Revised Work Scope Dated April 23 rd, 2015

Size: px
Start display at page:

Download "Revised Work Scope Dated April 23 rd, 2015"

Transcription

1 Revised Work Scope Dated April 23 rd, SCOPE OF SERVICES The following combines the Scope of Services included in RFQ No. 671 dated March 12, 2015 and the Invitation to Interview letter dated March 27, The Architect shall communicate with the City of Stamford Engineering Bureau representative, Jeffrey Pardo, Construction Manager, and copy on all and/or correspondence, Chris Gioielli, Sargent, Stamford Police Department. The Architect shall thoroughly investigate the site, and make recommendations to the City for the most economical design that satisfies the objectives established. The Architect shall develop and prepare the Needs Assessment and Programmatic Specifications. The City has obtained the services of Fuss & O Neal to perform and prepare a hazardous material survey and report for 671 Bedford Street and the existing police maintenance garage. The City has obtained the services of TRC to perform a Phase I Environmental Study and report. If deemed necessary, TRC will also perform a Phase II Environmental Study and report. The City is in the process of obtaining proposals from licensed surveyors to prepare a consolidation map of all three properties, 671, 713 and 805 Bedford Street. This survey shall be prepared to an A-2 level and will include all building structures, utilities, plants/trees and grades in 2 contours. The survey shall also include all utilities in North, Bedford and Hoyt Streets. The scope of professional services shall be the AIA Architects Basic Services for the Schematic Design through Bidding and Construction Administration Phase for the project phases as: The Scope of professional services shall include an independent construction cost estimate updated at each phase of the project, including the design options during schematic design, design development and final bid documents. The selected firm shall be responsible for the following design items: 1. The selected firm will meet with the Engineering Bureau and Stamford Police Department to develop and prepare the programmatic specifications. 2. This firm will provide a minimum of three design options during schematic design for review and comment by the Engineering Bureau and the Stamford Police Department. A cost estimate shall be provided for each option. The City and the police Department are open to all possible design solutions for the proposed site. However, abating and renovating the existing building while permitting the Police Department to remain fully operational appears to be logistically impossible. Therefore, the City believes the most logical location for the new Police Headquarters is a combination of 671, 713 and a portion of 805 Bedford Streets. Develop a phasing plan so that the Stamford Police Department remains fully operational at all times during this entire project. Staging and construction of the new structure will most likely limit the PD s ability to maintain the existing on-site parking. Based on the F&O reports develop hazardous material abatement documents to be included in the demolition bid set. The City shall engage Hygienists to perform the monitoring, inspections and testing during the abatement and demolition portion of the project. Development of the architectural/structural/site and MEP package for the new facility. Preparation of FFE package for the new/renovated facility. 3. The firm will be required to evaluate traffic flow and parking patterns and develop plans for site circulation, parking and direct access to the new/renovated buildings. It is the intent of the Police Dept. to have a covered parking facility for their fleet as part of this project. 4. The selected firm will be required to contact the State of Connecticut Traffic Commission and prepare a traffic study of the area surrounding the new site, as required by the Connecticut State Traffic

2 Commission, Section of the Connecticut General Statutes, and prepare the required Application for Certificate in conformance with Major Traffic Generator Submission Guidelines. The selected firm will be responsible for making any modifications to the Application as required by the Traffic Commission. 5. The selected firm will prepare a project development schedule consisting of the establishment of tentative schedule for schematic design, design development, construction documents, regulatory review and approval, bidding and construction. 6. The selected firm will work with the City in the preparation of a preliminary Total Project Budget including estimates of related costs, such as site development, landscaping, utilities, services, furniture and equipment, and technology infrastructure. This shall be updated and submitted prior to progressing into the next phase along with progress drawings and specifications. 7. It shall be the proposer's responsibility to get all approvals from all state and local agencies having regulatory jurisdiction over this project. 8. The selected firm shall prepare independent cost estimates for each phase of work and provide updates to the estimate at each submittal to the City for schematic design, design development and 100% contract documents. At each submittal the Architect and Engineers shall be responsible for reconciling the building design program with the City s allocated budgets. Independent cost estimates shall be prepared for ALL aspects of the primary designer s work including ALL subconsultant work items. 9. The selected firm shall prepare value-engineering analysis and recommendations following the completion of both schematic and design development. However, should value engineering recommendations be determined during the contract document phase, the selected firm may be required to revise contract documents accordingly. 10. The City s goal is to obtain and operate an energy efficient, sustainable, and cost effective building. The selected firm will determine and incorporate the High Performance Building Construction Standards, as regulated by Section 16a-38k of the Connecticut General Statutes. The process starts at the inception of the design and shall include all members of the design team, as identified in the statutes along with those in the City Ordinance #1071 for LEED Silver requirements; see Appendix D. 11. The selected firm shall produce a 3D electronic model rendering at completion of the design development stage. The rendering shall include the entire building and the entire area of the proposed site. 12. The selected firm shall complete a project schedule using P3 (or similar program) for insertion into the bid documents. 13. During the construction administration phase, the selected firm shall use and maintain an electronic RFI and submittal software system, web based preferred. 14. The selected firm shall include all necessary sub-consultants, designers, engineers, surveyors, consultants, etc. in original proposals. Later claims for specialty consultants will not be permitted. 2.5 PROJECT PHASES 2.5a NEEDS ASSESSMENT/PROGRAMATIC SPECIFICATIONS The Architect shall meet with the Stamford Police Department and all sub-departments to determine the needs and square foot requirements of each department. Needs assessment shall account for all present personnel and account for expansion of the department based on the predicted growth of the City. Account for all equipment (loose and fixed) required by the PD as well as all other necessary building equipment required to maintain a modern day police facility. Prepare a detailed report accounting for all personnel, offices, labs, mechanical and all other auxiliary spaces required in a modern police facility. Indicate required square footage, equipment, parking and all other requirements.

3 Submit a preliminary report and meet with the Engineering Bureau and the PD for comment prior to finalizing. The final report will form the basis for the design of the new facility. 2.5b DEMOLITION The Architect shall review any existing documents available for 671 Bedford Street and the Police Maintenance Garage. Survey the existing structures and prepare bid documents to publically solicit competitive bids to completely demolish both structures. Include the removal of all subsurface structures including foundations and UST s. If fuel, oil or other substances are discovered in existing UST s, the existing material is to be properly evacuated and disposed of by the demolition contractor. Based upon the hazardous materials reports as prepared by F&O and the Environmental Phase I (II) Study as prepared by TRC, prepare hazardous material abatement documents and the removal of any and all subsurface contaminated material. All hazardous or contaminated material is to be properly removed and legally disposed of offsite by the demolition contractor. 2.5c SCHEMATIC PHASE The Architect s design services must include architectural, civil, structural, mechanical, electrical, plumbing, data tech, telecom, security systems, and all specialty engineering consultants services needed for a project of this nature and as required for this program. The selected firm shall schedule a kickoff meeting with all of the representatives that the City feels will be integral to the development of the project. From this meeting an organizational flow chart will be developed to streamline the decision making process. At all times the proposer s primary contact will be the Engineering Bureau who will be the contract administrator. The firm shall then prepare schematic designs of elevations and floor plans, and plan out mechanical, electrical and plumbing connections. At this stage a minimum of three layouts of the floor plans and the building elevations with associated cost estimates shall be prepared. All plans shall be developed to incorporate the contractual requirements set forth by the separation plan. These shall be submitted to the Engineering Bureau and presented to the Stamford Police Department for approval prior to proceeding into the next phase. A public information meeting will be scheduled at the completion of schematic design. The selected firm will be responsible for presenting the design and project costs to the public. Public input and response to public comments shall be addressed in the Design Development Phase of the project. The selected firm shall prepare value engineering analysis and recommendations following the completion of schematic design. 2.5d DESIGN DEVELOPMENT PHASE Prepare design development documents and specifications for the proposed facility. These documents should be developed in sufficient detail as required for review by the following State and Local regulatory agencies: State and Local Fire Marshall City of Stamford Department of Health City of Stamford Police Department City of Stamford Building Department City of Stamford Engineering Bureau Meet with all Utility companies to insure their standards and requirements are incorporated into the design. Provide required load letters. Documents will include, but not be limited to, the following: Site and Utilities Plan including landscaping Mechanical, Plumbing, Sprinkler and Electrical Plans Technology Infrastructure Plans Architectural, Civil, and Structural Plans Control Diagrams and Sequence of Operations Installation Details and Construction Requirements

4 Equipment Specifications and Schedules Project Technical Specifications and General Conditions The selected firm shall prepare an independent cost estimate at the completion of Design Development Furnishings, Fixtures, and Equipment (FFE) shall be included under this phase. Some light design of the technology infrastructure to support the Program including cabling, intercom, computers, telephones and teleconference will be required under the scope of this project. All technology systems must be designed and coordinated with all disciplines involved including the FFE phase of the project. Coordination with the Stamford Technology Management Services and Stamford Police Department Technology Information Services will be required to ensure that their standards are followed. This includes data wiring, backbone infrastructure, wireless, fiber & copper, placement of computers, and all associated technologies. Internal building communication systems and security are required. 2.5e CONSTRUCTION DOCUMENTS/BIDDING PHASE Prepare final Construction Documents and FFE package, consisting of drawings, specifications and other applicable documents as necessary, to a level suitable for competitive bidding of the project as well as obtaining State Department of Transportation, State Department of Public Works, and State Department of Energy and Environmental Protection approval for bid. Obtain all necessary approvals and provide three signed and sealed bid documents (plans and specifications) to secure a building permit. Include all design drawings and Construction Documents in AutoCAD 2014 and PDF on CD s for the City s records. Attend pre-bid meeting, and answer contractor questions; provide needed addenda, etc. Assist in the review of contractor bids and attend the pre-award meeting with the lowest qualified bidder. Evaluate contractors and sub-contractors references; make recommendations to City. Assist in the preparation of contract between City and contractor. 2.6 CONSTRUCTION ADMINISTRATION (CA) PHASE The CA time period shall include architectural and engineering services from start of construction through the 1 1/2-year warranty period. Time through warranty period shall be billed at Hourly Rates as required. Assist in the coordination of the construction efforts with the General Contractor and the Engineering Bureau. Review and comment on contractors schedule. Provide periodic project observation and issue a detailed field report in a format acceptable to the City Engineer, including but not limited to, photographs (to include all disciplines) of on-site construction activities to ensure that they are being performed in accordance with the Contract Documents (minimum of once a week for 8 hours/day or more often depending upon magnitude of work being performed). Attend and prepare minutes of all project meetings (bi-weekly), perform onsite inspections, and issue field report of activities (bi-weekly). Evaluate contractors work performance and adherence to schedule. Review and make recommendations for approval of contractor s payment requisitions, requests for extra work and change order applications. Monitor work onsite for compliance with construction documents, good construction practices/industry standards, and utility company requirements.

5 Respond to contractor Requests for Information by providing drawings/sketches, specifications or other data as may be required and maintain log. The selected firm shall use and maintain an electronic RFI software system, web based preferred. Review shop drawings and other submittals for approval and compliance with construction documents, performances, industry standards, utility company requirements, and coordination with other trades. Prepare and maintain punch list of completed construction and work deficiencies until project is completed and closed out. Assist the Client with Project Close-Out, As-Built drawings, reviews, warranties, manuals, training, etc. and issuance of final payment to contractor and resolution of any issues that arise during the 2 year warranty period. 2.7 A/E FIRM TIME REQUIREMENT Based upon the conceptual schedule provided prior to selection, the City is looking to occupy the new facility by the end of June Programmatic Specifications to begin after issuance of the contract and purchase order. Survey of existing buildings, demolition documents which shall include hazardous material abatement design to be completed by July 1, Bid documents for the demolition of 671 Bedford Street and the Maintenance Garage shall be completed by September 1, Schematic Design of the new Police Facility to be completed by September Design Development of the new Police Facility to be completed by December Construction Documents of the new Police Facility to be completed by May 1, Bid June 1, DELIVERABLES 3 copies of the plans, specifications, and cost estimates shall be submitted for each progress review by the City. Construction Documents are to be prepared and provided to the City in electronic format, on latest version of AutoCAD but no later than AutoCAD 2014 and PDF-A. The firm will also be required to submit three (3) complete sets of reproducible drawings, stamped and signed by a Connecticut licensed Architect/Engineer. Specifications and estimates are to be prepared utilizing CSI Masterformat and Excel respectively. Project schedule including Phasing shall utilize Primavera P3 or other acceptable project management scheduling software. Documents and As-built drawings are to be as hard copy and on CD s. Three sets of all plan submissions shall be made.

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1 REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Project Information PS-0748-A Page 1 5/4/2016 Table of Contents Project Budget Worksheet Program Plan Project Location (Site Plan) Scope of Services

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

SAMPLE. CONTRACT FOR PROFESSIONAL SERVICES: Lump Sum by Phase. Federal Identification (I.D.) Number

SAMPLE. CONTRACT FOR PROFESSIONAL SERVICES: Lump Sum by Phase. Federal Identification (I.D.) Number Lump Sum A/E R 12/16/13 STATE OF MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET This contract authorizes the professional services contractor to provide professional services. (Authority: 1984

More information

ATTACHMENT A1 SCOPE OF WORK

ATTACHMENT A1 SCOPE OF WORK ATTACHMENT A1 SCOPE OF WORK Title-I Services June 6, 2016 Page 1 of 5 DISTRICT OF COLUMBIA DEPUTY MAYOR FOR PLANNING AND ECONOMIC DEVELOPMENT RENOVATION TO WILSON BUILDING 2 ND AND 3 RD FLOOR SUITES TITLE-I

More information

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services

More information

Request for Qualifications 2015-162

Request for Qualifications 2015-162 Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015

More information

Animal Health Center for Reid Park Zoo, Tucson, Arizona

Animal Health Center for Reid Park Zoo, Tucson, Arizona Reid Park Zoological Society Request for Qualifications Professional Architectural and Engineering Services for Animal Health Center for Reid Park Zoo, Tucson, Arizona SUBMITTAL DUE DATE: March 21, 2014

More information

REQUEST FOR ARCHITECTURAL SERVICES (RFS)

REQUEST FOR ARCHITECTURAL SERVICES (RFS) REQUEST FOR ARCHITECTURAL SERVICES (RFS) For the Development of three parcels into affordable housing: Highland Ave Site, 9 Manahan Street in Chelmsford and 173 Carlisle Rd. in Westford CHOICE Inc., an

More information

ADDENDUM NUMBER ONE (1)

ADDENDUM NUMBER ONE (1) Page 1 of 1 MINNESOTA DEPARTMENT OF TRANSPORTATION Office of Maintenance: Building Services Section ADDENDUM NUMBER ONE (1) ADDENDUM DATE: 19 October 2012 Request for Proposals for Designer Selection for

More information

Guidelines for Determining Architect/Engineer Fees for Public Works Building Projects (effective July 1, 2015)

Guidelines for Determining Architect/Engineer Fees for Public Works Building Projects (effective July 1, 2015) Guidelines for Determining Architect/Engineer Fees for Public Works Building Projects (effective July 1, 2015) When budgeting for state capital projects, the estimated value of the Architectural/Engineering

More information

ARCHITECTURAL SERVICES AGREEMENT

ARCHITECTURAL SERVICES AGREEMENT ARCHITECTURAL SERVICES AGREEMENT Architectural Design Services THIS ARCHITECTURAL SERVICES AGREEMENT, including all exhibits thereto ( Agreement ), made this day of, 2009, by and between Central New Mexico

More information

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION REQUEST FOR PROPOSAL For MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES For VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION CITY OF ROCHESTER November 2009 TABLE OF CONTENTS GENERAL INFORMATION

More information

Attachment 5 Electrical Engineering

Attachment 5 Electrical Engineering A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or

More information

Request of Qualification Proposal for Construction Management Services

Request of Qualification Proposal for Construction Management Services Request of Qualification Proposal for Construction Management Services Dated June 10, 2014 Table of Contents Overview 3 Introduction 4 Scope of Construction Managers Services 4 Submission of Qualifications

More information

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times

More information

TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT

TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT The Milford Board of Library Trustees, as the Awarding Authority, invites the submission of qualifications by responsible

More information

CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015

CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015 CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015 Dorchester County Public Schools is intending to engage the services

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS A. SCOPE OF PROJECT... 1 B. BASIC SERVICES... 1 C. PRE-DESIGN AND START-UP SERVICES... 4 D. SCHEMATIC DESIGN PHASE... 7 E. DESIGN

More information

GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES Greenburgh Central School District No. 7 ( The District ) invites proposals to perform construction management

More information

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the th day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client

More information

NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK 12110-5349 INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS

NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK 12110-5349 INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK 12110-5349 INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS The North Colonie Central School District invites your firm to submit

More information

AGREEMENT BETWEEN OWNER AND ARCHITECT (Where Contractor is a Construction Manager at Risk)

AGREEMENT BETWEEN OWNER AND ARCHITECT (Where Contractor is a Construction Manager at Risk) AGREEMENT BETWEEN OWNER AND ARCHITECT (Where Contractor is a Construction Manager at Risk) This Agreement made as of the effective date set forth below. Between: Austin Community College District 9101

More information

N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE

N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE The City of Frisco is seeking qualification statements from experienced engineering, architecture, and

More information

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2 CONTRACT FOR DESIGN SERVICES Contract Documents Design Services PS-0748-A Page 1 5/4/2016 Table of Contents Design Services Contract Contract references Attachments described below that will be provided

More information

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS Rhode Island Department of Education School Building Authority 255 Westminster Street, Providence, RI 02909 Telephone (401)222-4600 Website: www.ride.ri.gov

More information

AGREEMENT BETWEEN OWNER AND PROFESSIONAL (FOR USE ON CONSTRUCTION MANAGEMENT PROJECTS)

AGREEMENT BETWEEN OWNER AND PROFESSIONAL (FOR USE ON CONSTRUCTION MANAGEMENT PROJECTS) BUSINESS AFFAIRS FACILITIES PLANNING AND CONSTRUCTION (FOR USE ON CONSTRUCTION MANAGEMENT PROJECTS) This Agreement between Owner and Professional (the Agreement ) is made and entered into this day of Month,

More information

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER Project: BT Project Name: Architect/Engineer: April 2016 Edition AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This Agreement Between Owner and Architect/Engineer

More information

REQUEST FOR QUALIFICATIONS RFQ NO. 001-09

REQUEST FOR QUALIFICATIONS RFQ NO. 001-09 REQUEST FOR QUALIFICATIONS RFQ NO. 001-09 COAST COMMUNITY COLLEGE DISTRICT Facilities & Planning Department 1370 Adams Avenue, Costa Mesa, CA 92626 Telephone (714) 438-4673 Fax (714) 438-4893 The is inviting

More information

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho REQUEST FOR QUALIFICATIONS Independent School District No. 1, Lewiston, Idaho ( District ) is seeking responses from individuals

More information

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. SCHEDULE OF CONSULTANT S SERVICES Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. Project (Insert name and description

More information

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS On-Call Consultant List for Mechanical Engineering Services TABLE OF CONTENTS REQUEST FOR QUALIFICATIONS PAGE NO. SECTION I PROJECT

More information

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS ANNUAL CONTRACT FOR CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES CONSTRUCTION PROJECTS NOT TO EXCEED

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

ACG Commissioning Guideline

ACG Commissioning Guideline ACG Commissioning Guideline Appendix A Sample Commissioning Specification NOTES TO APPENDIX A This appendix contains a sample Request for Proposal (RFP) for Commissioning Services as would be issued by

More information

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES AGREEMENT FOR PROFESSIONAL DESIGN SERVICES This Professional Design Services (this "Agreement"), made as of 20 by and between the University of Cincinnati (the "University") by the Division of Administration

More information

5047P Architectural and Engineering Services for the Cambie Fire Hall and Ambulance Station Project- Addendum #2

5047P Architectural and Engineering Services for the Cambie Fire Hall and Ambulance Station Project- Addendum #2 January 23, 2013 Business and Financial Services Department Finance Division Telephone: 604-276-4218 Fax: 604-276-4162 Attention: To All Proponents Dear Bidders: Re: 5047P Architectural and Engineering

More information

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES Article I Article II Article III Article IV Article V Article VI Article VII Article VIII Article IX Responsibilities of Construction Manager Scope of Construction

More information

CAD Standards Guideline For Facility Documentation and Construction Projects

CAD Standards Guideline For Facility Documentation and Construction Projects CAD Standards Guideline For Facility Documentation and Construction Projects Page 1 of 12 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4. External References 5.

More information

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School Request for Qualifications Owner s Project Manager Design and Construction of a New School Facility K~8 Charter School 26 Madeira Avenue New Bedford, MA 02746 REQUEST FOR QUALIFICATIONS (RFQ) Issued: 4/16/2014

More information

Capital Project Delivery Handbook

Capital Project Delivery Handbook Capital Project Delivery Handbook Volume One Facilities Planning & Construction 1 FACILITIES PLANNING & CONSTRUCTION 3/8/09 2 FACILITIES PLANNING & CONSTRUCTION 1. WELCOME TO FACILITIES PLANNING & CONSTRUCTION...

More information

LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION

LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION 1985 Edition INCLUDING ADDENDA ONE AND TWO M.J. AMike@ Foster, Jr. Governor Mark C. Drennen, Commissioner of Administration

More information

Request for Qualification (RFQ) For Architectural Services. McCormick, South Carolina

Request for Qualification (RFQ) For Architectural Services. McCormick, South Carolina Request for Qualification (RFQ) For Architectural Services McCormick, South Carolina 1 REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES TABLE OF CONTENTS I. PURPOSE OF RFQ... II. SITES DESCRIPTION..

More information

Construction Manager at Risk

Construction Manager at Risk Request for Qualifications (RFQ) Construction Manager at Risk Beaufort County Jail and Sheriff s Office Jim Chrisman, Assistant County Manager/Finance Officer Beaufort County Government Beaufort County

More information

ARCHITECTURAL SERVICES AGREEMENT

ARCHITECTURAL SERVICES AGREEMENT ARCHITECTURAL SERVICES AGREEMENT This AGREEMENT is made and entered into this 10th day of May in the year 2013 by and between the ST. HELENA UNIFIED SCHOOL DISTRICT, hereinafter referred to as DISTRICT,

More information

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For. Construction Management Services for the

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For. Construction Management Services for the City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For Construction Management Services for the Renovation and Expansion of Portsmouth Middle School INVITATION The City of Portsmouth,

More information

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable. DESIGN EQUIEMENTS POJECT DELIVEABLES CHECKLISTS GENEAL INFOMATION 1.1 The following is a checklist to be used as a guide for the required deliverables for the Schematic Design phase. 1.2 Schematic Design

More information

GUIDELINES FOR AUGUST 1995

GUIDELINES FOR AUGUST 1995 GUIDELINES FOR ELECTRICAL ENGINEERING SERVICES AUGUST 1995 PUBLISHED BY: PROFESSIONAL ENGINEERS AND GEOSCIENTISTS OF NEWFOUNDLAND & LABRADOR (PEGNL) P.O. Box 21207, St. John's, NL A1A 5B2 Telephone: (709)

More information

PRIME CONSULTANT SERVICES

PRIME CONSULTANT SERVICES GUIDELINES FOR Professional Engineers providing PRIME CONSULTANT SERVICES 1.0 INTRODUCTION 1.1 PURPOSE OF GUIDELINES The "Guidelines for Professional Engineers providing Prime Consultant Services" have

More information

REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES. The Battery Conservancy

REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES. The Battery Conservancy REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES The Battery Conservancy Issue Date: March 23, 2012 Responses Due: April 20, 2012 Introduction The Battery Conservancy ( TBC ) is a 501(c)(3) not-for-profit

More information

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117 Introduction The Board of Education for Jacksonville School District 117 is soliciting Statements of Interest and Qualifications pursuant to 50 ILCS 510/0.01 from qualified firms to provide comprehensive

More information

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES (Construction Manager At-Risk) FOR PROJECTS IN THE CENTER UNIFIED SCHOOL DISTRICT April 7, 2005 The ( District ) is seeking Statements

More information

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES www.nicet.org 888-476-4238. Fire Alarm Systems

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES www.nicet.org 888-476-4238. Fire Alarm Systems Fire Alarm Systems Level IV Content Outline Standard Model/CBT The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive

More information

School of Veterinary Medicine Second Floor Student Clinical/Instructional Space

School of Veterinary Medicine Second Floor Student Clinical/Instructional Space REQUEST FOR ARCHITECTURAL & ENGINEERING DESIGN SERVICES School of Veterinary Medicine Second Floor Student Clinical/Instructional Space For Enumeration in the 2015-17 Capital Budget March 2014 Project

More information

Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program

Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program SECTION 1 - GENERAL INFORMATION The Greenville-Spartanburg

More information

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs.

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs. SCHOOL PLANNING/SCHOOL CONSTRUCTION PROGRAMS Effective: August 14, 2014 I. Policy Statement The Board of Education is responsible for providing safe, engaging and supportive educational and work environments

More information

CAD Standards Guideline For Facility Documentation and Construction Projects

CAD Standards Guideline For Facility Documentation and Construction Projects CAD Standards Guideline For Facility Documentation and Construction Projects Implemented March 2010 Page 1 of 9 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4.

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) Administration of Project: School District Board + OFCC Project Name Groveport Madison High School Response Deadline 10/17/2014 4:00pm local time Project

More information

EXHIBIT F POSITION DESCRIPTIONS

EXHIBIT F POSITION DESCRIPTIONS EXHIBIT F POSITION DESCRIPTIONS RFQ R-14023, Construction Management Exhibit F, Page 1 of 61 October 2013 EXHIBIT F - POSITION DESCRIPTIONS The following descriptions provide a general overview of the

More information

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering

More information

Healthcare 101 Committee Member James E. Sykes, AIA, LEED AP BD+C MorrisSwitzer Environments for Health, LLC JSykes@MorrisSwitzer.

Healthcare 101 Committee Member James E. Sykes, AIA, LEED AP BD+C MorrisSwitzer Environments for Health, LLC JSykes@MorrisSwitzer. Healthcare 101: Master Planning Presenter Eduardo S. Egea, CAAPPR, AIA, NCARB Senior Vice President / Associate Principal Director of Healthcare for the Caribbean and Latin America HKS Architects, Inc.

More information

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 Section 1: General 1.0 Alignment with Organizational Vision In the space provided below, read

More information

Agreement between Owner and Architect

Agreement between Owner and Architect Agreement between Owner and Architect This AGREEMENT is made as of the - day of - in the year - BETWEEN the Owner: Drexel University - 3141 Chestnut Street - Philadelphia, Pa 19104 - - - and the Architect:

More information

CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714

CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 BUILDING DIVISION (714) 961-7120 Single Family Residential New Construction, Additions & Alterations Submittal Requirements Required agency approvals

More information

How To Design An Affordable Housing Rehabilitation Project

How To Design An Affordable Housing Rehabilitation Project REQUEST FOR QUALIFICATIONS AFFORDABLE HOUSING ARCHITECTURAL SERVICES APPARTMENT REHABILITATION 205/207 5TH ST. HUNTINGDON, PA ISSUE DATE MARCH 5, 2014 RESPONSE DATE MARCH 25, 2014 PROJECT SITE VISIT MARCH

More information

C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program

C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program Friday, April 29, 2011 9:00 a.m. to 3:00 p.m. Ontario Airport Radisson 2200 East Holt Boulevard Ontario, California Design

More information

AGREEMENT FOR DESIGN/BUILD SERVICES WITH GUARANTEED MAXIMUM PRICE

AGREEMENT FOR DESIGN/BUILD SERVICES WITH GUARANTEED MAXIMUM PRICE BUSINESS AFFAIRS PLANNING, DESIGN & CONSTRUCTION AGREEMENT FOR DESIGN/BUILD SERVICES WITH GUARANTEED MAXIMUM PRICE THIS AGREEMENT FOR DESIGN/BUILD SERVICES (the Agreement ) is made and entered into this

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES ISSUED BY: INGLEWOOD UNIFIED SCHOOL DISTRICT Issued: November 20, 2015 Due: December 18, 2015 SCHEDULE OF EVENTS INGLEWOOD UNIFIED SCHOOL

More information

Planning and Construction Management Services

Planning and Construction Management Services Planning and Construction Management Services Construction Project Management Services New construction, major renovations or improvements to building structures and systems are part of the Department's

More information

GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS. Perley Elementary School Roof Replacement Project DESIGN SERVICES

GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS. Perley Elementary School Roof Replacement Project DESIGN SERVICES GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS Perley Elementary School Roof Replacement Project DESIGN SERVICES The Georgetown School Committee seeks proposals for Design Services in connection with

More information

AGREEMENT BETWEEN OWNER AND ARCHITECT/ ENGINEER

AGREEMENT BETWEEN OWNER AND ARCHITECT/ ENGINEER AGREEMENT BETWEEN OWNER AND ARCHITECT/ ENGINEER Project Name: Continuing Services Architect/Engineer: April 2016 Edition AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This Agreement Between Owner and

More information

MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES

MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES This Master Agreement made this 11 day of December, 2012, by and between the St. Lucie County School Board (hereinafter referred to as the School Board

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request

More information

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services Project Management Methodology Framework 1 - Executive Summary The purpose of this document is to introduce the University community

More information

Hard copies should be sent to: The Denver Waldorf School Attn: Lori Pucelik 940 Fillmore St Denver, CO 80206

Hard copies should be sent to: The Denver Waldorf School Attn: Lori Pucelik 940 Fillmore St Denver, CO 80206 April 24, 2013 RE: THE DENVER WALDORF SCHOOL SCHEMATIC DESIGN ARCHITECTURAL SERVICES REQUEST FOR PROPOSAL Dear Contact, Beecher Development Services has been retained by to provide Owners Representation

More information

THE GLOCESTER SCHOOL DEPARTMENT Request for Proposals G-2015-01 Architectural Services RIDE 5 Year Capital Plan

THE GLOCESTER SCHOOL DEPARTMENT Request for Proposals G-2015-01 Architectural Services RIDE 5 Year Capital Plan The Glocester School Department is accepting sealed proposals for Architectural Services RIDE 5 Year Capital Plan. Proposals for Architectural Services -RIDE 5 Year Capital Plan are due at the Treasurer

More information

Request for Proposal Architectural/Engineering Services. Adapt/SouthRiver CHC. P a g e 1

Request for Proposal Architectural/Engineering Services. Adapt/SouthRiver CHC. P a g e 1 P a g e 1 Request for Proposal Architectural/Engineering Services Adapt/SouthRiver CHC RFP for Architectural/Engineering Services P a g e 2 Introduction (SRCHC), a Federally Qualified Health Center, is

More information

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS EAST VALLEY ADULT RESOURCES TENANT IMPROVEMENT Project Funding by the United States Department of Housing and Urban Development Through

More information

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND HUCKABEE & ASSOCIATES, INC., ARCHITECT/ENGINEER

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND HUCKABEE & ASSOCIATES, INC., ARCHITECT/ENGINEER AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND HUCKABEE & ASSOCIATES, INC., ARCHITECT/ENGINEER TABLE OF CONTENTS ARTICLE 1 ARCHITECT/ENGINEER S SERVICES AND RESPONSIBILITIES

More information

Construction Services Procedure

Construction Services Procedure Construction Services Procedure Table of Contents.1 General Information... 2.2 Process Overview... 2.3 Who Needs to Know This Procedure... 2.4 Roles and Responsibilities... 2.5 Types of Construction Contracts...

More information

CONTRACT FOR PROJECT MANAGEMENT SERVICES (Green Repair Program)

CONTRACT FOR PROJECT MANAGEMENT SERVICES (Green Repair Program) CONTRACT FOR PROJECT MANAGEMENT SERVICES () This Contract is made this day of in the year between (day) (month) (year) the, (Owner), Massachusetts (City) (State), (Zip Code) hereinafter called "the Owner"

More information

TABLE OF CONTENTS. Article 1ARTICLE 1 -- ARCHITECT/ENGINEER S BASIC SERVICES

TABLE OF CONTENTS. Article 1ARTICLE 1 -- ARCHITECT/ENGINEER S BASIC SERVICES - Architect/Engineer sa/e Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES...

More information

Segreti Design Scope of Interior Design Services

Segreti Design Scope of Interior Design Services Segreti Design Scope of Interior Design Services Programming: During this phase, Segreti Design consults with the owner to develop the applicable requirements of the project and studies the feasibility

More information

THE TEXAS STATE UNIVERSITY SYSTEM OWNER /ARCHITECT-ENGINEER AGREEMENT. (Construction Manager-At-Risk)

THE TEXAS STATE UNIVERSITY SYSTEM OWNER /ARCHITECT-ENGINEER AGREEMENT. (Construction Manager-At-Risk) Please note that this document is a draft contract and that modifications should be expected. THE TEXAS STATE UNIVERSITY SYSTEM OWNER /ARCHITECT-ENGINEER AGREEMENT (Construction Manager-At-Risk) THIS AGREEMENT

More information

HUMAN RESOURCES PROCEDURE 10.5

HUMAN RESOURCES PROCEDURE 10.5 HUMAN RESOURCES PROCEDURE 10.5 Subject: Master Facilities Planning and Construction Committee Date: August 10, 2011 Pages: 14 Replaces Procedure Dated: N/A Purpose The purpose of the Master Facility Planning

More information

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid July, 2003 MEMORANDUM UCF-05.01-07/03 TO: Members, Council of Presidents FROM: SUBJECT: Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid AUTHORITY: Sections 240.209(3)(p),

More information

AGREEMENT FOR PROGRAM MANAGEMENT SERVICES WITH SINGLE GENERAL CONTRACTOR DELIVERY (Ocean View Elementary School Project)

AGREEMENT FOR PROGRAM MANAGEMENT SERVICES WITH SINGLE GENERAL CONTRACTOR DELIVERY (Ocean View Elementary School Project) AGREEMENT FOR PROGRAM MANAGEMENT SERVICES WITH SINGLE GENERAL CONTRACTOR DELIVERY (Ocean View Elementary School Project) This Program Management Services Agreement ( Agreement ) is made and entered into

More information

Architect s Guide. April 2016

Architect s Guide. April 2016 Architect s Guide April 2016 The Minnesota Housing Finance Agency does not discriminate on the basis of race, color, creed, national origin, sex, religion, marital status, status with regard to public

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM

San Antonio Water System Standard Specifications for Construction ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM 903.1 DESCRIPTION: This item shall govern the preparation and implementation of the Contractor s Construction Quality Control/Quality Assurance (QC/QA) Program for

More information

RFQ REQUEST FOR QUALIFICATIONS. Architectural/Engineering Services. MENANDS SCHOOL DISTRICT 19 Wards Lane Menands, NY 12204

RFQ REQUEST FOR QUALIFICATIONS. Architectural/Engineering Services. MENANDS SCHOOL DISTRICT 19 Wards Lane Menands, NY 12204 RFQ REQUEST FOR QUALIFICATIONS Architectural/Engineering Services MENANDS SCHOOL DISTRICT 19 Wards Lane Menands, NY 12204 Issued: January 28, 2015 Submission Deadline: February 26, 2015 @ Noon Att: Joanne

More information

Facilities Management and Construction Project Delivery Manual

Facilities Management and Construction Project Delivery Manual Facilities Management and Construction Project Delivery Manual Page 1 CONTENTS Introduction... 5 Purpose of the Manual... 5 Overview of the Manual... 6 Facilities Management (FMC) Organization mission...

More information

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement

More information

Project Management Manual for Design and Construction Projects. (Revised August 2010)

Project Management Manual for Design and Construction Projects. (Revised August 2010) Project Management Manual for Design and Construction Projects (Revised August 2010) Table of Contents 1. Overview...5 1.1 Introduction... 6 1.2 Design and Construction Process... 7 1.3 Project Delegation

More information

NORTHERN ARIZONA UNIVERSITY EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL

NORTHERN ARIZONA UNIVERSITY EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL NORTHERN ARIZONA UNIVERSITY EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL (CM@Risk Edition) June 1, 2015 Edition Exhibit A Scope of

More information

Information for Charter Schools. The following six requirements cannot be waived by a charter school:

Information for Charter Schools. The following six requirements cannot be waived by a charter school: Information for Charter Schools Site, Facility, and School Codes There are three codes associated with any school. The site code references the property on which an educational facility is located. Site

More information

REQUEST FOR PROPOSAL. Design Services

REQUEST FOR PROPOSAL. Design Services Ventura County Community College District Ventura College Parking Lot Renovation REQUEST FOR PROPOSAL Design Services Proposals due by: 2:00 p.m. December 15, 2003 Deliver to: Project Director The JCM

More information

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by

More information