Role of Project Management Consultancy in Construction Project



Similar documents
Consultancy Services Proposal

Crosswalk Between Current and New PMP Task Classifications

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

Limited and sealed bids are hereby invited on behalf of State Bank of India, Estate Department, GITC, CBD Belapur for appointment of Architect.

Volume II- Project Development Processes

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

A REVIEW ON FACTORS AFFECTING CONTRACTOR PERFORMANCE IN CONSTRUCTION WORK

Imagine the power of both working for you

Contract / Construction Management. November 2006

D. MCLAUGHLIN & SONS LTD QUALITY MANUAL

VENDOR PREQUALIFICATION QUESTIONNAIRE

DIRECTORATE OF ESTATES & FACILITIES

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

PMP Examination Tasks Puzzle game

Construction Management Standards of Practice

Revised Work Scope Dated April 23 rd, 2015

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Manage Deliverables - Construction Step 6. July 12, 2012

1 OF 7. there will be few "surprises" as the work progresses.

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi

Demonstrate and apply knowledge of project management in

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES)

PROJECT MANAGEMENT PLAN CHECKLIST

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

Terms of Reference. Egypt Post - Several position: Architects, Interior Design, Structure Design, Site Engineer and Electromechanical Design.

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

Develop Project Charter. Develop Project Management Plan

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

ASSAM POWER GENERATION CORPORATION LIMITED

Delivery Management Guidelines Delivery Process 2 - Project Management

Capital Project Delivery Handbook

ICT Competency Profiles framework Job Stream Descriptions

PROJECT MANAGEMENT FRAMEWORK

Project Management Guidelines

MNLARS Project Audit Checklist

Business Logistics Specialist Position Description

Exhibit C: Scope of Work and Schedule of Deliverables

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:

PROJECT COMMUNICATIONS MANAGEMENT - A WEB BASED CONSTRUCTION MANAGEMENT APPROACH

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

Project Management Manual Update Transportation Department City of Edmonton

MSc in Construction Management (Cycle 2, level 4)

PHASE 3: PLANNING PHASE

Ashghal (or the Public Works Authority) is the government organisation responsible for providing major infrastructure for the State of Qatar.

IT SYSTEM LIFE-CYCLE AND PROJECT MANAGEMENT

Engineering Procurement Construction Quality Plan

IT Service Provider and Consumer Support Engineer Position Description

State Bank of India invites applications in a two cover system (technical and price

PHASE 3: PLANNING PHASE

NFSA Project Management Guidelines

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

Employability Skills Summary

Facilities Development Manual Chapter 2 Project Management Section 15 Project Integration Management

EFFECT OF PROCUREMENT SYSTEMS ON THE PERFORMANCE OF CONSTRUCTION PROJECTS

Step by Step Project Planning

A Comparison Study Between Event Chain Methodology And Critical Path Method In The Construction Industry

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

Contract and Vendor Management Guide

Information Technology Project Oversight Framework

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

Business Management System Manual. Context, Scope and Responsibilities

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Project Management Plan for

Fixed Scope Offering Fusion Financial Implementation

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

Partnering for Project Success: Project Manager and Business Analyst Collaboration

THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini)

CONSTRUCTIBILITY REVIEWS: CASE STUDY OF BID DOCUMENT ERRORS AND OMISSIONS

REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT

Occupational Profile and Curriculum Summary

Design Consultant Project Management Requirements

SCHEDULING AND PROJECT MANAGEMENT

Program Management Professional. PgMP

GUIDELINE. Professional Engineers Providing Project Management Services. Published by Association of Professional Engineers of Ontario

BASICS OF PROJECT MANAGEMENT István Vidovszky PhD. table of contents

Layton Construction Co., Inc. Quality Management Manual

Attachment 5 Electrical Engineering

Morgan Stanley. Policy for the Management of Third Party Residential Mortgage Servicing Providers

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART C CERTIFIED PRACTISING PROJECT MANAGER (CPPM)

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Planning and Construction Management Services

Service Level Agreement for the provision of a Finance and Accounting service to Mr. ABC Pty Ltd. Agreement Execution Date:

The South African Council for the Project and Construction Management Professions (SACPCMP)

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

Business Analyst Position Description

Request for Proposal Architectural/Engineering Services. Adapt/SouthRiver CHC. P a g e 1

ICAO Procurement Process Briefing

The 10 Knowledge Areas & ITTOs

Module 3: The Project Planning Stage

1.040 Project Management

Transcription:

IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 10, Issue 6 (Jan. 2014), PP 14-19 Role of Project Management Consultancy in Construction Project Atul R Nikumbh 1, Dr. S.S. Pimplikar 2 1 Post graduate student, 2 Prof & Head of Dept. of Civil Engineering, 2 MAEER S Maharashtra Institute of Technology,Pune university, India. Abstract : The construction industry generally deals with the various types of construction sectors viz Real Estate & Infrastructure. Real Estate Sector is segmented in Residential, Industrial, Corporate, and Commercial. Whereas Infrastructure sector in Roads, Railways, Urban Infrastructures, Ports, Airports and Power. To manage such kind of unique projects requires an expertise with organizations and a thorough body of knowledge. The purpose of this paper is to provide the analysis or breakdown of Role of Project Management Consultancy and study the Problems faced by PMC for implementing the project. Project Management Consultancy plays multifaceted part in such projects and provides the services from inception to completion of projects. At every stage of project life cycle, the principles of pro-activeness and creating the win-win situation is necessary keeping in mind the customer / client s requirements. Use of Project Management Consultancy (PMC) offers one of the effective management solution to increase and improve the efficiency and outcome of a project in construction. A case study of construction of a Mega Industrial Project which is dealt by PMC and Project consist of various type of buildings for Manufacturing unit, Assembling unit, Logistic unit, Process unit with allied Infra of Electrical utilities, Services like Fire fighting, Sewage line, Storm water arrangement and Road etc have been considered for this research work. Keywords: Body of Knowledge, Industrial Buildings, Project Management Consultancy (PMC), Role &Responsibility Matrix. I. INTRODUCTION The Project Management Consultancy has a wide variety of roles to play during the construction process. Construction project gives benefits to the Customer / Client in terms of satisfaction and it consists of business development, profit, resources utilization, etc. Because of this consultancy plays a multifaceted part in the construction project, and is usually involved in the project from the project s inception to its completion. It is important to fully understand Project Management Consultancy and authority. Doing so ensures that the Consultancy can be fully maximized on each construction project. Normally the job is managed by the Project Manager and supervised by the Construction Manager, and allied team of design engineer, construction engineer or project architect. Efficiency in Management is needed to gain a higher level in competitiveness. Every construction project is different i.e. unique, every construction project demands the full attention, professionalism and energy of its project team, every construction project depends upon an experienced leader to make it happen. The construction industry in India has grown very fast with the construction of new projects. Due to the rapid expansion in the construction industry, the services provided by the Consultancy need to be improved in terms of performance and quality of work to meet the construction project goals and objective and also the clients satisfaction. Paper highlights the case study for research of dealing the Mega Industrial Projects by PMC through their role and responsibility during project life cycle from Project Initiation Phase and A/E Selection - Schematic Design Phase- Design Development Phase-Construction Documents Phase-Bidding and Award Phase-Construction Phase -Closeout. In all phases PMC manage the project by various services like Scheduling, Cost budgeting, Value engineering, Risk Identifying, Monitoring & controlling, Time line optimization, Resources Allocations, etc. II. NEED FOR CONSULTANCY : 1. Shortage of specialized staff with the Industry since at present the supervisory staff conversant with latest construction technique is not available in bulk. 2. Also, in general, there is a shortage of supervisors who can be associated with a single project. 3. Faster execution of projects in short time. III. PMC ROLES AND RESPONSIBILITY MATRIX: There is no specific definition of project consultant. Most definitions describe management consultants by their roles and responsibility and services that they provide using tools and skills they have in delivering a task assigned by the client or the owner of the project (Dzulkarnaen, 2005). 14 Page

Project is a Temporary endeavor with a specific beginning and end (i.e. has limited life) and creates a unique product, service or result (i.e. each project by definition is unique). Project management is the art of directing and coordinating human and material resources throughout the life of a project by using modem management techniques to achieve pre-determined objectives of scope, cost, time, quality and participation satisfaction. Consultation is happening if the clients seek expert knowledge or some opinions on some engineering problems or anything that involves engineering matters. Consultation maybe brief or extended which involves only few hours of time, with the clients sitting across the desk of the consultant. Other consultation may require traveling, some period of substantial portion of a consultant s time over a period of several months, and repeated presentations and discussions with the client (Maxwell, 1982). Table 1 shows the roles and responsibility matrix for the various stakeholders of the project at different stages of construction. Table: 1 Roles and Responsibility Matrix (R- Responsibility, I- Participatory responsibility) Code Description of Project Management Consultancy s Roles and Responsibility Matrix @ Industrial Projects Client PMC Architect A. Pre-construction Stage: A.1 Analyze Client s project related requirements I R R A.2 Prepare the Design Brief in terms of function ability, cost, time, quality and safety R R R A.3 Develop project control systems I R I A.4 Finalization of project organization chart. R R I A.5 Establishment of project communication and reporting system I R I A.6 Preparation of works breakdown structure I R I A.7 Preparation of Project Master Schedule with base line I R I A.8 Preparation of Design / Drawings deliverables schedule I R I A.9 Feedback on the Master Budget of the project I R I A10 Co-ordination and follow-up with Architect and other design consultants for their inputs I R I A.11 To identify and suggest consultants/designers for specialized requirements I R I A.12 Lead project meetings as necessary for review of progress I R I A.13 To set up,track, monitor a design deliverable schedule I R I A.14 Checking & verification of designer s submissions (design basis reports, value engineering, cost benefit analysis, drawings etc) I R I A.15 Cost control during all stages of design and design development R R I A.16 Preparation of procurement plan R R I A.17 Review of technical specifications and Bill of Quantities (BOQ) I R R A.18 Monitoring the statutory approvals process by follow-ups with liaison consultants and reporting the progress. R R R A.19 Conducting Pre-bid meetings and feedback for completeness of tender specifications and technical parameters. R R I A.20 comparative statements & techno-commercial evaluation reports R R I A.21 Submitting Weekly and Monthly progress reports I R I B. Construction Stage B. 1 Full time supervision of All construction works / activities for the project I R I B.2 On-site design co-ordination and issue of drawings / clarifications I R R B.3 Organize approval to contractors shop drawings, product data sheets, samples, R R R B.4 Refinement of works breakdown structure I R I B.5 Monitoring the progress of work with the Master construction schedule I R I B.6 Prior flagging of anticipated bottlenecks and analysis of its reasons I R I B.6 Day to day correspondences including contractual issues I R I B.7 Change order management for design changes and extra items I R I B.8 Prepare QA/QC plan and Method Statement I R I B.9 Quality assurance and control to ensure conformance to drawings and specifications. I R I B.10 Establish EHS plan (Environment, Health and Safety) I R I B.11 Issue GFC drawings to respective contractors and keep updated record issued. I R I B.12 Scrutinize and check working drawings received from Architects /designer I R I B.13 Organize Progress review meetings on weekly basis. I R I B.14 Collect, review and maintain all the records of contractors daily progress reports. I R I C. Post-Construction Stage: C.1 Advice about probable date of Substantial Completion I R I C.2 Preparing & addressing the schedule of defects / punch lists I R I C.3 Provide assistance in Testing and commissioning of the facility I R I C.4 Collection and integration of various O and M manuals, commissioning & test certificates I R I C.5 Reconciliation and Certification of Final bills of contractors, suppliers, vendors and consultants I R I C.6 Preparation of project close-out report including learning I R I C.7 Collate and verify all As-built drawings I R I C.8 Addressing any queries during defects liability period I R I C.9 Co-ordination with the Contractors to rectify the defects during the defects liability period, I R I 15 Page

IV. CASE STUDY: Project Management Consultancy manages the Mega Industrial Project in Maharashtra, India. Project land area of 90.00 Acre and proposed Industrial Buildings are 8 No ( 16.50 Lac sqft ) space with supporting utilities building, other services like fire fighting, etc and whole project is bifurcated in to 3- Phases with allied infra works as follow : Table: 2 Overview of Industrial Project Phase 1: (Completed and Operational) Building B1 Building B3 Building B4 (B4A+B4D) Building B8 ElectricalSubstation- 33 KVA Roads, STP, General Infrastructure Phase 2: ( Construction in Progress) Building B1A- 106,284 Sqft Building B5-162,096 Sqft Building B2-58,056 Sqft PMO, Gatehouse- 12,086+2,968Sqft Roads and Infrastructure Phase 3: ( Proposed construction) B uilding B6 B uilding B7 4.1 Methodology: The data of this research was collected from different sources. Literature and theoretical reviews have been taken from books, articles and papers to describe main concepts about consultant service management in construction project. The main methods are descriptive, explanatory and quantitative. In description, it starts by providing information about the current situation on the field of the construction industry. The quantitative works done by collecting data from field / Site.Also collecting data by some questionnaires from the case study.experiences shared by supervisor engineers, managers, in tackling problems at various levels in these projects put forth during planning stage of a new project helps in over viewing the project and identifying the expected expert judgments. 4.2 Project Scheduling Phase-1: Generally Industrial buildings are constructed and earlier ready in the form of Cold Shell, but it is very difficult to completely make it 100 % ready for functional use. It is reflected from Table-2 data that the within 9-12 months Industrial building having built area 1.5 Lac (Appr.) Sqft can be completed with a slight delay with satisfactorily functioning and commission in the presence of PMC. Table 3 gives the schedule actually achieved for the completion for phase I. Table: 3 Project Schedule Industrial Project- Phase- 1 Activity Building B3 Building B4A Building B4D Building B8 Concept Initiation 03.05.2012 20.01.2012 01.06.2012 28.03.2012 Civil Works 11 Months 06 Months 08 Months 07 Months Structural Work (Pre-Engineered building) 09 Months 06 Months 07 Months 07 Months Services 05 Months 03 Months 03 Months 05 Months Allied Infra 06 Months 04 Months 05 Months 07 Months Office Bldg. with Interior Works 08 Months 04 Months 07 Months 07 Months Completion & Handing Over 22.05.2013 20.08.2012 26.03.2013 19.03.2013 Total Duration 12 Months 08 Months 09 Months 12 Months The proposed project cash flows for the phase- II are shown in fig 01, whereas the projected manpower requirements are indicated in fig 02. Fig 02 reflects the need for averaging out the resource allocation, particularly in the period from April-14 to August -14. 16 Page

4.3 Project Cash Flow Phase-2 Fig-1 Cash-Flow 4.4 Resource Allocation -Project Total Manpower-Phase-II Fig-2 Allocation of Total Manpower 4.5 Project Time Line Optimization: PMC tried to optimize the time factor through various phases, where delays have occurred. These efforts are mentioned in Table 4. Table: 4 Time Line Optimization Design Phase Procurement Phase Construction Phase 1. Finalization of Building Elevation and sign off with concept 2. Addendums of Tenant Improvement finalization in early design stage & sign off on concept & details 3. Incorporation of statutory requirements in design phase 4. Addition of Mezzanine structural works to PEB (preengineered building) scope 5. Linking Building Schedule to Design delivery schedule 6. Finalization of Power requirements of End user 7. Introduction of Precast Waffle wall 1. Delinking of PEB (pre-engineered building) & civil package to concept finalization 2. Linking Procurement schedule to building deliverables 3. Untimely processing per lead delivery of long lead items viz. Dock leveler, Fire door, HT Cables, etc. 4. Soft copy approvals Reduction in Hard copies turnaround time 1. Milestone linking to individual package delivery timelines, Set points briefing & acceptance 2. Progress balancing per requirements through work scope shuffling 3. Progress communication & running catch up plans for delays 4. Lesser turnaround time trough design communication in soft forms 5. Identification & attention of snags through process 17 Page

4.6 Project Governance Structure: Fig-3 Project Governance Structure 1.Respond to escalation from project team 2.Provide guidance & way forward 3.Meet every month 4.Review & respond to escalated items from on site project team 5.Escalate to senior management 6.Meet every day with PMC project team 7.Review delays, issues/risks with PMC project team 8.Meet every day with on site contractors, suppliers 9.Reports progress highlights,delays through delay logs 10.Review risks,issues and key topics every week with contractors through weekly review meetings 11.Schedule status review 12.Escalate risks/issues & related recommendations to CLIENT project team as appropriate 13.Meet every day with team members 14.Review progress issues, review status of specific areas & ensure common understanding of project progress 15.Inform & escalate the issues Project Governance structure is for easy communication through authorities to avoid the conflict and the further delay. In order to channelize this structure smoothly various lines of actions need to be implemented such as escalating any issue of contractor to PMC and further firm PMC to client and to the Project Team. PMC also reports through dash board to higher management of client and provide the direction to contractor as per feedback received. This is shown in Fig 3. Table 5 reflects the key challenges faced by the project management consultant whereas, Table 6 indicates the various efforts undertaken by the PMC to overcome these challenges. Table 5: Key Challenges faced by project management consultant 1. Constructability issues 2. Supply chain risk material delays 3. Poor quality engineering process runs 4. Inter-Contractor Coordination Issues 5. Activity dependency structure 6. Lack of Safety Awareness & Unsafe work methods 7. Meteorological limitations Table 6 efforts done by PMC to overcome the Challenges Coordination meetings, Services Coordinator right from design phase Higher management reporting dashboard issues & achievements communication Planning sign off & adherence system Conversion of RCC to Composite structure Mezzanine, Package additions to pre engineered buildings Project Delivery Material delivery interface & forecast communications Activity sequencing to reduce idle man hours in Monsoon Round table progress reviews, design construction interface Daily quality audits, quality diligence & delivery sessions in team, calibrations & standardizations enforcement Safe working methodologies, Safety awareness programs, Penalty enforcement on defaulters V. KNOWLEDGE: There is no unique solution to what knowledge areas are necessary for managing a project. Knowledge needs to vary from project to project. Some of the knowledge needed to manage projects is unique or nearly unique. Project management knowledge areas do overlap with disciplines in General Management and Technology Management. The Project Management Institute in USA advocates 10 knowledge areas for managing projects in their A guide to the project management body of knowledge Fifth Edition-2013. These are also supported by ISO 10006 and renowned project management institutions in the world. These knowledge areas in construction project management can be broadly grouped as under: 1. Project Integration management 18 Page

2. Project Scope Management 3. Project Time Management 4. Project Cost Management 5. Project Quality Management 6. Project Human Resource Management 7. Project Communications Management 8. Project Risk Management 9. Project Procurement / Contract Management 10. Project Stake holder Management Role of Project Management Consultancy in Construction Project 5.1 Dealing with the Risks: Risk identification, proper analysis and scientific mitigation are essential for a successful project. The PMC s role as implemented on the project is as shown in Table 7. Risks Identified Table 7: Role or PMC in dealing with project risk 1.Concept Plan finalization 2.Turnaround time of Design approvals 3.Alignment of scope sheet of tenants with BOQ s 4.Procurement system ambiguity 5.Vendors not on board 6.Modifications to Building Elevation 7.Market risks & supply chain factors 8. Adoption of new execution methodology (Waffle wall, FM II floor etc) 9.Cash flow factors 10.Design errors & omissions M I T I G A T I O N P L A N a. Sign off on the tenants on all concept layouts & scope sheets b. Follow up meetings with A/E every week c. Identify long lead items & trace those well in time d. Participate & educate team in training to all new techniques e. Quality Assurance Plan implementation f. Adoptions of recommendations by Liasioning agencies for future development & compliances g. To review the Risks & Issues on Weekly basis, discuss more often with client VI. CONCLUSION: Project Management Consultants manage the Project by application of their Knowledge, Skills, and Experience at various stages. However PMC has to face various challenges like Design Issues, Constructability Issues, Long lead material Issues,Inter Contractor Coordination Issues, Engineering Issues,Safety Issues, etc These issues could be tackled by a well organised approach of the PMC. This also includes adopting the various types of tools of higher management like Reporting dashboard, Round table progress Review and conduction of brainstorming sessions, training on various field, design construction interface, Daily quality audits, quality diligence & delivery sessions in team. In addition to above Project Management Consultancy is effective and efficient only when it is involved in Total Project Life Cycle from Conception to Closeout. Awareness of various Processes involved in Project Management and detail study of multiple constraints of project like Time-Cost-Risk-Scope-Quality-Resource are an integral part of any project management consultancy. ACKNOWLEDGEMENT The authors would like to thank to M/s client of Mega Industrial Project Pvt Ltd, India & Project Management Consultants for their support and guidance in completing the research for the case study. REFERENCES: [1] Adnan Enshassi1, Sherif Mohamed2, Saleh Abushaban3 Factors affecting the performance of construction projects in Gaza strips;journal of civil Engineering and Management 2009, 15(3): 269 280 [2] Cheung, S.-O.; Suen, H. C. H.; Cheung, K. K. W. 2004. PPMS: a Web-based construction project performance monitoring system, Automation in Construction 13: 361 376. doi:10.1016/j.autcon.2003.12.001. [3] Project Management Institute, Inc. (2013):A Guide to Project Management Body of Knowledge, (PMBOK) Fifth Edition, Project Management Institute, Inc.Pennsylvania 19073-3299 USA [4] Bernard, W. T. (1985). Construction and Development. Selangor, Pelanduk Publication. [5] K KChitkara,(2000):Construction Project Management, Second Edition, Tata McGraw Hill Pvt Ltd. New Delhi. [6] O P Khanna (1999):Industrial Engineering and Management Revised Edition, DhanpatRai Publications, New Delhi. [7] P K Joy,(1994) :Total Project Management, Second Edition, Macmillan India Limited. New Delhi. [8] Foxhall, W. (1976). Professional construction Management and project administration. New York: Architectural Record and the American Institute of Architects. [9] Dzulkarnaen Ismail (2005), Services Provided by Project Management Consultant in Malaysian Construction Industry, MSc Thesis, Faculty of Civil Engineering, Universiti Teknologi Malaysia. 19 Page