beacon Tower (FY 2012 DP) $ 15,000 Jet A Water Defense $ 15,000 Jet A Fuel Tanks $ 50,000 Hose Upgrades (BBC) $ 1,200 Helipad Lights $ 3,000 Hangar Maintenance $ 5,000 Runway Lighting Systems $ 5,000 Repair T-Hangar Doors $ 30,000 TOTAL $ 124,200
26 Future CIP Projects Maintenance & CIP Projects Option A Option B Option C Deferred Maintenance Projects $ 124,200 $ 124,200 - Taxiway Pavement Rehab. $ 500,000 $ 500,000 - Ramp Pavement Rehab. $ 370,000 $ 370,000 - Hangar Access Road $ 12,000 $ 12,000 - Master Drainage Plan $ 330,000 $ 330,000 - Drainage Improvements $ 700,000 $ 700,000 - Wildlife Fencing $ 170,000 $ 170,000 - Runway Lighting Systems $ 250,000 $ 250,000 - Extend Runway to 5,000 ft $ 2,000, TOTAL $ 4,456,200 $ 2,256,200 -
27 Future Project Costs Option A and B Deferred Maintenance and CIP Projects FY2013 FY2014 FY2015 FY2016 FY2017 TxDOT Match Local Match Deferred Maintenance $ 75,000 $ 49,200 $ 62,100 $ 62,100 Taxiway Rehab. $ 500,000 $ 450,000 $ 50,000 Ramp Pavement Rehab. $ 370,000 $ 333,000 $ 37,000 Hangar Access Road $ 12,000 $ 10,800 $ 1,200 Master Drainage Plan $ 330,000 $ 297,000 $ 33,000 Drainage Improvements $ 700,000 $ 630,000 $ 70,000 Wildlife Fencing $ 170,000 $ 153,000 $ 17,000 Replace Runway Lights $ 250,000 $ 225,000 $ 25,000 Extend Runway to 5,000 ft $ 2,000,000 $ 1,800,000 $ 200,000 TOTAL $ 75,000 $ 61,200 $ 1,040,000 $ 1,030,000 $ 2,250, TxDOT Match $ 37,500 $ 35,400 $ 936,000 $ 927,000 $ 2,025,000 $ 3,960,900 - Local Match $ 37,500 $ 25,800 $ 104,000 $ 103,000 $ 225,000 - $ 495,300
28 Future Equipment Costs Option A and B Future Investments FY2013 FY2014 FY2015 FY2016 FY2017 Electric Tug $37,000 Jet Fuel Truck** $18,000 Ground Power Unit $25,000 Lavatory Services $4,000 Potable Water Cart $4,000 Commercial Refrigerator for Food Services $5,000 Ice Machine $200 $3,000 Courtesy Vehicle $15,000 Restaurant FBO $400,000 TOTAL $51,200 $15,000 $37,000 $8,000 $400,000 TOTAL YEAR 1 YEAR 4 $511,200 **BBC Purchased for $10,000
29 Future Costs Option C Projects for Last 20 Years Option C Costs RPZ and Runway* $550, PAPI Lights $23, Terminal Building $267, Taxiway Rehab. $1,186, Access Road $89, RAMP Projects $11, Airport Dev. Plan $81, RAMP Projects $24, Property (60 Acres)* $379, Runway Rehab. Design $68, Runway & Apron Rehab $485, RAMP Projects $14, Maintenance Hangar $282, Self Serve Fuel (Ascent15k) $40, Ramp Projects $8, Ramp Projects $28,916 TOTAL $3,541,118 * FUNDS obligate sponsor indefinitely with FAA **RAMP = Routine Airport Maintenance Program
30 Additional Annual Revenue BBC: Box Hangar Leases $ 14,600 Oil and Gas Revenue $ 8,700 BCAD Taxes Paid $ 16, planes / 1 pvt. hangar Total $ 39,400
31 Additional Annual Revenue Additional ground leases based on new lease model: Land - $1,400 (Approximately 29 spaces) Taxable - $1,300 T-hangar lease rate increases FY12 Budget based on increase
32 Proposed Rates Hangars Monthly Lease Existing Lease Rate ($ / sq. ft.) Monthly Lease Proposed Lease Rate ($ / sq. ft.) Percent Increase E1, E2, E3, E5, and E7 $ $0.13 $ $ % E4, E6, and E8 $ $0.13 $ $ % E9 through E18 $ $0.23 $ $ % W1 through W8 $ $0.18 $ $ % W12 and W21 $ $0.21 $ $ % W13 and W20 $ $0.21 $ $ % W14 through W19 $ $0.21 $ $ % Monthly Revenue $6,708 $8,850 $2,142 Total increase in revenue: $25,704
33 Expense Reductions Option B Modify staffing and operational hours Travel and training for full time staff Other budgetary items related to full time staff and full time staffing of airport
34 Summary of Option A Description FY2013 FY2014 FY2015 FY2016 FY Year Total Future Project Costs - $ 37,500 - $ 25,800 - $ 104,000 - $ 103,000 - $ 225,000 Future Equipment Costs - $ 51,200 - $ 15,000 - $ 37,000 - $ 8,000 - $ 400,000 Additional Revenue $ 39,400 $ 39,400 $ 39,400 $ 39,400 $ 39,400 Additional Ground Leases $ 8,100 $ 13,500 $ 21,600 $ 27,000 $ 35,100 Additional Fuel Sales $ 7,800 $ 13,000 $ 20,800 $ 26,000 $ 33,800 TOTAL - $ 33,400 $ 12,100 - $ 59,200 - $ 18,600 - $ 516,700 - $ 615,800 - $ 33,400 $ 12,100 - $ 59,200 - $ 18,600 $ 83,300 - $ 15,800
35 Summary of Option B Description FY2013 FY2014 FY2015 FY2016 FY Year Total Future Project Costs - $ 12,500 - $ 25,800 - $ 104,000 - $ 103,000 - $ 25,000 Future Equipment Costs - $ 18,000 $ 0 $ 0 $ 0 $ 0 Additional Revenue $ 39,400 $ 39,400 $ 39,400 $ 39,400 $ 39,400 Additional Expense Reductions related to full time staff $ 41,250 $ 41,250 $ 41,250 $ 41,250 $ 41,250 TOTAL $ 50,150 $ 54,850 - $ 23,350 - $ 22,350 $ 55,650 $114,950
36 Summary of Option C City is obligated to repay $ 3,541,118 in grant money FAA obligation may still require City to have an airport
37 Recommendation Create and Pass Resolution for additional revenue to be credited to airport operations Implement Option A
38 Questions/Direction
How To Know The History Of The Airport
Pekin Municipal Airport (C1) John C. Kriegsman Air Field: Fact Sheet General aviation airport included in the National Plan of Integrated Airport Systems (NPIAS) Federally funded at an estimated $6,81,412
The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport
The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport All proposals shall be addressed to: City of Rockwall Attn: Lea Ann Ewing, Purchasing
Corporate Address 215 East Freeman, Suite 105 Duncanville, Texas 75038 (972) 465-8400 phone (972) 767-5122 fax www.hangarsales.com
HANGAR #3 17,500 SF HANGAR #2 22,500 SF HANGAR #1-19,500 SF HANGAR #X54 11,200 SF Corporate Hangar Facilities Now Available FOR LEASE David Wayne Hooks Memorial Airport (KDWH) (Northwest) Actual Property
OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES
OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES Revised June, 2012 1 OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES TABLE OF CONTENTS
CHAPTER 3 ALTERNATIVES CONSIDERED
3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short
NORTH TEXAS REGIONAL AIRPORT FACT SHEET. Approximately 60 miles north of Dallas, between Sherman and Denison, Texas
NORTH TEXAS REGIONAL AIRPORT FACT SHEET CONTACT: Mike Shahan, Airport Director 903-786-2904 [email protected] or Bill Retz, Project Manager 484-343-4040 [email protected] LOCATION: AIRPORT: Approximately
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.
Existing Facilities. Current and Forecast Demand
Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway
3.0 FACILITY REQUIREMENTS
3.0 FACILITY REQUIREMENTS This chapter identifies the facility requirements necessary to meet existing and forecast airport requirements, satisfy FAA design standards, and improve safety. The facility
2. LIABILITY COVERAGE OPTIONS AND LIMITS DESIRED (please complete using N/A when not applicable)
Aerospace New York - 1 WFC 200 Liberty Street. 3 rd Fl New York, NY 10281 USA Tel: 212-915-7000 Fax: 203-569-5290 www.xlaerospace.com Airport General Liability Insurance Application Please complete all
Cuyahoga County Airport - A Guide to Funding Capital Improvements
7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.
COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary
COLUMBUS REGIONAL AIRPORT AUTHORITY Economic Impact Study Update Executive Summary November 2012 INTRODUCTION Hearing a plane overhead is an everyday occurrence. But how many people stop to think that
MASTER PLAN PREPARATION
Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger
Application For General Liability Coverage
HOLMAN INSURANCE BROKERS LTD. Application For General Liability Coverage Instructions Please read carefully This application form deals with all areas of operations that may require this type of coverage.
Strategic Business Plan
Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4
Georgetown Airport Business Analysis
E xecutive Summary Georgetown Airport Business Analysis Prepared for City of Georgetown, Texas May 28, 2013 CH2M HILL Engineers, Inc. 11200 Richmond Ave, Ste. 300 Houston, TX 77082 In association with:
COMMERCIAL AND GENERAL AVIATION
Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 7L/25R (10,500 feet long by 150 feet wide),
Current and Forecast Demand
Existing Facilities A new terminal opened in September 2005 at the Southwest Florida International Airport (RSW), replacing the 17-gate original terminal that opened in 1983. The $438 million Midfield
Delaware Airpark Airport Business Plan
Airport Business Plan Final Technical Report Prepared for: Delaware River & Bay Authority Prepared by: R.A. Wiedemann & Associates, Inc. P.O. Box 621! Georgetown, KY 40324 (502) 535-6570! FAX (502) 535-5314
COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO)
QBAV-3019 (07-11) COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO) (Check which is desired) A QUOTATION INSURANCE POLICY RENEWAL POLICY Name of Applicant Address Applicant is:
Page Intentionally Left Blank
Page Intentionally Left Blank Division Description The Airports Division, part of the Real Estate Assets Department (READ), is responsible for operating two general aviation airports, Montgomery Field
2006 Report Card for Pennsylvania s Infrastructure
AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone
COMMERCIAL AND GENERAL AVIATION
Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway
Charlotte County Airport
Charlotte County Airport Origin Originally acquired by Charlotte County in early 1940s County leased the property to the US Army during WWII Army improvements were deeded back to the County as Surplus
NORTH TEXAS REGIONAL AIRPORT RULES & REGULATIONS
NORTH TEXAS REGIONAL AIRPORT RULES & REGULATIONS 1.0 INTRODUCTION This document is part of the set of primary guiding documents that govern the operation, management and development of North Texas Regional
RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING
U.S. Department of Homeland Security Arlington, VA 22202 RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING Recurrent FSSA Training for Flight School Employees and independent Certified Flight
> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29
Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing
10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter
10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends
Southwest Florida International Airport Skyplex Development
Southwest Florida International Airport Skyplex Development Ellen Lindblad Director, Planning & Environmental Compliance Lee County Port Authority Lee County Port Authority Airports Northside Skyplex Area
ESER was established in 1968 under the name of Tekser Technical Services Inc. Following a change in its name in 1985, it has served its customers under the name of ESER Consulting Engineering Inc. ESER
Massachusetts Statewide Airport System Plan. Technical Report
Massachusetts Statewide Airport System Plan Technical Report TABLE OF CONTENTS CHAPTER ONE: AIRPORT SYSTEM VISION, GOALS AND PERFORMANCE MEASURES INTRODUCTION... 1-1 STUDY OVERVIEW... 1-1 Study Approach
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN
2.34 Economic Development Immokalee Regional Airport
2.34 Economic Development Immokalee Regional Airport A. Introduction & Background: In accordance with the Letter of Understanding between Collier County and the Florida Department of Community Affairs
Draft Technical Report
Business Plan Study Draft Technical Report Prepared for: Delaware River & Bay Authority Delaware Department of Transportation, Office of Aeronautics Prepared by: R.A. Wiedemann & Associates, Inc. P.O.
HILLSBOROUGH COUNTY AVIATION AUTHORITY FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS
FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS YEARS ENDED SEPTEMBER 30, 2015 AND 2014 TABLE OF CONTENTS YEARS ENDED SEPTEMBER 30, 2015 AND 2014 INDEPENDENT AUDITORS REPORT 1
PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND
PROJECT PROPOSAL FOR THE SUPPLY AND INSTALLATION OF A RADAR SYSTEM, CONSTRUCTION OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PRESIDENTIAL LOUNGE AT BANJUL INTERNATIONAL
5703 South Sossaman Road Aviation Center
5703 South Sossaman Road Aviation Center has an available Class A aviation center with a 10,000 s.f. hangar. This facility includes 10,000 s.f. of space for offices, avionics repair, or other uses. It
CITY OF CHARLOTTE COUNCIL POLICY SUBJECT POLICY NO. APP. DATE PAGE. Airport Rules and Regulations 2008-06 07/28/2008 1 of 11
Airport Rules and Regulations 2008-06 07/28/2008 1 of 11 1. PURPOSE The purpose of this policy is to establish rules and regulations governing operations and activities taking place at Fitch H. Beach Municipal
AVIATION GENERAL LIABILITY INSURANCE APPLICATION
AVIATION GENERAL LIABILITY INSURANCE APPLICATION Applicant s Name: Mailing Address: Name of Airport: Applicant is Individual Partnership Joint Venture Corporation Other: Type of Business is: FBO FAA Certified
King County: A Case Study Model for Strategic Marketing Planning for Airport Managers
Abstract King County: A Case Study Model for Strategic Marketing Planning for Airport Managers William Rankin University of Central Missouri Marketing planning in an airport as with other organizations
Signature Flight Support
Signature Flight Support Proposed Lease Amendments at Love Field Briefing to the Council Economic Development Committee Department of Aviation November 1, 2010 Purpose Background on leasing objectives
MCAS Miramar Construction. Christopher Manis Deputy S-4, MCAS Miramar
MCAS Miramar Construction Christopher Manis Deputy S-4, MCAS Miramar PV streetlights ongoing, and they save ~750 KW-hr per year each 342,000 KW-hrs per year from this carport enough to power a 35Ksf bldg
City of Chicago, Illinois Chicago O Hare International Airport
City of Chicago, Illinois Chicago O Hare International Airport Basic Financial Statements as of and for the Years Ended December 31, 2010 and 2009, Required Supplementary Information, Additional Information,
Out of Control. HANG ON! It s GOING TO GET ROUGH! DISASTER is just ahead! DON T JUST SIT THERE DO SOMETHING!
Out of Control Brent Anderson HANG ON! It s GOING TO GET ROUGH! DISASTER is just ahead! DON T JUST SIT THERE DO SOMETHING! No, we are not talking about the aircraft we re flying, but rather the way our
CITY OF KAWARTHA LAKES MUNICIPAL AIRPORT CNF4
CITY OF KAWARTHA LAKES MUNICIPAL AIRPORT CNF4 A CASE FOR INVESTMENT & BUSINESS VISION Photo courtesy of Bob Burns Table of Contents A 1 Pages 1. Executive Summary [1] - [11] 2. Foreword 1 3. Background
Yakima Air Terminal-McAllister Field MOVEMENT AREA DRIVING GUIDE
Yakima Air Terminal-McAllister Field MOVEMENT AREA DRIVING GUIDE Section 1: Definitions Yakima Air Terminal-McAllister Field The following terms are defined as indicated in this section for the purpose
Executive Flight Office & Hangar
ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE
Data Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
FINAL TECHNICAL REPORT South Texas Regional Airport at Hondo Business Plan
FINAL TECHNICAL REPORT South Texas Regional Airport at Hondo Business Plan 1. INTRODUCTION THE PURPOSE OF THIS BUSINESS PLAN FOR South Texas Regional Airport at Hondo (HDO) is to assess potential means
The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.
Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority
Carson City Airport. Driving Rules and Regulations
Carson City Airport Driving Rules and Regulations Adopted February 18, 2009 The following Driving Rules and Regulations were adopted on February 18, 2009 by the Carson City Airport Authority in accordance
AIRPORT MANAGEMENT CONTRACT
AIRPORT MANAGEMENT CONTRACT FITCH H. BEACH MUNICIPAL AIRPORT AGREEMENT effective November 1, 2015, made by and between the City of Charlotte, 111 E. Lawrence Avenue, Charlotte, MI 48813 ( City ), and Charlotte
King County International Airport Minimum Standards
i TABLE OF CONTENTS 1.0 PREAMBLE... 1 2.0 POLICY... 5 2.1 GENERAL INFORMATION... 5 2.1.1 General Policy Statement... 5 3.0 DEFINITIONS... 7 4.0 PREQUALIFICATION REQUIREMENTS... 19 4.1 APPLICATION... 19
Dallas/Fort Worth International Airport SMS Safety Risk Management Airport Early Implementation
Dallas/Fort Worth International Airport SMS Safety Risk Management Airport Early Implementation ACI-NA 15 th Annual Risk Management Conference January 13, 2014 Paul Martinez DFW Airport, VP Operations
M i d M i d V V a a l lle ly e y A i r p A i o r p r o rtt Weslaco, T xas exas Airport Master Plan Airport Master Plan Airport Master Plan
i l l e y Mid Valley l i r Airport p o r Weslaco, Texas Airport Master Plan MID VALLEY AIRPORT Weslaco, Texas AIRPORT MASTER PLAN FINAL TECHNICAL REPORT Prepared By Coffman Associates Airport Consultants
VNY 01.0 Minimum Standards for Engaging in Aeronautical Activities (4/22/02) VNY 02.0 Relationship Between Capital Investment and Lease Term (4/22/02)
Executive Directives: Van Nuys LIST OF DIRECTIVES VNY 01.0 Minimum Standards for Engaging in Aeronautical Activities (4/22/02) VNY 02.0 Relationship Between Capital Investment and Lease Term (4/22/02)
AIRPORT SECURITY BADGING PROGRAM PRESCOTT MUNICIPAL AIRPORT
INTRODUCTION TO THE TSA MANDATED AIRPORT SECURITY BADGING PROGRAM FOR THE PRESCOTT MUNICIPAL AIRPORT WHY ARE WE HERE... Prescott Municipal Airport The Prescott Municipal Airport is regulated by the Transportation
Martha s Vineyard Airport Master Plan. Workshop December 6, 2012
Workshop December 6, 2012 Runway 15/33 Martha s Vineyard Airport Master Plan Airport Overview Runway 6/24 Business Park Terminal and Apron Workshop Agenda Agenda Introductions Master Plan 101 Recent Airport
Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY
Introduction EXECUTIVE SUMMARY The Nanaimo Airport Commission (NAC) engaged Jacobs Consultancy Canada Inc. (JC) to develop a Business Plan for the airport. The Business Plan incorporates the findings of
REQUEST FOR PROPOSALS. Fixed Based Operator Freeport Albertus Airport Freeport, Illinois
REQUEST FOR PROPOSALS Fixed Based Operator Freeport Albertus Airport Freeport, Illinois CONTENTS SECTION I: SECTION II: SECTION III: SECTION IV: SECTION V: SECTION VI: SECTION VII: SECTION VII: BACKGROUND
Appendix D GENERAL AVIATION AIRPORTS GROUND VEHICLE OPERATIONS TRAINING PROGRAM
Appendix D GENERAL AVIATION AIRPORTS GROUND VEHICLE OPERATIONS TRAINING PROGRAM Section 1. Airport Driving Rules and Regulations I. Applicability. This training program applies to all users of, and persons
Mary C. Frederick, RCE PMP Division Chief. Caltrans Division of Aeronautics 1
Mary C. Frederick, RCE PMP Division Chief Caltrans Division of Aeronautics 1 Aeronautics Mission Assist in the development and preservation of a safe and environmentally compatible air transportation system
Aviation Feasibility Study
Aviation Feasibility Study Executive Summary April 2007 Crop marks are added to trim paper size to 9x11, alllowing for a half inch more width than the paper and having the color and images to the edge
Radio Communications in Class D Airspace by Russell Still, Master CFI
Radio Communications in Class D Airspace by Russell Still, Master CFI Class D airspace is one of the most common parts of the airspace system that requires specific radio communications. Although you can
TRAINING PROGRAM FOR AIRPORT LIGHTING MAINTENANCE PERSONNEL
TRAINING PROGRAM FOR AIRPORT LIGHTING MAINTENANCE PERSONNEL Copyright 2006 by Navaid Lighting Associates, Inc. About This Training Program This training program was developed at the request of the airport
Springdale Fire Department Policy & Procedures Manual Volume 2 Operations Section 203 Fire Operations 203.20 City Airport Emergency Plan
Springdale Fire Department Policy & Procedures Manual Volume 2 Operations Section 203 Fire Operations 203.20 City Airport Emergency Plan In order to better protect the lives and property on and around
Appendix E FAA ALP Sheet Checklist
Appendix E FAA ALP Sheet Checklist AC 150/5070-6B (incl. Chg. 1, 5/1/07) Airport Layout Plan Drawing Set The following list provides general guidelines in preparing the Airport Layout Plan set. The individual
County of Santa Clara Roads & Airports Department Airport Operations
County of Santa Clara Roads & Airports Department Airport Operations RA05 042903 DATE: April 29, 2003 Prepared by:carl Honaker Assistant Director, Airport Operations TO: Board of Supervisors FROM: Michael
Aviation Infrastructure Costs
MIT Global Airline Industry Program Industry Advisory Board/Airline Industry Consortium Joint Meeting October 25, 2007 Prof. Joakim Karlsson (Daniel Webster College) Prof. Amedeo R. Odoni (MIT) Ms. Megan
Louisiana s Aviation Program
Louisiana s Aviation Program Mission To continually improve our aviation infrastructure to insure a safe, modern, and well managed system of airports. Bradley R. Brandt Aviation Director Overview Airport
REGULAR COUNCIL MEETING MONDAY, JULY 13, 2015 5:30 P.M. 1 2. ACTION: Motion to approve minutes of the Regular Council Meeting of June 22, 2015.
1.0 CALL TO ORDER City of Pekin REGULAR COUNCIL MEETING MONDAY, JULY 13, 2015 5:30 P.M. 1 2 2.0 PLEDGE OF ALLEGIANCE Mayor John McCabe 3.0 ROLL CALL Clerk to Call the Roll 4.0 APPROVAL OF AGENDA ACTION:
COUNTY OF LOS ANGELES
Gail Farber Director of Public Works COUNTY OF LOS ANGELES AVIATION COMMISSION "To Enrich Lives Through Effective and Caring Service" 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone:
Bozeman Yellowstone International Airport Media Guide
Bozeman Yellowstone International Airport Media Guide www.bozemanairport.com 1 Bozeman Yellowstone International Airport Media Guide The goal of public relations staff at the Bozeman Yellowstone International
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
Snohomish County Airport Paine Field
Snohomish County Airport Paine Field PUGET SOUND REGIONAL COUNCIL AND THE REGIONAL AIRPORT SYSTEM The Puget Sound Regional Council (PSRC) is the planning agency for the central Puget Sound region, which
