1 4211 Yonge Street Suite 500 Toronto Ontario M2P 2A f smithandandersen.com ELECTRICAL SCHEMATIC DESIGN BRIEF FOR CENTRE FOR BIODIVERSITY GENOMICS NEW TWO STOREY BUILDING UNIVERSITY OF GUELPH TO HOK GROUP INC. 720 KING STREET WEST, SUITE 505 TORONTO, ONTARIO M5V 2T3 OUR PROJECT NUMBER: DATE: DECEMBER 7, 2009 Ottawa Ontario Dubai United Arab Emirates Calgary Alberta

2 1. INTRODUCTION 1.1. A proposed mixed use building with a Group D and a Group F Division 3 occupancy classification located in Guelph, Ontario The facility is to be owned and operated by the University of Guelph 1.3. Building is to be approximately 3,310 square meters, three stories tall with two above grade and one storey below-grade. It will be approximately 10 meters tall The facility includes the following unique features Server Farm Green Atrium Ethanol/Reagent (Sample storage) Building Link 2. DESIGN STANDARDS 2.1. The Electrical systems will be designed in accordance with the current edition of the following Codes and Standards: Ontario Building Code Ontario Electrical Safety Code National Fire Protection Authority (NFPA) Ontario Fire Code Local Ordinances and Authorities Institute of Electrical and Electronic Engineers (IEEE) standards LEED Illumination Engineering Society (IES) Standards ASHRAE 90.1 Energy Efficient Design of New Buildings National Electrical Safety Code The Uptime Institute Tier Classifications The Model National Energy Code For Buildings (MNECB) and shall meet or exceed the minimum requirements of the Commercial Building Incentive Program (CBIP). National Electrical Manufacturer s Association (NEMA) Standards Telecommunication Industries Association (TIA) CAN-ULC-S524 Standard for the Installation of Fire Alarm Systems. CAN-ULC-S536 Inspection and Testing for Fire Alarm Systems University of Guelph Standards University of Guelph CAD Drawing Standards (Feb 2009;Rev Mar 2009) 2 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

3 3. NORMAL POWER DISTRIBUTION 3.1. The building will be serviced from the University of Guelph owned 13.8kV, 3 phase, 3 wire distribution system The primary utility feeders will come below ground in a concrete duct-bank off the local UofG campus loop distribution system. The University of Guelph electrical distribution system has multiple high voltage loops with the high voltage feeders running throughout the campus to supply power to the various buildings. This building will be added to the nearest campus loop, loop #3, which also feeds the existing Biodiversity Bldg, #138. Two new duct banks would be required, one to the manhole adjacent to the Biodiversity Bldg #138 high voltage substation and the second to an existing manhole by E.C Bovey Bldg # There will be three 13.8kV load break switchgear located in the main electrical room located in the basement of the building. Two of the cells will be the loop switches with no fusing the third switch will be a fused switch to supply the single ended substation for the building. Space will be provided to install an additional switch on the end of the switchgear line-up to supply future building via a radial feed Lightning arresters will be provided on the load break switch feeding to the transformer The building will house a 500kVA, 13.8kV to 600V delta-wye transformer in the basement electrical room that will supply a secondary switchboard directly coupled to the transformer. The distribution through 3.6. Our design will be based on power density calculations as required by the Ontario Electrical Safety Code rule for other types of occupancies and OBC for lighting power densities with the data centre load taken in addition to the base load The primary distribution voltage, throughout the facility will be 600V with localized /208V transformers. The basement and ground floor will be supplied from the main electrical room with the second floor being supplied from the penthouse. 120/208V electrical panels will be located throughout the building Main electrical rooms will have a 2-hour fire rating. All sub-electrical rooms and closets are to have a minimum 1-hour fire rating All electrical equipment is to be sprinkler proof All electrical conductors are to be copper. All equipment to be copper bus In general all conductors are to be cable in conduit unless otherwise noted. High voltage feeders to be 15kV, Teck90, single conductor copper cables Every laboratory will be equipped with a 120/208V, 100A, 42 circuit electrical panel. 3 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

4 4. ESSENTIAL POWER DISTRIBUTION 4.1. A new 100A essential power feed will be run from the essential panel located in Chamber F in the tunnel system that is being supplied from the Science Complex essential power plant. This feeder will be routed through a new duct bank installed from the new building to manhole #68 located North West of the proposed new building. The existing duct bank will be utilized to manhole 67 located North of manhole #68. A new duct bank will be installed from manhole #67 to chamber F where the essential feeder will terminate into an existing 400A distribution panel The main service will terminate in a splitter and will feed the following automatic transfer switches: 60A transfer switch for Life Safety Loads Essential lighting systems with exit signage Fire Alarm network panels 60A transfer switch for non-life Safety Loads Essential power for specific lab equipment such as freezers Building Automation control panels General exhaust fans Sanitary pumps Storm water pumps Sump pumps Security System Telephone system Domestic hot water system Domestic cold water pumps 4.3. Emergency power has NOT been included for the following systems: Uninterruptable Power Supply (UPS) systems Server Farm If this equipment is required to be on essential power then an alternate price should be identified to install a dedicated diesel generator set for this building located on the east side of the building on grade. The generator will be 250kW standby rated. Generator will be housed in a suitable weather-proof, sound attenuated enclosure. The generators will be specified to meet Tier III emission standards Emergency power will meet the minimum operation requirements for a period of no less than 30 minutes All emergency wiring is to be wire in conduit or multi-conductor cables The emergency transfer switch will be 3 phase, 3-pole, contactor style, with electronic controller, bypass-isolation, generator start signal and load-dump relays 4 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

5 5. FIRE ALARM 5.1. The building will be provided with an addressable single stage fire alarm system with battery charger and standby batteries The main fire alarm control panel will be located in north entrance to the building All fire alarm detection and addressable loop wiring will be class A. All output device wiring will be Class B Horns will be provided throughout the building with combination horn-strobes used where a strobe is required Visual strobes will be installed in public corridors and in floor areas where public may congregate in Group A occupancy Visual strobes will also be utilized in areas of high ambient noise including all mechanical rooms and as required by code Primary means of detection will be via manual pull stations and the sprinkler system. Smoke and heat detectors will be provided where required by Ontario Building Code The fire alarm will monitor the following systems: Standby emergency generators (Trouble/running) If applicable 5.9. All magnetic locks will be release upon activation of the evacuation signal on the fire alarm Duct-type smoke detectors will be supplied in air handling systems that serve more than one storey or fire separation. Air handling equipment will be designed to shut down upon activation of its dedicated duct detector or the fire alarm system The sprinkler system will be electrically supervised via flow switches and supervised valves All computer room areas with raised floor will be fitted with a suitable double-interlocked pre-action sprinkler system with cross-zoned smoke detection both above and below the raised floor An elevator recall system is being provided. The floor of egress is the ground floor. Smoke detection will be provided on all floors The complete fire alarm system will be tested and verified as per the requirements of the Ontario Building Code and CAN-ULC-S536 Inspection and Testing for Fire Alarm Systems. 5 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

6 6. LIGHTING 6.1. High efficiency luminaires will be provided as per the recommendations of the IES Lighting will be designed to OBC and as per LEED requirements 6.3. Primary interior lighting will be provided by recessed fluorescent fixtures equipped with 2-T8 lamps and K12 acrylic prismatic lenses. Lamps will be 32 watt complete with matching dimmable energy electronic ballasts Laboratory areas shall be illuminated with recessed fluorescent fixtures equipped with 3- T8 lamps aligned with the laboratory benches. Fixtures shall be enclosed and gasketted with a prismatic lens and stainless steel housing and UL listed for wet locations. All lighting fixtures shall be sealed at perimeter and all penetrations. The fixtures will be controlled with local switches Average Light Level Table Area Offices & Building Support Enclosed Private Lobbies, Lounges and reception areas Conference / Meeting Rooms Corridors & Circulations Secondary Corridors Locker Washrooms Storage (small items) Storage (large items) Mechanical / Electrical Rooms Telecommunications/Server Rooms Computer Labs Average Maintained Lux as per IES standards 300 [500 w/ task lights] 300 [500 w/ task lights] Laboratory Labs Equipment Corridors 500 [700 w/ task lights] The Lobby and public circulation area luminaries will suit architectural elements Washrooms will be finished and contain recessed mounted luminaries and decorative or architectural cove lighting appropriate for its environment Shower area luminaires are to be compact fluorescent down lights with lenses, suitable for wet environments. 6 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

7 6.9. Service rooms will be lit with chain hung, direct parabolic fluorescent luminaries with wire guards Stairwells will be illuminated by fluorescent light fixtures equipped with T8 lamps Emergency lighting will be provided to meet building code and will be provided in electrical and mechanical services rooms. Battery packs will be installed in LAN rooms, main electrical rooms and main mechanical rooms Emergency lighting will be provided by the essential power distribution system throughout Exterior lighting: Walkway lighting will be mounted on 12 foot poles and similar to Kim Lighting SET Entablature series Exit doors will be similar to Gardco lighting, mini sconce or super sconce Canopy lighting will be similar to Gardco semi flush canopy fixture 220/221 series Bollards and other landscape lighting may be introduced Exit lights will be energy efficient LED type Lamps shall be TCLP compliant with a minimum CRI of 85 and from one manufacturer: GE, Philips or Osram Sylvania. Ballasts shall be electronic and manufactured by General Electric, Advance, Magnatek or Osram Sylvania Decorative lighting will be provided for any art work on display or architectural features. 7. LIGHTING CONTROL 7.1. A low voltage lighting control system will be provided for the facility, including LV switches, occupancy sensors, photo sensors and time-clocks In areas with natural lighting, luminaires will be controlled by daylight sensors to make maximum use of natural light Mechanical and electrical room lighting shall be controlled by standard wall switches. Other service rooms that do not house electrical or mechanical equipment shall have PIR motion sensor lighting control Washrooms, storage rooms, office areas will be provided with ceiling or wall mounted occupancy sensors utilizing dual infrared/ultrasonic sensing technology and will not be affected by the master switches Exterior lighting shall be automatically controlled capable of turning off exterior lighting when sufficient daylight is available or when the lighting is not required during night time hours Motion sensor to be PIR, Ultrasonic or a combination sensor with a capability to add slaves. These will be optional wall mounted in small rooms and ceiling mounted in all other areas Daylight sensors to switch fixtures. 7 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

8 8. GROUNDING SYSTEM 8.1. An AC grounding system will be provided in the main electrical room. All transformer neutrals will be connected to the grounding bar and a common cable connected back to the system ground Grounding will be provided following IEEE 1100 and Electrical Safety Code Section 10 standards Separated communication ground will be provided off of the main building ground system Ground all elevators and equipment in the elevator pits. 9. SERVER FARM 9.1. Electrical distribution system will be designed to tier two as defined by The Uptime Institute with the capacity of being expanded in the future to tier three The server farm is estimated to have approximately 10 to 15 server racks. Each server rack is estimated to have a load of 4kW Raised floor will be grounded as per the Ontario Electrical Safety Code An equipment grounding bar will be provided under the raised floor on two sides of the room Fire alarm for this room will be a double interlock sprinkler system and the smoke detectors will be cross zoned as mentioned under the fire alarm section in this document. A dedicated zone on the fire alarm panel will be allowed for this room Air conditioning units will only be shut down upon activation of its dedicated duct detector or smoke detectors within room Parabolic fluorescent fixtures equipped with 2-T8 lamps and a wire guard will be hung using rods and will provide an average light level of 350lux Emergency lights connected to the emergency system and will be of the same type as mentioned above. 10. GREEN ATRIUM Day light harvesting will be provided throughout the Green Atrium Decorative lighting will be provided in the Green Atrium for any art work on display or architectural features Recessed floor mounted receptacle and data boxes will be supplied in all seating areas Task lights will be provided in seating areas. 8 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

9 11. ETHANOL/REAGENT (SAMPLE STORAGE) This room will be designed in accordance to section 18 and 20 of the Ontario Electrical Safety Code Light fixtures will be explosion proof All conduits will be explosion proof. 12. BUILDING LINK This link will connect the existing Biodiversity building to the new Genomics building. The link will be considered part of the new Genomics building The link would be approximately 140 square meters The link will be illuminated to an average of 50lux Convenience receptacles will be supplied. 13. EMI CONSIDERATIONS All wiring will be in conduit. All major normal power feeds will be in totally enclosed metal bus duct Routing of power cables and bus duct will be selected to minimize the effect of magnetic fields on other equipment Single conductor Teck or armoured cable will be avoided. 14. COMMUNICATIONS Rough in conduit and junction box system will be provided for the communication system by the Electrical Contractor. All wiring, devices and installation will be provided by others Communications room for telephone/internet/catv will be provided in the basement along with a 3m x 3m room on each floor Typical distribution for buildings: Sleeves in walls to serve floor Cable tray will be provided to circle the floor ¾ drops from cable tray to a double gang box A ground bar and grounding riser system will be provided in each communication room. 15. SECURITY SYSTEM Rough in conduit and junction box system will be provided for the security system by the Electrical Contractor. All electronic devices and installation will be provided by others. 9 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

10 15.2. All security devices will be connected as per the security consultant s drawings. Infrastructures will be installed by electrical contractor to support this Doors contacts, electric strikes and security cameras will be roughed in by the electrical division as directed by the Owner Include an allowance for security devices such as CCTV system and Door Access Control System. 16. CO-ORDINATION OF MECHANICAL AND ELECTRICAL AND OTHERS All starters, fire alarm shutdown, pressurization control, smoke evacuate control, motor control centres, and power wiring shall be by the electrical division except for units with starters as part of a package or for VFDs All power wiring shall be by the Electrical contractor including power wiring from variable speed drives to motors. VFDs to be mounted on or near the equipment and VFD cable will be run from the VFD drive to the motor with no disconnect between them All control wiring and controls shall be by Mechanical contractor. 15A, 120V, 1 phase breakers will be provided in electrical panels on each floor for the controls contractor to extend the circuits to the equipment All fire alarm wiring shall be by Electrical contractor. 17. LIGHTNING PROTECTION Lightning protection will be designed and installed in accordance to CAN/CSA-B72; Installation Code for Lightning Protection Systems Intercepting conductor shall be installed on the entire roof perimeter at the highest part of the roof and as close to the edge as possible but never more than 0.5m from the edge of the roof Air terminals to be located within 0.5m of the outside corner of the roof spaced on intervals not exceeding 8m around the perimeter An intercepting conductor connected at both ends and at least every 50m shall be installed within the perimeter so that no point on the roof is more than 5m away from a conductor Every stack, and other objects located on the roof susceptible to strikes will have air terminals Conductor cables will interconnect air terminals and offer a multiple path to ground. Down lead conductors will be placed every 30m around the perimeter of the building (but never less than two), run down exterior columns, and terminate in a ground rod system in the lowest level of the building. Metal objects with in 6 feet of conductor cable will be grounded Perimeter ground loop with 3m ground rods every 6m will be installed around the foundation of the building. The lightning ground grid will be connected to the main building electrical ground grid at a minimum of 2 locations. 10 OF 10 DECEMBER 7, E 001 UOFG GENOMICS DESIGN BRIEF.REV3.DOC

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval. Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 P.S. 64 (OLD 71) - MANHATTAN, 600 EAST 6 STREET, MANHATTAN, NY, 10009

NYC Department of Education Building Condition Assessment Survey 2014-2015 P.S. 64 (OLD 71) - MANHATTAN, 600 EAST 6 STREET, MANHATTAN, NY, 10009 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 P.S. 64 (OLD 7) - MANHATTAN, 600 EAST 6 STREET, MANHATTAN, NY, 0009 Time In Last Edited 095 ELECTRICAL 205-0-6 08:45AM

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

Fire Alarm System Plans Review Checklist Property location Date of Review

Fire Alarm System Plans Review Checklist Property location Date of Review Fire Alarm System Plans Review Checklist Property location Date of Review 1. Is application completed in entirety? 2. Are the plans review fee submitted with the application? 3. Does floor plan include

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:

More information

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 105.8a-6.1 TITLE: FIRE ALARM SYSTEM REQUIREMENTS SCOPE: This guideline

More information

PLAN REVIEW GUIDE FOR FIRE ALARM

PLAN REVIEW GUIDE FOR FIRE ALARM PLAN REVIEW GUIDE FOR FIRE ALARM PROJECT NAME: PERMIT # PROJECT ADDRESS: CONTACT PERSON: PHONE Fire alarm system installation information shall be provided on the appropriate architectural and electrical

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum

More information

Lighting Management solutions

Lighting Management solutions Lighting Management solutions Best practice guide for office buildings PUTTING A STOP TO ENERGY WASTE INTRODUCTION Table of contents 1 Lighting control Best Practice Guide for Office Buildings 2 Guide

More information

Tech Report 2: Electrical System Existing Conditions

Tech Report 2: Electrical System Existing Conditions , Tech Report 2: Electrical System Existing Conditions Oct 12, 2013 Yucheng Lu Lighting/Electrical AE Faculty Consultant: Dr. Shawn Good Executive Summary This report is a summary of my study about the

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 2014-12-12 08:48AM 2014-12-17 10:39AM. Description Mechanical Room Basement

NYC Department of Education Building Condition Assessment Survey 2014-2015 2014-12-12 08:48AM 2014-12-17 10:39AM. Description Mechanical Room Basement School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 P.S. 86 - BRONX, 2756 RESERVOIR AVENUE, BRONX, NY, 0468 Time In Last Edited 0677 ELECTRICAL 204-2-2 08:48AM 204-2-7 0:39AM

More information

HERNANDO COUNTY FIRE ALARM GUIDELINES

HERNANDO COUNTY FIRE ALARM GUIDELINES HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 2015-02-10 08:37AM 2015-02-23 08:14AM. Description

NYC Department of Education Building Condition Assessment Survey 2014-2015 2015-02-10 08:37AM 2015-02-23 08:14AM. Description School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 P.S. 83 - MANHATTAN, 49 EAST 66 STREET, MANHATTAN, NY, 002 Time In Last Edited 352 ELECTRICAL 205-02-0 08:37AM 205-02-23

More information

Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while

More information

FIRE DETECTION AND ALARM

FIRE DETECTION AND ALARM Scope Provide a fire alarm system, or expand the existing system, as required by Code, the requirements in the Special Instructions to Designers (SID) of the Design Guidelines, and/or as noted in the Program

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

University Design Standard. Fire Alarm Systems

University Design Standard. Fire Alarm Systems University Design Standard Fire Alarm Systems 1.0 Overview This document provides Virginia Tech s standards for the design and installation of fire alarm systems and equipment in new construction, retrofit

More information

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS PROPERTY ADDRESS (BRT Address Required) TESTING CONTRACTOR (Name and Address) License No. ANNUAL

More information

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems Fire Alarm System Plans Submittal Guidelines For New and Existing Systems SCOPE The Temecula Fire Prevention Bureau (TFPB) has established the following requirements for the submittal of all fire alarms,

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Design and Construction Design Phase Deliverables

Design and Construction Design Phase Deliverables Design and Construction Design Phase Deliverables Notes: 1. The Architect or Engineer of record shall submit this document along with the deliverables for the project at the end of each design phase for

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Engineers Edge, LLC PDH & Professional Training

Engineers Edge, LLC PDH & Professional Training 510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Communication

More information

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems 1.0 Purpose A. The following guideline provides the minimum standards and requirements for fire alarm systems. 2.0

More information

50 St Mary Axe London EC3

50 St Mary Axe London EC3 50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series

More information

DTW Works Master Specification Version 2006

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section 13852 Multiplex Fire Alarm System Page 1 of 10 PART 1 GENERAL 1.1 RELATED WORK.1 Section 01330 Submittal Procedures..2 Section 01780 Closeout Procedures..3 Section 01810 Commissioning..4

More information

1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri.

1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri. GENERAL: 1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri. 2. Fire alarm systems are Life Safety Systems

More information

FIRE-FIGHTING DESIGN BRIEF REPORT

FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

CFAA NCR CHAPTER ANNUAL SENINAR. Commonly Overlooked Fire Alarm Requirements

CFAA NCR CHAPTER ANNUAL SENINAR. Commonly Overlooked Fire Alarm Requirements CFAA NCR CHAPTER ANNUAL SENINAR Commonly Overlooked Fire Alarm Requirements Introduction of Who I Am And My Experience (aka: only legitimate chance to catch a quick nap) Definitions ( if you nap during

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 2/12 Fire Chief Wes Rhodes Fire Marshal Paul Smith EFD-FMO 3-2 2009 International Fire & Building Code as Amended NFPA Standards Adopted

More information

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS CHAPTER 93 MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS Note: Chapter 93 is entirely Seattle amendments to the International Fire Code and is not underlined. Point of Information The requirements of this

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING

SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING 10A NCAC 13D.3401 HEATING AND AIR CONDITIONING Heating and cooling systems shall meet the American Society of Heating, Refrigerating, and Air Conditioning

More information

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager FIRE RATED WIRING What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager INTRODUCTION OBC requirements for emergency power OBC requirements for emergency power for fire alarm systems and other building

More information

Data Center Due Diligence List

Data Center Due Diligence List Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West

More information

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee FDA Building One R. Andy Pahwa Faculty Advisor: Jim Freihaut/Dustin Eplee Project Background Building One Project Background Originally the headquarters of the Naval Surface Warfare Center Project Background

More information

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

10 ELECTRICAL ENGINEERING

10 ELECTRICAL ENGINEERING Conventional Facilities Chapter 10: Electrical Engineering 10-1 10 ELECTRICAL ENGINEERING 10.1 Design Criteria 10.1.1 Codes and Standards The latest edition of the codes, standards, orders, and guides

More information

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14 City of Mercer Island Development Services Group Fire Code Review and Inspection 9611 SE 36 th Street Mercer Island, WA 98040-3732 PHONE (206) 275-7605 FAX (206) 275-7726 www.mercergov.org Commercial Fire

More information

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011 Office of the Fire Marshal 1.0 PERMITS FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011 1.1 To acquire an installation

More information

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively

More information

SECTION 16721 FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND SMOKE DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fire Alarm Control Panels B. Manual Fire Alarm Stations C. Automatic Smoke D. Fire Alarm Notification Appliances E. Auxiliary Fire Alarm Equipment

More information

City of Columbus Department of Building and Zoning Services

City of Columbus Department of Building and Zoning Services City of Columbus Department of Building and Zoning Services Introduction This manual is designed to provide you, the contractor, owner or design professional with a step-by-step guide to our process, beginning

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA

More information

Appendix G. Security management plan

Appendix G. Security management plan Appendix G Security management plan Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter

More information

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor

More information

IRRIGATION PUMPING Table of Contents - Section 900

IRRIGATION PUMPING Table of Contents - Section 900 IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS

More information

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

Top Commercial / Residential Electrical Requirements *

Top Commercial / Residential Electrical Requirements * Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial

More information

FIRE ALARM SYSTEM CHECKLIST For Addressable Systems PRIOR TO INSPECTION

FIRE ALARM SYSTEM CHECKLIST For Addressable Systems PRIOR TO INSPECTION Building Name/Location: Installing Company: Observation By: Date: Time: 1 Building Occupants, Authorities and Alarm Monitoring Co Have Been Notified 2 FACP Manufacturer and Panel is Approved for NCSU Campus

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

SECTION 16853 ZONED (DC LOOP) FIREALARM SYSTEM

SECTION 16853 ZONED (DC LOOP) FIREALARM SYSTEM SECTION 16853 ZONED (DC LOOP) FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

Fire Alarm System Monitoring - CAN/ULC-S561-03

Fire Alarm System Monitoring - CAN/ULC-S561-03 Fire Alarm System Monitoring - CAN/ULC-S561-03 Brian McBain ULC Regulatory Services May 4, 2011 Copyright 1995-2007 Underwriters' Laboratories of Canada. All rights reserved. No portion of this material

More information

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.

More information

A1.5 Classroom Standards

A1.5 Classroom Standards A1.5 Classroom Standards Note: The following standards have been developed and adopted by KU's Instructional and Mediated Spaces Committee (IMSAC), which includes representatives from DCM, Instructional

More information

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier

More information

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION PERMITS AND INSPECTIONS FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT LOCATION Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011, Updated March 2012 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,

More information

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION Phone System Owner Phone System Engineered by: of Record Drawings: of System Manuals: of Test Reports: System Installer 1. GENERAL INFORMATION Phone Delaware License No: Certificate Holder No. System Supplier

More information

Original Document 10/16/07 Revised 01/30/09 2 nd Revision 01-23-12 3 rd Revision- 12/18/14

Original Document 10/16/07 Revised 01/30/09 2 nd Revision 01-23-12 3 rd Revision- 12/18/14 North Collier Fire Control & Rescue District Greater Naples Fire Rescue District Immokalee Fire Control & Rescue District 2800 North Horseshoe Drive Naples, Florida 34104 SYSTEM REHABILITATION PLAN CHECKLIST

More information

Electrical Code Regulation

Electrical Code Regulation Electrical Code Regulation St. Clair County has adopted the 2005 National Electrical Code in its entirety for the unincorporated areas of the county and all communities that have contracted with the county

More information

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Submit shop drawings for equipment provided under this section Shop drawings shall indicate: Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,

More information

Electrical Service Guidelines

Electrical Service Guidelines Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4

More information

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire. The Fire Installers Mate. A guide to fire alarm systems design Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects

More information

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007 Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007 FIRE ALARM SYSTEMS POLICY TELLURIDE FIRE PROTECTION DISTRICT TABLE OF CONTENTS FIRE ALARM PROTECTION POLICY PLAN REVIEW SUBMITTAL

More information

High Bay Occupancy Sensor Selection Guide

High Bay Occupancy Sensor Selection Guide High Bay Occupancy Sensor Selection Guide Make the most of your energy SM 1 2 Schneider Electric offers a vast array of lighting control sensors for HID and Fluorescent High Bay applications. HID High

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEM

SECTION 16721 FIRE ALARM AND DETECTION SYSTEM SECTION 16721 FIRE ALARM AND DETECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

2007 ICC FINAL ACTION AGENDA

2007 ICC FINAL ACTION AGENDA 907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal

More information

Design Standards Fire Alarm Systems Division 13860 (1995 CMS); 283100 (2004 CMS) Amended Feb 2015

Design Standards Fire Alarm Systems Division 13860 (1995 CMS); 283100 (2004 CMS) Amended Feb 2015 Design Standards Fire Alarm Systems Division 13860 (1995 CMS); 283100 (2004 CMS) Amended Feb 2015 13860 (283100) FIRE ALARM SYSTEM The following standard shall be followed for the design of University

More information

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included

More information

BASIC NEC CODE RULES AND DESIGN PRACTICE

BASIC NEC CODE RULES AND DESIGN PRACTICE BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

City of Bettendorf Fire Alarm System Requirements

City of Bettendorf Fire Alarm System Requirements City of Bettendorf Fire Alarm System Requirements Section 907 of the 2009 Edition of the International Fire Code (IFC) and Section 10-7-3 of the Municipal Code provide fire alarm requirements. IFC Section

More information

Sustainable Office Design (SOD) is different than existing programs STEP 1: STEP 2: STEP 3: STEP 4:

Sustainable Office Design (SOD) is different than existing programs STEP 1: STEP 2: STEP 3: STEP 4: A NGuide a t i o n a l for G r i d Applicants a n d E v e r s o uand r c e Lighting Practitioners V4-20150202 Sustainable Office Design (SOD) is different than existing programs The new SOD Lighting Initiative

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Exhibit C Design Review Guidelines

Exhibit C Design Review Guidelines Exhibit C Design Review Guidelines January 2015 Included in this Exhibit for Design Guidelines includes: Electrical Design Guidelines Electrical and Mechanical /Plumbing Construction Requirements Temporary

More information

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or comments regarding the

More information