Denver International Airport Total Facility Optimization. Josh Foerschler Aurom Mahobian



Similar documents
Agenda. Part I: Introduction to OptimumHVAC. Part II: Initial Energy Savings Analysis for MCO Main Terminal. Part III: Case Studies & Conclusion

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS

Heating & Cooling Efficiency

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Commissioning - Construction Documents (Page 1 of 6)

HVAC Systems: Overview

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

Benefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

NEW JERSEY CENTER OF EXCELLENCE

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Second Place: Industrial Facilities or Processes, New

Rental Cooling Plant Design & Energy Performance. Presented by: Lee Cox Rental Solutions & Services IDEA Conference 2009

Pharmaceutical central utility plants

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Maximize energy savings Increase life of cooling equipment More reliable for extreme cold weather conditions There are disadvantages

Xcel Business Customers: Program and Rebate Summary

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

Texas State University Utility Analysis. Sheri Lara, CEM, CEFP Texas State University Morgan Stinson, PE, LEED AP - EEA Todd Schmitt, PE, LEED AP EEA

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

Chilled Water System Commissioning: Variable Primary Flow. John D. Villani, P.E. Associate Grumman/Butkus Associates

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Enclosed Football Stadium Design History and Lessons Learned

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Water cooled chiller plant (cp/vs)

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

Energy Audits Waste Water Treatment Plants

National Grid Your Partner in Energy Solutions

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Tips to Reduce Chilled Water Plant Costs

Utility Recovery and Continuous Energy Oversight of the Chilled Water Generation for New York Presbyterian

COMMERCIAL HEATING VENTILATION & AIR CONDITIONING (HVAC)

Condensing Boiler Efficiency

Ground Source Heat Pumps The Fundamentals. Southington, Connecticut John F. Sima III P.E.

MIAMI-DADE COUNTY PLANT EXPANSION AND LOOP INTERCONNECTION PROJECT. Competitive Energy Businesses

HVAC Processes. Lecture 7

CGC s Hybrid System Loop Control

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted.

Chapter 3.4: HVAC & Refrigeration System

IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION.

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

Benefits. Air-Cooled Systems

Typical Cooling Load Profile

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014

Geothermal Case Studies and Considerations

Building Energy Systems. - HVAC: Heating, Distribution -

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Appendix C. Minimum Equipment Efficiency Standards

Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.

Hybrid Geothermal / Solar Thermal HVAC System: Part1 Design (OU Human Health Building)

In the compression-refrigeration loop (air conditioning), which is likely to be warmer? 1. Condenser coil 2. Evaporator coil

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.

Tim Facius Baltimore Aircoil

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned

ABSTRACT DCMCCT PROJECT OVERVIEW

What are the Carrier ChillerVu Energy Dashboards?

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Section 2: Estimating Energy Savings and Incentives

Wet Bulb Temperature and Its Impact on Building Performance

Columbia University Master Planning & Optimization

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS

Data Center Commissioning: What you need to know

Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)


Consumers Energy Business Solutions. Commercial and Industrial Energy Efficiency Program April 18, 2013

EnergyPro Building Energy Analysis. Assisted Living Building

GREEN DATA CENTER DESIGN

THERMAL STORAGE WITH ICE HARVESTING SYSTEMS

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

HEATING, VENTILATION & AIR CONDITIONING

Hybrid heat pumps. saving energy and reducing carbon emissions

OEH Energy Efficient HVAC for Business Training Course

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

PRESENTATION BY: MIKE BURT AIR FILTER SOLUTIONS INC. DENVER, COLORADO

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

for Plans Examiners and Building Inspectors

TES for Medical Center

Smart Ideas for Your Business. Energy Saving Opportunities for Hospitals

Building Controls MORE than a Time Clock. Building Automation is a Tool for the building to use to manage their environment

Data Center Planning. PUE Overview

CHILLED WATER PLANT PUMPING SCHEMES. James J. Nonnenmann, PE Stanley Consultants, Inc. Muscatine, Iowa

Transcription:

Denver International Airport Total Facility Optimization Josh Foerschler Aurom Mahobian

AGENDA DIA Intro BMcD-DIA History Optimization Projects Results Conclusion

Denver International Airport Opened February 28, 1995 15 th Busiest Airport in the World 34,000 Acres (Largest Land Area Airport in US) 76,000 Feet of Length on Six Runways >6M Square Feet of Space Under Roof Terminal, 3 Concourses & Airport Office Building >52M Passengers per Year 3

Slide 3 OLA1 Add inforgraphic Ash, Olivia L, 2/4/2015

DIA - Burns & McDonnell History 1980-1983 1989 1995- Present City of Denver initiates site planning activities Burns & McDonnell hired to assist in schematic design for terminal Held various on-call contracts, numerous designs. Scopes: MEP design througho ut terminal 4

DIA CENTRAL UTILITY PLANT (CUP) MASTER PLAN COMMISSIONED CUP UTILITY MASTER PLAN IN 2010 South Terminal, Hotel and Concourse planned expansions Equipment performance, system demands, plant efficiency and useful life considered. EQUIPMENT: 12,750 tons of mechanical cooling (5 Units) 6,650 tons of free cooling (3 Units) 8 cooling towers, 2 separate sumps 300,000 Btu/hr of boiler capacity CUP Master Plan Outcome: Timeline for plant expansions Site wide pumping system mods Pressure independent control valves at Concourses Cooling tower sump mods Free cooling addition (4,150TR) Plant Data Historian R22 replacement master plan 5

HYDRONIC SYSTEM OPTIMIZATION 6

HYDRONIC SYSTEM OPTIMIZATION PROJECT SUMMARY Original BRDG-TNDR blending system in place (HW & CHW) Poor delta T, three levels of pumping from CUP to users AFT Fathom models created Goals of Program: Convert system to true variable primary, variable secondary Eliminate tertiary loop Eliminate all blending/3-way valves Improve delta T at coils Increase efficiency of CUP Extend capacity of CUP Energy efficiency gains Better control and reporting at equipment level Energy savings from eliminating pumps Energy Rebates 7

HYDRONIC SYSTEM OPTIMIZATION ENERGY IMPACT & COST SAVINGS TERTIARY LOOP ELIMINATED: 168 Pumps >1,900 HP PRESSURE INDEPENDENT CONTROL VALVES INSTALLED: >500 valves at AHUs, UHs, etc. DELTA T IMPROVEMENT: HW: 30 deg F Energy Savings: 6.8M kwh/yr Demand Savings: 820 kw CO 2 Emissions 15M lbs/yr Annual Cost Reduction: >$400,000 Xcel Energy Rebate: $330,000 8

CONDENSER WATER SYSTEM OPTIMIZATION 9

CW SYSTEM OPTIMIZATION PROJECT SUMMARY 8/10 Cooling Tower Cells Used One Common Sump Two Levels of Pumping Undersized HXs for Free Cooling Poor Maintenance Access in Sump Goals of Program: Design sump separation for variety of uses: Maintenance Access Dual Temperature Abilities Free Cooling Addition (new HX) Variable speed pumping on CW system Temp CTs & piping needed during construction 10

CW SYSTEM OPTIMIZATION ENERGY IMPACT & COST SAVINGS (est.) ENERGY SAVINGS: Sump Pit Wall Erected with Slide Gates CW Piping Modifications (new 48 isolation in CW header) 4,150 TR Heat Exchanger Installed BAS Sequence Updates 2.4M kwh/yr NEW AVAILABLE TON-HRS 5.7M Ton-Hrs ANNUAL COST REDUCTION: >$140,000 XCEL ENERGY REBATE: $200,000 (anticipated) 11

CHILLER ADDITION AND DISPATCH OPTIMIZATION 12

CHILLER ADDITION & DISPATCH OPTIMIZATION PROJECT SUMMARY Chiller #4 Failure Stapleton chiller moved to DIA, chiller froze multiple times in recent years Goals of Program: Evaluate mult. chiller configurations, quantities, sizes & dispatch models Single/Dual Chiller(s) Parallel/Series Setup Single/Dual Compressor(s) Variable/Constant Compressor Evaluate variable primary CHW and CW conversions Perform LCCA for each config Install additional capacity in CUP 2 x 2,500 TR Space constraint in Chiller Room Created BIM model of plant to prove fit 13

CHILLER ADDITION & DISPATCH OPTIMIZATION PROJECT PHOTOS 14

CHILLER ADDITION & DISPATCH OPTIMIZATION ENERGY IMPACT & COST SAVINGS Ultimate Design: Two chiller setup, parallel configuration Dual compressor machines Variable speed compressors 2,500 TR each Variable CHW flow CHW/CW pumping improvements ENERGY SAVINGS: 1.5M kwh/yr DEMAND SAVINGS 140kW XCEL ENERGY REBATE: $150,000 15

CUP CONTROLS UPGRADE & CHW OPTIMIZATION (HARTMAN LOOP) 16

CUP CONTROLS UPGRADE + CHW OPTIMIZATION PROJECT SUMMARY Original DIA Building Automation System in Place Multiple generations, terminals BRDG-TNDR Panel Still in Place Constant Speed CT Fans Goals of Program: Update BAS system CHW Optimization via Hartman LOOP technology Implement energy efficiency measures & advanced sequences Increase level of reporting and trending for DIA personnel Convert CT to variable speed Motor and VFD installations Before After 17

CUP CONTROLS UPGRADE + CHW OPTIMIZATION ENERGY IMPACT & COST SAVINGS (est.) >10,000 Points on New BAS System Hartman LOOP integration BAS Sequence Updates Plant Efficiency Increase: 0.921 to 0.615 kw/ton ENERGY SAVINGS: 7.3M kwh/yr DEMAND SAVINGS: 322 kw CT WATER SAVINGS: 4M gal/yr CO2 EMISSIONS REDUCTION: 14.6M lbs/yr XCEL ENERGY 18

TOTAL FACILITY OPTIMIZATION RESULTS 19

TOTAL FACILITY OPTIMIZATION RESULTS DIA OPERATORS HAVE WITNESSED Matched Plant & System CHW & HW flows Chilled Water Delta T increase from 9 to 14ᴼF Hot Water Delta T increase from 40-50 to 70ᴼF Ability to project tonnages with outside air, and match-load CUP chillers to achieve best KW/ton Ability to load 64MM BTU boilers up to desirable 70 90% load (most efficient) This year alone, compared to last year, we only had to run one boiler 90% of the time between the months of December thru February vs. last year we ran both boilers 100% of the time. Projected all time high gas savings this year. Addition of VFDs to all pumps & modulating control valves on the decoupler allows up to 5,000 TR free cooling Higher sump temperatures lead to less run time on cooling fans In free cooling mode this year alone, we are seeing record low electric usage. 20

Conclusion So what are we saying? Commit to a client, develop a relationship, get to know their facilities/systems Start with a Utility Master Plan, set the roadmap for future projects Identify all energy-efficiency & system optimization projects even if little to no funding available! Work with client to execute projects one at a time, work towards the goal of completion 21

BURNSMCD.COM/ONSITE CONTACT Josh Foerschler, PE, LEED AP O+M, CEM Project Manager P: 303-474-2290 E: jfoerschler@burnsmcd.com Aurom Mahobian, PE, LEED AP Project Manager P: 303-474-2267 E: amahobian@burnsmcd.com