Contract and Vendor Management Guide

Size: px
Start display at page:

Download "Contract and Vendor Management Guide"

Transcription

1 Contents 1. Guidelines for managing contracts and vendors Purpose and scope Introduction Contract and Vendor Management 2.1. Levels of management/segmentation Supplier relationship management matrix Supplier relationship management reporting Measuring successful supplier relationship management Management and escalation procedures Contract management objectives Probity and transparency Retention of documentation Contract Management Plans Issues and disputes Vendor meetings and performance reviews Key stakeholders Managing compliance to contract obligations Providing advice Reviewing contract expiries and managing extensions Monitoring and reporting benefits realisation Managing variations Maintaining records / disclosure obligations Conducting post-contract reviews Relevant links: Benefits Realisation Plan and Report template Contract Management Plan template Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 1 of 10

2 1 Guidelines for managing contracts and vendors 1.1 Purpose and scope The purpose of these guidelines is to assist all staff within the Department who are responsible for overseeing contracts to ensure successful and best-in-class contract management. Contract management involves those activities during the contract, once established, including: Confirming contract requirements Developing a Contract Management Plan Developing risk and performance management frameworks Implementing contract strategies including communication and contract review Implementing purchase to pay arrangements Managing probity Managing the business relationship Managing performance of the contract, including the development of innovation and financial improvements Managing contractual issues (variations to contract, performance, disputes, conflicts and negotiation) Benefits realisation implementing and tracking Implementing a communication/information strategy Implementing a contract review strategy. 1.2 Introduction The objective of a contract is rarely achieved simply by entering into an agreement. Unless it is monitored and responsibilities for achieving the objectives shared, it is unlikely to deliver the expected value. How the contract is to perform and how it will be managed must be incorporated during the tender and negotiation process to ensure it is effective. Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 2 of 10

3 2 Contract and vendor management The contract and vendor management approach is defined by the levels of risk and value. DoE must ensure appropriate levels of management are applied to the process in line with the importance and risk to the Department. The segmentation will define the level of management that should occur. Contracts and their vendors should be segmented as follows: 1. Operational (low importance) For the supply of back office commodity items or services that are deemed to be low risk, low volume, have multiple suppliers, little or no front line impact and are typically of a low value. 2. Tactical (low or medium importance) For the supply of back office goods or services that are deemed to be low or medium risk. There may be multiple or stable vendors that can supply the required goods or services and the impact to front line is typically minor. 3. Strategic (high importance) For the supply of goods and or services that directly impact the front line or are highly sensitive. In most situations, issues with the supply of the goods or services will impact the Department at varying degrees of severity. 2.1 Levels of management/segmentation Levels of management can be confirmed based on the value of the contract expenditure per annum and the importance as defined in the Procurement Strategy document. Refer to the table below. SPEND VALUE Operational and Tactical Operational Operational, Tactical and Strategic Operational and Tactical IMPORTANCE Operational management The nominated Contract Manager within the Department is responsible for ensuring that the goods and or services are delivered based on the requirements of the agreement. Standard contract management best practise should be applied. Therefore, meetings should be held (using the Vendor Operational Meeting template) to ensure complete delivery and visibility of the requirements are being met. Regular reporting of basic measures should be submitted to ensure that potential issues are managed prior to escalation. The focus of these meetings is at the operational level. It is anticipated that any issues, challenges or risks associated with the delivery of the required goods and or services will be addressed within this level of management. The Contract Manager must monitor the contract to ensure the objective is realised within budget. Tactical management This level of management must ensure regular meetings, as agreed by both parties. The management will focus on ensuring that the key conditions of the agreement are being met and that opportunities to improve Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 3 of 10

4 outcomes and ensure any challenges associated with the delivery of goods and or services are understood and mitigated. Download the Vendor Tactical Meeting template. In most instances, this level of management will be facilitated by the relevant Contract Manager with the Procurement Solutions Directorate Category Manager attending periodically or as required, along with the Suppliers senior management. Reporting should be completed monthly and reviews attended by senior management of both sides should occur annually. A Benefits Realisation Report is to be submitted at least quarterly. Strategic management This requires high level stakeholder engagement to ensure that focus is applied at senior management levels to keep the contract functioning in a positive manner. The focus of strategic management is ensuring that senior management of all parties have high level visibility of the relationship, the goods and or services being supplied, the challenges associated with the supply of the goods and or services and an understanding of the long term objectives between both parties. Monthly operational meetings to review KPIs, reports and address any issues are expected (use the Vendor Strategic Meeting template). Formal six monthly reviews should be held with high level attendance (e.g. the CPO, CIO, DoE Directors or Senior Executives and the CEO or equivalent from the vendor party). A Benefits Realisation Report is to be submitted each month. 2.2 Supplier Relationship Management Matrix. The following matrix summarises the levels of management, frequency and required staff. Note that if a Contract is deemed to require Operational and Tactical Management, then both levels of relationship management must apply. Strategy Level Meeting & Report Frequency DoE Representative Vendor Representative Benefits Report Operational Management Periodically as required (e.g. reports may be weekly for short term contracts) Contract Manager Operational Account Manager responsible for the delivery of required goods and or services. At conclusion (if less than 9 month term) or 6 monthly. Tactical Management Monthly Reports Meetings as agreed (e.g. monthly or quarterly) Annual Review Contract Manager Category Manager, where appropriate and at Annual Review with Senior Management Operational Account Manager responsible for the delivery of required goods and or services. Senior Management at Annual Reviews At least quarterly Strategic Management Monthly, 6 monthly and Annual Reviews Contract Manager, Category Manager as appropriate and at Half and Full Year Reviews with Senior Management, CPO/CIO Director where required. Account Manager monthly, Senior Management with full delegation/ownership as required and with CEO or equivalent at Half and Yearly Reviews Monthly Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 4 of 10

5 2.3 Supplier Relationship Management reporting The need for supplier reporting is paramount. It is important to note that reporting is required at each level. The following provides an indication of the types of information required. This is not a fully comprehensive list, should additional information be required, it should be agreed with all parties and implemented accordingly. Operational management Agreed frequency reporting suite Risk plan and status Issues Logs & Service Improvement Reports where applicable Compliance to Project Plans (where applicable) Performance against agreed Key Performance Indicators (KPIs) (scorecard reporting where applicable) Management / operational reports that validate KPIs / Performance (delivery of services and or goods, etc.) Compliance to other contractual requirements Tactical management Agreed frequency Reporting suite Risk plan and status Issues Logs & Service Improvement Reports where applicable Compliance to Project Plans (where applicable) Detailed spend and savings Key Performance Indicators (KPI) (scorecard reporting where applicable) Management / operational reports that validate KPIs / Performance (delivery of services and or goods, etc.) Summary of performance against the objective over the agreed period Compliance to other contractual requirements Strategic management Agreed frequency Reporting suite Risk plan and status Issues Log & Service Improvement Reports where applicable Compliance to Project Plans (where applicable) Detailed spend and savings Key Performance Indicators (KPI) scorecard reporting Management / operational reports that validate KPIs / Performance (delivery of services and or goods, etc.) Summary of performance against the objective over the agreed period Future opportunities, including innovation. 2.4 Measuring successful Supplier Relationship Management The key outcome of Supplier Relationship Management is the ongoing satisfactory performance of the contract at a minimum with a goal of driving improved value and innovation wherever possible. Improvements through proactive management can be delivered at all three levels of contract management. Performance Reviews are to be conducted on a regular basis by the Contract Manager, and, where required, the Category Manager and high level management. Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 5 of 10

6 A template Supplier Scorecard is provided in the Contract Management Plan template to assist the Contract Manager to prepare the KPI performance reporting and develop the calculation methodology that will assist in the scoring. These performance reviews should comprise the following: Operational Delivery of the required goods and or services. Where appropriate these can be measured, weighted and scored as part of the KPI scorecard process (refer Contract Management Plan template). Management, financial and reporting Delivery of financial, reporting and risk management obligations as contracted. The supplier s ability to develop and apply innovation should also be considered as part of the contract management requirements. This can include baseline price and savings deliverables, process efficiency recommendations and improved products and or outcomes Details are submitted in a timely manner, gaps discussed and addressed, and risk practices met and documented at each meeting/review. Satisfaction Where the contract involves delivery of goods or services to other parties, surveys should be conducted periodically to gauge satisfaction, with issues noted in the issues and actions log. Evidence of an outcomes focused approach The supplier must also report the performance of the contract against the objective of the contract to allow a Benefits Realisation Report to be submitted. 2.5 Management and escalation process In managing the Supplier relationships, issues can occur that may have an impact on the contract deliverables. These issues may vary from minor operational to major strategic issues. Whenever an issue arises, the following should be taken into consideration: What is the nature of the issue? What is the impact of the issue? Can the issue be addressed in a short time frame? Will the issue require a contract review/contract variation? Is it a recurrent issue, has it occurred more than once? All issues and risks should be addressed immediately as they occur direct with the Supplier Relationship Manager. Consider ways to resolve the issue and implement agree actions. If the issue is significant and / or attempts to rectify the issue directly fail, refer to dispute resolution clauses for formal escalation of the issue to resolution. NB: all evidence of attempt to resolve must be documented and stored within the Department s approved document storage system (TRIM) and placed with the copy of the agreement. These records may be drawn upon throughout any dispute resolution process. 2.6 Contract management objectives The Contract Manager should ensure the Supplier is treated and represented fairly and honestly, as well as verifying that the Supplier has fulfilled its obligations and accepts its responsibilities under the contract. Adherence by both parties to the agreed terms of the contract will result in: Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 6 of 10

7 Optimal contract performance Value for money outcomes Probity in outcomes Accuracy and timeliness Cost effectiveness. 2.7 Probity and transparency During the contract management process it is important from a probity perspective that: Detailed records of all contractual and performance documentation and written communications as well as records of meetings, s, phone calls and conversations are kept. At least two Department representatives attend every Supplier meeting and at least one takes notes of the meetings. Regular reviews are undertaken to ensure the performance measurements are still relevant. Independent auditing or sample auditing of supplier reports (e.g. by internal audit) are conducted where applicable. Anyone involved in a procurement project should sign the Code of Conduct for Procurement Activities, as it includes a declaration of interest statement and a non-disclosure agreement. 2.8 Retention of documents As well as the need to retain documents on a contract file for information and audit purposes, it is necessary to comply with the requirements of the Department s record keeping policies and procedures. 2.9 Contract Management Plan Contract Managers are to contribute to the development of and approving Contract Management Plans. The Contract Management Plan should be established within the schedules of the Contract from the outset with details negotiated and agreed with the supplier prior to execution. The Contract Management Plan is to be implemented and used throughout the contract as agreed. It should be reviewed as required, but at least annually Issues and disputes Issues are identified through ongoing review of usage and performance data and by ensuring users and suppliers know who to contact when things are not going plan. The Department s designated Contract Manager must be actively involved in resolving any supply or technical issues that arise from the contract. While users should initially look to resolve this at the operational level, the Contract Manager must take action if initial attempts fail. This may be as simple as an to the relevant parties or it may require meetings, negotiations and agreed action plans. Contract Managers should seek support from a Category Manager if required or where matters are escalating before any formal dispute processes are applied Vendor meetings and performance reviews Regular meetings should be held with the vendor during implementation of the contract and then ongoing with frequency based on whether the contract / vendor is segmented into Operational, Tactical or Strategic. Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 7 of 10

8 The meetings will cover operational matters and performance as established in the scorecard. Formal review meetings will include presentations covering the Department s and the industry environment and future direction. Any performance issues must be addressed with action plans for rectification established and followed up. Consequences as outlined in the contract plan / contract and next steps are discussed and actioned as required Key stakeholders If the contract is being used by or impacts others in any way it is important to ensure that it continues to meet their needs by providing them with avenues for feedback and input to future direction. Procurement Solutions Directorate Category Managers will hold regular category management meetings to review benefits realisation and future direction for categories and strategic contracts. Contract Managers represent various parties to individual contracts at these meetings and so should understand their needs and level of satisfaction with their contracts at all times Managing compliance to contract obligations Contract Managers are to ensure that obligations of all parties continue to be met throughout the term of the contract. From a supplier s perspective these should mostly be covered within the KPI scorecard, including service delivery, business continuity, insurance currency, etc. The Department can be deemed to have accepted certain behaviours (e.g. delivery outside agreed timeframes) if it does not address it as soon as it starts to occur. The Department can be at risk if the supplier s insurances lapse or if their disaster recovery processes are not established or sound the Contract Managers must therefore verify that these are being maintained. Similarly, if the Department does not act in accordance with the contract it can be at risk of, for example, penalty, breach or reputational damage. The Contract Manager must ensure the Department s contract parties, (e.g. users, accounts payable, etc.) understand and follow the requirements of the contract Providing advice The Contract Manager is the expert on their contracts. They should advise The Vendor on any developments within the Department, where such developments are likely to affect the contract. Contract users on the benefits and use of the contract and their rights and responsibilities, e.g. delivery timeframes, warranty processes, service levels, etc. Category Managers of any changes or issues with a contract and likely implications, including a reduction or increase in forecast benefits. Senior management to ensure awareness of business benefits or risks associated with the contract at any given time Reviewing contract expiries and managing extensions Contracts are to be reviewed months prior to their expiry dates and decisions made whether they are to be extended, lapsed or renewed based on what will deliver the best value for money. Considerations will include procurement policy regarding contract terms and extensions, performance to date and benefits realised against forecast; current and future usage and needs; changes in best practice processes, products or technology; and external market factors. The decision should be made in consultation with stakeholders and the relevant Category Manager. Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 8 of 10

9 The decision may also hinge on whether the supplier is prepared to offer additional benefits, e.g. upgraded products or services, better pricing, etc. in return for an extension. The Department only has this opportunity if the supplier knows there is sufficient time to go elsewhere if necessary; this is why the Contract Manager must ask the question well in advance of the expiry date. Contract Managers can obtain guidance with negotiations from the Contract Negotiation Guidelines, or by contacting Procurement Solutions Directorate for further advice. Where the decision is to renew, Contract Managers should engage the Procurement Solutions Directorate, who can program the project and provide any support or manage the project as required. Where the decision is to lapse or extend, the Contract Manager must ensure all parties are notified in writing, including Procurement Solutions Directorate so that the Department s contracts register can be updated accordingly. All documentation and communications pertaining to the decision must be duly filed with the contract Monitoring and reporting benefits realisation Every contract is established for a reason. The Contract Manager must ensure the contract meets and continues to meet the original objective and continues to deliver value for money. Contract Managers are to record the benefits of the contract at commencement and then monitor and report them periodically, as defined in the Benefits Realisation Plan established when completing the sourcing project. Guidelines and templates for developing and managing detailed benefits realisation plans are available on the Department of Finance, Services & Innovation website. Contract Managers are responsible for ensuring high-level contract benefits are recorded against the Contracts Register managed by the Procurement Solutions Directorate. The Department is required to report its contracts realised benefits to the NSW Procurement Board Managing variations The Contract Manager must manage and record all variations. Regardless of whether variations are instigated by the supplier or the Department, they must be formal and documented. This includes changes to products, pricing, service or contract terms. Where applicable, changes to products and pricing may be managed through the Department s ecatalogue the process for which is available in the Procurement Operations Manual refer to your Category Manager for advice. The principles of the changes however will apply as agreed in the contract and Contract Management Plan (i.e. whether products are to be tested first, if price increases are requested they should be when agreed and calculated against the appropriate drivers with verification of changes to those drivers). The underlying objective of value for money must be considered and continue to be achieved despite changes. Action must be taken where the contract is no longer delivering value to the Department. Supplier-instigated variation the supplier is required to formally approach the Department in writing requesting a variation. The formal advice must include: What is being varied For contract variations, reference to specific clauses in the contract that the supplier is requesting be varied and why If price or product variations are proposed, the supplier is required to provide justification for the increase. If the variation is driven by a third party, formal notice from the third party to the supplier is required Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 9 of 10

10 Department-instigated variation the Department is required to formally approach the suppliers in writing requesting a variation. The formal advice must include: What is being varied For contract variations, reference to specific clauses in the contract that the Department is requesting be varied and why If product or price variations, reasons for the request with evidence based information leading to the request for the supplier to consider. Other considerations for managing variations include: Instruct a variation only within the general scope of the Contract, unless the Contractor agrees. An instruction can only be given by the Principal s representative and must be in writing. Where possible, instruct a variation only after the full cost and time implications have been evaluated and agreed in writing with the Contractor (the instruction will constitute approval to the cost and time impacts agreed with the Contractor). Do not alter a Contractor s written quotation without the agreement of the Contractor. If there is a change agreed, it is preferable to have the Contractor submit a revised quotation. Alternatively, if verbal agreement is reached, confirm that agreement in writing. Instructions should include a brief description of the variation work and a requirement that the work is undertaken in accordance with the identified instruction, the Contract Documents or any other document referred to in the instruction. A short summary of the variation is sufficient if reference is made to other documents describing the agreement in detail. Only instruct a variation only if it is within the authority delegated by the client and sufficient funding is available. If agreement to cost and time cannot be reached before the commencement of an unavoidable variation, attempt to reach agreement at the earliest possible time. If agreement cannot be reached on a variation that is unavoidable, consider whether it is preferable to defer the change to the works so it can be done more economically done by others at a later date. Do not instruct a variation after Completion unless the variation relates to rectifying defects Maintaining records / disclosure obligations All documents and dealings with contracts and suppliers are to be recorded in sufficient detail on the contract file to provide an audit trail. This includes s and file notes of telephone conversations where decisions or allegations are made, agreements reached or instructions given. Contract Managers are responsible for ensuring the Department s contracts register is accurately maintained in respect to their own contracts by reporting major changes and benefits to Procurement Solutions Directorate. Details of new and significantly varied contracts must be publicly disclosed via as per the Government Information (Public Access) Act 2009 (GIPA Act) requirements, via Procurement Solutions Directorate Conducting post-contract reviews At the conclusion of a contract the Contract Manager should review its overall performance and document outcomes, performance and any learnings for future reference. Provide a summary to the Procurement Solutions Contract Manager and file in the contract file. Ensure performance is reported for consultants and contractors engaged under the Performance Management Prequalification Scheme as required under that Scheme. Contract and Vendor Management Guide DOC15/ Version 2.9, 24 November 2015 Page 10 of 10

CONTRACT MANAGEMENT POLICY

CONTRACT MANAGEMENT POLICY CONTRACT MANAGEMENT POLICY Section Finance Approval Date 25/08/2014 Approved by Directorate Next Review Aug 2016 Responsibility Chief Operating Officer Key Evaluation Question 6 PURPOSE The purpose of

More information

1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party).

1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party). CONTRACT MANAGEMENT PROCEDURE Section Risk Management Contact Risk Manager Last Review February 2013 Next Review February 2016 Approval Not required Procedures Contract Initiation Request Mandatory Guidance

More information

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which must

More information

Operations. Group Standard. Business Operations process forms the core of all our business activities

Operations. Group Standard. Business Operations process forms the core of all our business activities Standard Operations Business Operations process forms the core of all our business activities SMS-GS-O1 Operations December 2014 v1.1 Serco Public Document Details Document Details erence SMS GS-O1: Operations

More information

Procurement of Goods, Services and Works Policy

Procurement of Goods, Services and Works Policy Procurement of Goods, Services and Works Policy Policy CP083 Prepared Reviewed Approved Date Council Minute No. Procurement Unit SMT Council April 2016 2016/0074 Trim File: 18/02/01 To be reviewed: March

More information

Contract Management Guideline

Contract Management Guideline www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract

More information

Procurement guidance Managing and monitoring suppliers performance

Procurement guidance Managing and monitoring suppliers performance Procurement guidance Managing and monitoring suppliers performance Procurement guidance: Managing and monitoring suppliers performance Page 2 of 16 Table of contents Table of contents... 2 Purpose of the

More information

Procurement, Contracting and Contract Management Policy

Procurement, Contracting and Contract Management Policy Procurement, Contracting and Contract Management Policy Corporate policy 8.4 Responsible Officer: Group Manager Accounting and Taxation Policy Custodian: Chief Finance Officer Division: Finance and Resources

More information

One Government Contract Management Framework. September 2014

One Government Contract Management Framework. September 2014 One Government Contract Framework September 2014 One Government Contract Framework Table of contents 1 Introduction... 4 2 Purpose... 4 3 Scope... 5 3.1 Contract management planning starts before a contract

More information

Contract management: renewal and transition. Report to Parliament 10 : 2013 14

Contract management: renewal and transition. Report to Parliament 10 : 2013 14 Contract management: renewal and transition Report to Parliament 10 : 2013 14 Queensland Audit Office Location Level 14, 53 Albert Street, Brisbane Qld 4000 PO Box 15396, City East Qld 4002 Telephone (07)

More information

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.????

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? 1 1. PRE-AMBLE All transactions undertaken by the Cape Winelands District Municipality involves a contract whether explicitly

More information

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Contract Management Framework

Contract Management Framework Contract Management Framework Contents Purpose and Scope... 2 The Contract... 2 The importance of the Contract... 2 Contract Management... 3 The Toolkits... 4 Outline of establishing a Contract Management

More information

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts

More information

Contract Management The Mavericks Won t Like This!

Contract Management The Mavericks Won t Like This! Contract Management The Mavericks Won t Like This! Keith Wallis How Much Did That Project Cost? Real Life Example Original contract amount $500K Variations scope changes not visible Total variations =

More information

Reference Check Review Guidelines

Reference Check Review Guidelines Reference Check Review Guidelines P a g e 2 Overview The purpose of these guidelines is to provide clarity on implementation of the Province of British Columbia s internal reference check requirements

More information

POSITION DESCRIPTION. General Manager Network Operations (dotted line to Chief Architect)

POSITION DESCRIPTION. General Manager Network Operations (dotted line to Chief Architect) POSITION DESCRIPTION Position Title: Reports To: Location Date: Enable Overview Systems Developer General Manager Network Operations (dotted line to Chief Architect) Christchurch Enable is a partnership

More information

Part E: Contract management

Part E: Contract management Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems). FAT MEDIA QUALITY ASSURANCE STATEMENT NOTE 1: This is a CONTROLLED Document as are all quality system files on this server. Any documents appearing in paper form are not controlled and should be checked

More information

CONTRACT MANAGEMENT FRAMEWORK

CONTRACT MANAGEMENT FRAMEWORK CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...

More information

APPLICATION OF THE KING III REPORT ON CORPORATE GOVERNANCE PRINCIPLES

APPLICATION OF THE KING III REPORT ON CORPORATE GOVERNANCE PRINCIPLES APPLICATION OF THE KING III REPORT ON CORPORATE GOVERNANCE PRINCIPLES Ethical Leadership and Corporate Citizenship The board should provide effective leadership based on ethical foundation. that the company

More information

-17 2015 OUTSOURCING POLICY

-17 2015 OUTSOURCING POLICY Outsourcing Policy TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 Aim & Introduction... 3 POLICY PARAMETERS... 4 Key Terms... 4 Outsourcing Agreement Requirements... 5 MATERIAL OUTSOURCING AGREEMENTS... 6 Board

More information

POLICY CONTRACT MANAGEMENT POLICY POLICY STATEMENT

POLICY CONTRACT MANAGEMENT POLICY POLICY STATEMENT POLICY CONTRACT MANAGEMENT POLICY POLICY STATEMENT The intent of this policy is to establish a University-wide governance structure for managing contracts and other legally binding documents. The Policy

More information

APPLICATION OF KING III CORPORATE GOVERNANCE PRINCIPLES 2014

APPLICATION OF KING III CORPORATE GOVERNANCE PRINCIPLES 2014 WOOLWORTHS HOLDINGS LIMITED CORPORATE GOVERNANCE PRINCIPLES 2014 CORPORATE GOVERNANCE PRINCIPLES 2014 CORPORATE GOVERNANCE PRINCIPLES 2014 This table is a useful reference to each of the King III principles

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

Supplier Performance Management Guide

Supplier Performance Management Guide Supplier Performance Management Guide DRAFT PR04-503 (Nov14) PR04-503 (Nov 14) Page 1 of 11 Contents 1 Introduction... 3 1.1 ATPACE Responsibilities... 3 2 Completing Performance Evaluations... 4 2.1 Performance

More information

Impartiality must be maintained in selecting suppliers to fulfil Council s requirements.

Impartiality must be maintained in selecting suppliers to fulfil Council s requirements. Title: Type: Council Adopted: 17 December 2014 File No: SF/491 TRIM Reference: 14/35410 Attachments: Guidelines (TRIM: 14/38862) 1. Purpose The purpose of this policy is to provide principles, processes

More information

University of New England Compliance Management Framework and Procedures

University of New England Compliance Management Framework and Procedures University of New England Compliance Management Framework and Procedures Document data: Document type: Administering entity: Framework and Procedures Audit and Risk Directorate Records management system

More information

Mitchell Shire Council

Mitchell Shire Council ATTACHMENT Mitchell Shire Council Ordinary Council Meeting CONTRACT MANAGEMENT POLICY AND TENDERING POLICY Contract Management Policy 25 March 2013 Attachment 1 Pages 12 CORPORATE SERVICES DOCUMENT NUMBER

More information

Part One: Introduction to Partnerships Victoria contract management... 1

Part One: Introduction to Partnerships Victoria contract management... 1 June 2003 The diverse nature of Partnerships Victoria projects requires a diverse range of contract management strategies to manage a wide variety of risks that differ in likelihood and severity from one

More information

OVERSTRAND MUNICIPALITY

OVERSTRAND MUNICIPALITY C 3 / 001 OVERSTRAND MUNICIPALITY CONTRACT MANAGEMENT POLICY Approved by Council 28 May 2015 Implementation date: 1 July 2015 TABLE OF CONTENTS C 3 / 002 1. PRE-AMBLE 2 2. DEFINITIONS 3 3. ABBREVIATIONS

More information

Compliance. Group Standard

Compliance. Group Standard Group Standard Compliance Serco is committed to good governance practices and the management of risks supported by a robust business compliance process SMS-GS-G2 Compliance July 2014 v1.0 Serco Public

More information

Contract Management. Brief 22. Public Procurement. September 2011

Contract Management. Brief 22. Public Procurement. September 2011 Brief 22 September 2011 Public Procurement Contract Management C O N T E N T S The process of contract management Contract management in practice Post contract performance review www.sigmaweb.org This

More information

Fermilab Computing Division Service Level Management Process & Procedures Document

Fermilab Computing Division Service Level Management Process & Procedures Document BMC Software Consulting Services Fermilab Computing Division Process & Procedures Document Client: Fermilab Date : 07/07/2009 Version : 1.0 1. GENERAL Description Purpose Applicable to Supersedes This

More information

Monitoring the Performance of Suppliers

Monitoring the Performance of Suppliers CIPS Position on Practice Monitoring the Performance of Suppliers The term performance monitoring means measuring, analysing and managing a supplier's ability to comply with, and preferably exceed, their

More information

ICT SERVICE LEVEL AGREEMENT MANAGEMENT POLICY (EXTERNAL SERVICE PROVIDERS/VENDORS)

ICT SERVICE LEVEL AGREEMENT MANAGEMENT POLICY (EXTERNAL SERVICE PROVIDERS/VENDORS) ICT SERVICE LEVEL AGREEMENT MANAGEMENT POLICY (EXTERNAL SERVICE PROVIDERS/VENDORS) TABLE OF CONTENTS 1. INTRODUCTION... 3 2. LEGISLATIVE FRAMEWORK... 3 3. OBJECTIVE OF THE POLICY... 4 4. AIMS OF THE POLICY...

More information

451 s Procurement and Vendor Management Capability Development Program

451 s Procurement and Vendor Management Capability Development Program The case for improved Procurement and Vendor Management The current market environment is calling for increased operational efficiency and effectiveness, where value for money and market contestability

More information

Shona Morrison, OPCC Policy Development Manager. This is a Controlled Document

Shona Morrison, OPCC Policy Development Manager. This is a Controlled Document Title: POLICE AND CRIME COMMISSIONER FOR THAMES VALLEY CONTRACT MANAGEMENT STRATEGY Version: 3.0 Authors: Master Copy: Section: Document Status: Authorized By: Shona Morrison, OPCC Policy Development Manager

More information

Hornsby Shire Council Position Description

Hornsby Shire Council Position Description Hornsby Shire Council Position Description Position Title: Procurement Manager Branch: Finance Reporting to: Position type: Permanent Full Time (35 Hrs) Division: Corporate Support Child Protection Risk

More information

Complaints Standard. for Suppliers. Categorised as Basic (B or F)

Complaints Standard. for Suppliers. Categorised as Basic (B or F) Complaints Standard for Suppliers Categorised as Basic (B or F) (UK version) Contents Introduction 3 Definitions 3 1. Process, Procedures and Controls 5 2. Regulatory Standards 7 3. Employees 7 4. Publicising

More information

Technology Delivery Co Ordinator

Technology Delivery Co Ordinator Technology Delivery Co Ordinator Information Package Full Time Technology Delivery Co Ordinator (IT Project & Service Desk Co Ordinator) The Sydney Anglican Schools Corporation caters for the academic,

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

SAFETY and HEALTH MANAGEMENT STANDARDS

SAFETY and HEALTH MANAGEMENT STANDARDS SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents

More information

3. Strategic Community Plan Approach. 4. Legislative Requirements and Corporate Policy Context

3. Strategic Community Plan Approach. 4. Legislative Requirements and Corporate Policy Context Co r p o r a t e Cr ed it Ca r d P o lic y Classification: Policy Name: First Issued / Approved: Last Reviewed: Council Policy Corporate Credit Card Policy 11 August 2015, C10311 11 August 2015, C10311

More information

Supplier Performance Management. Eliot Madow CPSM VP Client Services - Hiperos Director - PMAB

Supplier Performance Management. Eliot Madow CPSM VP Client Services - Hiperos Director - PMAB Supplier Performance Management Eliot Madow CPSM VP Client Services - Hiperos Director - PMAB Agenda Different Approaches Service Level Agreement (SLA) Approach Balanced Scorecard Approach Best-in-Class

More information

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA Quality Manual Kellaw Road Yarm Road Business Park Darlington DL1 4YA MANUAL IDENTIFICATION This document is a controlled/uncontrolled copy. Copy Number:...of... Issued to... Title... Holders of controlled

More information

Procurement Policy. 2.1 Mosaic and all its North American subsidiary companies.

Procurement Policy. 2.1 Mosaic and all its North American subsidiary companies. 1.0 PURPOSE 1.1 This Procurement Policy ( Policy ) is intended to govern the conduct of The Mosaic Company and its subsidiaries ( Mosaic or Company ) and its Partners when doing business with Mosaic. 2.0

More information

3.6. Please also note, unless your policy confirms otherwise, the rights under your policy may only be pursued in an English court.

3.6. Please also note, unless your policy confirms otherwise, the rights under your policy may only be pursued in an English court. Terms of business agreement - commercial customers M & N Insurance Service Limited Authorised and regulated by the Financial Conduct Authority No: 305837. Registered Office: 248 Hendon Way London NW4 3NL

More information

Procurement & Supply Chain

Procurement & Supply Chain Group Standard Procurement & Supply Chain An effective procurement and supply chain is a critical success factor in driving competitive advantage for Serco and driving benefits for our customers SMS GS-PSC1

More information

Service Level Agreement for Database Hosting Services

Service Level Agreement for Database Hosting Services Service Level Agreement for Database Hosting Services Objective Global Service Levels include the general areas of support that are applicable to every ITS service. The purpose of the Service Level Agreement

More information

Template K Implementation Requirements Instructions for RFP Response RFP #

Template K Implementation Requirements Instructions for RFP Response RFP # Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship

More information

PSPPROC506A Plan to manage a contract

PSPPROC506A Plan to manage a contract PSPPROC506A Plan to manage a contract Revision Number: 2 PSPPROC506A Plan to manage a contract Modification History PSPPROC506A Release 2: PSPPROC506A Release 1: Unit Descriptor Layout adjusted. No changes

More information

Code of Conduct For Subscribers

Code of Conduct For Subscribers Code of Conduct For Subscribers WHEREAS: A. The Bureau is in the business, amongst others, of producing credit reports B. Subject always to Credit Reporting Agencies Act 2010 and any other applicable legislation,

More information

KING III COMPLIANCE REGISTER 2015

KING III COMPLIANCE REGISTER 2015 KING COMPLIANCE REGISTER 2015 Partially Not 1.1 The Board should provide effective leadership based on an ethical foundation. Mr Paul Jenkins is currently the executive chairman of MNY. He is a well respected

More information

Introduction. Table of Contents

Introduction. Table of Contents Introduction To stay competitive, you know how important it is to find new ways to streamline and save on your company s operations. Learning how leading companies handle commercial payments can give you

More information

4.06 Consulting Services

4.06 Consulting Services MANAGEMENT BOARD SECRETARIAT AND MINISTRIES OF THE ENVIRONMENT, FINANCE, HEALTH AND LONG-TERM CARE, NATURAL RESOURCES, AND COMMUNITY SAFETY AND CORRECTIONAL SERVICES 4.06 Consulting Services (Follow-up

More information

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU PURPOSE: To lead and facilitate effective organisation-wide contracts development,

More information

1 Health Purchasing Policy 4. Contract Management and Asset Disposal

1 Health Purchasing Policy 4. Contract Management and Asset Disposal Health Purchasing Policy 4. Contract Management and Asset Disposal Ensuring value for money outcomes are realised with effective and efficient contract management 26 June 2014 1 Health Purchasing Policy

More information

INTER-PARLIAMENTARY UNION

INTER-PARLIAMENTARY UNION INTER-PARLIAMENTARY UNION 5, CHEMIN DU POMMIER CASE POSTALE 330 1218 LE GRAND-SACONNEX / GENÈVE (SUISSE) TELEPHONE (41.22) 919 41 50 - FAX (41.22) 919 41 60 - E-MAIL postbox@mail.ipu.org TELEGRAPHIC ADDRESS

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

QUALITY MANAGEMENT SYSTEM REQUIREMENTS QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR TRADE CONTRACTORS 2014 400 Prince George s Blvd. Upper Marlboro, MD 20774 800.638.8556 HomeInnovation.com TABLE OF CONTENTS Introduction... iii Notes... iii

More information

2.2 All purchases for supplies, services (including construction) and equipment.

2.2 All purchases for supplies, services (including construction) and equipment. St. Mary s General Hospital Kitchener, Ontario ========================================================================== Supply Chain Guidelines ==========================================================================

More information

Preparation of a Rail Safety Management System Guideline

Preparation of a Rail Safety Management System Guideline Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management

More information

EMALAHLENI LOCAL MUNICIPALITY SUPPLIERS PERFORMANCE MONITORING POLICY

EMALAHLENI LOCAL MUNICIPALITY SUPPLIERS PERFORMANCE MONITORING POLICY EMALAHLENI LOCAL MUNICIPALITY SUPPLIERS PERFORMANCE MONITORING POLICY SUPPLY CHAIN MANAGEMENT UNIT Page 1 of 15 TABLE OF CONTENT No Description 1. Definitions 2. Preamble 3. Purpose 4. Problem Statement

More information

This procedure should be read in conjunction with the Purchasing By-Law 113-2013, as amended from time to time.

This procedure should be read in conjunction with the Purchasing By-Law 113-2013, as amended from time to time. Page: 1 of 10 27.1 Purpose and Overview 27.2 Definitions 27.3 Forms 27.4 Roles and Responsibilities 27.5 Contractor Performance Evaluation Form 27.6 Interim Evaluations 27.7 Procedure Pre-Qualification

More information

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES General Terms of Public Procurement in Service Contracts January 2015 Contents Introduction...3 Issues to be observed in applying...5 General Terms of Public Procurement in Service Contracts ()...9 1 Definitions...9

More information

Management of Business Support Service Contracts

Management of Business Support Service Contracts The Auditor-General Audit Report No.37 2004 05 Business Support Process Audit Management of Business Support Service Contracts Australian National Audit Office Commonwealth of Australia 2005 ISSN 1036

More information

SCHEDULE 10. Contract Management and Reporting. the Management Information and reporting requirements,

SCHEDULE 10. Contract Management and Reporting. the Management Information and reporting requirements, SCHEDULE 10 Contract Management and Reporting 1. Scope 1.1 This schedule sets out: contract management procedures; and the Management Information and reporting requirements, with which the Service Provider

More information

Digital Continuity in ICT Services Procurement and Contract Management

Digital Continuity in ICT Services Procurement and Contract Management Digital Continuity in ICT Services Procurement and Contract Management This guidance relates to: Stage 1: Plan for action Stage 2: Define your digital continuity requirements Stage 3: Assess and manage

More information

Reserve Bank of Fiji Insurance Supervision Policy Statement No. 8 MINIMUM REQUIREMENTS FOR RISK MANAGEMENT FRAMEWORKS OF LICENSED INSURERS IN FIJI

Reserve Bank of Fiji Insurance Supervision Policy Statement No. 8 MINIMUM REQUIREMENTS FOR RISK MANAGEMENT FRAMEWORKS OF LICENSED INSURERS IN FIJI Reserve Bank of Fiji Insurance Supervision Policy Statement No. 8 NOTICE TO INSURANCE COMPANIES LICENSED UNDER THE INSURANCE ACT 1998 MINIMUM REQUIREMENTS FOR RISK MANAGEMENT FRAMEWORKS OF LICENSED INSURERS

More information

FUNCTIONAL POLICY MANDATORY PROCUREMENT POLICY REQUIREMENTS FOR THE APPROVED CONTRACTOR INSURANCE PROGRAM INITIATIVE. Contracting Policy and Practice

FUNCTIONAL POLICY MANDATORY PROCUREMENT POLICY REQUIREMENTS FOR THE APPROVED CONTRACTOR INSURANCE PROGRAM INITIATIVE. Contracting Policy and Practice FUNCTIONAL POLICY MANDATORY PROCUREMENT POLICY REQUIREMENTS FOR THE APPROVED CONTRACTOR INSURANCE PROGRAM INITIATIVE Business Process Owner: Business Process Authority: Ms Liesl O Meara, FAS Commercial

More information

LSB Procurement Framework

LSB Procurement Framework LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)

More information

Statement of Procurement Conduct

Statement of Procurement Conduct Statement of Procurement Conduct December 2014 Copyright of Western Power Any use of this material except in accordance with a written agreement with Western Power is prohibited. Introduction Western Power

More information

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the

More information

MODULE 3: ONGOING MANAGEMENT

MODULE 3: ONGOING MANAGEMENT MODULE 3: ONGOING MANAGEMENT Purpose of module This module has the following objectives: To emphasise the importance of ongoing management of any contract, and of meeting the University s contractual obligations;

More information

Royal Borough of Kensington and Chelsea. Data Quality Framework. ACE: A Framework for better quality data and performance information

Royal Borough of Kensington and Chelsea. Data Quality Framework. ACE: A Framework for better quality data and performance information Royal Borough of Kensington and Chelsea Data Quality Framework ACE: A Framework for better quality data and performance information March 2010 CONTENTS FOREWORD 2 A CORPORATE FRAMEWORK FOR DATA QUALITY

More information

INTERNAL AUDIT SERVICES Glenorchy City Council Internal audit report of Derwent Entertainment Centre financial business and operating systems

INTERNAL AUDIT SERVICES Glenorchy City Council Internal audit report of Derwent Entertainment Centre financial business and operating systems INTERNAL AUDIT SERVICES Internal audit report of Derwent Entertainment Centre financial business and operating systems ADVISORY Contents Executive summary...2 Internal audit findings...4 Summary of other

More information

International Construction Warranties Limited. Terms & Conditions. Version UK1

International Construction Warranties Limited. Terms & Conditions. Version UK1 International Construction Warranties Limited Terms & Conditions Version UK1 Rules of Registration Version 5 All Companies applying for or taking out a Warranty on a New Development with ICW shall comply

More information

PRISON MANAGEMENT CONTRACT FOR MT EDEN CORRECTIONS FACILITY

PRISON MANAGEMENT CONTRACT FOR MT EDEN CORRECTIONS FACILITY PRISON MANAGEMENT CONTRACT FOR MT EDEN CORRECTIONS FACILITY between HER MAJESTY THE QUEEN IN RIGHT OF NEW ZEALAND ACTING BY AND THROUGH THE CHIEF EXECUTIVE OF THE DEPARTMENT OF CORRECTIONS and SERCO NEW

More information

Capital Works Management Framework

Capital Works Management Framework POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset

More information

Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan

Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan CBI s Biopharmaceutical Forum on Clinical and Commercial Global Supply Chain Excellence Sandy Onorato

More information

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014

More information

GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES

GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES Level 37, 2 Lonsdale Street Melbourne 3000, Australia Telephone.+61 3 9302 1300 +61 1300 664 969 Facsimile +61 3 9302 1303 GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES ENERGY INDUSTRIES JANUARY

More information

POSITION DESCRIPTION, PERFORMANCE MEASURES AND TARGETS

POSITION DESCRIPTION, PERFORMANCE MEASURES AND TARGETS POSITION DESCRIPTION, PERFORMANCE MEASURES AND TARGETS Attachment 1 Position Title: Programs & Client Relations Manager Responsible to: Chief Executive Officer Responsibility: Programs Management and Client

More information

KING III CORPORATE GOVERNANCE COMPLIANCE REGISTER

KING III CORPORATE GOVERNANCE COMPLIANCE REGISTER KING III CORPORATE GOVERNANCE REGISTER CHAPTER 1: ETHICAL LEADERSHIP AND CORPORATE CITIZENSHIP NON 1.1. The board should provide effective leadership based on an ethical foundation 1.2. The board should

More information

ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT. Schedule 3 Support Services

ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT. Schedule 3 Support Services ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT Schedule 3 Support Services December 2013 Table of Contents 1. SERVICE SCHEDULE 3 SUPPORT SERVICES... 3 1.1 OVERVIEW... 3 1.2 STANDARD

More information

Code of Conduct for Marketing Retail Energy in Victoria

Code of Conduct for Marketing Retail Energy in Victoria Code of Conduct for Marketing Retail Energy in Victoria January 2009 TABLE OF CONTENTS Page INTRODUCTION...1 1. MARKETING REPRESENTATIVES - TRAINING...3 2. CONTACT WITH CONSUMERS...4 2.1 Personal contact...4

More information

ASTRAZENECA GLOBAL POLICY SAFEGUARDING COMPANY ASSETS AND RESOURCES

ASTRAZENECA GLOBAL POLICY SAFEGUARDING COMPANY ASSETS AND RESOURCES ASTRAZENECA GLOBAL POLICY SAFEGUARDING COMPANY ASSETS AND RESOURCES THIS POLICY SETS OUT THE REQUIREMENTS FOR SAFEGUARDING COMPANY ASSETS AND RESOURCES TO PROTECT PATIENTS, STAFF, PRODUCTS, PROPERTY AND

More information

Quality Standard Customer Service Complaints Handling

Quality Standard Customer Service Complaints Handling Quality Standard Customer Service Complaints Handling Version 1 Date:- 2 nd December 2010 Page 1 Contents INTRODUCTION 4 OVERVIEW OF THE COMPLAINTS STANDARD 5 FRAMEWORK 6 MANDATORY SECTIONS 7 SECTION 1

More information

Outsourcing. Knowledge Summary

Outsourcing. Knowledge Summary Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best

More information

Policy: D9 Data Quality Policy

Policy: D9 Data Quality Policy Policy: D9 Data Quality Policy Version: D9/02 Ratified by: Trust Management Team Date ratified: 16 th October 2013 Title of Author: Head of Knowledge Management Title of responsible Director Director of

More information

APPENDIX L Generalist - Service Standards 2015

APPENDIX L Generalist - Service Standards 2015 APPENDIX L Generalist - Service Standards 2015 Nominal Insurer And Schedule 5 - Appendix L (Service Standards) Page: 1 of 26 Overview... 5 1. Service Standard 1 Premium Calculation... 7 1.1 Purpose...

More information

Information Governance Policy

Information Governance Policy Information Governance Policy Reference: Information Governance Policy Date Approved: April 2013 Approving Body: Board of Trustees Implementation Date: April 2013 Version: 6 Supersedes: 5 Stakeholder groups

More information

Information Technology Project Oversight Framework

Information Technology Project Oversight Framework i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11

More information

Policy and Procedure for approving, monitoring and reviewing personal data processing agreements

Policy and Procedure for approving, monitoring and reviewing personal data processing agreements Policy and Procedure for approving, monitoring and reviewing personal data processing agreements 1 Personal data processing by external suppliers, contractors, agents and partners Policy and Procedure

More information

INSURANCE BROKERS CODE OF PRACTICE

INSURANCE BROKERS CODE OF PRACTICE INSURANCE BROKERS CODE OF PRACTICE INSURANCE BROKERS CODE OF PRACTICE OVERVIEW 4-5 IMPORTANT BACKGROUND INFORMATION What does the Code do for you? (Code Objectives) How to navigate the Code How up to date

More information

ITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0

ITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0 ITIL by Test-king Number: ITIL-F Passing Score: 800 Time Limit: 120 min File Version: 15.0 Sections 1. Service Management as a practice 2. The Service Lifecycle 3. Generic concepts and definitions 4. Key

More information

White Paper. PPP Governance

White Paper. PPP Governance PPP Governance The Governance of Projects, Programs and Portfolios (PPP) (sometimes called project governance for convenience) is the sub-set of corporate and organisational governance 1 focused on assisting

More information

A P P L I C A T I O N F O R T E N A N C Y

A P P L I C A T I O N F O R T E N A N C Y A P P L I C A T I O N F O R T E N A N C Y Property Applying For IMPORTANT IF YOU ARE SERIOUS ABOUT HAVING YOUR APPLICATION APPROVED, YOU MUST FILL IN ALL THE FIELDS REQUIRED. WHERE FIELDS DO NOT APPLY

More information

SCHEDULE 16. Exit Plan. sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and

SCHEDULE 16. Exit Plan. sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and SCHEDULE 16 Exit Plan 1. Scope 1.1 This schedule: (A) sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and requires the Service Provider

More information