Shortlist of projects. References viaducts, bridges and infrastructures



Similar documents
References on tube and transport analysis

VIA INGEGNERIA SRL consulting engineers COMPANY PROFILE


US 51 Ohio River Bridge Engineering and Environmental Study

Aluminium systems profile selection

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

Safe & Sound Bridge Terminology

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Chapter 3 Pre-Installation, Foundations and Piers

Via Ex Internati 11/a Balconi di Pescantina (VERONA) ITALY. Phone number: Fax

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Belt and Roller Conveyor for boxes and containers

Company Profile.

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Milan M5 metro extension the construction of Lotto station

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

How To Write An Analysis System For Bridge Test

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

FLOORS REINFORCEMENT Shear Stud Connector for steel- concrete composite structures cold applied by pins

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

The minimum reinforcement for the stem wall is the placement of:

Rear Impact Guard TEST METHOD 223. Standards and Regulations Division. Issued: December 2003

HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long

ETABS. Integrated Building Design Software. Concrete Shear Wall Design Manual. Computers and Structures, Inc. Berkeley, California, USA

16. Beam-and-Slab Design

Storm Drainage Systems

3.1 Historical Considerations

Detailing of Reinforcment in Concrete Structures

State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work

References on tunnels

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

FRACASSO SCAFFOLDING PS 720

Section 2100-Trenching and Tunneling

METHOD OF STATEMENT FOR STATIC LOADING TEST

Macetti Ing. Alessandro Via Marconi 12H Palosco (BG) Tel:

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

Technical Notes 3B - Brick Masonry Section Properties May 1993

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

BAGGAGE HANDLING SYSTEMS. Trastecnica S.p.A. Handling Baggage Systems Edition Rev

APPENDIX H DESIGN CRITERIA FOR NCHRP PROJECT NEW BRIDGE DESIGNS

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Delineation. Section 4 Longitudinal markings

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

CHAPTER 2 QUANTITY TAKE-OFF

Design rules for bridges in Eurocode 3

METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER

New Troja Bridge in Prague Concept and Structural Analysis of Steel Parts

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

INMET Konstrukcje sp z o.o. Leading steel forms for prefabrication manufacturer in Poland

Brandangersundet Bridge A slender and light network arch

Bending, Forming and Flexing Printed Circuits

SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Redundant and Robust Structures by Joint Ductility

Design and Construction of Cantilevered Reinforced Concrete Structures

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)

UNIVERSAL RAILING, STEEL

CURRENT PRACTICE SHEET

Breakaway Walls

A transverse strip of the deck is assumed to support the truck axle loads. Shear and fatigue of the reinforcement need not be investigated.

Preliminary steel concrete composite bridge design charts for Eurocodes

Stress and deformation of offshore piles under structural and wave loading

Residential Decks. Planning and Development Services Department

PmB Expansion Joints World leaders in expansion joint technology

Steel and composite bridges in Germany State of the Art

Index Series Prestressed Florida-I Beams (Rev. 07/12)

ABSTRACT 1. INTRODUCTION 2. DESCRIPTION OF THE SEGMENTAL BEAM

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

Joist. Reinforcement. Draft 12/7/02

How To Understand The World Trade Center'S Structural Design

Numerical modelling of shear connection between concrete slab and sheeting deck

Laying the First Course. 1. Excavate the site and construct the footing.

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Field Welding Inspection Guide

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

Page & Turnbull imagining change in historic environments through design, research, and technology

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Modular Access Floor for Data Center. From Rack to Row to Room to Building

FOOTING DESIGN EXAMPLE

Statics of Structural Supports

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Chaudière Crossing Bridge Rehabilitation

Rehabilitation of a 1985 Steel Moment- Frame Building

Slab Track Austria. System ÖBB-PORR elastically supported slab

Transcription:

Shortlist of projects

Client: Provincia di Roma Assignment: Detailed design inside the PRUSST asse Tiburtino Nodo di Ponte Lucano Team members: VIA Ingegneria srl Mission: Preliminary design-build contract including the Study of Environamental assessment General plan Location: Villa Adriana, Tivoli (RM) Year of implementation: 2004 2006 Construction cost: 15.620.000 Progress: Ongoing contract Design phase completed Section through the viduct on the Aniene river Plauti s mausoleum Villa Adriana Archeologic zone Elevation of the viduct on the Aniene river Ponte Lucano, Villa Adriana Tivoli (RM)

3D visual 3D visual Project description: The intervention in implementing the project connecting Maremmana - Tiburtina through the creation of a new bridge on the Aniene 313.0me of a split-level junction, achieving the target of a link with no points of conflict and away from the town. The route embraces three operations described in PRUSST, GT4-11 GT - GT12. A pr. 0 +163.63 the path of the project exceeds the Fosso Scalette, in the section in which these discharging into River Aniene, with a bridge single span of length equal to 23.00 m. The project involves the simultaneous reprofiling of the bed of the Pit ladders, just upstream of crossing that emerges after a long stretch tombato, and the establishment of appropriate bank protection works with mattresses like "Reno" and their subsequent re-naturation. Ponte Lucano, Villa Adriana Tivoli (RM)

Client: ANAS SPA (client) /ING. PAVESI & C SPA (contractor) Assignement: Design and Build of the new road 284 Western-Etnea Team members: Ing. Pavesi & C SPA (main contractor), team: Cogip SPA, Franco Giuseppe SrL, Nuova Costruzione Siciliana COOP. A. R. L. Mission: Detailed design (structural and hydraulic) Location: Bronte (CT), Italy Year of implementation: 2009 Construction cost: 23.641.659 Progress: Works in progress Detailed design completed and approved General plan Section through the Madonna della Vena viaduct Section on pillars Viadotto Madonna della Vena Bronte (CT)

Environmental impact of the Madonna della Vena viaduct Project description: The viaduct is composed of 6 spans a total length of 270 m, measured on axis supports shoulders. The deck is in steel-concrete composite structures, consisting of two steel beams of variable height between 1.50 m at the centerline and at the supports of the ends of compact board, and 2.40 m to intermediate supports. The beams are arranged at intervals of 8.0 ft above the base solid completion in a total thickness equal to 0.31 m. The lattice of deck beams shall be supplemented by longitudinal and transverse pin positions on the span and at the alignment of support. The static scheme, with reference to vertical loads, is of the continuous beam of more spans. The diagram of constraint of the deck provides at each alignment support the use of elastomeric isolators able to ensure a coefficient of viscous damping at least equal to 15%. These insulators will be characterized by high vertical stiffness at least equal to 800 times the horizontal stiffness. View of the building phase of the Madonna della Vena viaduct Perspective of the Madonna della Vena viaduct Viadotto Madonna della Vena Bronte (CT)

Images of the open site of the Madonna della Vena viaduct Viadotto Madonna della Vena Bronte (CT)

Project description: The viaduct consists of 3 spans a total length of 86.60 meters, measured in the lean-back axis. Characteristic of the work are the side spans of light greatly reduced compared to the central span. The set consisting of each span of the edge and the shoulder allows to realize a constraint "snap" to the central span consequently reducing the stresses due to the actions agents. It follows that the two ends of the bridge remain subject to tension for any load condition. The transmission of the relevant traction stresses behind will be through a particular system of anchoring in metal structural work. The deck is a steel-concrete composite structures. General plan Elevation of the details of the deck Details Long section through the viaduct Viadotto Ciapparo Bronte (CT)

Images of the open site of the Ciapparo viaduct Viadotto del Ciapparo Bronte (CT)

Client: ANAS SPA 3D view of the model Assignement: Design of the new road and viaduct leading to La Spezia Completamento del Lotto 2 Team members: VIA ingegneria SrL Mission: Detailed design (structural and hydraulic) Location: La Spezia (SP), Italy Year of implementation: 2011 Progress: Tender stage ongoing Detailed design completed Contact: COGIP SpA via Trinacria 15 Tremestieri Etneo (CT) Project description: The metal core is made with tubular steel elements in "COR.TEN", to provide intermediate support to the deck structures. It is a three-dimensional structure, with tubes inclined in two directions which tend to converge at the top, connected below the plane of the deck by cross-members, always made with tubular elements, which constitute the intermediate supports of the main beams, and in the direction longitudinal members by two other tubular elements to stabilize the structure in this direction. It follows that the deck, with an overall length axes in support of 60 m, is divided into three bays of light equal to 15 m for spans of 30 m to the edge and center. The deck is provided with a composite steel-concrete section. General plan 3D view of the model Variante all abitato di La Spezia, Lotto 2 La Spezia

Client: PENTAPOLI SCARL Assignement: Detailed design of the third roadway on the road between North Rimini and Pedaso Team members: VIA ingegneria SrL Mission: Detailed design (structural and hydraulic) Location: Cesi (MO), Italy Year of implementation: 2010 Progress: Tender stage ongoing Detailed design in progress Cesi viaduct plan Long section through the Cesi viaduct Viadotto di Cesi Rimini (RI)

Long section through the back deck Project description: The viaduct is planned as part of expansion work to the third lane of the Catholic - Fano A14 motorway. It consists of 3 spans a total length of 166 m, measured on axis supports shoulders. The deck is in steel-concrete composite structures, consisting of two steel beams of constant height equal to 3.40 m, placed at a center distance of 10.75 me connected by transverse load-bearing core filled with a distance of 6.0 m (4.0 m in adjacency to the backing stack). A longitudinal beam plug is the main pillar of the slab. The changes have sidelightequalto2.80m. The slab is complete reinforced concrete and has a total thickness equal to 0.29 m and is connected to the beams by means of pegs Nelson. It is provided the use of prefabricated self-supporting slabs (predalles) with bottom metal sheet 5 mm thick woven in the transverse direction. The static scheme, with reference to vertical loads, is of the continuous beam of more spans. Joint details Short sections through the viaduct Viadotto di Cesi Rimini (RI)

Client: Comune di Tivoli Assignment: Feasibility study (environmental, technical and economic) of the Monteripoli Tunnel Team members: VIA Ingegneria SrL Mission: Detailed design (structural and hydraulic) Location: Tivoli (RM), Italy Year of implementation: 2008 Progress: Tender stage ongoing Detailed design completed General plan Short section through pillar Viadotto di Monteripoli Tivoli (RM)

Project description: Regarding the connections, the segments of the main beams are fully welded, while the links between the transverse beams and the main beam and the unions regarding the type of plug will be bolted. The insole is constituted by the predalle of a thickness of 6cm,dulyarmedinamannerastobeself-supporting during casting, and by the jets of completion in place of a thickness of 25 cm. The static scheme, with reference to vertical loads, is of the continuous beam of more spans. Environmental impact simulation of the Monteripoli viaduct The diagram of constraint involves the use of check valves antiseismic double acting on one of the two shoulders of each viaduct (shoulder fixed, in this case corresponding to the shoulder "A" - side Saragat), acts to limit the extent of the horizontal actions longitudinal transmitted seismic event. In addition, the viaducts have been equipped with insulation system also in the transverse direction through the adoption of the supports in steel-teflon insulators equipped with transverse elastoplastic behavior. Ante operam Post operam Viadotto di Monteripoli Tivoli (RM)

S.S. 280 S.S. 106 JONICA Client: ANAS Direzione generale Team members: VIA Ingegneria SrL De.MA.CO SrL, Tecno IN Assignement: S.S. 106 Jonica Categoria B Mission: Preliminary design-build contract including the Study of Environamental assessment Location: Calabria, Italy Year of implementation: 2003 Construction cost: 807.000.000 Progress: Works finished Viadotti e Opere Calabria

Images of the open site of the DG21 viaduct Viadotti e Opere Calabria