Wellesley Municipal Light Plant. Standard Requirements for Electric Service
|
|
|
- Franklin McKenzie
- 9 years ago
- Views:
Transcription
1 Wellesley Municipal Light Plant Standard Requirements for Electric Service Index Section 1... General Information Section 2..General Requirements for Service Section 3. Types of Available Service Section 4..Underground Service Section 5....Overhead Service Section 6....Underground Residential Developments Section 7 High Voltage Service Equipment Located on Private Property Section 8..Wiring and Voltage Requirements Section 9...Metering Requirements Section 10. Theft of Service Section 11 Motors and Utilization Equipment Attachment 1 Underground Policy Study Executive Summary - 1 -
2 Section 1 General Information 1.1 Introduction - The Wellesley Municipal Light Plant (WMLP) issues these Standard Requirements for Electric Service (Requirements) in order to communicate to its customers, architects, builders, electrical contractors, engineers and any other entity undertaking work which affects WMLP's electric system, its requirements for electric service. These Requirements, in conjunction with WMLP s Schedule of Rates and its terms and conditions on file with the Massachusetts Department of Telecommunications and Energy (DTE), as well as its Customer Service policies, constitute WMLP's requirements to obtain electric service within the Town of Wellesley. 1.2 Applicability - These Standard Requirements for Electric Service supercede all previous policies issued by the Wellesley Municipal Light Board and its predecessor, the Wellesley Board of Public Works, and is effective immediately for all construction work affecting WMLP, with reasonable allowance for the completion of work in progress. Revisions of the information contained in these Requirements will be made as necessary and WMLP reserves the right to make any such changes. 1.3 Service Voltages - The information contained in these Requirements applies primarily to electric service delivery voltages not exceeding 600 volts, although requirements for receipt of service at higher voltages is also provided in Section 7, High Voltage Service Equipment Located on Private Property. Service requirements for installations at higher voltages are also subject to individual agreements between the customer and WMLP. 1.4 Jurisdiction - All customer wiring intended for connection to the WMLP system shall be subject to the jurisdiction of the Town of Wellesley Wire Inspector and shall be in accordance with the National Electric Code, the Massachusetts Electric Code, any other applicable codes and with WMLP's requirements. 1.5 Quality of Service - All connections to the WMLP's system shall be designed, installed and operated in a manner that will not adversely affect the quality of service to other WMLP customers. No service connection shall be made by WMLP until approval is received from the appropriate authority and communicated to WMLP. The WMLP reserves the right to discontinue service, at its sole discretion, to any customer who, after proper notice from WMLP, continues to use any equipment or apparatus that adversely affects the quality of service to other WMLP customers, creates an unsafe working condition for WMLP employees or hinders WMLP in maintaining proper system conditions. 1.6 Advisory Service - WMLP's policy is to actively cooperate with customers, architects, contractors, engineers and any other entity undertaking work which affects WMLP's electric system. However, neither by inspection nor by the rendering of advisory service, - 2 -
3 nor in any other way, does the WMLP provide any warranty, expressed or otherwise implied, as to the adequacy, safety, or other characteristics of any equipment, wires, appliances or devices owned, used, or maintained by customers. The WMLP will furnish all information regarding the availability of service and the cost to the customer to supply such service. Therefore, it is strongly urged that WMLP s assistance be requested prior to the commencement of construction in order to facilitate timely rendering of service by WMLP. 1.7 Customer Service Department Requirements In many cases, WMLP receives information from its Customer Service Department in order to energize new services or services which have been disconnected for non-payment. All proper account information, advance deposits and payments must be in good standing with WMLP's Customer Service Department before any service shall be connected to WMLP's system. 1.8 Theft of Service Theft of service as defined in Section 10.1 is a serious crime and WMLP will prosecute violators to the full extent of the law. 1.9 Work Near Overhead High Voltage Lines - General contractors, electrical contractors, electricians, their employees and any other person(s) undertaking work in the proximity of WMLP's overhead electric lines must take proper precautions and observe the prohibitions prescribed by federal and state law when working or using any tools, machinery, or construction equipment near these lines. The applicable federal provisions for work near overhead high voltage lines are set forth in the regulations of the Federal Occupational Safety and Health Administration (OSHA) at 29 CFR (a)(15). Massachusetts General Laws, Chapter 166, Sections 21A-21G, prohibits anyone from performing any type of work within close proximity (defined as six feet) to any overhead high voltage lines without having promptly notified, and making satisfactory arrangements with, the appropriate utility company. In Wellesley, this is WMLP. In every case in which work needs to be performed near electrical lines, WMLP must be contacted prior to the beginning of work. WMLP reserves the right, at its sole option, to install protective equipment at the contractor s expense prior to the beginning of construction, in order to protect both the contractor and its employees as well as WMLP's facilities Limitation of Liability - WMLP shall not be liable for damage to the person or property of a customer or any other person(s) resulting from that customer s use of electricity or the presence of WMLP's equipment on customer premises. WMLP is a municipal entity governed in accordance with the provisions of Massachusetts General Law Chapter
4 1.11 Excavation in Public Way - Any work in the public right-of way must comply with the requirements of the Wellesley Department of Public Works Work in the Public Right-of Way, issued on April 1, 1998 and as amended from time to time DIG SAFE Requirements - Federal and Massachusetts law require excavators to notify the appropriate utility companies before commencing underground excavation work. The term excavating shall include, but not be limited to, digging; trenching; grading; tunneling; auguring; boring; drilling; pile driving; plowing-in or pulling-in pipe, cable, wire, conduit, or any other substructure; backfilling; demolition; and blasting. Massachusetts s law requires that before underground excavation work begins, DIG SAFE be notified. The DIG SAFE phone number is as follows: DIG SAFE DIG SAFE will notify the appropriate utility companies, including WMLP, of the proposed excavation area. DIG SAFE regulations require the proposed construction area to be pre-marked with white paint. WMLP will mark its existing underground electric facilities within 3 working days (72 hours, exclusive of Saturdays, Sundays and legal holidays). WMLP personnel are also available to meet with excavators should any questions arise with respect to the location of WMLP's underground facilities. Customer owned underground facilities are not marked by WMLP. Extra care should be taken when excavating on private property. Specific requirements for excavators and utility companies regarding underground excavation are set forth in Massachusetts General Law Chapter 82, Section 40-40E. Additional information concerning excavations requirements may be obtained from DIG SAFE
5 Section 2 General Requirements for Service 2.1 Application Location - Written application for new electric service or alteration to an existing electric service shall be made at WMLP's offices, 455 Worcester Street, Wellesley Hills, Massachusetts, on a form supplied by the WMLP. 2.2 Written Application - Application for new service or alteration of an existing service should be made as far in advance as possible to assure time for engineering, material procurement, system additions (if necessary) and construction. A plot plan indicating the location of the buildings and additions shall be provided, if available, as well as additional load data. WMLP will review the application for service and advise the party applying for service whether the type of service requested is available, what the customer or their designated representative must do to prepare for WMLP to install the service and what charges WMLP will require to be paid in advance in order for WMLP to install and connect the new service. The customer or their designated representative should not proceed to make any load additions until WMLP has notified them that the conditions under which WMLP can supply the new or increased load have been met. 2.3 Customer Wiring - The WMLP will not install, or be responsible in any way, for wiring on the consumers premises. The WMLP will not knowingly supply electric energy to any premises where the electrical wiring is not in conformance with all applicable codes and the requirements of the Town of Wellesley Wire Inspector. 2.4 Wire Inspector Approval - The WMLP is not allowed to energize a new service, or reconnect an existing service which has been disconnected for wiring work to be performed, until the Wire Inspector for the Town of Wellesley has issued a certificate of approval to WMLP. It is the responsibility of the electrical contractor to receive all Wire Inspector approvals so that WMLP will be directed by the Wire Inspector to energize the service. 2.5 Service Relocation or Alteration - When relocation or alteration are to be made to an existing service, WMLP shall be notified in advance so that it can determine the conditions under which such changes can be made. The customer or their designated representative shall be responsible for the WMLP's cost of such relocation or alteration work and such cost estimate will be prepared by WMLP and paid in advance of WMLP performing any work to relocate or alter the service. 2.6 Customer Equipment - The customer shall use their service from WMLP with due regard for the effect of such use on the quality of service to other customers of WMLP. Customers shall notify WMLP prior to the installation of any major appliance so that WMLP will have sufficient time to evaluate the impact of such load on its system
6 WMLP, at its sole option, shall determine the feasibility of adding such load to WMLP's system and will undertake work as necessary, at the customer s expense, to accommodate the added or changing nature of the load and thus prevent any possible disruption of service to the area. 2.7 Access to Premises - The WMLP shall have the right of access to the customer s premises at all reasonable times in accordance with Massachusetts General Laws, Chapter 164, Section 124 for the purpose of inspecting and keeping in repair WMLP equipment, meter reading, or removing any or all of WMLP's equipment and for such purposes that the customer authorizes and requests his landlord, if any, to permit WMLP to enter said premises. 2.8 Temporary Service - WMLP shall make available temporary electric service to any customer or their authorized representative upon written application at WMLP's offices, subject to the availability of such service, at WMLP's sole option. Temporary service is any service for a construction project or temporary display which is not expected to continue in use for a period long enough to justify a permanent service installation. For residential home construction, temporary service shall be permitted for a period not to exceed one (1) year. The WMLP is not allowed to energize a temporary service until the Wire Inspector for the Town of Wellesley has issued a certificate of approval. Temporary service shall be made available upon advance payment of the cost for WMLP to install and remove the service. 2.9 Conditions of Service The WMLP shall not be responsible for any failure to supply electric service hereunder, nor for the interruption of service, reversal or abnormal voltage of supply if such failure, interruption, reversal or abnormal voltage is without willful default or gross negligence on the part of WMLP. WMLP shall always endeavor to operate its system in accordance with good utility practice. Whenever the integrity of the WMLP system or the supply of electricity is threatened by conditions on the WMLP system or the systems with which WMLP is directly connected or indirectly connected, or whenever it is necessary or desirable to aid in the restoration of service, the WMLP may, in its sole judgment, curtail or interrupt electric service or reduce voltage to some or all of its customers and such curtailment, interruption or voltage reduction shall not constitute gross negligence or willful default on the part of WMLP
7 Section 3 Types of Available Service 3.1 Availability of Service - The acceptance of an application for electric service will be contingent upon WMLP having the necessary poles, wires, conduits, cables, etc. to supply service at the location where it is requested. When the application is for a supply of energy in excess of the capacity of the WMLP system as it then exists to deliver service to the requested location, WMLP reserves the right to delay the acceptance of such application. Prior to the customer or their designated representative ordering equipment or commencing construction, it is the customer s responsibility to make application to WMLP to ascertain the availability of the service characteristics for the service desired and to determine if WMLP has additional requirements to those contained herein for such service. Designation of the service entrance location, meter location and size of service shall be specified by WMLP. All costs associated with extension of service shall be the responsibility of the customer. 3.2 Electric Meter - All meters are to be installed on the customer s premises in a meter socket supplied by the customer s electrician and located in a manner satisfactory to WMLP. The Wire Inspector must approve the final electrical connections in the meter socket before WMLP will install the meter. The meter will be supplied by the WMLP at no expense to the customer. Metering requirements for WMLP are more fully explained in Section 9 of these Requirements. 3.3 Equipment Acquisition - In the event that the WMLP is forced to pay a premium to obtain transformers, switchgear or other equipment required to meet the schedule or special service requirements of the applicant, the applicant shall reimburse WMLP that portion of the premium above and beyond the cost which WMLP would normally incur to provide electric service, as determined solely by WMLP. 3.4 Standard Service Characteristics The following types of service are generally standard but it must be noted that not all types of service are available at all locations. Before purchasing any equipment or performing any wiring, a customer must submit a service application to WMLP to determine the availability of the desired service. a) 120/240 volt, single-phase, 3-wire Most commonly used for residential customers and small commercial customers up to 50 kva of load and individual motors not over 5 hp. b) 120/208Y volt, single-phase, 3-wire May be available to customers who are located in a 120/208Y volt, 3-phase area if the connected load is less than 50 kva. c) 120/208Y volt, three-phase, 4-wire For customers with loads larger than can be served with 120/240 volt single phase supply. If three-phase service is allowed for - 7 -
8 loads less than 50 kva, the additional cost above and beyond the cost of a singlephase service may, at WMLP's sole option, be at the expense of the customer. d) 277/480Y volt, three-phase, 4-wire Normally for large commercial and industrial load applications with loads significantly higher than can be served with either 120/240 volt single phase or 120/208Y volt three phase supply. e) Customers seeking high voltage service under the terms of WMLP's Large General Service Primary tariff shall consult with WMLP to determine service requirements. f) Voltages other than those specified herein may be available from WMLP through negotiation and may involve additional cost to the customer to account for equipment acquisition required to provide the requested voltage. 3.5 Services Per Building Generally one electric service will be installed per building. Additional services may be required and can be installed at WMLP's sole discretion and with the Wire Inspector s written approval, subject to applicable electrical and fire codes. In addition, a letter of consent from the Wellesley Fire Department is also required indicating that they are aware that more than one electric service enters the premises. The cost to install additional building services shall be borne entirely by the customer. 3.6 Multiple Meter Charges Where electricity to a building is delivered through more than one meter, each meter shall have a separate account established with WMLP's Customer Service Department and shall be subject to the applicable WMLP tariff. 3.7 Customer Requirements Where it is determined that the customer s load level requires that WMLP equipment, with the exception of house service cable, be placed on private property for the purposes of supplying electric service to that property, WMLP shall require and the customer shall grant WMLP an easement for the location of the WMLP's equipment on the property. WMLP will prepare the easement documents and record the easement. The cost of preparing and recording the easement shall be at customer expense. 3.8 Unbalanced Load The customer shall at all times utilize energy is such a manner that the load will be balanced between phases to within 10% of one another. WMLP reserves the right to require that the customer make necessary changes at customer expense to correct the unbalanced condition. 3.9 Final Electrical Connections WMLP personnel will make the final connection of the customers wiring to the WMLP system for permanent or temporary service. Unauthorized personnel are not permitted to connect to WMLP conductors or equipment Secondary Surge Arresters Secondary surge arresters may be installed by a customer at their own expense. For such protection to be effective, the devices should be connected to the service-entrance conductors and bonded to the metallic water pipe - 8 -
9 system, the raceway system, the grounded service conductor at the service entrance equipment and any metallic drainage system. Where the service from WMLP is 750 volts or less, the surge arrester may be mounted on the service equipment enclosure. The customer shall be responsible for providing and installing any secondary surge protection devices and for operating, maintaining and inspecting such installations. The WMLP shall not be responsible for the operation, maintenance or inspection of a customer installation or for any damage to a customer s equipment resulting from voltage surges which may occur on the customers wiring Short Circuit Currents In order that engineers and contractors may select proper service equipment to meet National Electric Code regulations for short circuit ratings, the following will apply to new installations served: a) Residential Supplied at 120/240 volts from overhead or underground fed transformers. Fault current available at residential service equipment will generally be more than 5,000 amperes but less than 10,000 amperes. b) Commercial, Industrial and Apartment Complexes Available fault currents will vary with each installation. Inquire to WMLP for the fault levels at a particular location in WMLP's system Customer Emergency Standby Generation The customer must notify WMLP in advance of installing standby generating equipment and obtain WMLP's approval for the method of connection. Where the customer installs a standby generator for the purpose of supplying all or part of their load, in the event of an interruption in the supply of service from WMLP, the customer wiring shall be arranged so that no electrical connection can occur between the WMLP lines and the customer s alternate source of electric supply. This will require installation of a double-throw switch that has a visible break. This transfer scheme must meet the non-parallel requirements established by WMLP. All wiring associated with the customer installation shall comply with all applicable codes and be approved by the Town of Wellesley Wire Inspector. Any metering costs associated with the customer s standby generation due to special metering requirements, as determined by WMLP, shall be the responsibility of the customer. Customer on-site generation and fuel storage are often located adjacent to the padmounted equipment of the electric utility. Because of the proximity of the electric room to the transformer, WMLP requires protection between the transformer and the generator fuel storage unit, by either a twenty (20) foot separation or a masonry wall. The wall shall be erected parallel to and located three (3) feet from one side of the transformer foundation. The wall should be a minimum of six (6) feet high and extend approximately - 9 -
10 three (3) feet beyond each end of the transformer foundation. The design shall be submitted to and reviewed by WMLP personnel for approval before construction Customer Auxiliary Generation Should a customer elect to install solar, wind turbine or other auxiliary generation for the purpose of operating interconnected with WMLP, customers shall notify WMLP of the installation in writing to assure proper interface between the different power systems. Proper precautions must be taken to maintain adequate safety, to maintain the quality of service to WMLP's other customers and to protect WMLP's system and its workers. The customer shall be required to provide protective and synchronizing equipment to safeguard WMLP's system from the auxiliary equipment at customer expense. The design of the protective system shall be submitted to WMLP for review and approval before implementation. Any metering costs associated with the customer s auxiliary generation due to special metering requirements, as determined by WMLP, shall be the responsibility of the customer Customer Cogeneration Cogeneration equipment is designed to produce electrical energy and steam, or other useful forms of energy, which is used by a customer for industrial, commercial, heating or cooling applications. Prior to the design and installation of any cogeneration equipment, a customer considering cogeneration shall consult with WMLP to ascertain WMLP's policy for such installations
11 Section 4 Underground Service 4.1 Service Connections - All electric services to customer premises, either new installations or upgrades of existing service, shall be installed underground. Service to customers may originate from a WMLP pole or manhole. Exceptions to this requirement shall be at WMLP's sole discretion. 4.2 Cost of Service - All service shall be installed by WMLP in accordance with its specifications, at the expense of the customer. Whenever an application for electric service is received which will require the installation of a new service, the applicant will be required to deposit, in advance of construction, an amount equal to the estimated cost thereof. WMLP will determine, at its sole discretion, which installations are to be performed on a fixed cost basis and which will be performed on the basis of an estimated cost. When the installation has been completed, the cost of service installations that are not performed on a lump sum basis shall be computed. Should the customer deposit be found to be in excess of the actual cost, such excess shall be refunded to the customer. If the cost should exceed the deposit, then before the meter is connected and the service is committed to use, the applicant shall pay the deficiency. Specific requirements for underground electric service to homes, covered in WMLP's Electric Service Upgrades and New Installations Policy, are available at WMLP's office. 4.3 Ownership of Underground Service WMLP shall own and maintain the service lateral from the line side of the meter socket back into the WMLP system. WMLP will also assume ownership and maintenance responsibility of the conduit system installed for the service cable once the system is approved by WMLP. 4.4 Failure of Underground Service - Should an underground electric service installed by WMLP to a customer premises fail on the line side of the meter socket, resulting in a temporary service installation by WMLP to the customer in order to provide electric service, WMLP shall be responsible for repairing the failed underground service cable. All interruptions of service due to equipment failures from the meter socket into the customer premises are the sole responsibility of the customer. Where WMLP determines that the cable is repairable, WMLP will repair the cable, arrange with the customer to remove the temporary electric service and re-energize the repaired cable. Should WMLP determine that it is appropriate to replace the service, WMLP will arrange to have underground conduit installed from the source of the WMLP service to the customer premises (if necessary), install new underground cable and arrange with the customer to remove the temporary electric service and energize the new service
12 Electrical panel work required to accommodate the repair or replacement of the failed underground service shall be performed by WMLP. The extent of the electrical work to be performed from the meter socket into the home shall be at WMLP's sole discretion and subject to the Town of Wellesley Wire Inspector s approval. At the time that WMLP installs new underground cable to replace a failed service, the customer will have the option of upgrading the cable that would normally be required to provide the same capacity as the old service with a higher capacity cable. The customer will be responsible for the difference in the cost of the cable between the cable WMLP would normally install and the higher capacity cable. Payment for the higher capacity cable shall be made by the customer to WMLP before WMLP performs the service installation. In addition, all electrical work from the meter socket into the home required to accommodate the higher capacity service shall be at customer expense and subject to the Town of Wellesley Wire Inspector s approval. 4.5 Temporary Underground Service - WMLP shall make available temporary electric service to any customer or their authorized representative upon written application at WMLP's offices, subject to the availability of such service at WMLP's sole option. Temporary service connections may be underground fed, as determined by WMLP. All temporary service connections shall be in conformance with all applicable codes and shall be subject to conditions imposed by and require approval of the Town of Wellesley Wire Inspector. WMLP will not energize any temporary service until authorized to do so by the Wire Inspector. Temporary service shall be installed for a period not exceeding twelve (12) months. In the event that the temporary service is fed underground and a meter pedestal is used, the meter pedestal shall conform to the requirements of Section The meter pedestal shall be located adjacent to and as close as possible to the permanent structure so that the service may be transferred to the point of permanent attachment when the construction is completed. Where temporary service is made available by WMLP, advance payment of the cost for WMLP to install and remove the service shall be made prior to energizing the temporary service. It shall also be the responsibility of the customer to establish an account with WMLP's Customer Service Department for the cost of electricity before the service can be energized. 4.6 Undergrounding of WMLP Facilities Should the undergrounding of WMLP's overhead distribution facilities become an issue in any section of Wellesley, WMLP's policy shall be as outlined in the Wellesley Municipal Light Plant s Underground Policy Study Executive Summary, as accepted by the Wellesley Municipal Light Board (Attachment 1)
13 Section 5 Overhead Service 5.1 Service Connections No overhead services are allowed on the WMLP system, either for new installations or for upgrades of existing service, in order to permanently connect a customer to the WMLP system. The only case in which an overhead service is allowed is for temporary service, as defined in Section 2.8 of these Requirements. The Town of Wellesley requires that all new or upgraded utility services to residences and businesses be placed underground. 5.2 Temporary Overhead Service - WMLP shall make available temporary electric service to any customer or their authorized representative upon written application at WMLP's offices, subject to the availability of such service at WMLP's sole option. Temporary service connections may be overhead fed, as determined by WMLP. All temporary service connections shall be in conformance with all applicable codes and shall be subject to conditions imposed by and require approval of the Town of Wellesley Wire Inspector. WMLP will not energize any temporary service until authorized to do so by the Wire Inspector. Temporary service shall be installed for a period not exceeding twelve (12) months. The customer shall provide a support structure which meets the requirements of the Wire Inspector and WMLP with respect to service drop clearances, metering, grounding and safety for temporary overhead service, as defined in Section 2.8. The service entrance equipment shall be installed on a pole set five (5) feet in the ground or on a braced timber structure approved by the Wire Inspector and WMLP. The temporary structure shall be located adjacent to the permanent building whenever possible. The temporary overhead service cannot be used for permanent service. Where temporary service is made available by WMLP, advance payment of the cost for WMLP to install and remove the service shall be made prior to energizing the temporary service. It shall also be the responsibility of the customer to establish an account with WMLP's Customer Service Department for the cost of electricity before the service can be energized. 5.3 Ownership of Temporary Service - Once a temporary overhead electric service is installed, WMLP shall own the service from the connections at the weatherhead back into the WMLP system. 5.4 Overhead Line Extensions on Private Property Overhead line extensions on private property are not allowed by WMLP
14 5.5 Existing Overhead Services In the event that there is an existing permanent overhead service to a WMLP customer, WMLP's ownership ends at the physical point of attachment of the overhead service to the customer s cable. This is typically at the service weatherhead. All equipment beyond this connection, including the service drop attached to the side of the house that feeds into the meter socket, is the property of the customer. It is the customer s responsibility to maintain all proper National Electric Safety Code (NESC) clearances required for the overhead service drop and to notify WMLP in the event that clearances to the service will be affected by construction work on the customer s property
15 Section 6 Underground Residential Developments 6.1 Residential Developments - Upon request from a developer proposing to construct a residential development consisting of dwelling facilities and requiring electric facilities to provide service to such facilities, the WMLP will provide an underground distribution system in public or private ways, or rights of way to be installed throughout the entire development subject to the provisions set forth herein. Even where an existing public way is in place with overhead electric facilities, WMLP shall require all electric facilities for the residential development to be placed underground. A qualifying residential development is one proposed to be built on a land area defined in a real estate development plan, approved by the Town of Wellesley Planning Board and subject to the requirements of the Rules and Regulations Governing the Subdivision of Land in Wellesley Massachusetts as adopted by the Wellesley Planning Board on December 13, 1971 and as amended from time to time. 6.2 Initial Requirements - When no electric distribution system exists in an area contemplated for subdivision, the developer shall request that WMLP provide the design of an underground distribution system in public or private ways and specify easements or rights-of-way required to service the proposed development and adjacent undeveloped areas. The developer shall furnish to WMLP proposed plans, which will include: a) A plan showing the layout of the lots and ways with grading contours. b) A plan showing the proposed construction of the streets and other underground utilities. c) A plan showing the outline of lots, ways and easements on which the electric system may be overlaid for reproduction of the plan and d) Proposed electrical loads, service sizes and service voltage required. 6.3 Schedule - The developer shall furnish in writing to WMLP the anticipated schedule for construction of houses on a lot-by-lot basis. 6.4 Electric Distribution Design Utilizing the information provided by the developer as required in Section 6.2, WMLP will develop a detailed design of the underground electric system for the developer, which shall conform to the policies of WMLP. WMLP will make its best efforts to work with the developer in designing a system that considers the developer s other utility requirements
16 6.5 Cost of Infrastructure - All costs associated with construction of the underground infrastructure to house WMLP s distribution system shall be the responsibility of the developer. This shall include all conduit, manholes, transformer pads, grounding grids and any other appurtenance required to extend complete electrical service to the development, subject to WMLP's requirements. 6.6 Cost of Providing Electric Service - All costs associated with the installation of electrical equipment required to provide service shall be the responsibility of the developer. This shall include, but not be limited to, all cable, transformers, streetlights and any other appurtenance necessary to provide complete electrical service to the proposed development. WMLP shall prepare an estimate of all charges associated with its work for the developer. Payment of WMLP's estimated costs shall be made before WMLP begins work. WMLP also reserves the right to charge additional amounts above and beyond its estimate to the developer for significant changes in the scope of work. Payment of these additional amounts shall be due immediately upon presentation to the developer. 6.7 Construction Standards - Construction of the infrastructure to house WMLP's high voltage system shall be in accordance with the design and standards approved by WMLP. Specific construction requirements for the conduit and manhole work will be as specified by WMLP and in accordance with the Rules and Regulations Governing the Subdivision of Land in Wellesley Massachusetts as revised November 27, 2001, Section VI (D). Any work in the public right-of way shall also comply with the requirements of the Wellesley Department of Public Works Work in the Public Right-of Way, issued on April 1, 1998 and as amended from time to time. 6.8 Ownership WMLP shall assume ownership of the electric distribution infrastructure once the Town elects to accept the residential development as a public way. In the event that the development is not accepted as a public way or if the development is maintained as a private way, ownership of the electric distribution infrastructure reverts to WMLP upon fulfillment of the following conditions: a) WMLP is granted a permanent, perpetual easement for the manholes, conduit, conductors, transformers and any other appurtenance that WMLP deems necessary for extension of service on private property. b) The customer is responsible for payment of all costs associated with the extension of service on private property as outlined in Sections 6.5 and 6.6. c) The customer transfers ownership of underground private property construction to WMLP upon execution of the easement documents with all rights to perform maintenance of the manhole and conduit system and the electrical distribution system, as necessary. d) The customer installs at least one service drop from the underground system on private property
17 6.9 Easements WMLP shall require and the customer shall grant WMLP an easement for the location of the WMLP's equipment on the property in order to provide permanent and perpetual access to all electrical faculties owned by WMLP, including but not limited to; conduit, manholes, cable, transformers, transformer foundations, street lights, poles (as the origin point of the underground service) and any other appurtenance required to extend complete electric service to the proposed development. The easement shall be granted to WMLP by the developer as a condition of service. The size of the easement shall be determined by WMLP and specified to the developer during the design phase. WMLP will prepare the easement documents and record the easement. The cost of preparing and recording the easement shall be at customer expense
18 Section 7 High Voltage Service Equipment Located on Private Property 7.1 General The general provisions of this section apply to customers who take service from WMLP owned equipment and are considered commercial customers with secondary metering. These requirements do not apply to customers taking primary service from WMLP, who are classified as Large General Service Primary customers with primary metering. 7.2 Type of Installation - Customers may be required to provide space on private property for WMLP owned transformers and protective equipment. This would typically occur in the following manner: a) Padmount Transformer - A padmount transformer supplied by an underground cable fed from a pole or manhole. The pole or manhole supplying the transformer may also be on private property. 7.3 Cost All costs associated with the extension of electric service on private property shall be the responsibility of the customer. WMLP will prepare an estimate of applicable charges for the customer. The estimated cost of WMLP's installation work must be paid prior to construction. WMLP will provide the transformer and metering equipment to the customer at no cost, subject to the provisions of Section Customer Design Requirements All construction performed to accommodate the padmount transformer must be performed in accordance with WMLP standards, a portion of which is as follows: a) Padmount Transformers - Sufficient space must be provided around the transformer pad to allow ease of installation of the padmount transformer unit, preparation of terminations in the high and low voltage compartments and unhindered operation of the transformer. The space requirements are a minimum of ten (10) feet open clearance in the front and five (5) feet open clearance on the remaining three sides, free of any obstructions. The unit must also be located a minimum of ten (10) feet from any flammable surface or a minimum of five (5) feet from a non-flammable surface, such as a building wall. The customer shall check with WMLP to determine any additional requirements which may apply. 7.5 Customer Installation Requirements Customer requirements for private property installation work are outlined below: a) Secondary Cable and Conduit - The customer shall supply and install all secondary conduit, cable, hardware and transition enclosures, where applicable. If the secondary cable is required for installation to a WMLP manhole, WMLP
19 shall supply and install the cable at customer expense. WMLP requires copper secondary conductors for connection to WMLP transformers and aluminum secondary conductors are not allowed. Conductor sizes over 500 MCM must be specifically approved by WMLP. Size of the conductors and conduit will be in accordance with all applicable codes and subject to Wire Inspector approval. b) Transformer Pad The customer will be responsible for installation of a transformer pad and grounding grid to accommodate the padmount transformer. The transformer pad shall be constructed to WMLP specifications. WMLP will provide the specifications for the pad to the customer as well as advisory service during the construction process to ensure that the pad is properly constructed. If the pad is located adjacent to a parking lot or other exposed area, WMLP may require lally columns to be installed to provide physical protection for the transformer. c) Final Connections All final connections to WMLP equipment shall be performed by WMLP at customer expense. Connectors used to connect customer secondary cable to WMLP equipment shall be supplied and installed by WMLP at customer expense. 7.6 WMLP Installation Requirements - WMLP requirements for private property installation work are outlined below: a) Source of Supply from Overhead System WMLP will perform all high voltage work required to extend high voltage service from the WMLP overhead system. The cost for all work shall be at customer expense. If the installation originates from a pole to a padmount transformer, WMLP will install all cable terminations and protective equipment on the pole, pull high voltage cable to the transformer, terminate the high voltage cable in the primary compartment of the transformer and make all secondary connections on the cable installed by the customer using WMLP secondary termination lugs. The WMLP will also install the transformer on the customer-supplied pad. b) Source of Supply from Underground System - WMLP will perform all high voltage work required to extend high voltage service from the WMLP underground system to the customer pad. The cost for all work shall be at customer expense. It must be noted that WMLP requires two high voltage supplies to transformers fed from WMLP's underground system, if possible, in order to expedite service restoration in the event of an outage on the underground system. If the installation originates from WMLP's underground system to a padmount transformer, WMLP will install two (2) sets of high voltage cables from the manhole to the padmount transformer. In addition, WMLP will perform all
20 required splicing in the manhole on both high voltage supplies, terminate both high voltage supplies in the primary compartment of the transformer, and make all secondary connections on the cable installed by the customer using WMLP secondary termination lugs. The WMLP will also install the transformer on the customer-supplied pad. 7.7 Ownership of Equipment WMLP will assume ownership and maintenance responsibilities for the conduit, manholes, poles, equipment and any appurtenant facility required to extend service to the customer upon completion of the project and the granting of an easement as outlined in Section 7.8. WMLP ownership shall end at the connectors used for the secondary terminals of the transformer. All equipment beginning at the secondary cables supplying the customer will continue to be the property of the customer. 7.8 Easements As a condition of service, WMLP shall require and the customer shall grant WMLP an easement for the location of WMLP's equipment on the property in order to provide permanent and perpetual access to all electrical faculties owned by WMLP which WMLP deems necessary for extension of service to the property. WMLP will prepare the easement documents and record the easement. The cost of preparing and recording the easement shall be at customer expense. 7.9 Primary Service Installations Customers who request primary service from WMLP shall be subject to the requirements listed in WMLP's Large General Service Primary Tariff, currently on file with the Massachusetts Department of Telecommunications and Energy. The specific details regarding the installation of primary service by WMLP to a customer requesting such service are subject to negotiation and development of a specific agreement covering the terms and conditions of service between the customer and WMLP
21 Section 8 Wiring and Voltage Requirements 8.1 Fluctuating Loads Electric welding equipment, furnaces, boilers, compressors, pumps or similar equipment should not be installed except under the conditions specified by WMLP. WMLP shall be advised of the proposed installation of this type of equipment in accordance with Section 2.6. Voltage fluctuations caused by this type of equipment, regardless of their frequency, shall not cause undue degradation to the quality of service experienced by WMLP's other customers. Installation of this type of equipment shall not cause WMLP difficulty in maintaining proper voltage conditions on its system. WMLP, at its sole option, shall determine the feasibility of adding such load to WMLP's system and will undertake work as necessary, at the customer s expense, to accommodate the added load and thus prevent any possible disruption of service to the area. The WMLP reserves the right to discontinue service, at its sole discretion, to any customer who, after proper notice from WMLP, continues to use any equipment or apparatus that adversely affects the quality of service to other WMLP customers, creates an unsafe working condition for WMLP employees or hinders WMLP in maintaining proper system conditions. 8.2 Grounding All grounding shall be done in accordance with National Electric Code standards and all applicable codes and under the authority of the Town of Wellesley Wire Inspector. WMLP shall not be liable for damage to the property of a customer resulting from unbalanced voltage conditions due to the opening of a grounded neutral service conductor. 8.3 Grounding Secondary Service Where the secondary system is grounded at any point, the grounded conductor shall be run to each individual service. Services having a grounded conductor shall have that conductor and the service equipment grounded on the customer s premises by connecting the grounding electrode conductor to the grounded service conductor of the distribution system on the supply side of the service disconnection means. This connection should be made within the service entrance equipment enclosure. An underground metallic water pipe, either local or supplying a community, shall always be used as a part of the grounding electrode system where such pipes are available. It shall be supplemented by one or more acceptable grounding electrodes as required by the National Electric Code or other applicable code for grounding electrodes and equipment grounding. To minimize the hazard of electrical shock, all metallic water piping systems inside a building shall be bonded to the grounding electrode. Where extensive metal in or
22 on buildings may become energized, adequate bonding to the grounding electrode will provide additional safety, as required by the Wire Inspector. 8.4 Power Factor Maintenance of a high system power factor is of the utmost importance to WMLP in the efficient operation of its system. Electric rates are based on customers maintaining a minimum 90% power factor, which is the threshold WMLP shall accept before requiring power factor correction by the customer. Should a customer anticipate operation of their system at a power factor lower than 90%, WMLP shall be notified so that corrective measures may be developed between WMLP and the customer. The cost to implement such corrective measures will be borne entirely by the customer. 8.5 Power Factor Correction Capacitors When a customer desires to install capacitors for the purpose of power factor correction, WMLP shall be consulted prior to the ordering of such equipment. Approval by WMLP for all capacitor installations is required to assure that the quality of service to other WMLP customers is not adversely affected by the manner in which the equipment is installed and operated. 8.6 Power Supply to Voltage Sensitive Appliances Customers who use computers, microprocessor controlled equipment, x-ray equipment, or other sensitive electronic equipment should consider the installation of auxiliary devices designed to protect the customer equipment from power fluctuations and disturbances. These disturbances shall include, but not be limited to, voltage sags or swells, voltage spikes, temporary loss of power, or any other deviation from normal system conditions. WMLP will work closely with customers to identify and minimize the causes and effects of these disturbances. 8.7 General Conditions - WMLP shall not be held liable for disturbances resulting from weather conditions, Acts of God, operations on WMLP's system which are within good utility practice or any other disturbance which may be generated by the operation of other customer owned equipment or of systems with which WMLP is directly connected or indirectly connected
23 Section 9 Metering Requirements 9.1 General Requirements All energy supplied by WMLP shall be measured, in general, by appropriate meters for billing purposes. The installation of meters and metering equipment shall comply with the requirements set forth in this Section. WMLP shall supply and install, at no expense to the customer, all meters required for billing purposes, except as noted in Sections 3.12 and Definitions The following definitions shall apply: Delivery Point The point of connection between WMLP's facilities and the facilities of the customer. This is also the line of demarcation between WMLP's maintenance responsibility and the customer s maintenance responsibility. Metering Point The location of WMLP's meter or metering equipment, such as potential transformers and current transformers. The metering point is typically on the secondary side of the transformer. Generally, the Delivery Point and the Metering Point are the same location. In the case of customers on the Large General Service Primary tariff, however, the Delivery Point and the Metering Point are not the same. Other exceptions to this requirement exist, which include, but are not limited to, those indicated in Sections 5.5 and Standard Meter Installations WMLP will specify the type of metering which will apply for each installation. Self-contained single phase socket metering is standard for up to 400 ampere service where the load side capacity is not more than 320 amperes continuous. In general, self-contained polyphase socket metering is standard where the load capacity is not more than 320 amperes continuous and the voltage is less than 300 volts to ground. Current transformers are required for all services where the load side capacity exceeds 400 amperes. Installations with both current and voltage transformers are required for all services exceeding 400 amperes where the line-to-ground voltage is more than 300 volts and on ungrounded systems where the line-to-line voltage is more than 500 volts. Consult WMLP for proper meter sockets for each application. Conductors for instrument transformer runs shall not exceed 50 circuit feet from the meter. 9.4 Assigning Location of Service and Metering Equipment The location of the service and metering equipment shall be assigned by WMLP. No wiring dependent upon service entrance and meter locations shall be started until these locations have been assigned by WMLP and approved by the Wire Inspector
24 9.5 Meter Locations Metering equipment shall be installed on the line side of the service disconnecting means (hot sequence) at a point to be determined by WMLP. The exception to this requirement shall be in network areas, where the metering equipment shall be installed on the load side of the service disconnecting means (cold sequence). On projects requiring installation of current transformers, hot sequence metering is preferred. Outdoor meter locations are required for all single occupancy installations. Each location shall be readily accessible to WMLP for meter reading, testing, maintenance and removal. Service shall not be provided if accessibility to the meter requires WMLP employees to use adjacent property, climb fences or encounter other obstructions to read or remove the meter. Final meter location shall be determined by WMLP for new installations or for upgrades to existing service during the service planning process. Customers in a single occupancy dwelling who have meters which are located inside the home and who are performing a service upgrade of the existing service must relocate the meter to the outside of the home to accommodate the new service. Exceptions to this requirement shall be granted only by the WMLP Director and only in such cases where the installation would be deemed impractical or cost prohibitive, at WMLP's sole discretion. In areas subject to vandalism or damage, WMLP may require the meter to be installed in a lockable enclosure furnished and installed by the customer. A WMLP padlock will be used on such installations to ensure access to WMLP personnel. In multiple occupancy buildings, for residential or commercial use or both, meters may be installed in one common location accessible to WMLP. The owner or their designated representative shall provide a key to WMLP for accessibility. 9.6 Unmetered Conductors Unmetered conductors shall not be installed in the same raceway as metered conductors. Where unmetered conductors are run through the customer premises, they shall be enclosed in a continuous run of rigid metal conduit or service bus way. The installation of pull boxes or other similar devices is not permitted on unmetered raceways on customer premises. 9.7 Meter Height - The following requirements shall be followed when locating electric meters: a) Outdoor Meters Outdoor meter sockets or troughs shall be mounted so that the face of the meter is between three (3) and five (5) feet above final grade. In no case shall the meter face be less than three (3) feet above final grade. Exceptions to this requirement shall be granted only by the WMLP prior to the installation of the meter socket. A clear area of three (3) feet square in front of the meter shall be required and maintained at all times. Clear and unimpeded access to the meter for WMLP personnel shall be maintained at all times
25 b) Indoor Meters Indoor meter sockets or troughs shall be mounted so that the face of the meter is approximately five (5) feet above floor level. In no case shall the bottom of the meter be less than four (4) feet above floor level. Exceptions to this requirement shall be granted only by the WMLP prior to the installation of the meter socket. A clear area of three (3) feet square in front of the meter shall be required and maintained at all times. Clear and unimpeded access to the meter for WMLP personnel shall be maintained at all times. 9.8 Location of Service Disconnect In general, the service disconnect shall be located on the load side of the meter (hot sequence). The service disconnecting means shall be installed at a readily accessible location nearest the point of entrance of the service entrance conductors. The following exceptions apply: Exception No. 1 At any location where more than six meter sockets are required, the service disconnect shall be installed on the line side of the metering equipment (cold sequence). Exception No. 2 In underground network areas, the service disconnect means shall be installed on the line side of the metering equipment (cold sequence). Exception No. 3 On 277/480Y volt meter sockets, a circuit breaker shall be installed on the line side of each meter socket (cold sequence). 9.9 Meter Mounting Meter sockets and meter breaker centers shall be mounted plumb and firmly secured to supports, independent of conduit or cable connections. Where supports are attached to masonry or concrete walls, expansion bolts or anchors shall be used. Wood plugs driven into holes in masonry, concrete, plaster or similar materials are not acceptable. Rust resistant screws shall be used for both indoor and outdoor locations. The threads on conduit, fittings, or sealing plugs screwed into the hubs of meter sockets located outdoors shall have joint compound applied to prevent the entrance of water Meter Socket Identification For multiple occupancy installations, the electrical contractor or owner is responsible for clearly and permanently marking the meter socket and/or the customer disconnecting means. This marking shall clearly identify which individual occupancy is supplied by the meter socket and customer disconnect. WMLP will not provide service to a multi-occupancy building until the meter sockets are properly identified Moving / Removing Metering Equipment Meters, instrument transformers, and other metering devices are the property of WMLP and shall not be moved, removed, or altered in any way. Wiring and connections to metering equipment shall not be altered in any way, except by employees of WMLP, with the exception of specific situations where special permission is expressly obtained from WMLP. Violators will be prosecuted
26 In the event of service upgrades, it is the responsibility of the electrician to make sure that all metering equipment that is removed to accommodate the new service is returned to WMLP. Under no circumstances shall an electric service go unmetered during a service upgrade. Electricians who leave customer installations unmetered during service upgrades shall be subject to the theft of service and meter tampering provisions of Sections 10.1 and Meter Sockets for Self Contained Meters For each service with self-contained metering, the customer shall furnish and install an approved meter socket that shall have a UL label and conform to WMLP's requirements as follows: a) Automatic bypasses are never permitted. b) All meter sockets installed on commercial and industrial services, and for meters which serve common areas in apartment or condominium complexes, shall be equipped with a safety arc shield and an approved single handle operated manual bypass. c) Individual or multiple position meter sockets without bypasses are acceptable for most residential services. All 320 ampere meter sockets shall be specifically approved for installation by WMLP. Sockets with manual bypass must meet WMLP requirements Meter Connections The service or line-side conductors shall always be connected to the top terminals of the meter socket or trough and the load-side conductors shall always be connected to the bottom terminals. The customer electrician shall be responsible for connecting WMLP's conductors on the line side of the meter socket as well as connecting the customer s conductors on the load side of the meter socket. The conductor numbered three (3) will be white taped by WMLP and shall be used by the customer electrician as the neutral wire. Before installation of the meter, the Wire Inspector, who authorizes WMLP to energize the service and install the meter, must approve all connections Clearance Clearances to the meters shall be as specified in Section 9.7. Clearance between the meter socket and gas meters or gas fitting openings shall be a minimum of 3 feet Grounding of Meter Sockets Where the meter socket is installed on the line side of the service disconnecting means, the socket shall be grounded by bonding to the grounded conductor (the neutral). Where the socket is installed on the load side of the service disconnecting means, it shall be permissible to ground the socket by connection to the grounded conductor on the load side of the service disconnect if: a) No service ground fault protection is installed and
27 b) All meter sockets are located near the service disconnecting means. The grounded conductor (neutral) may be insulated from the grounded parts of the socket Meter Pedestals Meter pedestal enclosures are freestanding units intended to be mounted outdoors on a concrete pad in conjunction with underground wiring. If a meter pedestal is not mounted on concrete, it must extend a minimum of 36 inches below finished grade or ground line. The pedestal shall have a stabilizing means extending below the frost line to insure the meter mounting stays in the plumb position. The final meter height shall be in accordance with the requirements of Section 9.7. Meter pedestals shall also incorporate circuit breakers, although these are not intended to replace the service disconnecting means required at the building. The neutral strap in a meter pedestals shall be bonded to the enclosure and must be provided with a terminal for a grounding conductor Instrument Transformers For all installations requiring instrument transformers for metering purposes, WMLP shall supply and install the metering transformers. Enclosures shall be furnished and installed by the customer and approved by WMLP. Enclosures shall be equipped with WMLP padlocks. Instrument transformers may also be mounted in separate compartments of switchgear or other service equipment. WMLP will require mounting space for the meter and auxiliary equipment adjacent to or, if necessary, remote from the switchgear. Except for WMLP metering equipment, no instruments, meters or other equipment shall be placed in the instrument transformer compartments or connected to the secondaries of metering transformers Meter Sockets and Test Switches - Meter sockets and test switches for use with instrument transformers shall be furnished by WMLP at the customer s expense. Meter socket enclosures shall be installed by the Customer and the meter sockets inside those enclosures shall be wired by WMLP. Where the metering is pole mounted, WMLP will both install and wire the meter socket enclosure Instrument Transformer Cabinets Instrument transformer cabinets shall not be used as junction boxes or for branch circuit wireways. Service conductors shall enter and leave the cabinet as one circuit with no branches regardless of the number of conductors per phase. Line-side connections to other meters shall not be made in the transformer cabinet or enclosure Primary Metering Primary metering shall be installed for customers who are being served under WMLP's Large General Service Primary tariff. If the customer is served
28 at more than one point, totalization will be required to totalize the customer s coincident load for billing purposes
29 Section 10 Theft of Service 10.1 Theft of Service - Theft of service is diversion of electrical energy by any method or device used by any person that prevents the electric meter from properly registering the quantity of electricity supplied by WMLP and/or any taking of any electric energy without WMLP's consent. Where there is evidence of meter tampering or theft of electrical energy with intent to avoid a lawful charge for electricity by themselves or another person, such person or persons responsible shall be liable for prosecution under penalty of law. Under Massachusetts General Laws, the applicable sections dealing with theft of electrical energy are Chapter 164, Sections 127 and 127A; Chapter 266, Section 30; and Chapter 266, Section Meter Tampering Warning Meter seals and other locking devices installed by WMLP on metering equipment shall not be cut or removed except by authorized WMLP employees. All meters and metering equipment enclosures are sealed by WMLP with various types of locking devices. Seals and locking devices shall not be broken or removed by electrical contractors or other unauthorized personnel. Electrical contractors may request removal of meter seals and locking devices to perform work on service equipment. A one-day advance notice to WMLP is required from the contractor to allow WMLP to schedule personnel to visit the work site. The contractor is required to notify WMLP within one working day of completing work so that WMLP personnel may reseal the meter. In no case shall a contractor jumper the service without specific authorization from WMLP. Protection of WMLP owned meters and metering equipment is the responsibility of the customer. Relocation of meters and equipment damaged due to tampering, vandalism or negligence will be at the customer s expense
30 Section 11 Motors and Utilization Equipment 11.1 General Customers must not use electric service from WMLP in such a manner as to cause unusual fluctuations or disturbances on the WMLP's electric system or to adversely affect the quality of service to other WMLP customers. WMLP reserves the right to discontinue service or require that the customer modify their installation with appropriate control devices. Motors and other installations connected to WMLP's system must be of a type to utilize minimum starting current and must conform to WMLP's requirements as well as to the National Electric Code and any other applicable code with respect to wiring, equipment type and control devices Supply Voltage - Alternating-current single-phase motors rated at 5 horsepower or less will be regularly supplied at one of the following voltages: a) Frequently Started Motors Nominally 120 volts, provided the locked-rotor current does not exceed 20 amperes, and nominally 208 or 240 volts when the locked-rotor current exceeds 20 amperes. Motors starting more than once in any two-hour period are classified as Frequently Started. b) Infrequently Started Motors Nominally 120 volts, provided the locked-rotor current does not exceed 40 amperes, and nominally 208 or 240 volts when the lockedrotor current exceeds 40 amperes. Motors starting not more than once in any two-hour period are classified as Infrequently Started. c) Air Conditioning Motors Motors used for air conditioning units that are not thermostatically controlled are classified as Infrequently Started. Such motors having a full load running current greater than 7 ½ amperes but less than 15 amperes, shall be supplied at nominal 208 or 240 volts provided the locked-rotor current does not exceed 60 amperes Maximum Size of Motors Motors larger than 5 horsepower, but not exceeding 10 horsepower, may, at the WMLP's sole discretion, be accepted for single-phase operation in locations where 3-phase service is not available. Specific approval shall be obtained in writing from the WMLP Superintendent for single-phase operation of motors rated in excess of 5 horsepower Maximum Locked-Rotor Currents Motors having locked-rotor current values in excess of those shown on Table 1 shall be equipped with starters, which will limit the current to the values specified. For multi-motored devices arranged for starting of motors one at a time, the locked-rotor current limits shall apply to the individual motors
31 For multi-motored devices arranged for starting two or more motors simultaneously, the locked-rotor current limit shall be that value which would be applied to a single motor having a horsepower rating equal to the sum ratings of the two or more motors Single-Phase Motors on Three-Phase Service When multiple single-phase motors are supplied from a three-phase service, they shall be properly balanced across the three phases Three-Phase Motor Supply Voltage When WMLP agrees to supply three-phase service, it will typically be at 208 volts nominal. In certain locations, and under conditions specified by WMLP, nominal 240 volt or 480 volt, three-phase power service may be furnished. These voltages are not standard and their availability is solely at the discretion of WMLP. The WMLP shall be consulted as outlined in Section 2.6 and Section 3.4 regarding the proper voltage for each location Size of Three-Phase Motors When three-phase service is supplied, motors larger than 5 horsepower shall be three-phase. In general, the WMLP will not make available a threephase service for any motor of 5 horsepower or less, nor for any group of motors, which in aggregate total 10 horsepower or less, on an individual service. Single-phase motors, 5 horsepower or less, or any group of such motors may be supplied from a three-phase service, provided they are properly balanced across the three-phases Maximum Locked-Rotor Currents The maximum permissible locked-rotor current values in amperes for individual alternating current three-phase motors rated 25 horsepower or less are shown in Table 2. Motors have locked-rotor current values in excess of those shown in Table 2 shall be equipped with starters which will limit the current to the values specified. For motors rated in excess of 25 horsepower, WMLP shall be consulted prior to installation and will specify maximum permissible locked-rotor currents Protection Against Single-Phase Operation Three-phase motors should be protected against the possibility of the failure of any phase on the supply circuit. Providing this protection is the responsibility of the customer and WMLP shall not be liable for failure by the customer to provide proper single-phasing protection of any three-phase motor Undervoltage Protection All motors requiring protection against the application of full voltage at starting shall be provided with automatic undervoltage protection. Since occasional system disturbances may dip the system voltages sufficiently to operate instantaneous undervoltage protective devices, causing motors to shut down, it is strongly recommended where such shutdowns may have serious consequences for the customer, that a time delay attachment be added to instantaneous undervoltage devices to enable motors to continue to operate through such disturbances. Providing this protection is the
32 responsibility of the customer and WMLP shall not be liable for failure by the customer to provide proper undervoltage protection of any motor Overload Protection All motors should be protected against overload by the installation of adequate overcurrent thermal protection devices or their equivalent, which will operate so as to prevent excessive motor winding temperatures. Providing this protection is the responsibility of the customer and WMLP shall not be liable for failure by the customer to provide thermal overload protection of any motor Phase Reversal - On motors for passenger and freight elevators, cranes and hoists, or other equipment where reversal or direction of rotation might cause property damage or injury, an approved reverse phase relay should be installed so that the motor circuit will be opened in the event of loss of any phase or phase reversal. The operation of this relay and associated circuit breaker should be instantaneous and should be such that the circuit cannot be re-reenergized until the normal phase rotation is restored. Providing this protection is the responsibility of the customer and WMLP shall not be liable for failure by the customer to provide proper phase reversal protection of any motor Power Factor Individual units of alternating-current apparatus that operate with a power factor below 80 percent will be accepted only with the express and written permission of the WMLP Superintendent Power Factor Correction with Capacitors When the customer desires to, or is directed by WMLP to install capacitors for the purpose of power factor correction, WMLP shall be consulted prior to the ordering of such equipment. Approval by WMLP for all capacitor installations is required to assure that the quality of service to other customers will not be adversely affected by the manner in which such equipment is installed and operated. (See Next Page for Tables 1 and 2)
33 TABLE 1 Single-Phase Motors Maximum Permissable Locked-Rotor Current Values in Amperes with Related National Electric Code Name Plate Code Letter FREQUENT STARTING * INFREQUENT STARTING Horse- Nominal Service Voltage Nominal Service Voltage Horsepower 120 Volts 208 or 240 Volts 120 Volts 208 or 240 Volts power Rating Am- Code Am- Code Am- Code Am- Code Rating peres Letter peres Letter peres Letter peres Letter 1/8-1/4 20 A-L 30 A-V 40 A-U 60 A-V 1/8-1/4 1/3 20 A-J 30 A-U 40 A-P 60 A-V 1/3 1/2 20 A-E 30 A-T 40 A-L 60 A-V 1/2 3/4 20 A 30 A-P 40 A-G 60 A-T 3/ A-G 40 A-E 60 A-R 1 1 1/2-30 A-D 40 A 60 A-L 1 1/ A-B - 60 A-H A-B - 60 A-E A A-D 5 * Motors starting more frequently than once in any given two-hour period. TABLE 2 Three-Phase Motors * Maximum Permissable Locked-Rotor Current Values in Amperes with Related National Electric Code Name Plate Code Letter FREQUENT STARTING ** INFREQUENT STARTING Nominal Service Voltage Nominal Service Voltage 208 or 240 Volts 208 or 240 Volts Horsepower Code Code Rating Amperes Letter Amperes Letter 1 or less 25 A-L 30 A-N 1 1/2 25 A-G 40 A-M 2 29 A-F 50 A-L 3 39 A-E 60 A-J 5 59 A-E 90 A-H 7 1/2 78 A-C 120 A-G A-C 130 A-G A-C A-F A-C A-F A-C A-F Note: If a motor rated at 480 Volts has no Name Plate Letter, one half of the amperes shown in the table will apply to a 480 Volt motor. * Refer to Section 11.6 for availability of service. ** Motors starting more frequently than once in any two-hour period
34 Attachment 1 Excerpted from WMLP Study of Underground Policy, July 1999 WELLESLEY MUNICIPAL LIGHT PLANT Underground Policy Study Executive Summary Objective To identify major considerations necessary to establish a Town-wide policy that places all existing and future electric, telephone, cable television/internet and fire alarm overhead lines underground. Key Components Of An Effective Policy In order for the Wellesley Municipal Light Plant ( WMLP ) to formulate a successful policy the following minimum requirements must be achieved: Must be accepted and supported by Town Boards and Town Meeting members; WMLP must be able to absorb the additional costs without adversely affecting its ability to compete in a deregulated market specifically maintaining low rates; high reliability; and financial benefits to the Town; Financial obligation to compensate other impacted entities, e.g. Verizon, Comcast, etc., must be clearly defined and completely independent of the WMLP for funding purposes; and Must be in compliance with all applicable federal and state laws; specifically Chapter 166, Section 22 of the Massachusetts General Laws
35 Benefits To Underground Infrastructure Within the Town of Wellesley the main benefit for the placement of lines underground is one of the aesthetic values to the townspeople. A number of Wellesley residents have expressed their displeasure with the unattractiveness of poles and overhead lines. A secondary benefit is the increased reliability to withstand major outages due to severe weather conditions such as the January 1998 ice and freezing rain that resulted in power outages in parts of New Hampshire, Maine and Canada which had some homes without electricity for almost a week. Contrary to popular belief, underground facilities are not significantly more reliable than overhead lines except in the case of natural disasters. Even if a natural disaster should occur, Wellesley would still be exposed to the New England electrical grid in which more than 90% of the system is supplied by overhead lines. Cost To Underground Existing Lines There are significant costs involved to relocate existing overhead systems underground. Given that most of New England utilizes overhead distribution systems it is obvious that the additional cost cannot be justified purely from an operational benefits standpoint. If undergrounding existing overhead systems were found to be cost-effective this practice would have been widely adopted a long time ago by all publicly /investor-owned electric and telephone companies. For electric utilities the labor and material costs (excluding excavation) to place electric facilities underground is estimated to be more than four times higher than the costs required to supply electricity with overhead lines. As a frame of reference the WMLP's budgeted capital expenditures to rebuild existing overhead lines for fiscal years 1997 through 2000 was $
36 million. To replace these same facilities with an underground infrastructure the total cost would have been $10.8 million, and this does not include excavation. Of the total cost to place all utilities underground the electrical infrastructure amounts to between 30% and 40%. Chapter 166, Section 22 of the Massachusetts General Laws allows all effected utilities to recover their costs through a 2% surcharge. This surcharge is collected by the utility by adding 2% to each Wellesley customer s bill until such time as all construction costs have been reimbursed
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 29987-G Cancelling Revised Cal. P.U.C. Sheet No. 22381-G Gas Sample Form No. 62-0982 Distribution and Service
Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES
P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an
The Narragansett Electric Company d/b/a National Grid, Filing to Amend Terms and Conditions for Distribution Service Docket No.
Jennifer Brooks Hutchinson Senior Counsel September 3, 2010 VIA HAND DELIVERY & ELECTRONIC MAIL Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson Boulevard Warwick,
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
In the year Two Thousand Eleven.. Resolved by the City Council of the City of Burlington, as follows:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 APPROVAL OF AMENDMENTS TO BURLINGTON ELECTRIC DEPARTMENT S OPERATING GUIDELINES In the year Two Thousand Eleven.. Resolved
ELECTRIC EPB OF CHATTANOOGA Chattanooga, Tennessee SCHEDULE OF RULES AND REGULATIONS
ELECTRIC EPB OF CHATTANOOGA Chattanooga, Tennessee SCHEDULE OF RULES AND REGULATIONS NOTE: EPB shall mean THE ELECTRIC POWER BOARD OF CHATTANOOGA whose main office is located in Chattanooga, Tennessee.
Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs.
Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs. REA Energy Services Sells and Installs: Heating and Air Conditioning Electrical Contracting Geothermal Heat Pumps Back-Up
PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.
INTRODUCTION These rules are issued for use by Customers, builders, electrical contractors, architects, engineers, etc. The rules require the installation of safe and adequate wiring and electrical equipment,
SPECIFICATIONS FOR ELECTRIC SERVICE GARLAND POWER & LIGHT
FOREWORD This booklet is issued by the Electric Department of the City of Garland, herein after referred to Garland Power & Light or GP & L, to acquaint electric customers of Garland Power & Light, or
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
Information and Requirements for Electric Service. Chapters 1, 2, 4, 6 and Appendix
Organization: Manual: Section: Electric Distribution Information and Requirements for Electric Service Chapters 1, 2, 4, 6 and Appendix Tracking Number: 05-077 Date: January 6, 2006 SME: Jim Calore Contact
Please check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information
4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to
TERMS AND CONDITIONS
XXII. ELECTRIC LINE EXTENSIONS AND INSTALLATIONS A. The Company will make electric line extensions for normal service to permanent service locations in accordance with the provisions stated herein. B.
CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013
CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT 103 WEST PARIS ST. P. O. BOX 527 HUNTINGDON, TENNESSEE 38344 Telephone
How To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
Considering UNDERGROUND. tampaelectric.com
Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type
Rules and Regulations of Johnson City Power Board (JCPB) Effective November 1, 2015
Rules and Regulations of Johnson City Power Board (JCPB) Effective November 1, 2015 1) Application/Contract for Service Each prospective Customer desiring electricity, herein referred to as service, will
208.652.7431 Report power outage after hours: 866.887.8442. 1150 N. 3400 E. Ashton, ID 83420 www.frr ec.com. Ashton, Idaho Headquarters Building
The aim of Fall River Rural Electric Cooperative, Inc. is to make electric energy available to its members at the lowest cost consistent with sound economy and good management. Ashton, Idaho Headquarters
Danvers Electric. Electric Service Policy and Requirements Handbook
Town of Danvers Department of Public Works Danvers Electric Electric Service Policy and Requirements Handbook 06-30-2012 2 BURROUGHS STREET DANVERS, MASSACHUSETTS 01923 Telephone: (978) 774 0005 1 P a
GENERAL RULES AND REGULATIONS FOR ELECTRIC SERVICE CUSTOMER'S UTILIZATION OF ELECTRIC SERVICE
Filed with the I. U. B. Substitute Fourth Revised Sheet No. 217 ORIGINAL TARIFF NO. 1 Canceling Third Revised Sheet No. 217 SECTION 5 5.01 APPLICATION FOR SERVICE: Any person, firm, association, or corporation,
Electric Service and Meter Installations Manual SCANA Corporation 2013
Electric Service and Meter Installations Manual SCANA Corporation 2013 Revised: June 2013 On file with South Carolina Public Service Commission Table of Contents Section 1: Introduction 1 Customer Call
Policy and Guidelines for Electric Service
Policy and Guidelines for Electric Service FRANKLIN MUNICIPAL POWER & LIGHT 1050 Pretlow Street Franklin, VA 23851 757-562-8568 757-562-7883 Fax January 2008 Franklin Power & Light HELPFUL TELEPHONE NUMBERS
SCHEDULE OF RULES AND REGULATIONS
Lewisburg Electric System (LES) SCHEDULE OF RULES AND REGULATIONS 1. Application for Service: Each prospective Customer desiring electric service will be required to sign Lewisburg Electric System s standard
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
Tucson Electric Power Company Rules and Regulations
Original Sheet No.: 907 Introduction The Company will construct, own, operate and maintain lines along public streets, roads and highways which the Company has the legal right to occupy, and on public
Electric Service Guide for Commercial Construction
Electric Service Guide for Commercial Construction Contents Contacting KCP&L... 2 Voltages... 2 Temporary Service... 2 Customer-Provided Temporary Service... 2 KCP&L-Provided Temporary Service.... 2 Current
ELECTRICITY [CH.194 35
ELECTRICITY [CH.194 35 ABACO ELECTRIC COMPANY LIMITED REGULATIONS (SECTION 60) [Commencement 15th May, 1972] 1. These Regulations may be cited as the Abaco Electric Company Limited Regulations. 2. In these
Electric Service Guide for Residential Construction
Electric Service Guide for Residential Construction Table of Contents Contacting KCP&L... 2 Existing Home Remodeling or Additions... 2 Changing your electric service... 2 What you need to know before you
ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering
ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering Requirements Clearance Requirements August 2015 A current version
POWER CORPORATION Requirements for Distribution Wires Access
POWER CORPORATION Requirements for Distribution Wires Access Contact Information: ENMAX Power Corporation 8820 52 St SE Phone: 514-3700 Calgary, Alberta Fax: 514-3719 T2C 4E7 Version 3.0 January 2005 i
3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
Carolina Power & Light Company 51 d/b/a Progress Energy Carolinas, Inc. SERVICE REGULATIONS
Carolina Power & Light Company 51 d/b/a Progress Energy Carolinas, Inc. 1. SERVICE AGREEMENT SERVICE REGULATIONS (d) (e) (f) Description: The Service Agreement (hereinafter sometimes termed "Agreement")
SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)
SOUTH CAROLINA Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard) 1. Overview: This Standard contains the requirements, in addition
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
Applying For New or Revised Electric Service
Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service
CUSTOMER INSTALLATION STANDARDS FOR ELECTRIC SERVICE
CUSTOMER INSTALLATION STANDARDS FOR ELECTRIC SERVICE February 1, 2013 A transition period will exist in which installations may be approved and connected as long as they meet either the 2008 or the 2013
Homeowner Information Guide Electrical Safety. British Columbia Safety Authority
Homeowner Information Guide Electrical Safety British Columbia Safety Authority The following information should be carefully reviewed before performing any electrical work. The information contained in
Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva
Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Issued: August 2009 SIZED UP TO 100 KVA TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Applicability... 1 1.2 Definitions...
Application for. Commercial New Service
Application for Commercial New Service Welcome to Lake Country Power! In order to make your new service installation easy, we provide individualized help to process and install a new service. In order
Section 2 General Requirements
Table of Contents Section 2. General Requirements Section 2 General Requirements A. SCOPE... 2-3 B. AVAILABILITY OF SERVICE... 2-3 C. APPLICATION FOR SERVICE... 2-4 D. SERVICE ENTRANCE LOCATION / METER
SERVICE ENTRANCE REQUIREMENTS MANUAL
SERVICE ENTRANCE REQUIREMENTS MANUAL 7th Edition 2012 TABLE OF CONTENTS BTU General Policies and Procedures... 3 SECTION 1: Temporary Construction Meter Poles... 5 Temporary Overhead Fed Meter Pole...
Contents. Section 1 General Information 2. 1.A Introduction 3 1.B Overview 3 1.C Pricing, Billing, and Payment Policies 6
Contents Section 1 General Information 2 1.A Introduction 3 1.B Overview 3 1.C Pricing, Billing, and Payment Policies 6 Section 2 Engineering Design 7 2.A Introduction 8 2.B Pepco s Commercial Service
Article 10 - ADMINISTRATIVE SECTION
Article 10 - ADMINISTRATIVE SECTION 10.1 TITLE These Administrative Regulations along with the requirements included in the 2011 Edition of the National Electrical Code (NFiPA-70-2011) as adopted by the
MOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
ELECTRIC SERVICE HANDBOOK
ELECTRIC SERVICE HANDBOOK Revised July 2006 Table of Contents Electric Construction Title: Electric Service Handbook Page No. TOC Rev. July-06 Section 1: Introduction...1-010 Section 2: DP&L Offices...2-010
AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION
AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION This Interconnection Agreement ( Agreement ) is made and entered into this day of,, by Sharyland Utilities, L.P. McAllen (
To complete the process for a net metering interconnection, please follow the steps below:
We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
ABACO POWER AND LIGHT COMPANY LIMITED REGULATIONS
CH.194 64] ELECTRICITY Fuel Adjustment Clause: The energy charge shall be increased or decreased 0.15c/KWhr for each 1.0c (or major fraction thereof) by which the cost of diesel fuel consumed by the Company
Questions and Answers for Heating and A/C Contractors
1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded
DOCUMENT NAME: 20080207ITDH1 UTILITY EASEMENTS GRANTED (0904-02)
Staff Summary Report Council Meeting Date: 02/07/08 Agenda Item Number: SUBJECT: Request Council approval authorizing the Mayor to execute an Agreement between the City of Tempe and Salt River Project
Customer Guide for Electric Service Ohio
Customer Guide for Electric Service Ohio March 2014 (Page Intentionally Blank) TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 DEFINITIONS...2 3.0 GENERAL INFORMATION...5 3.1 Availability & Character of Service...
DISTRIBUTION SYSTEMS INDEX NOV 06 SECTION 2. Detroit...2-1-5 Ann Arbor...2-1-6 Mt. Clemens...2-1-7 Port Huron...2-1-8
DISTRIBUTION SYSTEMS INDEX NOV 06 SECTION 2 Kinds and Uses of Service... 2-1-1 and 2-1-2 Wye Network Area Maps Detroit...2-1-5 Ann Arbor...2-1-6 Mt. Clemens...2-1-7 Port Huron...2-1-8 Transformer Connections
ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS
Revised Cal. P.U.C. Sheet No. 20093-E Cancelling Revised Cal. P.U.C. Sheet No. 15575-E ELECTRIC RULE NO. 15 Sheet 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines* of
PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 1, 2013. It is intended for information and reference purposes only.
Requirements for the installation of. Electric Services. September 8, 2003. Specifications for Electric Installations
Requirements for the installation of Electric Services & Meters September 8, 2003 Specifications for Electric Installations TABLE OF CONTENT Section I - Introduction... 1 Section II - Definitions... 3
ELECTRIC SCHEDULE LS-2 Sheet 1 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING
Revised Cal. P.U.C. Sheet No. 33883-E Cancelling Revised Cal. P.U.C. Sheet No. 28182-E ELECTRIC SCHEDULE LS-2 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to services for lighting
SERVICE - GENERAL Residential, Commercial, Industrial
PAGE 1 OF 9 USE: Rules and procedures for overhead or underground services. PREVIOUS REVISION 10-01-01 ORIGINATED 03-94 PREVIOUS NUMBER ER 1-290-B, 07-15-93 LATEST REVISION: Remove details of Facility
How To Manage A Power Station
CARESERV TECHNOLOGIES, LLC SERVICE AGREEMENT COLOCATION SERVICES SCHEDULE Version 2014.1 (01.01.2014) This Schedule, together with any Order referencing this Schedule or pursuant to which the services
Electric Service Rules
2016 Electric Service Rules GENERAL INFORMATION TEMPORARY SERVICES OVERHEAD SERVICES UNDERGROUND SERVICES DISTRIBUTED GENERATION METERING HUD MANUFACTURED HOMES FARM SERVICES UTILITY/CATV SERVICES PRIMARY
REQUEST FOR ELECTRIC SERVICE Commercial
This form should be completed if you are applying to have new electric facilities installed on your property for the purpose of providing electric service to a commercial entity. PROJECT CHECKLIST Below
Electric Service Guide for Residential Construction
Electric Service Guide for Residential Construction TABLE OF CONTENTS Contacting KCP&L... 2 Existing Home Remodeling or Additions... 2 Building a New Home... 3 KCP&L Services at a Glance... 4 Current Transformers...
PEDERNALES ELECTRIC COOPERATIVE, INC. TARIFF
200 Service Policy 200.1 Condition of Service The Cooperative s Service Policy applies to all locations within its service area, according to the type of service delivered and subject to the provisions
How To Install A Power Line In A Home Or Business
New Business Addresses and Phone Numbers NEW JERSEY OFFICES DELAWARE OFFICES MARYLAND OFFICES Cape May Courthouse Operations New Castle Region Montgomery County Region 420 Rt. 9 N. 401 Eagle Run Road 201
Guide for Electric Service and Meter Installations
Guide for Electric Service and Meter Installations April 28, 2009 Preface This booklet is not intended to conflict with the National Electrical Safety Code, the National Electrical Code, or such state
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service
Electrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
City of San Diego Residential Photovoltaic Systems Inspection Guidelines
City of San Diego Residential Photovoltaic Systems Inspection Guidelines The purpose of inspections by DSD staff is to ensure compliance with the California Electrical Code (CEC), other applicable codes
Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering
Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.
0095.05 June 30. 2011 July 18, 2014 1 of 7
Standard Number: Superseding: Effective Date: Page: 0095.05 June 30. 2011 July 18, 2014 1 of 7 Pole Attachments, Automated Meter Reading and Cellular Phone Antennas 1. Scope 2. Application This standard
Electric Service Manual
Table of Contents SECTION 1... 5 INTRODUCTION... 5 SECTION 2... 7 DEFINITIONS... 7 COMPANY... 7 CUSTOMER... 7 OVERHEAD SERVICE DROP... 7 UNDERGROUND SERVICE DROP... 7 SERVICE ENTRANCE... 7 SERVICE EQUIPMENT...
CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND
STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND NOTICE This is unofficial English translation of KYEPCO s STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND ( tokutei kibo juyo hyojun kyokyu joken
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
ELECTRICAL CONTRACTORS HANDBOOK (ECH)
Chapter ECH- 0.0 Table of Contents ELECTRICAL CONTRACTORS HANDBOOK (ECH) Subject Table of Contents Effective: 12/02/2015 Revision Number: 2 Electric Rules and Regulations Effective Date 1.0 General Information
County of Riverside Building and Safety Department
County of Riverside Building and Safety Department Mike Lara Director Photovoltaic Permitting Guidelines The information provided in this document is general and is intended only as a guide. Each project
BROADBAND INTERNET ACCESS TRANSMISSION SERVICE WHOLESALE SERVICE GUIDE AND WHOLESALE RATES GENERAL
GENERAL 1.1 General Regulations ( Cooperative ) is an Incumbent Local Exchange Carrier (ILEC). The service provided under these terms and conditions is the transport component of wireline broadband Internet
FORTISBC INC. ELECTRIC TARIFF B.C.U.C. NO. 2 FOR SERVICE IN THE WEST KOOTENAY AND OKANAGAN AREAS TERMS AND CONDITIONS AND RATE SCHEDULES
ELECTRIC TARIFF B.C.U.C. NO. 2 FOR SERVICE IN THE WEST KOOTENAY AND OKANAGAN AREAS TERMS AND CONDITIONS AND RATE SCHEDULES EXPLANATION OF SYMBOLS APPEARING ON TARIFF PAGES A - signifies Increase C - signifies
Approved Meter Sockets and Cabinets
Single Unit Residential Guide 1 PHASE, 120/240 VOLT S METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to center of meter ± 100 mm ( 4
INFORMATION AND GUIDANCE FOR CUSTOMER ELECTRIC SERVICE
INFORMATION AND GUIDANCE FOR CUSTOMER ELECTRIC SERVICE November 2009 November 2009 (PAGE INTENTIONALLY BLANK) CONTENTS INTRODUCTION... 1 DEFINITIONS... 2 GENERAL INFORMATION... 4 Availability & Character
ARTICLE B. SERVICE RULES AND POLICIES. As adopted by the City of Naperville Council as
ARTICLE B. SERVICE RULES AND POLICIES As adopted by the City of Naperville Council as Title 8: Public Utilities Chapter 1: Electricity Article B: Service Rules and Policies On April 01, 2014 TITLE 8 -
Requirements for Electric Service and Meter Installations
Requirements for Electric Service and Meter Installations Florida service area Revised 2012 Amended 7/2013 2014 Duke Energy Corporation 140165 01/14 Section TABLE OF CONTENTS Page Number Committee Member
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.
Net Energy Metering Southern California Edison
NET ENERGY METERING To encourage small electrical customers to install environmentally friendly sources of electrical power, the State of California has passed laws to make the process of interconnecting
SECTION 1 PURPOSE AND POLICIES
SECTION 1 PURPOSE AND POLICIES These Rules and Regulations have been enacted to serve the public in securing the health, safety, and general welfare of the inhabitants of the Southwest Suburban Denver