PLUMMER ELEMENTARY SCHOOL



Similar documents
DRAPER ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

BUNKER HILL ELEMENTARY SCHOOL

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

Chicago Public Schools

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

INDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft.

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Building Description Project Description Estimated Cost Notes Total Deferred

Print Shop/Mail Room

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

17,280 square feet Overview:

Building Condition Assessment Report

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

CAPITAL EXPENDITURES

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, :30 PM School Board Room

Building Condition Assessment Report

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

NORTH PENN HIGH SCHOOL RENOVATIONS

E X I S T I N G F A C I L I T I E S

Project Management Division

Frequently Asked Questions

Inspecting to a higher standard.

CONDITION OF QUALITY ITEMS

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

BILL OF QUANTITIES Part No.: Part Description

Facility Condition Assessment

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Colorado School Finance Project 1200 Grant Street, Denver, Colorado Fax: cosfp.org

Five-Year Capital Plan Request FY through FY

Self-Home Inspection Checklist

Colorado School Finance Project 1200 Grant Street, Denver, Colorado Fax: cosfp.org

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements

The University of Akron Main Campus Biennium 1 July June Priority Project Budget Description 1 Electrical Infrastructure Loop

KIEWIT CM/GC Enabling/Utilities

Project Close Out Summary

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

HOMEOWNER S PERMIT GUIDE

Cedarfield Plantation

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Important Information for Owners of Buildings in Flood Zones

A Quick Guide to Facility Management Services

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, , 2012

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Facilities Planning, Design & Operations University of Kansas Job Title Definitions Job Family Definition:

New Jersey City University Gilligan Student Union Center

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Transcription:

INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1

PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5 SQ. FT. (EXISTING) 69,400 SQ. FT. (ADDITION) TYPE PROPOSED TYPE PROPOSED Pre-School 1 Pre-Kindergarten 2 Kindergarten 2 1 2 2 2 3 2 4 2 5 2 Gym Bleachers Locker Rooms Gym-Cafeteria Cafetorium Gym-Cafetorium Gym-Auditorium Auditorium 1 Multi-Purpose 1 Cafeteria Kitchen Services 1 Special Education 1 Media Center 1 Administrative/Health 1 Computer Lab 1 OT/PT 1 Science Lab Art 1 Music 1 Teacher Workroom 2 Parent Resource 1 Proposed Planning Profiles The inventory of spaces listed here is intended to outline the program of educational and support spaces necessary to support the proposed program capacity. Individual educational specifications and facility programs will be developed with the School Improvement and School Planning / Design teams at the time of project initiation. PLUMMER - 2

CONDITION ASSESSMENT Building System ADA Compliance Conveying Systems Electrical Exterior Finish HVAC Interior Finish Plumbing Roof Condition Assessment The body of information summarized below is based on a detailed facility condition assessment completed in 2006 and updated by visual observations conducted in 2007. Improvement initiatives completed by OPEFM in 2007 and 2008 are noted in red text in each section. An overall summary of work completed under various OPEFM programs is provided at the end of the condition assessment. Structure Technology 2008 Rating Unsatisfactory Unsatisfactory Poor Unsatisfactory Poor Fair Fair Fair Good Poor Condition Scorecard These ratings reflect the overall condition and level of replacement need for an entire system, in adherence with the Facility Condition Index (FCI) System, categorizing systems as Good (FCI <.25), Fair (FCI 0.25 0.50), Poor (FCI 0.51 0.85), or Unsatisfactory (FCI >.86). Comments: 1 Conveying System No conveying system exists at this facility. The electrical system was installed with the original building; some panels and distribution upgraded in 1989. The building should have a complete electrical system upgrade. The fire alarm and emergency lighting are original and do not comply with current codes. The lighting 2 Electrical system has had some renovations but should be replaced with modern fixtures providing proper light levels in all areas. A recent lighting upgrade utilized low cost ballast that resulted in approximately 30% light fixture failure. Much of the brick structure is in poor condition and needs major renovation. Additionally, all of 3 Exterior Finish the exterior windows should be replaced. 2007: exterior brick pointing completed. Although the facility is nearly fifty years old, the structure of the facility is sound as it was 4 Structure constructed using CMU and bricks. The burners for the boilers were replaced in 1990, but the boilers are original 1957 equipment and require replacement. The distribution and terminal equipment is original and requires a system renovation. The building relies on window units for air conditioning; these should be 5 HVAC replaced as part of any renovation. The ventilation and exhaust systems typically are not functioning properly. When the window air conditioning is operating, little or no outside air is circulated. 2008: Repairs to boiler(s) and Classroom heating units completed. Installed 31 A/C window units. HVAC servicing completed. The interior of the facility is in generally fair condition. Asbestos tiles are present and should be removed. Large areas of ceiling tile are in poor condition and should be replaced. 6 Interior Finish Sections of VCT flooring are beginning to wear and should be replaced. 2007: Painting, flooring, completed. The piping and plumbing fixtures for this facility should be replaced entirely since most of the 7 Plumbing equipment is in poor condition and outdated. Water fountains and bathroom fixtures do not meet code requirements. 2007: Water fountain blitz, plumbing fixture replacement completed The roof is in fair condition although there are some issues with leaks that need to be 8 Roof addressed. Remediation will prevent further damage to interior finishes and delay the need to replace the roof entirely. 2008: Roofing repair completed. 9 ADA Compliance 10 Technology The facility is not in compliance with ADA due to the absence of appropriate conveying, ramps, door hardware, parking, and fixtures in the school facility. The building's internet and telephone connections have had various upgrades in recent years, but placing the head end systems in climate controlled rooms would provide greater reliability. The security and camera systems appear to be functioning properly. The intercom system appears to be approximately thirty years old and should be replaced. 11 Grounds The asphalt pavement in the playground needs resurfacing. PLUMMER - 3

RECENT HISTORY OF MODERNIZATION 2007 WHOLE SCHOOL BLITZ Interior Finishes - Drywall & Ceiling Repairs Interior Finishes - Select Carpet Replacements/Flooring Repairs Plumbing Repairs - Restrooms/Fixtures & Flush Valves; Water Fountains Mechanical Repairs - AHU & Boiler Repairs, HVAC Filter Replacement Exterior Work & Building Envelope - Lighting, Site Work, Playground, etc. Other Work Orders 2008 STABILIZATIONS AC Window Units Installations & Electrical Upgrades 2008 SUMMER BLITZ Site Work (Concrete Masonry, Painting, Fencing) Carpentry Doors & Windows Interior Finishes - Painting/Plastering Roof Repairs/Replacement Other Work Orders Mechanical Electrical LEGACY PROJECTS-OTHER STABILIZATIONS Interior Renovations-Swing Spaces/Libraries/Interior Athletic Facilities (Locker Rooms)/ADA Planning Design Pre-Construction In Progress Completed PLUMMER - 4

First Floor Concept Plans These floor plans represent planning concepts for proposed facility use, aligning the proposed program capacity, the proposed planning profiles, and the conceptual reconfiguration of the building. Each project is subject to a formal design process, incorporating input from the School Improvement team at the time of project initiation. PLUMMER - 5

Second Floor Concept Plans These floor plans represent planning concepts for proposed facility use, aligning the proposed program capacity, the proposed planning profiles, and the conceptual reconfiguration of the building. Each project is subject to a formal design process, incorporating input from the School Improvement team at the time of project initiation. PLUMMER - 6

Third Floor Concept Plans These floor plans represent planning concepts for proposed facility use, aligning the proposed program capacity, the proposed planning profiles, and the conceptual reconfiguration of the building. Each project is subject to a formal design process, incorporating input from the School Improvement team at the time of project initiation. PLUMMER - 7