The Tabernacle: Phoenix Award Winner for Excellence in Restoration



Similar documents
How To Prevent Water Damage To A Home

Case Studies. Disaster Recovery Restoration Remediation Decontamination

Restoration Services Company

Building Condition Assessment Report

Memorandum. July 16, To: Plan Commission City of Madison

17,280 square feet Overview:

Date: March 7, 2006 Report for [removed]

How To Save A Building From A Hurricane

PAST PERFROMANCE. Post testing was performed in all areas to ensure the building was safe for all visitors and employees.

CONDITION OF QUALITY ITEMS

Vision Home Inspection

Rehab Inspection Report Page 1

ASBESTOS SCIENCE TECHNOLOGIES, INC.

Chapter 11: Demolition

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Non Invasive Roof Leak Detection Using Infrared Thermography

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

University of Vermont

HOUSTON ELEMENTARY SCHOOL

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

Estimated Cost of Repair

Prestige Home Inspection LLC

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

Inspecting to a higher standard.

Building Condition Assessment Report

CABIN A Restored & Preserved 1850 Slave Cabin

MEMORANDUM. General: Foundation:

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

How To Perform A Mold And Indoor Air Quality Assessment

Case Studies. Disaster Recovery Restoration Remediation Decontamination

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

COMPREHENSIVE PROPERTY INSPECTIONS

Central Location: 30 Buchanan Street, Colorado Springs, Co Point Roof Inspection Report + Bonus

Important Information for Owners of Buildings in Flood Zones

WATER DAMAGE RECOVERY G U I D E

Notice to Property Owners

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

later damage - Loss ControL

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

HOME INSPECTION CHECKLIST

Substantial Improvement/Damage Notice to Property Owners

WATER DAMAGE INVESTIGATION. Massachusetts Gaming Commission 101 Federal Street Boston, Massachusetts

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Cost of Repair Worksheet

BUNKER HILL ELEMENTARY SCHOOL

Inspection Item COMMENTS

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

The Local Government Purchasing Cooperative

SCHOOL BUILDING RENOVATION REPORT I. BUILDING BEFORE RENOVATION

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

A Case Statement in Support Of Our Plans To Renovate and Restore our Campus Immaculate Conception Church Fort Smith, AR

Simpson Engineering A state licensed engineering firm F-1607

RRIO Checklist. Use of checklist: Definitions: Limitations

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Got Mold? Frequently Asked Questions About Mold

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT AIP 84

Estimating Database Checklist

J. Historic Buildings Pre- and Post-Disaster Mitigation

Total Home Inspection Checklist

Basement & Foundation Damage

How To Prevent And Manage A Flood And Mold

Creating the Ideal Environment for Accelerated Drying Times on Construction and Restoration Projects

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

Arbor Heights Indoor Air Quality Investigation Interim Report

While all losses can be devastating, TLC Water and Fire Restoration will work diligently from the initial call to the close of the loss to get the

Protecting Your Home From Water Damage

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

Windbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Property Inspection Report

Key Terms. The identifying six digit number, within the Freddie Mac Reimbursement System ( Reimbursement System ), for each Expense Item.

Home Warranty Inspection Report

Walls. Add Strength and Water Resistance When Repairing Your. Replace damaged framing members when walls are open

Self-Home Inspection Checklist

Construction Technologies Career Field Pathways and Course Structure

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Disaster Restoration, Fire I Historic Building. Bourbon & Tunns Tavern I Milwaukee, WI

Infrared Thermography and Water Damage Assessment

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

A trusted partner to insurance adjusters. Fast, accurate, claims solutions 24 hours a day, 365 days a year.


CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

Points of Construction

Certificate of Appropriateness Applications

Manual lifting and handling

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Cost estimate for renovating city owned rental building located on 2 nd Ave. SW

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

BUREAU OF ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

Transcription:

The Tabernacle: Phoenix Award Winner for Excellence in Restoration Historical buildings face a myriad of challenges to keep them in pristine condition while maintaining their functionality. Modernizing a building without losing its historical charm is a challenge in itself, and restoring these buildings takes skill and dedication to preserve their history. This year, the recipient of the Phoenix Award for Innovation in Restoration took on the task of preserving a nearly century old building. Built in 1910, The Tabernacle in Atlanta, Ga., was originally named for Dr. Leonard Gaston Broughton. First known as the Broughton Tabernacle, this building was the birthplace of the Georgia Baptist Medical Center and nursing school. From there it was converted into the Third Baptist Church, with over 4,000 active members until the mid 1980s. It was vacant until 1996, when it was then turned into a House of Blues Club during the Centennial Olympic Games. The Tabernacle is currently owned by Live Nation music and utilized as a live music venue and site for corporate functions. By Casey M. Geisler On March 14, 2008, this historical landmark was struck by the tornadoes tearing through downtown Atlanta. Throughout its modernization the original stained glass windows, maple flooring, millwork and hand-crafted plaster details of the structure were preserved. The devastating tornado had compromised the structure of this landmark. In need of restoration in a timely manner, Rolyn Companies, Inc. (www.rolyncompanies.com), of Rockville, Md., responded to the call. Utilizing their abilities and resources, and despite numerous challenges, Rolyn was able to complete the restoration within 73 days, in time for the next scheduled music event. The Tabernacle suffered damage to both its interior and exterior. The strong tornado blew portions of the roof off of the building, exposing the attic and rafters to the elements. The chimney collapsed through the roof, falling 50 feet on the performance stage below and exposing the interior woodwork to the weather and possible water damage. The original stained glass windows were shattered with some pieces of glass found up to 250 feet away from the building. In order to begin working on the building, Rolyn crews first had to make sure that the building was structurally safe for workers. The hole in the roof posed a threat to workers because of the falling bricks and other roofing debris. Rolyn began by removing as much debris from the roof as possible using a 120-foot bucket truck with a drop-pan. Any unstable debris and the compromised HVAC system were removed, and Rolyn teams constructed a temporary tarp roof 2 Cleaning & Restoration June 2009 www.restorationindustry.org

www.restorationindustry.org June 2009 Cleaning & Restoration 3

to protect the building s interior. The broken windows were then sealed to further minimize damage to the interior wood flooring and mullions from the rain storms. To further protect the workers, create a safe workspace, and to enable the teams to control the amount of damage on the stage area below the hole in the roof, mitigation crews fashioned a cushion of tires and deflection ramps to capture any loosened debris. A negatively pressurized containment plume was also used. Further inspection of the interior revealed that there were rodent droppings and coal dust debris from the original coal-burning heating system in the rafters above the plaster ceilings. This discovery increased the risk of histoplasmosis and contributed a new set of challenges. Rolyn teams now had to prevent crosscontamination from occurring as well. Using the already established containment, crews utilized air scrubbing and negative pressure with HEPA filtration in the entire work area, thus preventing the spread of dust particles and other environmental hazards. Using moisture meters, hydrometers and thermal imaging technology, teams completed their moisture surveys and assessment of the building s interior. They began the drying process by setting up three 6000 CFM desiccant dehumidifiers, numerous air movers and low-grain refrigerant dehumidifiers. Rolyn was then able to monitor the drying process over several days, looking for improvements and identifying when the building was dry. During the drying phrase, Rolyn faced the challenge of dealing with more rain storms and the resulting damage that could compromise the antique furnishings and original flooring. To combat the challenge, Rolyn decreased the cubic air space in the affected areas and intensified the effectiveness of the LGRs to achieve more air exchanges per hour. The key component to this project was completing the installation of the roof. Working with the insurance company, Rolyn crews provided a quick bid on the cost for approval. They also continued to remove any damaged mansard shingles. During this process they discovered part of the original roofing with the painted words Baptist Tabernacle, that had been covered over during modernization and were still completely in tact. Before repairing the roof, crews considered to how to incorporate modern lumber into the century old building s original structure. They found a solution that would not further compromise the history of the building. The damaged areas were repaired and the roofing was completely replaced while still preserving the original trim details. With only five weeks left to complete the project before the next scheduled event, Rolyn teams began to tackle the interior of the building. Time was spent debating how to best handle the task of repairing the plaster ceilings. Not wanting to lose the ceilings, Rolyn worked closely with Tabernacle officials to assess the damage. Replacing the ceilings would be a time-consuming project and could diminish the historical nature of the interior. In the end, it was decided that too much damage had been done and the ceilings would have to be replaced in the main auditorium despite the mitigation crew s best efforts. In order to complete this part of the task, Rolyn crews had to remove 90 tons of plaster using a 50-foot tall scaffolding system that created a temporary work surface ending just six feet below the existing ceiling. Once the ceiling was demolished, a new ceiling was designed and put into place, closely emulating the original molding and trim details. The process took 30 days to complete with the teams working three shifts per day, seven days a week. During the auditorium restoration, the teams encountered an antique chandelier, a gift to the Tabernacle from the Loews Grand Theatre, which 4 Cleaning & Restoration June 2009 www.restorationindustry.org

needed to be protected and cleaned. This particular chandelier graced the entry of the theatre during the world premiere of Gone with the Wind in 1939, and was appraised with a value of $2 million. It was lowered to the floor and placed in a vault to protect it for cleaning of the framework and individual crystals. A few modifications were made to the building during the restoration. Two large refrigeration coolers and other trade items were replaced along with the extensively damaged stage. The new stage was designed to allow for more technologically advanced performances. Light grids and lighting were upgraded along with the addition of a new sound system. Since the auditorium was not the only room damaged, crews also worked on restoring and reconstructing individual rooms used for other purposes. On the top floor of the Tabernacle there is a lounge known as the Blue Room. Here, crews had to reconstruct most of the area due to the collapsed roof. It took 23 days to install new ceiling joists, replace damaged windows and lay new hardwood flooring, all in keeping with the historical specifications. www.restorationindustry.org June 2009 Cleaning & Restoration 5

On the lower level of the Tabernacle, the Cotton Club and kitchen sustained heavy water damage and needed to be renovated. This included new structural framing, abatement of the asbestos floor tiles and a new ceiling grid with light system. The kitchen equipment was removed and cleaned before being tested and reset. During this process the management group for the Tabernacle decided to upgrade the bathrooms, electing to have the existing stalls, fixtures, lighting and walls replaced. In order to complete the restoration, Rolyn thought it best to contact the original painters who were part of the redesigning process in 1996. The company arranged for them to travel from California to Atlanta to repaint all of the freshly renovated rooms. The artists were able to successfully blend the newer areas of custom faux painting with the existing finishes. Upon completing the project, Rolyn sought out a stained glass specialist. Using photographed copies of the glass, the specialist was able to create replicas of the damaged and missing window panes. Rolyn created a perfect blend of preserving the historic look and feel of the building, while upgrading with modern technology and materials; a valued approach that saved both time and expense on the project. Casey M. Geisler is RIA s communications specialist. 6 Cleaning & Restoration June 2009 www.restorationindustry.org Reprinted with permission from the June 2009 issue of Cleaning & Restoration magazine, published by the Restoration Industry Association, 2009