1 November 2013 St Vincent s Catholic Ashfield Ten-year maintenance plan Final report Prepared by: ADN Managing Consultants Pty Ltd PO Box 6186 West Gosford NSW 2250 Ph Fax

2 Table of Contents 1. Executive Summary Summary of Findings Forecast Budget Conclusion Introduction Background Terms and Definitions Survey assumptions Methodology Survey Results Summary s to be maintained Maintenance Standards Corrective Maintenance Chapel Forward plan and budget Recommendations Appendix A 2013/14 Works Appendix B Detailed Report Appendix C Maintenance standards Category A - Exceptional Category B - High Category C - Standard Category D - Minimal Category E - Mothball

3 1. Executive Summary St Vincent s commissioned ADN Managing Consultants Pty Ltd to develop a maintenance plan for St Vincent s and Properties located at Ashfield. The primary objective of the maintenance plan was to: Develop a maintenance plan, which is related to a set of maintenance standards that can be used for maintaining the facilities to the requirements of the management of the for the next ten years. 1.1 Summary of Findings Risk Description Repair to lighting control missing switch hall Glazing repairs to hall Repair to ceiling hall level 1 Repair to hall window steel lintels Repair to roof Repair to roof Chimney Office Agree on maintenance responsibilities Cardinal Freeman retirement Chapel 1.2 Forecast Budget The indicative forecast cost to maintain the facilities up to an acceptable standard for the next 10 years is: Forecast expenditure for the next 5 years $ 355,092 For the remaining 5 years $ 263,625 Total for the 10 years $ 618,717 3

4 1.3 Conclusion The information in this report will provide the base case for the management to assess the relative economic benefits of each strategic option for future management of these facilities. Generally the internal of the is in reasonable condition as there was a major upgrade internally in There are some items internally that require work now which include minor painting repairs, installation of access ramp from the side entry of the to the Nave. Work has been carried out to the Chapel area but it was noted that there currently is water penetration through the ceiling to the Sacristy area. The Working Sacristy has an odour of dampness and requires investigation and the option of mechanical ventilation. To the external of the there appears to be stormwater issues to the down pipes and repairs are required to some down pipes as well. There is a tree located to the rear of the that is in a garden bed that has cracked and it is suggested that the garden bed be moved away from the and repair carried out as required. The render surface of the and block work requires work and there appears to be cracking to some areas. It is suggested the first step is to have a heritage architect review the building and look at options for repairs. The entry stair to the front of the church is in poor condition visually and repairs to the stairs should be included with the external upgrade. Please note no estimates have been included in this report for the repairs to the external block work, roof or render of the this should be included following a heritage architect review. The is in reasonable condition but there is a major issue with the roof which has resulted in water damage to a number of ceilings throughout level one of the. Internally there are signs of cracking to walls in the lower kitchen that should be repaired and monitored. It was also noted that the switch to the lighting control is missing and requires replacing. Externally there are some minor repairs required to eaves and painting of doors should be planned. The side entry door to the side room to the toward the rear of the building has water damage and needs repair. Externally to the there is movement to the lintels over the windows that appear to be from corrosion which is resulting in affecting the render around the window frames. The office is in good condition there are some minor issues that require work now such as inspection of flashing to the chimneys. A check to the rear of the building where there are signs of water to the brick wall, this may be due to the tap located to the wall. To the rear of the site there is a need to install a fence for security reasons the option of auto gate should be considered. The Cardinal Freeman retirement home is a privately operated site that has a Chapel that is used by the parish for services, Areas to the Chapel require maintenance now which include the Reconciliation room s Sacristy area and to the Sacristy area. 4

5 There is no defining agreement between the operator and the regarding the areas that are the responsibility of the and the operator. The agreement not only needs to cover maintenance but the intended condition that the Chapel will be maintained to. 5

6 2. Introduction This is a maintenance plan for St Vincent s Catholic at Ashfield. The objectives of the maintenance plan are to provide a summary of the following: Condition of existing property identified against maintenance standards Extent of work necessary and the funding to maintain the property to the maintenance standards identified by the over the next 10 years 3. Background This is situated on Bland St, Ashfield which is a suburb of the inner Western suburbs of Sydney; there are approximately 1500 parishioners that attend this. The 1st site consists of 3 buildings of which all where surveyed; these buildings included the, and. The second site at the Cardinal Freeman retirement home is used for services but has limited responsibility for the. The operation is generally 7 days a week for services. The parish office is operated 5 days a week from 8.00 am to 5.30 pm and currently has 2 staff member. 6

7 4. Terms and Definitions Generally The conduct of a survey of this nature requires a clear definition between what is maintenance expenditure and what is capital expenditure. This is to ensure the resulting economic decisions are based on the costs to maintain the current facilities, versus the costs to bring those same facilities up to an acceptable standard. The objective of maintenance funding is to ensure the asset remains fit for purpose for the duration of their useful life. Maintenance is not to substantially extend the life of the asset, achieve new functional requirements or standards. The objective of capital funding, on the other hand, is to deliver increased service potential through the acquisition of physical assets or to modify an existing asset in a way that increases its life expectancy or the scope of service it delivers. The asset management implications are that maintenance expenditure is expensed in the year it occurs, however, capital expenditure is not expensed and is shown as an increase in the value of the assets. Therefore, maintenance funds do not demonstrate in the accounts of the organisation any gain in asset value, whereas capital funds show a direct link to increased asset values. The site survey and the data collected have been based on the following terms and definitions. Maintenance an activity or program of activities that will ensure an asset remains functional in accord with its design use and achieves its economic life expectancy. Capital Works an activity or program of activities that will enhance the function of an asset, create/acquire a new asset or materially extend the life of an asset beyond its original designed life. Maintenance standards the standard to which an asset is to be maintained for a defined period of time and is related to the use and long term plans of the organisation. Routine maintenance minor maintenance works that generally occur on a per annum basis and is further defined as either preventive or repair maintenance. Preventive maintenance regular planned maintenance activities that occurs each year, i.e. fire protection, exit lighting, etc 7

8 Repair Maintenance unplanned maintenance activities that are budgeted for on a per annum basis. Corrective maintenance unplanned maintenance activities that are not budgeted for., i.e. broken locks, blocked toilets, etc Major periodic maintenance maintenance that occurs outside a pa cycle and can be planned on a regular basis or on a condition assessment. Major Periodic maintenance is further defined as either cyclic or replacement maintenance. Cyclic maintenance maintenance which occurs on a planned cycle other than pa, i.e. 10 year cyclic repaint 5. Survey assumptions In order to provide a base point from which to conduct the survey a number of assumptions have been taken. Future works the survey has taken account only of the impacts of future works that are planned and funded or most likely to proceed Basis of estimating costs all cost estimates are based on a commercial cost to undertake the works. All rates are based on Rawlinsons Cost handbook and commercial labour rates for the trades involved. Basis of life cycle assessments estimated times for replacements of assets and cyclic maintenance are based on data provided by NSW Public Works and accepted industry best practice. 8

9 6. Methodology The following methodology was used to undertake the survey. Step 1 s to be maintained Step 2 Maintenance Standards Step 3 Condition Assessment Step 4 Work Program Step 5 Forward Budget No Step Content Stage 1 - Planning 1 s to be List the assets covered in the survey maintained 2 Maintenance standards Stage 2 Survey 3 Condition assessment Define the maintenance standards each asset or component is to be maintained at and the forward impacts, i.e. capital works, etc Undertake a condition assessment of the assets in line with the standards and impacts 4 Works data Enter the results of the condition assessment in the database Stage 3 - Report 5 Forward plan and budget Develop the forward works plan and long term budgets over 10 years 7. Survey Results Summary The following is a summary of the survey results for the draft survey. 7.1 s to be maintained The following assets are included in the survey of the St Vincent s Catholic Ashfield and resulting long-term plan. No Chapel 4 9

10 7.2 Maintenance Standards The application of maintenance standards to each facility is the most crucial step in the survey methodology. A set of pre-developed maintenance performance standards was used to define the extent of maintenance to be undertaken at each facility. The standards are: A Highest B High C Standard (default) D Minimal E Mothball A full description can be found at Appendix C In order to establish a consistent policy of application a series of generic area descriptions were developed that cover the functions undertaken at the. The generic areas were: Code Name Description Maintenance standard OM Office Admin Management Administration Principles office B OG Office Admin General Administration area support staff B FO Foyer Entry area waiting rooms B OS Staff Amenities Canteen, Change rooms, Lunch Rooms, etc B AC Accommodation General living areas C Cl Classrooms General learning areas C CC Classrooms Craft Craftwork painting, pottery C CH Includes all areas of the B CA Canteen Canteens eating areas etc B KI Kitchen Cooking food preparation B ST Store Areas General storage D TO Toilet Areas WC, urinals, wash basin, showers, finishers B Plant rooms, pump sheds, Maint Switch PR Plant rooms boards C RO Roads Entry Roads C LS Landscape soft Gardens, irrigation, C LH Landscape hard Outside furniture C FE Fencing Gates C IS Infrastructure & Services Irrigation, fencing, power, hydraulics B IN Inner Grounds Foot paths, pavements, carpark C 10

11 7.3 Corrective Maintenance The following is a summary of the recommended works to bring the facilities up to and maintain at the Standards identified by the Management. Detailed works data sheets can be found at appendix B Condition Poor Fair Average Good Very Good Summary of Works Required Internal / External Minor paint repairs External inspection and report Down pipe repairs 11

12 Investigate - down pipes maybe blocked Repairs to down pipes required 12

13 Survey of the external condition of finishes is required Trim trees away from building 13

14 Replace garden bed located to rear of Secure earth strap rear of building 14

15 General repairs to eaves Replace damaged vent grills 15

16 Fix trip hazard school side of building Repair side entry door to Working Sacristy 16

17 Repair to paint finishes is required to some areas Investigate odour to Sacristy and replace vinyl 17

18 Replace damaged stain glass window Sacristy Install easy access ramp from side entry to Nave 18

19 Install hand rail to access ramp to Sacristy Investigate water penetration issues to Chapel 19

20 Servicing and sealing of seating Mould to walls confessionals areas 20

21 Cracked tiles outside of Sacristy Service all taps 21

22 All drains require cleaning as part of a maintenance program All concrete surfaces require servicing to reduce trip hazard 22

23 Repair, service and paint entry steps 23

24 7.3.2 Condition Poor Fair Average Good Very Good Summary of Works Required Internal / External Repair roof External repairs to window lintel Ceiling repair to level 1 Service windows and repair glazing 24

25 Repair to damaged glazing Service all windows as required 25

26 Repair to ceilings water damage in number of areas 26

27 Repair to ceilings water damage in number of areas 27

28 Look at the option of installing restriction to all classroom windows Remove items from fire cabinet 28

29 Install non slip to stair treads Repair to doors side entry to hall 29

30 Cracking to walls kitchen area Planned resealing of timber floor should be considered 30

31 Replace missing light switch control hall Repairs to eaves external 31

32 Ongoing cleaning of gutters required External painting of doors should be planned 32

33 Install spikes to reduce bird nesting Repairs to external rendered walls 33

34 Resecure vent stack Check all window lintels for corrosion 34

35 Check all window lintels for corrosion Carry out repairs to cracking render to windows 35

36 Inspect repair to door entry lintel 36

37 7.3.3 Condition Poor Fair Average Good Very Good Summary of Works Required Internal / External Minor repairs to roof flashings Installation of rear fencing 37

38 Trim trees away from building Remove garden and install fence with entry gate 38

39 Service all exit lights Planned update of kitchen is required 39

40 Seal splash back tiles to bench Planned update of stove 40

41 Check all chimney stacks Minor repair to fire place - office 4 41

42 Investigate damp wall rear of property Repair replace sub floor entry doors 42

43 Check all roof flashings 43

44 7.3.4 Chapel Condition Poor Fair Average Good Very Good Summary of Works Required Internal / External Repairs to art work There is a need to document who is responsible for maintenance Investigate water damage to ceiling Sacristy 44

45 Repairs to sacristy area Repairs required to art work 45

46 There is a need to document who is responsible for maintenance to this Chapel over the next 25 years Complete smoke detector installation - Sacristy 46

47 Repairs to access point to ceiling Sacristy Investigate water damage to ceiling - Sacristy 47

48 Investigate water damage to ceiling entry area to Sacristy General painting to Sacristy areas 48

49 Water damage entry to Sacristy Investigate water damage to ceiling - Reconciliation Room 49

50 Replace missing and old window coverings - Reconciliation Room Repairs to window frame - Reconciliation Room 50

51 7.4 Forward plan and budget The following 10-year forecast budget is a draft only. Budget Forecast Corrective Maintenance & Cyclic Maintenance Maintenance Years Maintenance Funding Program 2014/ / / / / / / / / /24 Routine Maintenance Corrective $81,250 Major Periodic Maintenance Cyclic $11,404 $55,795 $26,851 $79,792 $900 $38,613 $95,312 $28,800 Routine Maintenance Preventative $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 Routine Maintenance Repair Works $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 Total $112,654 $75,795 $46,851 $20,000 $99,792 $20,900 $58,613 $115,312 $20,000 $48,800 Budget Forecast Corrective Maintenance & Cyclic Maintenance Maintenance Funding Maintenance Program Years 2014/ / / / / / / / / /24 Routine Maintenance Corrective $10,900 Major Periodic Maintenance Cyclic $8,404 $22,431 $1,419 $2,500 $900 $20,613 $51,712 Total $19,304 $22,431 $1,419 $2,500 $900 $20,613 $51,712 51

52 Budget Forecast Corrective Maintenance & Cyclic Maintenance Maintenance Years Maintenance Funding Program 2014/ / / / / / / / / /24 Routine Maintenance Corrective $42,550 Major Periodic Maintenance Cyclic $150 $30,080 $2,040 $34,240 $18,000 $38,300 $28,500 Total $42,700 $30,080 $2,040 $34,240 $18,000 $38,300 $28,500 Budget Forecast Corrective Maintenance & Cyclic Maintenance Maintenance Funding Maintenance Program Years 2014/ / / / / / / / / /24 Routine Maintenance Corrective $7,000 Major Periodic Maintenance Cyclic $1,500 $3,284 $10,990 $31,264 $5,300 $300 Total $8,500 $3,284 $10,990 $31,264 $5,300 $300 Budget Forecast Corrective Maintenance & Cyclic Maintenance - Chapel Maintenance Funding Maintenance Program Years 2014/ / / / / / / / / /24 Routine Maintenance Corrective $20,800 $20,800 Major Periodic Maintenance Cyclic $1,350 $12,402 $11,788 $25,540 Total $22,150 $12,402 $11,788 $46,340 52

53 The following graph outlines the levels of expenditure for the next 10-year period. 53

54 8. Recommendations The following recommendations are made for both short and long term strategies for St Vincent s Catholic. Short Term All priority work should be carried out as soon as possible. These jobs include OH&S issues as well as asset preservation work, which if not repaired may affect the operation of the and compromise standards identified to maintain the. A maintenance program for the site is required to maintain the buildings and grounds to the appropriate standard identified by the and all records to be maintained for future reference. All corrective work identified be part of the next financial year budget and a quarantined budget to be used for such work in the future. Contracts There is a need to develop maintenance agreements with suppliers to maintain all statutory services such as exit and emergency lights and extinguishers. A review of this work needs to be carried out by the to ensure statutory compliance and compliance with the standards is met. Long term The long-term recommendations are. Maintenance funding Major review of the maintenance plan, and update of the forecasts for works and budgets as part of the yearly budget setting program. It is recommended that this work be managed across the financial year electronically so where funding requirements may change the opportunity for reallocation of priorities can be met. 54

55 9. Appendix A 2014/15 Works Facility Name Location Job Description Job Type Start Year Job Cost Priority Description Chapel Entry Sacristy Investigate and repair water penetration Corrective 2014/15 $1,500 Chapel Nave Repairs required to sanctuary structure Corrective 2014/15 $13,000 Chapel Nave Repairs required to artwork over sanctuary area Corrective 2014/15 $2,000 Chapel Reconciliation Room General repairs required throughout Corrective 2014/15 $500 Chapel Reconciliation Room Investigate and repair water damage Corrective 2014/15 $1,500 Chapel Reconciliation Room Remove window coverings, replace with similar quality and colour. Cyclic 2014/15 $1,350 Chapel Sacristy Repair manhole cover frame as required Corrective 2014/15 $300 Chapel Sacristy Reinstall smoke detector power supply as required Corrective 2014/15 $200 OH & S Statutory Chapel Working Sacristy Investigate and repair water penetration Corrective 2014/15 $1,500 Chapel Working Sacristy Reinstall power to smoke detectors as required Corrective 2014/15 $300 OH & S Statutory Chapel Investigate and repair water penetration Corrective 2014/15 $1,500 Choir Loft Investigate and repair water penetration Corrective 2014/15 $1,500 Choir Loft Repairs required to organ timber structure Corrective 2014/15 $500 External Investigate for and clear gutters of blockage as required Corrective 2014/15 $1,500 External Prepare and paint door, repair as required Cyclic 2014/15 $1,500 External Upgrade external lighting, end of life cycle Cyclic 2014/15 $1,200 External Trim trees away from building as required Corrective 2014/15 $100 External Reattach earth strap as required Corrective 2014/15 $100 OH & S Statutory External Upgrade entry steps, end of life cycle Cyclic 2014/15 $5,000 Nave Install ramp to side entry as required Corrective 2014/15 $2,000 OH & S Statutory Reconciliation Room Prepare all painted Cyclic 2014/15 $704 Reconciliation Room Investigate and repair water penetration Corrective 2014/15 $1,500 55

56 Facility Name Location Job Description Job Type Working Sacristy Working Sacristy Working Sacristy Entry Room - Level 1 External External External Prepare wall painted Repairs required to stain glass window Investigate and repair damp over door to room Repair ceiling as required Repair arch bar to rear window, investigate on all other windows Repairs required to fascias Replace clamps to vent stacks as required Start Year Job Cost Corrective 2014/15 $200 Corrective 2014/15 $500 Corrective 2014/15 $1,500 Corrective 2014/15 $3,000 Corrective 2014/15 $5,000 Corrective 2014/15 $500 Corrective 2014/15 $200 Front Entry Minor repairs required Corrective 2014/15 $200 Front Entry Kitchen Music Room - Level 1 Music Room - Level 1 Music Room - Level 1 Music Room - Level 1 Roof Side Room Side Room Small Classroom - Level 1 Stairwell 1 Stairwell 2 Back Room Back Room Upgrade lighting, end of life cycle Repair control light panel as required Service exit lights to Australian standards Repair cracking to wall as required Replace glazing, end of life cycle Service all windows and repair as required Minor repairs required to bi fold doors Investigate and repair water penetration in ceiling Investigate replacement of roof Service all windows and repair as required Replace side door and above frame as required Investigate and repair water penetration in ceiling Investigate and repair water penetration Install non slip surface to stairs as required Remove window coverings, replace with similar quality and colour. Service exit lights to Australian standards Cyclic 2014/15 $150 Corrective 2014/15 $100 Corrective 2014/15 $500 Corrective 2014/15 $450 Corrective 2014/15 $300 Corrective 2014/15 $500 Corrective 2014/15 $100 Corrective 2014/15 $1,500 Corrective 2014/15 $20,000 Corrective 2014/15 $200 Corrective 2014/15 $2,500 Corrective 2014/15 $3,000 Corrective 2014/15 $1,500 Corrective 2014/15 $3,000 Cyclic 2014/15 $1,500 Corrective 2014/15 $300 Priority Description OH & S Statutory High Risk OH & S Statutory High Risk High Risk OH & S Statutory OH & S Statutory 56

57 Facility Name Location Job Description Job Type Start Year Job Cost Priority Description Grounds Trim trees away from buildings as required Corrective 2014/15 $300 Grounds Repair rear garden bed as required Corrective 2014/15 $600 Grounds Install fence and sliding gate to rear boundary - 15m Corrective 2014/15 $4,000 Kitchen Repair kitchen, reseal splashback as required Corrective 2014/15 $300 Room 2 - Office Investigate and repair water penetration to fire place Corrective 2014/15 $1,500 Routine Preventative Maintenance Budget Preventative 2014/15 $5,000 High Risk Routine Repair Maintenance Budget Repair 2014/15 $15,000 $112,654 57

58 10. Appendix B Detailed Report Facility Name Location Job Description Job Type Start Year Job Cost Priority Description Chapel Entry Sacristy Investigate and repair water penetration Corrective 2014/15 $1,500 Chapel Nave Repairs required to sanctuary structure Corrective 2014/15 $13,000 Chapel Nave Repairs required to artwork over sanctuary area Corrective 2014/15 $2,000 Chapel Reconciliation Room General repairs required throughout Corrective 2014/15 $500 Chapel Reconciliation Room Investigate and repair water damage Corrective 2014/15 $1,500 Chapel Reconciliation Room Remove window coverings, replace with similar quality and colour. Cyclic 2014/15 $1,350 Chapel Sacristy Repair manhole cover frame as required Corrective 2014/15 $300 Chapel Sacristy Reinstall smoke detector power supply as required Corrective 2014/15 $200 OH & S Statutory Chapel Working Sacristy Investigate and repair water penetration Corrective 2014/15 $1,500 Chapel Working Sacristy Reinstall power to smoke detectors as required Corrective 2014/15 $300 OH & S Statutory Chapel Investigate and repair water penetration Corrective 2014/15 $1,500 Choir Loft Investigate and repair water penetration Corrective 2014/15 $1,500 Choir Loft Repairs required to organ timber structure Corrective 2014/15 $500 External Investigate for and clear gutters of blockage as required Corrective 2014/15 $1,500 External Prepare and paint door, repair as required Cyclic 2014/15 $1,500 External Upgrade external lighting, end of life cycle Cyclic 2014/15 $1,200 External Trim trees away from building as required Corrective 2014/15 $100 External Reattach earth strap as required Corrective 2014/15 $100 OH & S Statutory External Upgrade entry steps, end of life cycle Cyclic 2014/15 $5,000 Nave Install ramp to side entry as required Corrective 2014/15 $2,000 OH & S Statutory Reconciliation Room Prepare all painted Cyclic 2014/15 $704 Reconciliation Room Investigate and repair water penetration Corrective 2014/15 $1,500 58

59 Facility Name Location Job Description Job Type Working Sacristy Working Sacristy Working Sacristy Entry Room - Level 1 External External External Prepare wall painted Repairs required to stain glass window Investigate and repair damp over door to room Repair ceiling as required Repair arch bar to rear window, investigate on all other windows Repairs required to fascias Replace clamps to vent stacks as required Start Year Job Cost Corrective 2014/15 $200 Corrective 2014/15 $500 Corrective 2014/15 $1,500 Corrective 2014/15 $3,000 Corrective 2014/15 $5,000 Corrective 2014/15 $500 Corrective 2014/15 $200 Front Entry Minor repairs required Corrective 2014/15 $200 Front Entry Kitchen Music Room - Level 1 Music Room - Level 1 Music Room - Level 1 Music Room - Level 1 Roof Side Room Side Room Small Classroom - Level 1 Stairwell 1 Stairwell 2 Back Room Back Room Upgrade lighting, end of life cycle Repair control light panel as required Service exit lights to Australian standards Repair cracking to wall as required Replace glazing, end of life cycle Service all windows and repair as required Minor repairs required to bi fold doors Investigate and repair water penetration in ceiling Investigate replacement of roof Service all windows and repair as required Replace side door and above frame as required Investigate and repair water penetration in ceiling Investigate and repair water penetration Install non slip surface to stairs as required Remove window coverings, replace with similar quality and colour. Service exit lights to Australian standards Cyclic 2014/15 $150 Corrective 2014/15 $100 Corrective 2014/15 $500 Corrective 2014/15 $450 Corrective 2014/15 $300 Corrective 2014/15 $500 Corrective 2014/15 $100 Corrective 2014/15 $1,500 Corrective 2014/15 $20,000 Corrective 2014/15 $200 Corrective 2014/15 $2,500 Corrective 2014/15 $3,000 Corrective 2014/15 $1,500 Corrective 2014/15 $3,000 Cyclic 2014/15 $1,500 Corrective 2014/15 $300 Priority Description OH & S Statutory High Risk OH & S Statutory High Risk High Risk OH & S Statutory OH & S Statutory 59

60 Facility Name Location Job Description Job Type Grounds Grounds Grounds Kitchen Room 2 - Office Choir Loft Entry External External Nave Sacristy Working Sacristy External External Stairwell Entry Room 1 - Main Office Room 2 - Office Room 3 - Meeting Room Room 3 - Meeting Room Trim trees away from buildings as required Repair rear garden bed as required Install fence and sliding gate to rear boundary - 15m Repair kitchen, reseal splashback as required Investigate and repair water penetration to fire place Routine Preventative Maintenance Budget Routine Repair Maintenance Budget Prepare all church seating, repair and paint as required. Prepare all painted Service and maintain extra seating area Prepare all painted window surfaces, repair and Repair paint finishes as required Prepare all painted Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Prepare and paint external painted surfaces, repair as required Prepare and paint external door, repair as required Prepare and paint floor surface with non slip paint, repair as required Prepare all painted Prepare all painted Prepare timber floor, reseal as required. Prepare all painted Routine Repair Maintenance Budget Start Year Job Cost Corrective 2014/15 $300 Corrective 2014/15 $600 Corrective 2014/15 $4,000 Corrective 2014/15 $300 Corrective 2014/15 $1,500 Preventative 2014/15 $5,000 Repair 2014/15 $15,000 Cyclic 2015/16 $10,000 Cyclic 2015/16 $1,419 Cyclic 2015/16 $500 Cyclic 2015/16 $3,000 Cyclic 2015/16 $3,000 Cyclic 2015/16 $2,112 Cyclic 2015/16 $2,400 Cyclic 2015/16 $28,000 Cyclic 2015/16 $1,600 Cyclic 2015/16 $480 Cyclic 2015/16 $814 Cyclic 2015/16 $814 Cyclic 2015/16 $600 Cyclic 2015/16 $1,056 Repair 2015/16 $15,000 Priority Description High Risk 60

61 Facility Name Chapel Chapel Chapel Chapel Chapel Chapel Chapel Chapel Location Job Description Job Type Entry Sacristy Entry Sacristy Sacristy Sacristy Working Sacristy Working Sacristy Working Sacristy Working Sacristy Toilet Working Sacristy Side Room Back Room way Kitchen Kitchen Archives Records Room Room 4 - Office Room 5 - Store Store Room Routine Preventative Maintenance Budget Prepare all painted Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Prepare all painted Prepare timber floor, reseal as required. Remove window coverings, replace with similar quality and colour. Replace cupboards and sink, end of life cycle Prepare all painted Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Prepare all painted Prepare all painted Prepare timber floor, reseal as required. Prepare ceiling painted Prepare all painted Upgrade kitchen, end of life cycle Upgrade stove, end of life cycle Prepare all painted Prepare all painted Prepare all painted Prepare all painted Prepare ceiling painted Start Year Job Cost Preventative 2015/16 $5,000 Cyclic 2016/17 $1,034 Cyclic 2016/17 $1,000 Cyclic 2016/17 $1,034 Cyclic 2016/17 $560 Cyclic 2016/17 $450 Cyclic 2016/17 $5,000 Cyclic 2016/17 $924 Cyclic 2016/17 $2,400 Cyclic 2016/17 $495 Cyclic 2016/17 $924 Cyclic 2016/17 $2,040 Cyclic 2016/17 $231 Cyclic 2016/17 $1,755 Cyclic 2016/17 $5,000 Cyclic 2016/17 $1,500 Cyclic 2016/17 $396 Cyclic 2016/17 $446 Cyclic 2016/17 $814 Cyclic 2016/17 $633 Cyclic 2016/17 $83 Priority Description High Risk 61

62 Facility Name Chapel Chapel Chapel Toilet Nave Location Job Description Job Type Reconciliation Room Reconciliation Room Nave Reconciliation Room Toilet Anti Room Art Room - Level 1 Disable Toilet Entry Room - Level 1 Front Entry Front Entry Kitchen Music Room - Level 1 Side Room Prepare ceiling painted Routine Repair Maintenance Budget Routine Preventative Maintenance Budget Routine Preventative Maintenance Budget Routine Repair Maintenance Budget Upgrade sound system, end of life cycle Prepare timber floor, reseal as required. Prepare all painted Upgrade window air conditioning, end of life cycle Replace window air conditioning, end of life cycle Upgrade hydraulics, end of life cycle Prepare all painted Prepare all painted Prepare ceiling painted Prepare all painted Prepare all painted Prepare timber floor, reseal as required. Prepare all painted Prepare timber floor, reseal as required. Prepare all painted Prepare all painted Prepare all painted Start Year Job Cost Cyclic 2016/17 $132 Repair 2016/17 $15,000 Preventative 2016/17 $5,000 Preventative 2017/18 $5,000 Repair 2017/18 $15,000 Cyclic 2018/19 $10,000 Cyclic 2018/19 $600 Cyclic 2018/19 $1,188 Cyclic 2018/19 $500 Cyclic 2018/19 $500 Cyclic 2018/19 $1,500 Cyclic 2018/19 $484 Cyclic 2018/19 $2,376 Cyclic 2018/19 $99 Cyclic 2018/19 $1,749 Cyclic 2018/19 $495 Cyclic 2018/19 $180 Cyclic 2018/19 $5,280 Cyclic 2018/19 $4,320 Cyclic 2018/19 $1,760 Cyclic 2018/19 $3,828 Cyclic 2018/19 $4,158 Priority Description High Risk High Risk 62

63 Facility Name Location Job Description Job Type Small Classroom - Level 1 Stairwell 1 Stairwell 1 Stairwell 2 Toilets - Level 1 Back Room External Grounds way Kitchen Archives Records Room Room 1 - Main Office Room 1 - Main Office Room 2 - Office Room 2 - Office Room 3 - Meeting Room Room 4 - Office Prepare all painted Remove carpet, replace with similar quality and colour, dispose of removed carpet. Prepare all painted Prepare all painted Include handrails Prepare all painted Remove carpet, replace with similar quality and colour, dispose of removed carpet. Prepare all external painted surfaces, repair and Prepare and paint boundary fence Remove carpet, replace with similar quality and colour, dispose of removed carpet. Prepare all painted Remove carpet, replace with similar quality and colour, dispose of removed carpet. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Remove window coverings, replace with similar quality and colour. Prepare timber floor, reseal as required. Remove window coverings, replace with similar quality and colour. Remove window coverings, replace with similar quality and colour. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Start Year Job Cost Cyclic 2018/19 $1,320 Cyclic 2018/19 $4,000 Cyclic 2018/19 $1,716 Cyclic 2018/19 $1,584 Cyclic 2018/19 $891 Cyclic 2018/19 $7,000 Cyclic 2018/19 $5,000 Cyclic 2018/19 $300 Cyclic 2018/19 $4,250 Cyclic 2018/19 $814 Cyclic 2018/19 $600 Cyclic 2018/19 $750 Cyclic 2018/19 $2,000 Cyclic 2018/19 $600 Cyclic 2018/19 $400 Cyclic 2018/19 $600 Cyclic 2018/19 $600 Cyclic 2018/19 $2,000 Priority Description 63

64 Facility Name Location Job Description Job Type Room 4 - Office Room 5 - Store Store Room Entry Choir Loft Nave Nave Music Room - Level 1 Chapel Chapel Nave Nave Art Room - Level 1 Art Room - Level 1 Art Room - Level 1 Remove window coverings, replace with similar quality and colour. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Routine Preventative Maintenance Budget Routine Repair Maintenance Budget Prepare timber floor, reseal as required. Routine Repair Maintenance Budget Routine Preventative Maintenance Budget Remove carpet, replace with similar quality and colour, dispose of removed carpet. Prepare all painted Repair paint finishes as required Remove carpet, replace with similar quality and colour, dispose of removed carpet. Routine Preventative Maintenance Budget Routine Repair Maintenance Budget Prepare all painted Prepare timber floor, reseal as required. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Prepare timber floor, reseal as required. Remove window coverings, replace with similar quality and colour. Upgrade lighting, end of life cycle Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Start Year Job Cost Cyclic 2018/19 $600 Cyclic 2018/19 $5,000 Cyclic 2018/19 $750 Preventative 2018/19 $5,000 Repair 2018/19 $15,000 Cyclic 2019/20 $900 Repair 2019/20 $15,000 Preventative 2019/20 $5,000 Cyclic 2020/21 $9,000 Cyclic 2020/21 $8,613 Cyclic 2020/21 $3,000 Cyclic 2020/21 $18,000 Preventative 2020/21 $5,000 Repair 2020/21 $15,000 Cyclic 2021/22 $1,452 Cyclic 2021/22 $960 Cyclic 2021/22 $48,100 Cyclic 2021/22 $1,200 Cyclic 2021/22 $2,700 Cyclic 2021/22 $700 Cyclic 2021/22 $9,000 Priority Description High Risk High Risk High Risk 64

65 Facility Name Location Job Description Job Type Music Room - Level 1 Music Room - Level 1 Music Room - Level 1 Side Room Side Room Side Room Small Classroom - Level 1 Small Classroom - Level 1 Stairwell 1 Stairwell 2 General Kitchen Toilet Anti Room Art Room - Level 1 Entry Room - Level 1 Upgrade lighting, end of life cycle Upgrade fans, end of life cycle Remove window coverings, replace with similar quality and colour. Upgrade lighting, end of life cycle Upgrade fans, end of life cycle Upgrade lighting, end of life cycle Upgrade fans, end of life cycle Upgrade lighting, end of life cycle Remove carpet, replace with similar quality and colour, dispose of removed carpet. Remove window coverings, replace with similar quality and colour. Remove carpet, replace with similar quality and colour, dispose of removed carpet. Upgrade stairwell lighting, end of life cycle Upgrade lighting, end of life cycle Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Upgrade hydraulics, end of life cycle Routine Preventative Maintenance Budget Routine Repair Maintenance Budget Routine Repair Maintenance Budget Routine Preventative Maintenance Budget Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Replace benches, end of life cycle Remove vinyl, replace with similar quality and colour, dispose of removed vinyl. Start Year Job Cost Cyclic 2021/22 $1,800 Cyclic 2021/22 $2,400 Cyclic 2021/22 $3,600 Cyclic 2021/22 $2,450 Cyclic 2021/22 $900 Cyclic 2021/22 $750 Cyclic 2021/22 $300 Cyclic 2021/22 $1,200 Cyclic 2021/22 $4,200 Cyclic 2021/22 $1,800 Cyclic 2021/22 $5,600 Cyclic 2021/22 $900 Cyclic 2021/22 $300 Cyclic 2021/22 $2,000 Cyclic 2021/22 $3,000 Preventative 2021/22 $5,000 Repair 2021/22 $15,000 Repair 2022/23 $15,000 Preventative 2022/23 $5,000 Cyclic 2023/24 $800 Cyclic 2023/24 $10,000 Cyclic 2023/24 $6,300 Priority Description High Risk High Risk 65

66 Facility Name Location Job Description Job Type External Side Room Back Room Upgrade external lighting, end of life cycle Replace stage curtains, end of life cycle Resurface timber work benches Upgrade lighting, end of life cycle Routine Repair Maintenance Budget Routine Preventative Maintenance Budget Start Year Job Cost Cyclic 2023/24 $1,800 Cyclic 2023/24 $6,600 Cyclic 2023/24 $3,000 Cyclic 2023/24 $300 Repair 2023/24 $15,000 Preventative 2023/24 $5,000 $618,717 Priority Description High Risk 66

67 11. Appendix C Maintenance standards Introduction These standards define a desired condition of facilities with respect to visual appearance, functionality, economic performance and legal compliance. They are outcome oriented and do not themselves dictate maintenance or cleaning tasks or budgets. Maintenance and cleaning standards influence planning, and establish quality and presentation levels which maintenance and cleaning service providers are required to achieve. The standards are defined at five levels, each referring to a category that may be allocated to individual facilities or parts of a facility. The five levels are: Category A B C D E Standard Exceptional High Standard Minimal Mothball Areas or facilities may be allotted various categories at different points of their life cycle. As examples, the standard of some facilities may be raised by one level for the period of a special event or function, or reduced for a time prior to sale or demolition. Aims and usage Maintenance and cleaning standards are aimed at avoiding confusion and uncertainty about the overall level of condition to which a facility or part of a facility is to be maintained. The standards enable the development of maintenance and cleaning policies and practices to be negotiated and agreed between landlord and tenant, or owner and service provider. They can then be used to: set the type and frequency of cyclic maintenance and inspections define acceptable threshold levels of performance and presentation fix acceptable standards of workmanship, appearance and cleanliness establish acceptable response times for the correction of faults or for cleaning after special events or emergencies define performance criteria for maintenance or cleaning contracts. The following pages describe the characteristics of each category. 67

68 11.1 Category A - Exceptional Characteristics: In such areas the requirement is to preserve the facility in "as new" condition continuously and indefinitely, and to correct unacceptable conditions swiftly and unobtrusively. Examples: Prestige areas with symbolic significance or with critically important functional needs. Examples include Parliament Houses (public areas, the chambers, and ministerial accommodation), hospital operating theatres, prestige golf courses, overseas embassies, and the public areas of galleries, museums and other similar institutions. Industrial process plants where failures incur high cost or safety penalties (such as aluminium smelters or sewage pumping stations) also fit this category, although in such cases the "as new" criteria for visual appearance may be relaxed. Performance Criteria: Visual appearance As new, or highest quality reasonably achievable. Function Legal All elements must function as intended at all times, with no down time tolerated during periods of intended use. All legal responsibilities must be met. Financial Financial and economic criteria are not primary considerations in planning maintenance programs for buildings of this type. Maximum efficiency of maintenance and cleaning operations is required, to minimise expenditure in achieving the desired outcomes. Planning implications: A very high proportion of maintenance and cleaning in such areas must be undertaken on a pre-planned, regular basis. Inspections, maintenance tasks and cleaning operations must be scheduled outside normal working hours or when the facility is not in use, although cleaning staff must be on hand at all times for the regular and unobtrusive cleaning of items such as ash trays, rubbish containers, and areas subject to finger marking such as counter tops. A rapid response capability must be available to respond to any failures which occur when the facility is in use, and on a round the clock basis if required. All essential spares must be kept in inventory or readily available at short notice elsewhere. Planned redundancy or duplication of items may be appropriate. Comprehensive and regular inspections are carried out frequently and all existing or incipient defects rectified promptly. 68

69 Facilities in this category typically contain unusual special purpose finishes, structures and plant materials (marble cladding, tiling, integral sculptures, special paints, timbers or transplanted mature plant material) and may have to comply with heritage or other conservation criteria. Maintenance work orders must be fully detailed and include all necessary work practices and materials. Full reference manuals and instructions must be kept available for ready reference Category B - High Characteristics: In such areas the requirement is to preserve the facility in good condition both visually and functionally, and to respond promptly in the event of failures. Examples: Areas with public significance or commercial importance including reception areas and foyers of premises occupied by large organisations, board rooms, executive offices, hotels above three star, banking chambers, some retail stores such as jewellers and the fashion areas of department stores. Some industrial facilities also fit this category where cost or safety penalties may be incurred, with the visual appearance criteria relaxed. Performance Criteria: Visual appearance Minor signs of deterioration when viewed closely may be acceptable. No deterioration when viewed from normal distance. Some deterioration may be tolerated for short periods of time. Function Legal Financial All elements must function as intended during periods of intended use, with a low probability of failure. All responsibilities should be met. The primary aim in this category is to maximise the long term economic performance of the facility. Refurbishments, equipment replacements and maintenance planning should be in a strategic framework, and decisions taken on a lifecycle basis. 69

70 Planning implications: A high proportion of maintenance should be undertaken on a cyclic basis, in order to reduce failures and maintain an adequate level of functionality and appearance. Cleaning, inspections and maintenance tasks should be planned in conjunction with the user to minimise disruption, but some interruptions to service can be tolerated. Arrangements may have to be made for the regular cleaning of such items as ash trays, rubbish containers and counter tops at regular intervals to maintain satisfactory standards of presentation. A call out capability must be available when the facility is in use, in order to respond to failures reported by users. Unusual items should be kept in inventory, but some delays and certain substitutions may be acceptable. Inspections should be carried out regularly and defects rectified as soon as possible Category C - Standard Characteristics: This standard is the "default" standard which should apply if no special conditions are present. It is aimed at preserving essential functionality, complying with statutory health, safety and environmental obligations, and rectifying faults before consequential damage incurs additional cost. In such cases the requirement is to preserve the operational capacity of the facility as much as possible. This standard does not in itself require close attention to physical appearance except in so far as it is desirable in order to meet the other criteria. Examples: This standard applies to most areas which are in use for public or private purposes and to which no special conditions apply. Examples include administrative office accommodation for business organisations or Government, the operational areas of manufacturing operations, most areas of universities, s and gaols, and the non - public sections of transport terminals. Performance Criteria: Visual appearance In this category physical appearance is not the major consideration and some minor signs of deterioration when viewed from normal distance are acceptable. Function All required elements should function as intended during periods of intended use. Minor failures, excluding those which bring a threat to safety or security, can be tolerated. 70

71 Legal Financial All requirements with respect to health, safety and the environment must be met. Other responsibilities should be achieved to the maximum extent feasible. The primary aim in this category is to maximise the long term economic performance of the facility. Refurbishments, equipment replacements and maintenance planning should be in a strategic framework, and decisions taken on a lifecycle basis. Planning implications: Some maintenance is undertaken on a cyclic basis, in order to reduce failures and maintain an adequate level of functionality. Cleaning, inspections and maintenance tasks should be planned in conjunction with the user to minimise disruption, but interruptions to service are acceptable. A call out capability should be available in order to respond to emergency failures reported by users Category D - Minimal Characteristics: This standard applies to facilities which have a limited life or are in use on an interim basis. It can also be used for facilities that provide a basic utility function only and visual appearance and amenity are not critical. Maintenance is aimed at minimising current operational costs whilst continuing to preserve essential functionality for operational purposes and complying with statutory obligations to the maximum extent possible. The standard is normally applied where the expected remaining life of the facility is less than five years or where use is expected to meet basic operational needs only. Examples: This standard applies to facilities which are approaching the end of their life and for which vacation or disposal is planned, or areas that are rarely used. Examples might include buildings in an easement for a planned freeway, a bulk store, a which is planned to be closed or replaced, or a commercial office building approaching refurbishment. Performance Criteria: Visual appearance Some signs of deterioration are acceptable. Function Legal All required elements should function as intended during periods of intended use. Minor failures will be tolerated except for security. Legal responsibilities with respect to health, safety and the environment should be met. 71

72 Financial Limitation of short term maintenance costs is the primary objective. Planning implications: Most maintenance in such areas is reactive, and planned to retain functionality for a limited period only. Cyclic maintenance is confined to specialist areas such as the maintenance of lifts and grass cutting, and at the minimum required to retain safety and compliance with regulations. Regular cleaning is undertaken Category E - Mothball Characteristics: This standard applies to facilities which have been closed or vacated, and are not in current use. Maintenance is aimed at maintaining safety and security, protecting against vandalism or other damage, and limiting any cost penalties. Cleaning only takes place to ensure essential hygiene and safety. Performance Criteria: Visual appearance Not important. Function Legal Financial No requirement to retain any functional performance except to avoid degradation of asset value. Only essential responsibilities with respect to safety and the environment should be met. In this category the limitation of maintenance costs in the short term is the primary objective. Planning implications: Maintenance in such areas is confined to regular patrols and inspections, with only essential works undertaken such as the control of proclaimed noxious weeds or the removal of safety or fire hazards. Disclaimer This inspection report has been prepared by representatives of A.D.N. Managing Consultants Pty Ltd on behalf of St Vincent s Catholic Ashfield as limited by the client s brief. 72

THE VOID LETTABLE STANDARD

THE VOID LETTABLE STANDARD THE VOID LETTABLE STANDARD North West Leicestershire District Council is responsible for allocating empty Council owned homes. The Lettable standard has been agreed in consultation with the tenants of

More information

Preparing a maintenance plan

Preparing a maintenance plan The maintenance series Information sheet 1.1 Preparing a maintenance plan Introduction The regular expenditure of a small amount of maintenance funds is much better for a building, and more cost effective,

More information

How to report a repair

How to report a repair How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,

More information

Repair Responsibilities A Guide for Sadeh Lok Residents

Repair Responsibilities A Guide for Sadeh Lok Residents Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority

More information

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /

More information

C, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home

C, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

PLEASE REFER TO YOUR INDIVIDUAL QUOTE STANDARD INCLUSIONS AND EXCLUSIONS SECONDARY DWELLING 16/04/2014 PLEASE REFER TO YOUR INDIVIDUAL QUOTE Inclusions Super Structure: Timber Frames including Roof Trussing and Framing, Internal and External

More information

Defining who is responsible for items and areas in a Strata Scheme

Defining who is responsible for items and areas in a Strata Scheme www.lpi.nsw.gov.au No: 2011/07 Date: October 2011 Defining who is responsible for items and areas in a Strata Scheme Land and Property Information, a division of the Department of Finance and Services

More information

Sample Maintenance Plan

Sample Maintenance Plan Sample Maintenance Plan The of facilities is about: Resource management Providing a safe environment for students and staff Creating a physical environment that is conducive to learning. Accountabilities:

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Restaurant & café guide

Restaurant & café guide 'Helping our customers stay in business by reducing risk' NZI Risk Solutions TM About NZI Risk Solutions NZI has extensive experience in providing expert risk management advice to help our commercial customers

More information

Repairs and looking after your home

Repairs and looking after your home A guide to Repairs and looking after your home Contents Page No. Introduction 1 Information for tenants 2 Information for homeowners 3-4 Information for onsite NHS workers 5 Information for students 5

More information

Restaurant and Café Risk Management Guide. Don t Risk It!

Restaurant and Café Risk Management Guide. Don t Risk It! property & liability Restaurant and Café Risk Management Guide Don t Risk It! About Lumley Insurance Lumley Insurance has extensive experience in restaurant insurance and risk management. This experience

More information

London Borough of Redbridge

London Borough of Redbridge London Borough of Redbridge Private Rented Sector Scheme www.redbridge.gov.uk 1 London Borough Of Redbridge Private Rented Sector (PRS) Scheme Redbridge Council is aiming to increase its work within the

More information

Our repairs and maintenance service

Our repairs and maintenance service Your repairs Being a GHA tenant gives you special rights when it comes to getting things fixed. This is called your Right to Repair. Here you ll find all you need to know about that, and much more. If

More information

Repairs and maintenance

Repairs and maintenance Repairs and maintenance Customer focused, quality driven Repairs and maintenance Repairs and maintenance of your home is a joint responsibility between you as our tenant and us as your landlord. We are

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

Compensation Policy. When we have failed to carry out emergency or urgent repairs

Compensation Policy. When we have failed to carry out emergency or urgent repairs Compensation Policy Hexagon aims to give good standards of service in housing and care, but occasionally things do go wrong. If a tenant makes a complaint, we will investigate and put the matter right

More information

Arts Revitalisation Projects and the Planning System. January 2010 Guideline

Arts Revitalisation Projects and the Planning System. January 2010 Guideline Arts Revitalisation Projects and the Planning System January 2010 Guideline Photography credits: courtesy http://www.flickr.com/groups/renewnewcastle/ Arts Revitalisation Projects and the Planning System

More information

L&Q new home warranty L&Q new. home warranty

L&Q new home warranty L&Q new. home warranty L&Q new home warranty L&Q new Peace of mind in your new home home warranty Peace of mind in your new home Running in your new home You may not be aware that new homes have a running in period. One of the

More information

MAC-ENC-PRG-004 EDINGLASSIE AND ROUS LENCH HERITAGE MANAGEMENT PROGRAM

MAC-ENC-PRG-004 EDINGLASSIE AND ROUS LENCH HERITAGE MANAGEMENT PROGRAM EDINGLASSIE AND ROUS LENCH HERITAGE MANAGEMENT PROGRAM Document Owner Luke Stevens, Document Approver Rob Hayes, Environment and Community Manager Version Date Details No. Published 1.0 15/08/12 Draft

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Repairs and maintenance

Repairs and maintenance Repairs and maintenance TO YOUR HOME HOUSING at the heart of the community Contents Your responsibilities Reporting a repair Other useful contacts Out-of-hours emergency service The repair process How

More information

INVENTORY AND HOME CONDITION REPORT. Keys

INVENTORY AND HOME CONDITION REPORT. Keys Landlord / Agent Details INVENTORY AND HOME CONDITION REPORT Tenant Details * Please ensure you take a clipboard with you * Name Address Contact details Name/s Address Contact details inspection Date of

More information

Service Level Agreement/Specification

Service Level Agreement/Specification Service Level Agreement/Specification For Maintenance and Associated Risk Management Services at New College Campus and Associated properties May 2007 INDEX 1. SCOPE 2. MAINTENANCE SERVICE LEVELS a. Staffing

More information

Repairs: who s responsible?

Repairs: who s responsible? Your responsibilities as a tenant in a sheltered scheme Condensation Condensation Damage Damage caused by you Domestic appliances We will repair domestic appliances if they have been provided by us Keys

More information

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

TENANT AND LANDLORD REPAIR RESPONSIBILITIES TENANT AND LANDLORD REPAIR RESPONSIBILITIES REPAIR LANDLORD TENANT Notifying Repairs Any alteration or improvement you have carried out to the property Permission required Water damage caused by push-on

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION JOB REFERENCE: SCHEDULE OF CONDITION Islington, London. N1 XXX FOR Miss X Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: Islington, London. N1 XXX CONTENTS SCHEDULE OF CONDITION Elevations

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

PRE-PURCHASE INSPECTION REPORT

PRE-PURCHASE INSPECTION REPORT PRE-PURCHASE INSPECTION REPORT PREPARED FOR: PROPERTY ADDRESS: Waiheke Island DATE: 21 November 2012 Page 1 of 13 (a) This is a report of a visual only, non-invasive inspection of the areas of the building

More information

Address of food business: 17-27 Orford Place, Norwich, NR1 3QA Date of Inspection: 25 September 2014 Date of revisit: 8 th April 2015

Address of food business: 17-27 Orford Place, Norwich, NR1 3QA Date of Inspection: 25 September 2014 Date of revisit: 8 th April 2015 Public Protection (food & safety) Food Premises Inspection Report Name of Business: Pizza Hut Address of food business: 17-27 Orford Place, Norwich, NR1 3QA Date of Inspection: 25 September 2014 Date of

More information

LONDON BOROUGH OF ENFIELD EDUCATION DEPARTMENT. Garfield Primary School JOB DESCRIPTION. The Headteacher and School Business Manager

LONDON BOROUGH OF ENFIELD EDUCATION DEPARTMENT. Garfield Primary School JOB DESCRIPTION. The Headteacher and School Business Manager LONDON BOROUGH OF ENFIELD EDUCATION DEPARTMENT Garfield Primary School JOB DESCRIPTION POST: RESPONSIBLE TO: Resident Site Manager The Headteacher and School Business Manager RESPONSIBILITIES A. To be

More information

Orlando Home Inspection Services

Orlando Home Inspection Services PLEASE NOTE: Orlando Home Inspection Services Serving Central Florida since 1999 P O Box 915451, Longwood, Florida, 32791-5451 Phone: (321) 228-2493 Fax: (407) 374-8505 Web: http://www.orlando-home-inspections.com

More information

Minimum Housing and Health Standards

Minimum Housing and Health Standards APPENDIX M.O. 57/2012 Minimum Housing and Health Standards Original version July 20, 1999. Revisions to Part lll, Housing Premises, sections 3 and 4, June 30, 2012 (all revisions are bolded and underlined).

More information

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm Burns Home Services Service Makes the Difference 2620 W Grovers Ave, Phoenix, AZ 85053 Tel: 602-889-6970 Fax: 602-870-4563 Mobile: 602-291-7138 Garryh@burnshomeservices.com SUMMARY REPORT Client: John

More information

Internal Dry Area Finishes for Major Defects & Significant Items

Internal Dry Area Finishes for Major Defects & Significant Items THIS IS THE BODY OF A STANDARD TYPE REPORT WHICH HIGHLITES THE DEFECTS THERE IS ALSO A MAINTENANCE & RECOMMENDATION PROGRAMME WHICH IS NOT SHOWN FOR SECURITY REASONS s & Significant Items Note: in accord

More information

LONDON BOROUGH OF ENFIELD EDUCATION DEPARTMENT ST ANDREW S SOUTHGATE PRIMARY SCHOOL (CE) JOB DESCRIPTION

LONDON BOROUGH OF ENFIELD EDUCATION DEPARTMENT ST ANDREW S SOUTHGATE PRIMARY SCHOOL (CE) JOB DESCRIPTION LONDON BOROUGH OF ENFIELD EDUCATION DEPARTMENT ST ANDREW S SOUTHGATE PRIMARY SCHOOL (CE) JOB DESCRIPTION POST: RESPONSIBLE TO: Site Manager The Headteacher RESPONSIBILITIES A. To be responsible, under

More information

Housing Policy Repairs and Maintenance

Housing Policy Repairs and Maintenance Housing Policy Repairs and Maintenance This policy affects: Tenants X Leaseholders X Other: TMO Tenants X TMO Leaseholders X PFI1 Tenants PFI2 Leaseholders PFI2 Tenants PFI2 Leaseholders Author: Service

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Repair Guide for Tenants

Repair Guide for Tenants Repair Guide for Tenants REPAIR GUIDE FOR TENANTS 2014 1 This leaflet explains what to do if your home needs repair work. It tells you about what work we will carry out through our repairs contractors,

More information

(02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au. STANDARD INCLUSIONS (Residential)

(02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au. STANDARD INCLUSIONS (Residential) (02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au STANDARD INCLUSIONS (Residential) INCLUSIONS PRE-CONSTRUCTION ~ SITE WORKS ~ FOUNDATIONS Plans: Preparation of building plans and specifications

More information

Owner Cleaning and Maintenance Checklist

Owner Cleaning and Maintenance Checklist Owner Cleaning and Maintenance Checklist Whether in between rentals or on a yearly basis, it is important to keep your holiday home in great condition, which is why we have created this list to make it

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION 1. Minimum Standards: This document sets out the minimum standards required in HMOs located within the London Borough

More information

Building façade maintenance

Building façade maintenance Building façade maintenance Legal liability and damage limitation A guide for building owners and occupiers What is a façade? The façade forms the external weatherproof envelope of a building. In modern

More information

Your Services. Repairs

Your Services. Repairs Your Services Repairs Request a repair This leaflet explains the level of service you can expect from us and what you should do if you need to request a repair. You can request a repair in the following

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

Y O U R A N N U A L S E R V I C E C H A R G E E X P L A I N E D

Y O U R A N N U A L S E R V I C E C H A R G E E X P L A I N E D Y O U R E X P L A I N E D 02 Contents What is an annual service charge? 03 How we set up service chargeable accounts 04 Service chargeable items and descriptions 05 Understanding the paperwork 06 Annual

More information

Visual guidelines for student charges

Visual guidelines for student charges Visual guidelines for student charges The following information will be used as guidelines when looking at a re-charge for End of Tenancy and Inspections for all Damage and Deep Cleaning of accommodation.

More information

B-1 Buildings & Service Maintenance

B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

Technical Information Document MAINTENANCE MANAGEMENT SYSTEMS

Technical Information Document MAINTENANCE MANAGEMENT SYSTEMS Technical Information Document MAINTENANCE MANAGEMENT SYSTEMS RPS for INAC TID-AM-01 October 2000 Table of Contents Foreword... 1 MAINTENANCE MANAGEMENT SYSTEMS 2 1.0 Introduction... 2 2.0 Types of Maintenance...

More information

Making changes to your home

Making changes to your home Making changes to your home If you are a tenant living in one of our rented homes, you may be allowed to make some changes or improvements to your home. This guide tells you: what changes you can make

More information

A home owner s guide to rebuilding after a flood

A home owner s guide to rebuilding after a flood A home owner s guide to rebuilding after a flood March 2015 Steps to repair a house after a flood Below are the recommended steps to repair and restore houses after a flood event: ensure initial safety

More information

ACCESS AUDIT OF WESTPORT HOUSE

ACCESS AUDIT OF WESTPORT HOUSE ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance

More information

Advice Series. the maintenance and repair of historic buildings

Advice Series. the maintenance and repair of historic buildings Advice Series the maintenance and repair of historic buildings Jacqui Donnelly - Architectural Conservation Advisor, Department of the Environment, Heritage & Local Government Current publications in the

More information

How To Check For A Deficiency

How To Check For A Deficiency UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The

More information

Statement of Factoring Services

Statement of Factoring Services Statement of Factoring Services Abertay Housing Association Ltd Statement of Factoring Services In accordance with the Property Factors Code of Conduct in terms of the Property Factors (Scotland) Act

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

How to report a repair...4 What will happen when you call?...4 Our Standards...5 What happens when we are closed?...6

How to report a repair...4 What will happen when you call?...4 Our Standards...5 What happens when we are closed?...6 Repairs Contents How to report a repair...4 What will happen when you call?...4 Our Standards...5 What happens when we are closed?...6 What repairs are Newlon responsible for?...6 Improvements...7 Important

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Introduction... 4. Management... 4. Tenancy terms... 4. Applying... 4. Licence agreement... 4. Payment of fees... 4. Insurance... 4. Moving in...

Introduction... 4. Management... 4. Tenancy terms... 4. Applying... 4. Licence agreement... 4. Payment of fees... 4. Insurance... 4. Moving in... Page 1 Contents Introduction... 4 Management... 4 Tenancy terms... 4 Applying... 4 Licence agreement... 4 Payment of fees... 4 Insurance... 4 Moving in... 5 Moving out... 5 Office licence fees... 5 What

More information

Tenant & Leaseholder Compensation Policy

Tenant & Leaseholder Compensation Policy Tenant & Leaseholder Compensation Policy Housing Landlord July 202 Version Control Version 3 Status of Policy Sponsor Author/Reviewer Approved Review Date Draft Mark Gaynor, Corporate Director of Housing

More information

1. Landlord & Tenant Responsibility for Residential Premises

1. Landlord & Tenant Responsibility for Residential Premises Page 1-1 This Policy Guideline is intended to provide a statement of the policy intent of legislation, and has been developed in the context of the common law and the rules of statutory interpretation,

More information

How To Account For Ict Expenditure In A School

How To Account For Ict Expenditure In A School Extract from HMRC Guidance for Local Authorities (LA) and Voluntary Aided (VA) Schools in England Please note this is an extract from the HMRC Guidance. The full Guidance can be found on the VAT pages

More information

Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance

Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance Homeowners Handbook Contents Who is Premier Guarantee? Your Structural Warranty What to look out for in your New Home Running in your New Home DIY and Maintenance Structural Warranty Cover This booklet

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668 Inspection Report Property Address: 123 Dream Home Way Frisco, CO 80443 Prepared for: Inspector: Tim Nixon Tim Nixon Inspection date: 3/28/2014 1 of 9 General Information Property Information Address:

More information

MAINTENANCE MANAGEMENT

MAINTENANCE MANAGEMENT www.thebowquarter.co.uk MAINTENANCE MANAGEMENT Scheduled routine maintenance each year is as follows. Projects classified as exceptional works such as external/internal decorations are excluded, as are

More information

www.denhamconstruction.co.uk

www.denhamconstruction.co.uk www.denhamconstruction.co.uk Denham Electrical & Building Services Ltd is a national company based in Essex. We offer a variety of services from design, installation, servicing and maintenance carried

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Dealing with damp and mould growth

Dealing with damp and mould growth Dealing with damp and mould growth Dampness affects many homes in Britain. There are three main causes of dampness. This guide aims to help you to work out what may be the cause of the damp and how you

More information

Preventative Maintenance

Preventative Maintenance Preventative Maintenance Safety Committee To have a preventative maintenance plan, you should have a Safety Committee. Designate persons involved with day to day operations and grounds control. Use your

More information

Rainwater Goods and Drains. Roofs

Rainwater Goods and Drains. Roofs SPAB Faith in Maintenance SPAB, 37 Spital Square, London E1 6DY. Tel: 0207 456 0913 Email: info@spabfim.org.uk The SPAB is a charitable company limited by guarantee registered in England and Wales. Company

More information

31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG

31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG 31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG 31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG Newton Fallowell are excited to offer for sale this individually designed and unique three/four bedroom

More information

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004 New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004 Two bedroom apartment Two Bathrooms Approx 880 sq ft Stunning Views Sixth Floor Balcony Leisure Facilities Valet Parking

More information

A Guide to Repairs & Maintenance

A Guide to Repairs & Maintenance A Guide to Repairs & Maintenance your local housing provider www.ssha.co.uk V 1.1 Every home in tip-top condition Keeping your home well maintained and in good repair is as important to us as it is to

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive Warranties Time Limits for Reporting Manufacturer s

More information

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request

More information

Building Managers EDGEWOOD COMMUNITY

Building Managers EDGEWOOD COMMUNITY Building Managers Annual Report January 2010 December 2010 EDGEWOOD COMMUNITY Building Manager: Joshua Earl 1 Edgewood Crescent Cabarita NSW 2137 Mobile: 0408 649 554 Telephone: 9743 4800 24/7 Number:

More information

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SITEWORKS FOUNDATIONS & SURFACE BED Site to be cleared and leveled. Builder s rubble to be carted away. As per Engineer s design, with USB green waterproofing.

More information

G. Common Defects in Buildings - Leakage

G. Common Defects in Buildings - Leakage F. Common Defects in Buildings - Structural 32. Recently, some concrete chips have fallen from the ceiling in my kitchen. There are rusty steel bars and the area in question measures about 300 x 400mm.

More information

Georgia Home Inspection Services

Georgia Home Inspection Services Cover Page Property Inspection Report My street, Anytown GA, 30000 Inspection prepared for: John Doe Inspection Date: 7/18/2011 Time: 5pm Age: 25+ Size: >1500 Weather: Clear This ranch style home is in

More information

Windbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart

Windbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart Roof Siding Chimney Doors and Windows Building Maintenance Repair and restoration of interior damage caused by roof leak; repair or replacement of structural supports under the roof decking and sheathing

More information

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor. PROPERTY MANAGEMENT INTRODUCTORY GUIDANCE NOTES FOR THE APPLICATION TO THE APPROVED LIST OF CONTRACTORS CONTRACTORS GUIDANCE NOTES APPLICATION FORM ISSUED BY: PROPERTY MANAGEMENT UNIT WEST YORKSHIRE FIRE

More information

Home Improvement Insurance - UK Landlords

Home Improvement Insurance - UK Landlords COMPENSATION POLICY LEAD OFFICER Bruce Johnson Director of Technical Services Board Approval: January 2011 Next Revieww Date: January 2013 CONTENTS 1.0 Introduction 2.0 Purpose 3.0 Right to Repair 4.0

More information

Exterior Condition Report

Exterior Condition Report Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,

More information

1.1 CHISEL's main activity is providing homes for our tenants to rent.

1.1 CHISEL's main activity is providing homes for our tenants to rent. Maintenance Policies 1. Introduction 1.1 CHISEL's main activity is providing homes for our tenants to rent. 1.2 These homes have been provided with the aid of loans and are the security against which the

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

Common Property Maintenance Code Violations. An illustrated guide

Common Property Maintenance Code Violations. An illustrated guide Common Property Maintenance Code Violations An illustrated guide 1) Lawn and Vegetation Overgrown weeds, grass, or vegetation. Vegetation obstructing sidewalks, driveways, and other right of ways. Improper

More information

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile)

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile) American River Courtyard Charge List Damage Charge Lists LIVING ROOM FURNITURE Replace Repair Coffee Table $164.00 Sectional sofa corner section $457.00 Sectional sofa two seat section $525.00 Sectional