OPTIMAL DISTRIBUTION PLANNING INCREASING CAPACITY AND IMPROVING EFFICIENCY AND RELIABILITY WITH MINIMAL-COST ROBUST INVESTMENT



Similar documents
A Reactive Tabu Search for Service Restoration in Electric Power Distribution Systems

Phase Balancing of Distribution Systems Using a Heuristic Search Approach

Optimal Branch Exchange for Feeder Reconfiguration in Distribution Networks

Radial Distribution Network Reconfiguration for Loss Reduction and Load Balancing using Plant Growth Simulation Algorithm

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

Network Reconfiguration for Service Restoration in Shipboard Power Distribution Systems

The calm after the storm

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

IMPROVED NETWORK PARAMETER ERROR IDENTIFICATION USING MULTIPLE MEASUREMENT SCANS

ONE OF THE anticipated main benefits of a distribution

Application of GA for Optimal Location of FACTS Devices for Steady State Voltage Stability Enhancement of Power System

2Azerbaijan Shahid Madani University. This paper is extracted from the M.Sc. Thesis

Monitoring Underground Power Networks

Utilities the way we see it

Iman Ziari. M.Sc, B.Eng (Electrical Engineering) A Thesis submitted in Partial Fulfillment of the Requirement for the Degree of. Doctor of Philosophy

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

An Improved Ant Colony Optimization Algorithm for Software Project Planning and Scheduling

A Survey of Models and Algorithms for Emergency Response Logistics in Electric Distribution Systems - Part II: Contingency Planning Level

6545(Print), ISSN (Online) Volume 4, Issue 2, March April (2013), IAEME & TECHNOLOGY (IJEET)

International Journal of Software and Web Sciences (IJSWS)

Preparing for Distributed Energy Resources

Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS)

A Changing Map. Four Decades of Service Restoration at Alabama Power. By G. Larry Clark

SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID

Power System Security Monitoring, Analysis, and Control. George Gross

ADMS(Advanced Distribution Management System ) in Smart Grid

Multiobjective Multicast Routing Algorithm

White Paper. Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid

Network Consulting for Power Grid Optimization

Seven-Year Electric Service Reliability Statistics Summary

Efficient DNS based Load Balancing for Bursty Web Application Traffic

Big Data Collection and Utilization for Operational Support of Smarter Social Infrastructure

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

A Direct Numerical Method for Observability Analysis

Xiaoguang Yang, Valentina Cecchi, Karen Miu, Chika Nwankpa

International Journal of Emerging Technology & Research

METHODOLOGICAL CONSIDERATIONS OF DRIVE SYSTEM SIMULATION, WHEN COUPLING FINITE ELEMENT MACHINE MODELS WITH THE CIRCUIT SIMULATOR MODELS OF CONVERTERS.

Electric Distribution Network Multi objective Design Using Problem Specific Genetic Algorithm

CHAPTER 1 INTRODUCTION

Software Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling

Res. J. Appl. Sci. Eng. Technol., 8(24): , 2014

On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation.

Modeling Simulation Technology Research for Distribution Network Planning *

American International Journal of Research in Science, Technology, Engineering & Mathematics

A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility

ENHANCED HYBRID FRAMEWORK OF RELIABILITY ANALYSIS FOR SAFETY CRITICAL NETWORK INFRASTRUCTURE

Generic Reliability Evaluation Method for Industrial Grids with Variable Frequency Drives

Hybrid processing of SCADA and synchronized phasor measurements for tracking network state

Overview. Swarms in nature. Fish, birds, ants, termites, Introduction to swarm intelligence principles Particle Swarm Optimization (PSO)

Typical Data Requirements Data Required for Power System Evaluation

EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK

VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES

Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Power products and systems. Intelligent solutions for power distribution Zone concept

Network Structure or Topology

Nuclear Power Plant Electrical Power Supply System Requirements

How To Swap Output Phases Of A Power Supply With A Power Converter

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN

Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective

Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid

A MULTILEVEL INVERTER FOR SYNCHRONIZING THE GRID WITH RENEWABLE ENERGY SOURCES BY IMPLEMENTING BATTERY CUM DC-DC CONERTER

ON SUITABILITY OF FPGA BASED EVOLVABLE HARDWARE SYSTEMS TO INTEGRATE RECONFIGURABLE CIRCUITS WITH HOST PROCESSING UNIT

Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation

Federal Wage System Job Grading Standards for Electric Power Controlling, Table of Contents

Analecta Vol. 8, No. 2 ISSN

16 West Coast Regional Plan

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Weather-readiness assessment model for Utilities. Shy Muralidharan Global Product Manager Energy Solutions Schneider Electric

REQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES

An Alternative Approach to Improving SAIDI and SAIFI Indicators

Chapter 2 The Research on Fault Diagnosis of Building Electrical System Based on RBF Neural Network

Technology White Paper Capacity Constrained Smart Grid Design

VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR

Planning of UMTS Cellular Networks for Data Services Based on HSDPA

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015

IESO Supply Deliverability Guidelines

Journal of Theoretical and Applied Information Technology 20 th July Vol.77. No JATIT & LLS. All rights reserved.

Optimization applications in finance, securities, banking and insurance

Flauncher and DVMS Deploying and Scheduling Thousands of Virtual Machines on Hundreds of Nodes Distributed Geographically

Distributed Dynamic Load Balancing for Iterative-Stencil Applications

Using reporting and data mining techniques to improve knowledge of subscribers; applications to customer profiling and fraud management

Power over Ethernet technology for industrial Ethernet networks

A Network Reference Model for Distribution Regulation and Planning: the Spanish Case

Information Services for Smart Grids

A Proposed Scheme for Software Project Scheduling and Allocation with Event Based Scheduler using Ant Colony Optimization

How To Use Neural Networks In Data Mining

Research on the Performance Optimization of Hadoop in Big Data Environment

THREE DIMENSIONAL REPRESENTATION OF AMINO ACID CHARAC- TERISTICS

Neural Network Design in Cloud Computing

Transcription:

OPTIMAL DISTRIBUTION PLANNING INCREASING CAPACITY AND IMPROVING EFFICIENCY AND RELIABILITY WITH MINIMAL-COST ROBUST INVESTMENT L.A.F.M. Ferreira, P.M.S. Carvalho IST S.N.C. Grave L.M.F. Barruncho L.A. Jorge, E. Quaresma, J.A. Martins, F.C. Branco, F. Mira IOA EDINFOR EDP Distribuição Energia SUMMARY This paper is on optimal distribution planning. What does distribution planning mean here? What is the meaning of optimal in the context of distribution planning? In this paper, a distribution system is viewed as a network composed of many nodes (hundreds, sometimes thousands) and an even larger number of branches. The network operates radially. The redundancy of branches is typically of 5% to 15% 5% for large, widely spread networks with a strong rural component, 15% for smaller, urban networks. Redundancy serves reserve and reliability purposes, for it allows for network reconfiguration. Most of the nodes of a distribution system correspond to delivery points or load points. Some nodes are injection points distribution substations; some other nodes are switching stations; some others are simple connection points. Most of the branches correspond to electric cables. Other branches correspond to switching devices. Distribution planning is to choose a new distribution system from a set of possible distribution systems so as to meet the expected load profile in a better way, more reliably, and with fewer losses. The new distribution system is a plan, a plan to be carried out by project services if the plan comprises acquisition or installation of new equipment or a plan to be carried out by dispatch services if the plan involves only changes in the network configuration (i.e. switching operations). If one can define criteria to measure the goodness of a plan, then there will be one plan that ranks above the others that plan will be the optimal distribution plan. The optimal distribution plan is the subject matter of this paper. One can classify the activity of planning, hence the corresponding distribution plans, into the following three categories: Expansion Plan Operation Plan Emergency Plan An expansion plan is a plan to expand the distribution system, a plan to acquire and install new equipment so as to strengthen the system or to accommodate new loads. To choose an expansion plan means to choose the most appropriate set of investments from a set of all possible investments. A regular basis for the updating of an expansion plan should be a year. An operation plan is a plan to operate the system satisfactorily, i.e. a plan to modify the configuration of the network so as to accommodate the load, satisfy the voltage and current requirements, improve efficiency and increase reliability of the system. To choose an operation plan means to choose the most appropriate network configuration (i.e. the set of switching operations) from a set of all possible configurations. Operation planning should be carried out seasonally, or whenever the load changes or the network changes due to maintenance reasons. An emergency plan is a plan to operate the system following a contingency condition, a plan to attenuate the effects of the contingency and to lead the distribution system to a satisfactory, secure point of operation (if possible). The planning problem is formulated as an optimization problem and the algorithms and software requirements are addressed. For each planning activity, the paper reports the benefits of optimal planning in increasing capacity, improving efficiency and reliability, and selecting investments. Keywords Distribution planning, operation planning, expansion planning, emergency planning, capacity, efficiency, reliability, investment, reconfiguration.

OPTIMAL DISTRIBUTION PLANNING INCREASING CAPACITY AND IMPROVING EFFICIENCY AND RELIABILITY WITH MINIMAL-COST ROBUST INVESTMENT L.A.F.M. Ferreira, P.M.S. Carvalho IST S.N.C. Grave L.M.F. Barruncho L.A. Jorge, E. Quaresma, J.A. Martins, F.C. Branco, F. Mira IOA EDINFOR EDP Distribuição Energia Abstract The paper addresses the optimal distribution planning and its importance in three different contexts of distribution utilities practice: expansion planning, operation planning, and emergency planning. The planning problem is formulated as an optimization problem and the algorithms and software requirements are addressed. For each practice context, the paper reports the benefits of optimal planning in increasing capacity, improving efficiency and reliability, and selecting investments. Keywords Distribution planning, operation planning, expansion planning, emergency planning, capacity, efficiency, reliability, investment, reconfiguration. INTRODUCTION This paper is on optimal distribution planning. What does distribution planning mean here? What is the meaning of optimal in the context of distribution planning? In this paper, a distribution system is viewed as a network composed of many nodes (hundreds, sometimes thousands) and an even larger number of branches. The network operates radially. The redundancy of branches is typically of 5% to 15% 5% for large, widely spread networks with a strong rural component, 15% for smaller, urban networks. Redundancy serves reserve and reliability purposes, for it allows for network reconfiguration. Most of the nodes of a distribution system correspond to delivery points or load points. Some nodes are injection points distribution substations; some other nodes are switching stations; some others are simple connection points. Most of the branches correspond to electric cables. Other branches correspond to switching devices. Distribution planning is to choose a new distribution system from a set of possible distribution systems so as to meet the expected load profile in a better way, more reliably, and with fewer losses. The new distribution system is a plan, a plan to be carried out by project services if the plan comprises acquisition or installation of new equipment or a plan to be carried out by dispatch services if the plan involves only changes in the network configuration (i.e. switching operations). If one can define criteria to measure the goodness of a plan, then there will be one plan that ranks above the others that plan will be the optimal distribution plan. The optimal distribution plan is the subject matter of this paper. One can classify the activity of planning, hence the corresponding distribution plans, into the following three categories: Expansion Plan Operation Plan Emergency Plan An expansion plan is a plan to expand the distribution system, a plan to acquire and install new equipment so as to strengthen the system or to accommodate new loads. To choose an expansion plan means to choose the most appropriate set of investments from a set of all possible investments. A regular basis for the updating of an expansion plan should be a year. An operation plan is a plan to operate the system satisfactorily, i.e. a plan to modify the configuration of the network so as to accommodate the load, satisfy the voltage and current requirements, improve efficiency and increase reliability of the system. To choose an operation plan means to choose the most appropriate network configuration (i.e. the set of switching operations) from a set of all possible configurations. Operation planning should be carried out seasonally, or whenever the load changes or the network changes due to maintenance reasons. An emergency plan is a plan to operate the system following a contingency condition, a plan to attenuate the effects of the contingency and to lead the distribution system to a satisfactory, secure point of operation (if possible). The paper presents illustrative results concerning each one of the foregoing distribution plans. However, the three plans can be presented and discussed within a common formulation the object of next section. Let us reference the approaches to the planning problem taken in recent years. There have been many approaches: quadratic programming and heuristics [1], by branch-andbound and heuristics [2], branch-exchange and heuristics [3], neural networks [4], expert systems [5], and genetic algorithms [6-7]. Genetic algorithms have been found to be promising: they can accommodate complex objective functions, as required for a correct representation of the planning problem. However, they have been shown to be too slow to deal with large-scale problems [6-7]. References to our previous work include [8-18]. OPTIMAL DISTRIBUTION PLANNING

Formulation The distribution-planning problem can be formulated as follows: Min f(u) subject to u U where U is the set of all possible trees of the network, and f is a function which maps each tree u onto a corresponding value f(u), a measurement of the cost of u. The function f is usually very complex, does not follow an analytical expression, and its behavior cannot be assumed a priori. To evaluate f(u) one needs to run a full AC nonlinear power flow and analyse the network for power losses, reliability indices, structure patterns and other complex, user-defined performance criteria. The formulation presented here has evolved a long way since the problem formulation of [8]. It reflects our experience with the evolutionary model we have successively developed [8-18]. Algorithms The problem formulated in the foregoing is an optimization problem, but it is not a conventional convex programming type of problem. Because of the nature of f and because U is a discrete set, the optimization problem is not susceptible to mathematical programming algorithms. Our experience has led, upon successive iterations, to formulate the problem as a problem of choosing the optimal tree. As a result, we have designed specific evolutionary-based algorithms to search for that optimal tree [12-13]. Software From the many implementation issues, such as data structures for the evolutionary algorithm and network operation, and relationships with other techniques used (GIS), the following software results should be pointed out: R1 Investment decisions Investment decisions associated with the network branches: equipment and corresponding installation showing where new cables should be installed and existing cables replaced. The cables are selected from a specified set and the output shows the routes selected for new cables and identifies where common trenching (multiple cable route) is required. Similarly, for investment decisions associated with network nodes: equipment and corresponding installation showing new and replacing transformers, and additional switching capabilities for new connections. R2 Topological decisions These decisions comprise the selection of possible new branches, to connect disconnected existing branches, and to disconnect connected existing branches. R3 Voltage-current analysis A complete voltage-current analysis is carried out including the branches where cable current limits is exceeded and the nodes where system voltage levels are not satisfied. R4 Reliability: fault analysis and corrective switching. A fault can occur anywhere in the network, and the occurrence probability can be assessed from the fault rate statistics for each network branch. Following a circuit fault outage, in the majority of cases, supply restoration comprises a switching operation to a nearby feeder. A fault is simulated for each branch, and the feeder and corresponding switching operations are selected and the Expected Energy Not Supplied (EENS) is evaluated. Occasionally, even the best choice of switching may, due to cable current limits, prevent restoration of all power supplies. All these situations are analysed, the corresponding EENS value computed, and the selected switching reported. Other reliability indices (SAIDI, SAIFI, ASCI) are also computed. Interface Distribution planning software has to interface with the technical and geographical data, and with the user. The software makes use of cutting-edge graphic technologies to build up a friendly, fast geographical, multi-monitor multi-window user interface. It has capabilities for continuous, instantaneous analysis of the network every change the user makes in the network (for example, a new connection, or an increase in load) makes an instantaneous change in all views of the network. Zooming and panning are readily available at all times, continuously and instantaneously. The interface also includes the following: easy-to-use, intuitive editing facilities; special filters for symbols, ids, voltages, currents, flows, loads, investments, and reliability indices; colored patterns for investment, voltage, current, loss, reliability, and for feeder configuration; automaticallyscaled mapping facilities, and querying facilities. RESULTS We present a set of results concerning an urban distribution system of 385 nodes, 442 branches (Table 1). The results comprise the three types of planning: emergency, operation, and expansion. Results for larger networks are also presented in Table 1. Emergency Plan Consider the following major event: the outage of the main substation. The main substation is in the middle of the town (load center) and is the major power supply to the network. The other two substations play normally a secondary role. The key issue here is capacity, i.e. to maintain as much load as possible. Consider two plans: a simplistic plan, Plan P1, and the optimal plan. Plan P1 connects the feeders under outage to the neighboring feeders still in service. Some of those

connections heavily overload the circuits in service. The system can feed about 45% of the total load system capacity is 45%. The optimal plan does provide for nonobvious, deeper connections within the system the resulting system capacity increases to 88%. Fig. 1 depicts these results. Operation Plan Consider a distribution system operating satisfactorily, without problems, i.e. no voltage violations, no current violations. The question that may arise is whether the system is operating in the most appropriate configuration, i.e. is it optimal? Fig 2 compares the performance of the no problem system with the optimal configuration system. Losses decrease to a much lower value; expected energy not supplied and duration of interruptions also decrease. Thus, an optimal plan may lead to a substantial improvement in efficiency and reliability. [Note that the improvement in efficiency and reliability are with no investment costs, just reconfiguration costs.] What about capacity what are the capacity gains by reconfiguration? Fig. 3 shows the gains in capacity. Although the system load was causing no voltage and no current violations, they appear when the load profile is raised to 17% of the original load profile. For the optimal configuration (the same one that yields the results of Fig. 2), voltage or current violations only appear when the assigned load is 18% of the original load profile a substantial increase in capacity. Expansion Plan Consider a distribution system that needs expansion to satisfy load growth. [Note that expansion of the system is always necessary to satisfy the new loads, may be necessary to satisfy the load growth (increase in capacity), and may be desired to improve the efficiency and reliability of the system]. Consider two plans: a simplistic plan, Plan P2, and the optimal plan. Plan P2 reinforces weak branches and provides local relief to the weakest areas of the system. The optimal plan selects from the set of possible new connections and reinforcements those that are more important to increase overall capacity, to improve overall efficiency and reliability. Plan P2 selects on the basis of local information, whereas the optimal plan selects on the basis of global, network-wide information. Fig. 5 compares the performance of Plan P2 with the optimal plan. The investment costs are slightly higher. The losses decrease to a much lower value; expected energy not supplied and duration of interruptions also decrease. Thus, an optimal plan may lead to a substantial improvement in efficiency and reliability, with the same amount of investment. As far as capacity is concerned, the new additions of Plan P2 provide for a capacity reserve of about 5%. The optimal plan leads to about 1% reserve (see Fig. 4). [We note that gains in efficiency and reliability may justify investments; thus, the optimal system tends to have a considerable amount of reserve.] Complexity What is the level of complexity involved in the process of proposing an optimal plan? The complexity depends heavily on the scale of the problem, as given by the number of nodes, number of branches, number of possibilities for reconfiguration. Table 1 illustrates the level of complexity involved. Three networks are presented. Larger networks include rural areas larger scale, fewer reconfiguration options. Note that thousands of full AC power flows are required, and millions of faults have to be simulated and the corresponding corrective actions also simulated to evaluate the solutions generated along the optimization process. Number (#) CONCLUSION Table 1. Complexity vs. problem scale Networks Nodes 385 2,22 8,964 Branches 442 2,336 9,8 Substations 3 11 54 AC Power Flows 7,4 13,2 26,4 Simulated Faults 2,464,2 26,67, 215,136, Proposed Changes 12 34 78 Wall-Clock Time 8 s 6 min 28 min Distribution planning which include expansion planning, operation planning, and emergency planning can be made optimal. The benefits of optimal planning in increasing capacity, improving efficiency and reliability, and selecting investments have been reported.

1 88% 1 Before: 1% Capacity [%] 45% Before vs. Optimal Plan 52% 63% 8% Plan P1 Optimal Plan Losses EENS SAIDI Fig.1. Post-fault capacity after main substation outage Plan P1 vs. optimal emergency plan 2 18% Fig.2. System indices before vs. after optimal reconfiguration 2 23% 153% Capacity [%] 1 17% Capacity [%] 1 Before Optimal Plan Fig.3. Network capacity Before vs. after optimal reconfiguration. Plan P2 Optimal Plan Fig.4. Planned capacity Plan P2 vs. optimal expansion plan. 1 12% Plan P2: 1% Plan P2 vs. Optimal Plan 47% 56% 79% Investment Losses EENS SAIDI Fig.5. System indices Plan P2 vs. after optimal expansion plan

References [1] C.C. Liu, S.J. Lee, K. Vu, Loss Minimization of Distribution Feeders: Optimality and Algorithms, IEEE Trans. Power Delivery, Vol. 4, No 2 (1989). [2] Merlin, H. Back, Search for Minimum-Loss Operating Tree Configuration for an Urban Power Distribution System, Proc. of the 5th PSCC, Cambridge (1975). [3] M.E. Baran, F.F. Wu, Network Reconfiguration in Distribution Systems for Loss Reduction and Load Balancing, IEEE Trans. Power Delivery, Vol. 4, No 2 (1989). [4] K. Kin, Y. Ko, K.H. Hung, Artificial Neural Network Based Feeder for Loss Reduction in Distribution Systems, IEEE Trans. Power Delivery, Vol. 8, No 3 (1993). [5] T. Taylor, D. Lubkeman, Implementation of Heuristic Search Strategies for Distribution Feeder Reconfiguration, IEEE Trans. Power Delivery, Vol. 5, No 1 (199). [6] K. Nara, A. Shiose, M. Kitagawa, T. Ishihara Implementation of Genetic Algorithm for Distribution Systems Loss Minimum Re-configuration, IEEE Trans. Power Systems, Vol. 7, No 3, (1992). [7] V. Miranda, J.V. Ranito, L.M. Proença, Genetic Algorithms in Optimal Multistage Distribution Network Planning, IEEE Trans. Power Systems, Vol. 9, No 4, 1994). [8] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, Four Steps for Decision-Making in Distribution Planning, Proc. ELAB 96, Porto,, 1996. [9] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, An Evolutionary Approach to Decision-Making in Distribution Systems, 14th International Conference and Exhibition on Electricity Distribution, CIRED 97, Birmingham, UK, 1997 [1] P.M.S. Carvalho, L.A.F.M. Ferreira, F.G. Lobo, L.M.F. Barruncho, DistributionNetwork Expansion Planning under Uncertainty: a Hedging Algorithm in an Evolutionary Approach, Proc. PICA 97, Columbus, Ohio, USA, 1997. [11] P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Optimal Distribution Network Expansion Planning Under Uncertainty by Evolutionary Decision Convergence, International Journal of Electrical Power & Energy Systems (Special Issue on PSCC 96), Vol. 2, No. 2, February 1998. [12].P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Evolutionary Approach to Radial Network Planning: Algorithmic Operators, International Journal of Engineering Intelligent Systems, Vol 6, No 3, pp. 29-37, 1998. [13] P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Solving Radial Topology Constrained Problems with Evolutionary Algorithms, Proc. Simulated Evolution and Learning, SEAL 98, Canberra, Australia, 1998. [14] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, Evolutionary Computation Applied to Topological Configuration of Large-Scale Power Networks, Proc. Simulated Evolution and Learning, SEAL 98, Canberra, Australia, 1998. [15] L.M. Ferreira, P.S. Carvalho, L.M. Barruncho, L.A. Jorge, C.A. Santos, 'Advanced Distribution Planning Improves Development and Operation', Transmission and Distribution World, Vol. 5, No 11, pp. 24-32, Oct., 1998. [16] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, An Evolutionary Approach to Decision-Making in Distribution Systems, 14th International Conference and Exhibition on Electricity Distribution (CIRED 97), Birmingham, UK, 1997. [17] P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Hedging Large-Scale Distribution System Investments Against Uncertainty, Proc. PES Winter Meeting, NY, USA, Feb 1999. [18] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, L.A. Jorge, F.C. Branco, C.A. Santos, Distribution Planning of Large Urban Networks: Software, Algorithms, Practice and Experience, 15th International Conference and Exhibition on Electricity Distribution (CIRED 99), Nice, France, 1999.