1 University Corporation for Atmospheric Research National Science Foundation Funds Request 1. (NSF USE ONLY) 2. FACILITY NAME & LOCATION 3. PROJECT NAME 4. UCAR TRACKING NUM. NCAR Mesa Lab 15KV FEEDER REPLACEMENT NSF07ML INVESTMENT CATEGORY 6. DATE SUBMITTED New Program Expansion Replace Obsolete Energy Savings Cost Improvement Environmental Other (explanation) 01/31/2007 MM/DD/YYYY 7. TECHNICAL LEAD TELEPHONE 8. UCAR POINT OF CONTACT TELEPHONE 9. (REV. NUM.) & DATE 10. * UCAR PRIORITY 11. David Patterson (303) Jeff Reaves (303) (2) 08/17/ ITEM COST ESTIMATES 12. U/M 10. * UCAR PRIORITY: 25 = CRITICAL 1 = LESS IMPORTANT 13. QUANTITY 14. UNIT COST 15. COST ($000) Planning & Design Costs in 2007 dollars: Amount requested for $89 Construction Costs $981 Allowances: Rocky Soil Conditions & Asbestos Abatement Construction & Allowance Costs in 2008 dollars: Construction & Allowances, Adjusted for Inflation (5%) (+1 Yr) 2009 (+2 Yr) 2010 (+3 Yr) 2011 (+4 Yr) 2012 (+5 Yr) 2013 $114 $1,095 $1,150 $1,208 $1,268 $1,332 $1, DESCRIPTION OF PROPOSED CONSTRUCTION Proposed construction consists of the following: Install a new underground conduit ductbank from the Xcel Energy demarcation point to the Mesa Lab (~1 mile). Install one (1) new 15kV feeder cable in the new ductbank. Demolish one (1) old 15kV feeder cable in the old ductbank. Abandon the old ductbank in place. Replace pole mounted 15kV switches with ground mounted 15kV metalclad switchgear. 17. CURRENT SITUATION The Mesa Lab facility is electrically served by two 15kV feeder lines from Xcel Energy. One feeder, in a conduit ductbank, is 45 years old and the other, direct buried, is 25 years old. Both are past their predicted lifetimes and either or both could fail at any time. If one feeder were to fail, the Mesa would be able to operate on the second, though the second could also fail. It is estimated that a planned replacement of even one feeder could take up to 10 months. If both feeders should fail together, the Mesa Lab could potentially be out of power for several months while at least one new feeder is installed. Pole Mounted Switches: The existing pole mounted switches are hanging from decayed wooden structures. It is feared that if someone were to operate the pole cutout devices the entire crossarms, switches, and 15kV lines could potentially fall on the operator. In the past, Contractors have refused to perform repairs due to the possibility of creating further damage to poles and cables. Consultants recommend replacing the pole mounted equipment with safer ground mounted switching equipment. 18. IMPACT IF NOT PROVIDED There are no immediate impacts the feeders are operational today. Though, if a feeder did fail it would take many months to replace. In those months the second could fail during construction. If both feeders fail, the Mesa would have to be closed until power is restored. Page 1

2 University Corporation for Atmospheric Research National Science Foundation Funds Request 1. (NSF USE ONLY) 2. FACILITY NAME & LOCATION 3. PROJECT NAME 4. UCAR TRACKING NUM. NCAR Mesa Lab 19. ALTERNATIVE SOLUTIONS CONSIDERED 15KV FEEDER REPLACEMENT NSF07ML001 Install new direct buried 15kV feeders rather than install a new ductbank. Reason for rejecting: Rocky soil and shifting soil conditions could damage direct bury cables and direct bury cables have a shorter life expectanncy than cables in conduit. In the longterm, a new ductbank/conduit system will make future feeder replacements cheaper than direct burying cables each time a new one is needed. We also considered trying to "rout out" and reline the old ductbank conduits. Reason for rejecting: It is not a common technology for electrical conduits to be relined plus the existing Orangeburg type conduits contain asbestos. Grinding or routing out asbestos containing conduits would be cost prohibitive. 20. DELIVERABLES AT END OF PROJECT 1. One new underground ductbank with 4 conduits; 1 for the new 15kV feeder, 2 for 15kV spares, and 1 for fiber optic cable in order to monitor both the pump house and new ground mounted switchgear. 2. One set of ground mounted 15kV outdoor switchgear at the Xcel demarcation point to be connected to one existing Xcel Energy 15kV line. Another spare switch will be installed for a future connection to the 2 nd Xcel Energy 15kV line. 3. One new 15kV copper feeder conductor from the Xcel demarcation point (new ground mounted switchgear) to the Mesa Lab main switchgear; completely installed, terminated and tested. 4. Removal of 1 pole and pole switches. The 2 nd pole will remain in place until the 2 nd (direct buried) 15kV feeder is replaced. 21. ADDITIONAL The 2 nd 15kV (direct buried) feeder will not be replaced on this project. Either a planned replacement will occur when funds become available or it will be allowed to fail and then replaced. Either option is acceptable once the new feeder is installed. During this project, the intent is not to disturb the 2 nd feeder in any way, so as not to initiate premature failure. Page 2

3 PROJECT DETAI 1. PROJECT NAME 2. UCAR TRACKING NUM. REPLACE OBSOLETE 15KV POWER FEEDS NSF07ML001 BACKGROUND Electrical power to the Mesa Lab is delivered from Xcel Energy via two 13,200 volt electrical lines (also referred to as 15kV lines). The two electrical feeds begin at the same substation which Xcel calls their NCAR Substation. It is located east southeast of the Mesa Lab at the bottom of the hill near the residential areas. A combination of underground and overhead lines, owned by Xcel Energy, bring power through the residential areas to the east and around to an area north of Mesa Lab, at the bottom of a deep ravine, we refer to as the Pump House area. At this location is where Xcel Energy s responsibility for power feeder care ends and NCAR s begins. As a side note, the Xcel Energy feeders serve NCAR, the NOAA Campus to the north, the NIST campus to the north, and a large section of residential areas to the east. Much of the lines through residential areas are above ground with large trees very near the lines. Several residents do not allow trimming of their trees thus several outages each year can be attributed to wind and snow loads forcing trees against the main power lines feeding the Mesa Lab. At the Xcel Energy demarcation point, NCAR owns two poles and their associated switching equipment. Figure 1 illustrates typically how each appears in relation to the Xcel demarcation point, though the older original pole is not shown in this photo. The original older pole, equipment and cables were installed in 1965 when the building was built (~42 years old). The original work included a concrete ductbank from near the pole up to the Mesa through a series of manholes. Later, when the supercomputing computer room was built, around 1985, the second directburied feeder was installed to the right of the existing ductbank (~22 years old). The spare conduits in the old ductbank were unusable. The existing switching poles are rotted and there is concern that pulling on the pole mounted cutouts may cause the entire crossarm structure to fall. Contractors have been requested to repair the pole equipment but all have advised against it, citing that any work on the equipment could permanently damage the feeder cables and equipment, thus leaving the Mesa with a useless feeder. Both 15kV feeder cables to the Mesa Lab are well past their predicted lives. There is concern that one, or both, electrical feeders could fail anytime in the near future. Work to replace them will likely take several months. Figure 1 Xcel/ NCAR Poles PROPOSED SOLUTION The proposed solutions put forth by UCAR Engineering are conceptual and primarily based on experience and what is known today. The final design solution could be different in concept, cost and schedule. 1. Install a new ductbank over the old ductbank. It will save cost by installing new ductbanks and cables in the same area as the originals. Any digging outside this predug zone will likely result in problems digging through granite rock. (See Figure 2 15kV Route) The old ductbank cannot be used. The ductbank sleeves are Orangeburg conduits and have swelled shut. Orangeburg conduits are asbestos containing material so trying to drill through or rout out the old conduits would be expensive and hazardous. The old ductbank may be deep enough to place a new one directly on top thereby using the existing manholes. The old ductbank would be sealed and abandoned. This scenario can be performed with both feeders hot. During construction the oldest feeder, also the one being built upon, would be turnedoff for safety. The building would continue to operate on the other feeder. Each evening the feeder would be reenergized to provide redundant feeds to the building. The entire new feeder can be installed with only a brief outage for final terminations on each end. Page 3

4 PROJECT DETAI 1. PROJECT NAME 2. UCAR TRACKING NUM. REPLACE OBSOLETE 15KV POWER FEEDS NSF07ML001 If it is not possible to build over the existing duct bank, then significant work would be required to install the feeders directly adjacent to the old ductbank, again trying to avoid excavating new granite filled ground. The new ductbank would contain extra conduits; one for the 2 nd feeder replacement which would occur once the direct bury cable fails. A second spare would be installed for a future wire pull and if one of the other two were damaged and unusable. An additional small conduit would also be installed for fiber optic cable to the new switchgear and pump house for monitoring system connections. Figure 2 15kV Route 2. The poles and associated equipment at the Xcel demarcation point would be converted from pole mounted equipment to ground mounted switching equipment, for safety and ease of use. The new ground mounted gear configuration would be for two 15kV feeds from Xcel Energy out to two feeds to the Mesa Lab. Additionally, there would be a feed/switch to the pump house. The pump house should be able to get its power from either main feeder. A manual switch would allow the enduser to select either 15kV feeder. In the past, we have lost the one 15kV feeder feeding the pump house for long periods of time. There was concern that a) the water tank would run dry and thus the Mesa Lab would not have fire suppression, and b) the pump house would freeze and break the supply lines to the water tank, again leaving the Mesa without water. Without water the Mesa Lab would have to be closed. 3. While work is being done on the old manholes (used for the new ductbank) it is proposed we add gravity drains to each manhole. Currently, manholes fill with ever present ground water. Water has a tendency to degrade power lines. In the past, sump pumps were placed in the manholes and would keep them dry. Since then the sump pumps have failed and the manholes are continuously filled. While the manholes are being excavated, a simple core drill and drain pipe could be installed to allow any water accumulation to be drained downhill (to the east side of the access road). A better, simpler solution. 4. Possible Risks: The existing 15kV ductbank lies next to the access road. Just to the right of this 15kV ductbank is a fiber optic and communications ductbank. Just to the right of that is the direct buried 15kV power line. Damage could occur to one or all of these systems during construction. PREDECESSORS/ SUCCESSORS The ductbank work should occur before any repaving of the Mesa Lab access road. Installing the new 15kV ductbank is likely to damage the existing road edge. Another fund request to the NSF is, Replace the Pump House Switchgear. The pump house connects to the 15kV feeder pole that is to be replaced on this package. This means the old wire from the 15kV service point to the pump house would have to be replaced. While the pump house is down, the main transformer and pump house gear could easily be replaced. The new transformer and gear would be safer than the old equipment. At a minimum, this project and the replace obsolete pump house gear project should be designed together so the final systems can work as an integrated unit. Page 4

5 PROJECT DETAI 1. PROJECT NAME 2. UCAR TRACKING NUM. REPLACE OBSOLETE 15KV POWER FEEDS NSF07ML001 COST ESTIMATE DETAIL (see attached) Estimate Assumptions: It is assumed an Electrical Contractor will self perform all work and no subcontractors will be used. The UCAR Staff will be required to review designs and to project manage the installation. Markups are included for their support. The old Orangeburg conduits are asbestos containing materials. An allowance is shown in case the old ductbank has to be disturbed and the old conduits removed. An allowance is shown for rocky soil conditions in case excavation must be done away from the existing ductbank routes. The surrounding soils are full of solid granite and boulders. Planning and Design costs include money for a) potholing the depth of the existing ductbank, and b) survey work. Potholing is required to see if a new ductbank can be constructed directly over the old ductbank and still meet code requirements for minimum depth of coverage over the new ductbank. PROJECT SCHEDULE (see attached) Schedule Assumptions & Details: The existing feeders are operational at the time of construction; not an emergency. Engineering drawings and estimates are completed one year prior to construction. The Contractor will procure the longlead switchgear and materials after winning the project bid. The 15kV Power Feed project and the Replace Pump House Gear and Transformer project are interrelated and design should be coordinated. Therefore, the pump house design will occur the same time as design for this work. Construction of the pump house electrical can either occur the same time as this project or separately. The schedule shown includes the pump house construction. A separate, standalone schedule is shown for the pump house should it be constructed separately. Underground work is scheduled to occur in spring or summer. A milestone is shown for underground work complete and the paving of the access road can begin, at this milestone date or later. Page 5

6 Job Title: Replace Obsolete 15kV Power Feeds Conceptual Design/ Study PPS Project No.: NSF07ML001 08/17/07 Estimate Summary Contractor Install Material Labor Equip Total Markups to Roll Markup Amt For Totals for Description Qty Unit $ $ $ $ % of Subtotal Into Base Items Each Base Item New Totals NSF Sheet Electrical Demolition $10,189 $80,547 $6,944 $97,680 17% $61,300 $158,980 $159 Pad Mounted Switches $160,378 $16,869 $2,464 $179,711 31% $112,780 $292,491 $292 Feeder Ductbank and Cables $152,855 $95,884 $47,984 $296,722 52% $186,213 $482,935 $483 Subtotal $323,422 $193,300 $57,391 $574, % $360,294 $934,406 $934 Subcontractor Material Markup 10% $32,342 $32,342 $32,342 ubcontractor Labor Overhead and Profit 56% $108,248 $108,248 $108,248 Subcontractor Equipment Markup 10% $5,739 $5,739 $5,739 Price w/ Subcontractor Markups $355,764 $301,548 $63,130 $720,442 General Contractor Markup on Sub 0% $0 $0 $0 $0 $0 Bond 2.5% $8,894 $7,539 $1,578 $18,011 $18,011 Permit 0.0% $0 $0 $0 $0 $0 Price w/ Contractor Markups $364,658 $309,087 $64,708 $738,453 UCAR Overhead (on 1st $25K per year) 50.9% $12,725 $12,725 Contractor w/ UCAR OH $751,178 A/E design fees 12% $88,614 $88,614 $89 UCAR Overhead (on 1st $25K per year) 50.9% $12,725 $12,725 AE Fees w/ UCAR OH $101,339 Traffic services 0 ls $0 $0 $0 Doc Furniture relocation fees ea $1,200 $0 $0 NETS plates/services 0 ea $1,500 $0 $0 Maintenance Support ls $0 $0 $0 $0 $0 Price w/ UCAR Costs $852,517 Budget Contingency 20% $170,503 $170,503 Allowance for Asbestos Mitigation $25,000 $25,000 $25 Allowance for Rocky Soil Conditions $84,000 $84,000 $84 Estimated Construction Project Cost $1,132,021 $360,294 $1,132,021 $1,132 Sum of Markups Check Total NSF Total Inflation Rate 5.0% Design Construct Allowance Total Original 2007 Values + Inflation Replace (1) 15kV Feeder and Pole Mounted Switches 2007 $89 $934 $109 $1,132 Values highlighted in green and bold outline are used on NSF Request form yr $981 $114 $1, yr $1,030 $120 $1, yr $1,082 $126 $1, yr $1,136 $132 $1, yr $1,193 $139 $1, yr $1,252 $146 $1, yr $1,315 $153 $1, yr $1,381 $161 $1, yr $1,450 $169 $1, yr $1,522 $178 $1,700 Page 1 8/17/2007 NSF07ML001 COSTEST 15kV Feeder Replacement.xls

7 May September January May September January May Se ID Task Name Duration Start 5/6 6/24 8/12 9/30 11/18 1/6 2/24 4/13 6/1 7/20 9/7 10/26 12/14 2/1 3/22 5/10 6/28 8/ kV Feeder Replacement 472 days Fri 9/28/07 2 Design Funds Received from NSF 0 days Fri 9/28/07 3 A/E Bids/ Award 6 wks Fri 9/28/07 4 A/E Design 2 mons Fri 11/9/07 5 Construction Funds Received from NSF 0 days Tue 9/30/08 6 Construction Bids/ Award 2.5 mons Tue 9/30/08 7 Procure longlead materials 5 mons Tue 1/6/09 8 Underground ductbank 2 mons Tue 3/31/09 9 Access road paving can begin 0 days Mon 5/25/09 10 Ground mounted 15kV primary switches 1 mon Tue 5/12/ kV cable install & test 3 wks Tue 6/9/09 12 Energize 0 days Mon 6/29/09 13 O&M Manuals/ Closeout 3 wks Tue 6/30/ Pump House Gear & Xfmr 105 days Tue 2/3/09 16 Procure longlead materials 3 mons Tue 2/3/09 17 Replace pump house gear & xfmr 4 wks Tue 6/2/09 9/28 9/30 5/25 6/29 Title: Replace Obsolete 15kV Power Feeders Project: NSF07ML001 Date: Fri 8/17/07 Task Split Progress Milestone Summary Project Summary External Tasks External Milestone Deadline Page 1

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

Considering UNDERGROUND. tampaelectric.com

Considering UNDERGROUND. tampaelectric.com Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

Underground Cable Temperature Monitoring in the Real World

Underground Cable Temperature Monitoring in the Real World Underground Cable Temperature Monitoring in the Real World Executive Summary Background Brain Storming Possible Causes to Duct Bank Over Heating Mitigating Duct Bank Overheating DTS Installation for Duct

More information

When power interruptions happen.

When power interruptions happen. When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage

More information

How To Get A Power Line Extension

How To Get A Power Line Extension GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs

More information

PROJECT CHARTER. Windcliff FEMA Project (PW#258) Facility number 14 TOWN OF ESTES PARK. 170 MacGregor Avenue. P.O. Box 1200. Estes Park, CO 80517

PROJECT CHARTER. Windcliff FEMA Project (PW#258) Facility number 14 TOWN OF ESTES PARK. 170 MacGregor Avenue. P.O. Box 1200. Estes Park, CO 80517 PROJECT CHARTER (PW#258) Facility number 14 TOWN OF ESTES PARK 170 MacGregor Avenue P.O. Box 1200 Estes Park, CO 80517 February 24, 2015 pg. 2 Contents EXECUTIVE SUMMARY... 3 PROJECT PURPOSE/JUSTIFICATION...

More information

Electric Service Conversion Overhead-to-Underground. Minnesota

Electric Service Conversion Overhead-to-Underground. Minnesota Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Minnesota Process Please fill out these forms and complete this checklist to begin your application process: 1) Overhead-to-Underground

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska February 10, 2014 QUESTIONS AND ANSWERS TO: Prospective Proposers FROM: Chugach Electric Association, Inc. 5601 Electron Drive Anchorage, Alaska SUBJECT:

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB2 OFFICE OF THE PRESIDENT TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For the Meeting of May 15, 2013 ACTION ITEM APPROVAL OF THE BUDGET AND APPROVAL OF DESIGN FOLLOWING ACTION PURSUANT TO

More information

Underground vs. Overhead Transmission and Distribution

Underground vs. Overhead Transmission and Distribution electric power engineering Underground vs. Overhead Transmission and Distribution Your Power System Specialists June 9, 2009 1 NATIONAL TRENDS Municipalities have passed laws requiring new distribution

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Dana Louth, CL&P VP - Infrastructure Hardening December 14, 2011 0 Topics for today s presentation Review of

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB6 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Special Meeting of ACTION ITEM APPROVAL OF PHASE 1 OF THE UTILITY LINE REMEDIATION PROJECT RELATED TO THE MISSION BAY DILLER BUILDING, ROCK

More information

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed

More information

General Utility Work Obligations

General Utility Work Obligations General Utility Work Obligations This Section addresses the Utility Company (or Utility Owner) requirements. It does not apply to existing stormwater facilities, irrigation ditches, Intelligent Transportation

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

FIBER OPTIC CABLE PLANT DOCUMENTATION

FIBER OPTIC CABLE PLANT DOCUMENTATION C H A P T E R 13 FIBER OPTIC CABLE PLANT DOCUMENTATION JIM HAYES Documenting the fiber optic cable plant is a necessary part of the design and installation process for the fiber optic network. Documenting

More information

Utilities and existing services

Utilities and existing services Construction Services Building standards for mechanical and electrical installations Utilities and existing services October 2012 Directorate: Environment Construction Services - Building standards for

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes

Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes Optical Cable Pre-Construction Survey Author John Peters Issued December 2012 Abstract Pre-construction site survey is one of the most important steps in the engineering and placement of a new optical

More information

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address: City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit

More information

Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE

Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE PRESENTER: ROBERT BOB MEADS, PRESIDENT R&M Consultants & Project Management, LLC Virginia Beach, VA Purpose of Presentation To share

More information

ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS

ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS Revised Cal. P.U.C. Sheet No. 20093-E Cancelling Revised Cal. P.U.C. Sheet No. 15575-E ELECTRIC RULE NO. 15 Sheet 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines* of

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 SUBJECT COST ESTIMATE FOR A PROPOSED ELECTRICAL CABLE CONNECTION FOR PORTABLE GENSET ISSUE To conceptualize and

More information

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

2301.1 Scope: Communications and Electronic Systems addressed in this section include:

2301.1 Scope: Communications and Electronic Systems addressed in this section include: Chapter 23 COMMUNICATIONS / ELECTRONIC SYSTEMS SECTION 2301 - GENERAL 2301.1 Scope: Communications and Electronic Systems addressed in this section include: 1. Fire Alarm System 2. Telecommunication and

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

Requirements for the Attachment of Communication Cable Facilities on PPL Poles Page 99 of 137 Requirements for the Attachment of Communication Cable Facilities on Replaces: URS-3002 URS-3004 URS-101C-304 A-157649 Page 100 of 137 Reference Notes for Drawings: General 1. The term communication

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

261000 Medium Voltage Electrical Distribution

261000 Medium Voltage Electrical Distribution Sections Included In This Standard: 1.1 General 1.2 Underground Cable 1.3 Medium Voltage Switches 1.4 Transformers 1.5 Electrical Manholes 1.6 Switch Vaults 1.7 Distribution Switchgear/Switchboards This

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT S METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to center of meter ± 100 mm ( 4

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01 2.01 GENERAL This section contains general compliance and safety planning information to be used by design professionals and contractors in the design and construction of University facilities. The criteria

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN Adopted October 5, 2009 Table of Contents Chapter Description Page 1 Facility Descriptions... 3 1.1 Municipal Power Plant, 1001 Park

More information

BUSINESS POLICY ELECTRIC SERVICE PRACTICES SP 1.1 INTRODUCTION

BUSINESS POLICY ELECTRIC SERVICE PRACTICES SP 1.1 INTRODUCTION ELECTRIC SERVICE PRACTICES SP 1.1 INTRODUCTION The Saskatchewan Power Corporation (SaskPower) exists to provide electrical power to its customers. SaskPower's service area extends into most parts of Saskatchewan

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 29987-G Cancelling Revised Cal. P.U.C. Sheet No. 22381-G Gas Sample Form No. 62-0982 Distribution and Service

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Comprehensive Electrical Distribution Master Planning at North Carolina State University. Alan Daeke Michael Dempsey

Comprehensive Electrical Distribution Master Planning at North Carolina State University. Alan Daeke Michael Dempsey Comprehensive Electrical Distribution Master Planning at North Carolina State University Alan Daeke Michael Dempsey CAMPUSENERGY2015 Agenda Campus Overview Overview of Existing System Project Goals Project

More information

SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated

More information

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20

More information

Morris S. Stover, P.E. Sponsor, Transmission Area

Morris S. Stover, P.E. Sponsor, Transmission Area Page 1 of 5 Job Function Morris has nearly 28 years in the power industry including design and construction of transmission line and substation facilities, He has extensive experience in contract development

More information

Wellesley Municipal Light Plant. Standard Requirements for Electric Service

Wellesley Municipal Light Plant. Standard Requirements for Electric Service Wellesley Municipal Light Plant Standard Requirements for Electric Service Index Section 1... General Information Section 2..General Requirements for Service Section 3. Types of Available Service Section

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

Electric Service Guide for Commercial Construction

Electric Service Guide for Commercial Construction Electric Service Guide for Commercial Construction Contents Contacting KCP&L... 2 Voltages... 2 Temporary Service... 2 Customer-Provided Temporary Service... 2 KCP&L-Provided Temporary Service.... 2 Current

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

HURRICANE SANDY One Year Later A LOOK BACK AT ATLANTIC CITY ELECTRIC S STORM RESTORATION EFFORTS

HURRICANE SANDY One Year Later A LOOK BACK AT ATLANTIC CITY ELECTRIC S STORM RESTORATION EFFORTS HURRICANE SANDY One Year Later A LOOK BACK AT ATLANTIC CITY ELECTRIC S STORM RESTORATION EFFORTS OCTOBER 2013 SANDY STRIKES Hurricane Sandy made landfall bringing maximum sustained winds of 80 mph and

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

TELECOMMUNICATION SYSTEM HAZARD MITIGATION STRATEGIC PLANNING

TELECOMMUNICATION SYSTEM HAZARD MITIGATION STRATEGIC PLANNING TELECOMMUNICATION SYSTEM HAZARD MITIGATION STRATEGIC PLANNING A.K. Tang 1 1 President, L&T Engineering and Project Management Consultant, Mississauga. Canada Email: alexktang@mac.com ABSTRACT: Telecommunication

More information

City of South Haven Water Plant Projects. Monthly Status Report

City of South Haven Water Plant Projects. Monthly Status Report City of South Haven Water Plant Projects Monthly Status Report Report 13 October 19, 2009 Project No. G07734WP CITY OF SOUTH HAVEN WATER PLANT PROJECTS MONTHLY PROGRESS REPORT NO. 13 PREPARED FOR: THE

More information

0095.05 June 30. 2011 July 18, 2014 1 of 7

0095.05 June 30. 2011 July 18, 2014 1 of 7 Standard Number: Superseding: Effective Date: Page: 0095.05 June 30. 2011 July 18, 2014 1 of 7 Pole Attachments, Automated Meter Reading and Cellular Phone Antennas 1. Scope 2. Application This standard

More information

How to estimate the cost of installing an Electrical Distribution Center (EDC)

How to estimate the cost of installing an Electrical Distribution Center (EDC) How to estimate the cost of installing an Electrical Distribution Center (EDC) Candidate Number 0112233 June 2012 Table of Contents 1) Introduction 3 2) Types and Methods of Measurement 3 5 3) Specific

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

Guidelines for Fiber Optic Cable Permits

Guidelines for Fiber Optic Cable Permits Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway

More information

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT 103 WEST PARIS ST. P. O. BOX 527 HUNTINGDON, TENNESSEE 38344 Telephone

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

ELECTRIC SCHEDULE LS-2 Sheet 1 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING

ELECTRIC SCHEDULE LS-2 Sheet 1 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING Revised Cal. P.U.C. Sheet No. 33883-E Cancelling Revised Cal. P.U.C. Sheet No. 28182-E ELECTRIC SCHEDULE LS-2 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to services for lighting

More information

WHY CABLE TRAY? BECAUSE A CABLE TRAY WIRING SYSTEM PROVIDES SAFE AND DEPENDABLE WAYS TO SAVE NOW AND LATER

WHY CABLE TRAY? BECAUSE A CABLE TRAY WIRING SYSTEM PROVIDES SAFE AND DEPENDABLE WAYS TO SAVE NOW AND LATER Large numbers of electrical engineers have limited detail knowledge concerning wiring systems. There is the tendency by engineers to avoid becoming involved in the details of wiring systems, leaving the

More information

DISTRIBUTION OPERATIONS AND MAINTENANCE

DISTRIBUTION OPERATIONS AND MAINTENANCE EB-00-00 Filed: 00 Aug Page of DISTRIBUTION OPERATIONS AND MAINTENANCE PREVENTIVE MAINTENANCE Preventive Maintenance is intended to maintain or improve customer service reliability, extend equipment life

More information

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302 Addendum Number 1 Request for Bids #15-004 City Project CB 1302 To all prospective bidders under specifications for Request for Bids #15-004, the Bud Bender Park Rehabilitation Project, City Project CB

More information

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4 How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work Table of Contents Section 1 Introduction page 3 Section 2 Types of Methods of Measurements page 4 Section 3 Project Specific

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground

More information

Top Commercial / Residential Electrical Requirements *

Top Commercial / Residential Electrical Requirements * Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial

More information

Addendum #2 Contract UK-11-13

Addendum #2 Contract UK-11-13 Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of

More information

Section 21. Telecommunication Hardware. www.geindustrial.com BuyLog Catalog 21-1

Section 21. Telecommunication Hardware. www.geindustrial.com BuyLog Catalog 21-1 Introduction...21-1 Fiber Closure Hardware...21-2 Cable Location Surge Protectors...21-4 Introduction GE has been manufacturing Telecommunication Hardware products for over 20 years and has become a leader

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

Electrical Service Guidelines

Electrical Service Guidelines Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4

More information

TECHNICAL QUESTIONS AND ANSWERS ITN-DOT-14/15-7009RM TAMPA OPERATIONS CENTER VIDEO SURVEILLANCE/SECURITY ACCESS SYSTEM

TECHNICAL QUESTIONS AND ANSWERS ITN-DOT-14/15-7009RM TAMPA OPERATIONS CENTER VIDEO SURVEILLANCE/SECURITY ACCESS SYSTEM TECHNICAL QUESTIONS AND ANSWERS ITN-DOT-14/15-7009RM TAMPA OPERATIONS CENTER VIDEO SURVEILLANCE/SECURITY ACCESS SYSTEM 1) Does the department have an estimate on the total number of cameras required and

More information

SUMP PUMP DISCHARGES INFORMATIONAL PACKET

SUMP PUMP DISCHARGES INFORMATIONAL PACKET DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION SUMP PUMP DISCHARGES INFORMATIONAL PACKET Background Many homes have sump pumps located in crawl spaces and basement areas. If it weren t for sump pumps

More information

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT **ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT. YOU COULD PUT YOUR FAMILY AND WORLDLY POSSESSIONS IN DANGER!!!

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

800 Communications Circuits

800 Communications Circuits ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that

More information

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: UCC-F100, Construction Permit Application pg. 1. Applicant

More information

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

Treasure Valley Electric Plan - Community Advisory Committee

Treasure Valley Electric Plan - Community Advisory Committee Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high

More information

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

EARTHING AND BONDING AT SECONDARY SUBSTATIONS DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the

More information

SCOPE OF WORK PROVISIONS FOR ELECTRICIAN: MAINTENANCE ELECTRICIAN ORANGE COUNTY

SCOPE OF WORK PROVISIONS FOR ELECTRICIAN: MAINTENANCE ELECTRICIAN ORANGE COUNTY STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS DIVISION OF LABOR STATISTICS & RESEARCH 455 Golden Gate Avenue, 9 th Floor San Francisco, CA 94102 ARNOLD SCHWARZENEGGER, GOVERNOR ADDRESS REPLY TO:

More information

Information and Requirements for Electric Service. Chapters 1, 2, 4, 6 and Appendix

Information and Requirements for Electric Service. Chapters 1, 2, 4, 6 and Appendix Organization: Manual: Section: Electric Distribution Information and Requirements for Electric Service Chapters 1, 2, 4, 6 and Appendix Tracking Number: 05-077 Date: January 6, 2006 SME: Jim Calore Contact

More information

Tucson Electric Power Company Rules and Regulations

Tucson Electric Power Company Rules and Regulations Original Sheet No.: 907 Introduction The Company will construct, own, operate and maintain lines along public streets, roads and highways which the Company has the legal right to occupy, and on public

More information