Guidance for New Developments Surface Water Drainage Assessments

Size: px
Start display at page:

Download "Guidance for New Developments Surface Water Drainage Assessments"

Transcription

1 Guidance for New Developments Surface Water Drainage Assessments Updated: May 2014 The Planning, Design and Adoption of Sustainable Drainage Systems (SuDS) Under Schedule 3 of the Flood and Water Management Act 2010, yet to be implemented, it is to be the responsibility of the Lead Local Flood Authority to establish a SuDS Approval Body (SAB). This will mean that all new SuDS, serving two or more properties will need to gain approval by Devon County Council as the SAB. In the interim, it is essential that due regard is made for the provision of SuDS therefore this guidance note is intended to inform developers and planners of the standards that would be expected. New developments must have an effective and robust surface water drainage system which should not increase flood risk to adjacent properties or land and should be undertaken in accordance with SuDS principles. It is vital that applicants consult with the Local Planning Authority at the Pre-Application stage. Any new development should consider the benefits to: 1. Flood Risk 2. Water Quality 3. Amenity and Biodiversity Sustainable Drainage Systems (SuDS) are to be designed in accordance with CIRIA Report C697 SuDS Manual (2007) and if using infiltration then BRE 365 Soakaway Design (2003) or Part H of the Building Regulations (2000). When designing the drainage scheme for a site it is essential to: Ensure that people and property on the site are protected against flooding, and to Ensure that the impact of the development does not exacerbate flood risk at any other point (either upstream or downstream) in the catchment of a receiving watercourse/sewer.

2 The drainage design for the site should provide on-site flood protection from: Flooding from a watercourse. The drainage design should demonstrate that the development, including the SuDS system, is outside the functional floodplain and, wherever possible, outside the 1 in 100 year fluvial (or 1 in 200 year tidal) flood risk zone. Flooding from the drainage system. The drainage design should demonstrate that the SuDS will cater for the full range of storms up to the 100 year event(with a 30% allowance for climate change for all storms), without causing any significant unplanned flooding. The design should demonstrate that any blockage in the drainage system will be accommodated by suitable overflows, and exceptional rainfall by exceedance flow routing. When SuDS are overwhelmed by exceptional rainfall then exceedance routes protect people and property by providing unobstructed overland flow routes through the development and should be considered for all drainage schemes. Flooding from overland flows. The drainage design should demonstrate how exceptional flows generated within or from outside the site will be managed including overland flow routes, protection of buildings to prevent entry of water, and protection of major access routes including access to institutional buildings. The SuDS design standard SuDS design is to be based on a range of storm duration events with an annual probability of 1% (1 in 100 year storm event) with an allowance of 30% increase in predicted rainfall volume (due to climate change) for Southwest region (Ref. UKCIP). Under certain circumstances an alternative storm event may need to be catered for and other statutory authorities may need to be consulted. (Environment Agency, South West Water, etc.). The drainage design must ensure that the frequency and rate of discharge from the new development is, wherever possible, equal to the frequency and rate of discharge that would be discharged under equivalent greenfield conditions. Designs that consist solely of underground storage and an orifice plate/hydrobrake, are not in the truest sense a SuDS system as they do not mimic greenfield conditions. It must confirm the agreed greenfield surface water runoff rate and will take into account, where appropriate, the difference between the 1 in 1 year event, the 1 in 30 year event, and the 1 in 100 year event with a 30% allowance for climate change. The drainage design must ensure that the frequency and volume of surface water runoff from the new development is, wherever possible, equal to or less than the frequency and volume that would be discharged under equivalent greenfield conditions.(i.e. mimic greenfield conditions). It will confirm the storage volumes for the site taking into account: Interception storage Attenuation storage Long term storage.

3 Water Quality An appropriate management train of SuDS components should be implemented to effectively mitigate the pollution risks associated with different site users/activities. To remove the major proportion of pollution from surface water runoff it is necessary to: Capture and treat the surface water runoff from frequent, small events, and Capture and treat a proportion of the initial surface water runoff (the first flush) from larger and rarer events. Maintenance The design of each SuDS feature must take into account the day to day maintenance requirements, occasional tasks and long term design life elements of each structure. SuDS maintenance requirements for a development should be set out in a SuDS management plan that includes:- A SuDS overview A management statement to describe the SuDS scheme and set out the management aims for the site. It should consider how the SuDS will perform and develop over time anticipating any additional maintenance tasks to ensure the system continues to perform as designed. Specification notes that describe how work is to be undertaken and the materials to be used. A maintenance schedule describing what work is to be done and when it is to be done using frequency and performance requirements as appropriate. A site plan showing maintenance areas, control points and outfalls. Supporting documents. General Guidance: SuDS must be readily accessible via easements or sited within publically owned land. Siting of SuDS must take into account future maintenance and any foreseeable future developments which may affect or be affected by the SuDS. Where SuDS are to be sited on sloping ground the developer/engineer will have to prove that the outflowing water will not interfere with structures downslope or discharge at ground level and that the slope itself will not be affected. The ground slope downstream of the infiltration device should be no greater than 1:10. SuDS are not to be used in loose made ground/fill or where the introduction of water will adversely affect the soil structure (e.g. collapse, solution, heave etc.) Ground water quality must not be adversely affected by the use of SuDS. The EA should be contacted for further information regarding sensitivity of the site.

4 Adoption of SuDS When Schedule 3 of the Flood and Water Management Act 2010 is fully implemented, then the SAB will be required to adopt and maintain the approved SuDS that serve more than one property provided these Standards for SuDS are met. However, in the interim, there are no plans to adopt any SuDS. There are also no plans for the retrospective adoption of SuDS designed and built prior to the SAB being setup; however there is the possibility of these being considered on a site by site basis, dependant on the level of information provided. Full Application or Reserved Matters Application Requirements. The following lists give an idea of the types of information required to accompany a drainage application. The list is not exhaustive but gives a general indication of the information required. This will obviously vary on a site by site basis. Effectiveness Appraisal: 1. Flood Risk Assessment. 2. A description of the current surface water drainage arrangements for the site. 3. A location plan. 4. The proposed development layout drawing. 5. A description of the proposed surface water drainage system. 6. A brief summary of the SuDS incorporated with treatment stages highlighted. 7. The soil WRAP classification for the site. 8. Results of soil permeability testing. Impact Appraisal: 1. Calculations showing the pre and post development peak run off rate for the agreed critical rainfall event(s) using the ADAS Reference Book 345 Appendix 5, Institute of Hydrology Report 124, or R&D Technical Report W5-074-A Greenfield Runoff Revision D. 2. Design Storage calculations for the agreed control rates, and preliminary sizes of attenuation required on the site s drainage plans. 3. A survey of the conditions of agreed sections of existing downstream watercourses or culverts. CCTV information may be requested. Design Appraisal: 1. Design for Exceedance (flood routing) is required for all sites. Design must address the management of all excess water above the 1 in 100 year event plus 30% for climate change. The flood routing must take into account any existing or foreseeable future developments which may affect or be affected by the SuDS. 2. For design purposes the drained surface area must include all highway areas including road, footpath and any other adoptable impermeable surface which could contribute to water entering the SuDS.

5 Amenity Appraisal: 1. An assessment of the impact of the surface water proposals on habitats 2. The benefits for amenity from the proposed system Construction Appraisal: 1. Details of surface water runoff prevention measures during the construction phase. To the standards in C Details of protection of proposed SuDS during construction. 3. Provision of as-built drawings upon completion to the SAB. Maintenance Agreement: The Maintenance Agreement should include: 1. Confirmation of the maintenance responsibility for each of the drainage elements including who is responsible. 2. Lifespan, maintenance schedule and costs (annual and whole life costing) of SuDS. 3. Risk Assessments for each of the maintenance activities. 4. Method Statements for undergoing the routine maintenance.

6 Requirements for specific SuDS elements Rainwater Harvesting. Note: must not count towards attenuation volumes 1. Full design and supporting calculations. 2. Specification. 3. Pipework design layout and confirmation of system overflow arrangements. 4. Maintenance who has responsibility & the total life cost Infiltration Systems Infiltration systems should be designed in accordance with BRE Digest 365, Building Regulation 2000 Part H or BS EN752 Part 4 and Ciria C697 SuDS Manual. Where the CIRIA method is used for the calculation of the soakaway design the appropriate factor of safety based on the location of the SUDS should be used. The following will be required to accompany an application. The list is not exhaustive. 1. Full design, specification, details of management train/ treatment stages and supporting calculations including flood routing is to be supplied prior to approval. 2. Drawings indicating the proposed location of the infiltration system, conformation of the type of construction used and sectional drawings for embankments, pipework, flow control etc. 3. Plans showing topographical survey of the site, finished levels etc. Site Testing Regime 1. Percolation testing to determine soil infiltration rate to be carried out in accordance with BRE 365 Soakaway Design (2003) and CIRIA Report 156 Infiltration drainage manual of good practice (1996). Method of test must be relevant to proposed SuDS. 2. Testing must be carried out at or as near as possible to the proposed soakaway location (No greater than 25m from proposed soakaway for uniform subsoil conditions. For nonuniform subsoil conditions testing must be carried out at the location of the soakaway). 3. Testing must be carried out at the appropriate depth for proposed SuDS (e.g. invert level, base level of soakaway etc.) relative to existing ground levels. 4. Where more than one ring soakaway is required then testing must be carried out at each proposed soakaway location if they are sited more than 25m apart (10m intervals for non-uniform soils). Where a trench soakaway is used and is greater than 25m in length, testing must be carried out at a minimum interval of 25m (10m intervals for non-uniform soils). 5. Three percolation tests are to be performed at each trial pit location to determine the infiltration rate, where possible. Where slower infiltration rates are experienced, testing must be carried out over a minimum period of 24 hours (longer if 25% Effective depth is not reached). 25% Effective depth must be reached. Extrapolated test data will not be accepted.

7 General guidance for infiltration systems Maximum groundwater levels must be at least 1m below the base level of the proposed SuDS where infiltration is required. Maximum groundwater levels to be monitored and ascertained over a 12 month period prior to development. Where necessary the Environment Agency is to be consulted with regards to sensitivity of receiving aquifer. The location of trial holes/percolation tests must be carried out at, or as near to, the proposed soakaway location for the development. It should also be at the same depth/level as the proposed infiltration device. For any covered (below ground) infiltration device (including permeable paving) adequate monitoring devices must be provided to allow inspection with regards to functioning and performance. The outer edge of adjacent soakaways should be at least 10m apart to prevent them from interacting. Soakaways to be located 5m from any structure/ highway etc. Soakaways or similar infiltration devices are not to be used within the floodplain. Trench/ring soakaways or similar infiltration devices are not to be sited below the highway. The maximum depth of covered/ below ground infiltration devices will be 2-3m below the proposed ground level. Depths below 3m will be considered subject to maintenance issues. Permeable paving will be assessed on an individual site basis and will require additional special considerations including subgrade conditions, type/length of road, maximum gradient of 1 in 26 etc. At present Devon County Council would only consider small residential roads (such as cul-de-sacs) of approximately 50m length for permeable paving. Porous Asphalt pavements are not permitted at present.

8 Attenuation Systems. The following will be required to accompany an application. The list is not exhaustive and will obviously vary on a site by site basis. 1. Confirmation of the maximum discharge rate (litres/ second). 2. Full design, specification, details of the management train, treatment stages and supporting calculations including flood routing. 3. Plans showing topographical survey of the site, finished levels etc. 4. Drawing(s) indicating the proposed location of the attenuation system(s), confirmation of the type of construction used and sectional drawings for embankments, pipework, flow control etc. General guidance for attenuation For any covered (below ground) attenuation device (including permeable pavements) adequate monitoring devices must be provided to allow inspection with regards to functioning and performance. Where polypropylene cellular units (crates) are to be used as the storage device, the developer must provide information to prove the long term life of the units and that they are suitable for use for the site taking into account such matters as depth of soakaway etc. Such systems, where approved, must have BBA certification.

9 Further Guidance The SuDS manual (C697) Free: Follow this link Site handbook for the construction of SuDS (C698) Free: Follow this link Designing for exceedance in urban drainage: Good practice (C635) Free: Follow this link Interim Code of Practice for SuDS Free: Follow this link

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited i towards sustainable water stewardship Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited 1 Tomorrow s forecast is more frequent, more violent

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 BACKGROUND This guidance provides information for developers on the use of sustainable drainage techniques in new developments. It

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Development at 2 St Albans Road, Kingston, London, KT25HQ

Development at 2 St Albans Road, Kingston, London, KT25HQ Development at SuDS Report. Prepared for: Report prepared by: Dave Alonso Divine Ideas (UK) ltd Date: August 2015 Project/Issue number: Appendices Attached: 1510/01/SuDS A, B & C Divine Ideas (UK) Ltd

More information

Surface Water Management: Interim Guidance for Developers

Surface Water Management: Interim Guidance for Developers Surface Water Management: Interim Guidance for Developers www.shropshire.gov.uk Contents Executive Summary 1. Introduction...1 2. National Policy Context...2 Making Space for Water...2 Future Water...2

More information

Flood Risk Assessment and Drainage Statement

Flood Risk Assessment and Drainage Statement Trinity College, Cambridge Proposed Relocation of Felixstowe Rifle Range, Land north of Nicholas Road, Trimley St Mary, Felixstowe Quality Assurance Site name: Client name: Proposed Relocation of Felixstowe

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land

More information

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP Granville Road Estate, London Borough of Barnet Flood Risk Assessment and Drainage Strategy August 2014 New Granville LLP Document History JOB NUMBER: 237 DOCUMENT REF: Granville Road FRA REVISIONS: Final

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

Littleport Co-located Schools

Littleport Co-located Schools Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Introduction to sustainable drainage. www.ciria.org/suds

Introduction to sustainable drainage. www.ciria.org/suds Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary

More information

A DESIGN AND ADOPTION GUIDE

A DESIGN AND ADOPTION GUIDE SUSTAINABLE DRAINAGE A DESIGN AND ADOPTION GUIDE Issue 2 July 2013 Issue History Issue Change Release Date 1 Document release 2 Planning Policy Sub February 2013 July 2013 2 PREFACE Sustainable Drainage

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Guidance Notes: GARDEN FLOODING

Guidance Notes: GARDEN FLOODING Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

City of West Linn Public Works Design Standards 2010. Table of Contents

City of West Linn Public Works Design Standards 2010. Table of Contents City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2

More information

Flooding and Sustainable Urban Drainage Systems

Flooding and Sustainable Urban Drainage Systems Flooding and Sustainable Urban Drainage Systems Supplementary Planning Guidance Note Falkirk Council Development Services Welcome to this supplementary planning guidance note on Flooding and Sustainable

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

Sustainable Urban Drainage Systems (SUDS) and the Draft Flood and Water Management Bill: Briefing for UK Roads Board

Sustainable Urban Drainage Systems (SUDS) and the Draft Flood and Water Management Bill: Briefing for UK Roads Board Sustainable Urban Drainage Systems (SUDS) and the Draft Flood and Water Management Bill: Briefing for UK Roads Board UK Roads Board and implications from SUDS... 2 Background to SUDS... 5 Sustainable development

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils.

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils. Chapter Eleven Water Quality, Drainage and Hydrogeology Introduction 11.1 This Chapter considers the impact of the Relief Road on the hydrology of the area and considers both surface and groundwater. Runoff

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Briefing note: Sustainable Stormwater Management prepared by the NTUA

Briefing note: Sustainable Stormwater Management prepared by the NTUA Briefing note: Sustainable Stormwater Management prepared by the NTUA Sustainable drainage systems are cost-effective easy-to-manage solutions, designed to manage runoff flow rates, reduce the impact of

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

pavements permeable GUIDE TO THE DESIGN, CONSTRUCTION AND MAINTENANCE OF CONCRETE BLOCK PERMEABLE PAVEMENTS www.paving.org.uk

pavements permeable GUIDE TO THE DESIGN, CONSTRUCTION AND MAINTENANCE OF CONCRETE BLOCK PERMEABLE PAVEMENTS www.paving.org.uk January 2010 Edition 6 Uniclass L534:L217 permeable pavements GUIDE TO THE DESIGN, CONSTRUCTION AND MAINTENANCE OF CONCRETE BLOCK PERMEABLE PAVEMENTS www.paving.org.uk permeable pavements GUIDE TO THE

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

BUILDING SURVEYING 313021

BUILDING SURVEYING 313021 BUILDING SURVEYING 313021 Session topic SUDS - Sustainable Urban Drainage Systems Session objectives To examine various Sustainable Urban Drainage Systems (SUDS) for managing rainwater run-off and discuss

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Sewer Flooding Alleviation in the Counters Creek Catchment

Sewer Flooding Alleviation in the Counters Creek Catchment Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda

More information

Sustainable Drainage Systems (SUDS) An introduction

Sustainable Drainage Systems (SUDS) An introduction Sustainable Drainage Systems (SUDS) An introduction We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your environment

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

FRÄNKISCHE STORMWATER MANAGEMENT SYSTEMS RIGOFILL INSPECT STORMWATER MANAGEMENT SYSTEM

FRÄNKISCHE STORMWATER MANAGEMENT SYSTEMS RIGOFILL INSPECT STORMWATER MANAGEMENT SYSTEM Fränkische Rohrwerke Gebr. Kirchner GmbH & Co KG Hellinger Strasse 1 97486 Königsberg Bavaria Germany Tel: 00 49 95 88-490 Fax: 00 49 95 25 88-92 490 e-mail: horst.doerr@fraenkische.de website: www.fraenkische.com

More information

Report Relating to Incidents of Flooding within the Dollar Catchment

Report Relating to Incidents of Flooding within the Dollar Catchment Joint Position Statement Report Relating to Incidents of Flooding within the Dollar Catchment October 2012 Eric McQuarrie, Scottish Water Stuart Cullen, Clackmannanshire Council TABLE OF CONTENTS 1. INTRODUCTION...

More information

Permeable Pavement Treatment Capacity

Permeable Pavement Treatment Capacity Permeable Pavement Treatment Capacity April 20 2011 This investigation will analyze the pollutant removal capacity of various types of permeable paving techniques. Daniel Sullivan Joseph Fleury Contents

More information

Flood Risk Management in Southwark

Flood Risk Management in Southwark Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What

More information

Guidelines for. Permeable Pavement

Guidelines for. Permeable Pavement What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as

More information

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015.

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015. Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015 Contents Flood Map Confirmation Flood Map Extract Model Output Data Data

More information

The Planning System and Flood Risk Management

The Planning System and Flood Risk Management 20 The Planning System and Flood Risk Management Guidelines for Planning Authorities November 2009 The Planning System and Flood Risk Management Guidelines for Planning Authorities Contents PAGE Ministers

More information

Costs and Benefits of Sustainable Drainage Systems

Costs and Benefits of Sustainable Drainage Systems Costs and Benefits of Sustainable Drainage Systems Committee on Climate Change July 2012 Final Report 9X1055 CONTENTS Page 1 INTRODUCTION 1 1.1 Background 1 1.2 Report Structure 1 2 LITERATURE REVIEW

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE 12-O-1761 AN ORDINANCE TO AMEND VARIOUS SECTIONS OF CHAPTER 74, ARTICLE X OF THE CITY OF ATLANTA CODE OF ORDINANCES FOR THE PURPOSE OF PROMOTING GREEN

More information

Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council

Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014 David Keane Cork County Council 1 Contents 1. The Power of Water 2. Defenses 3. Flooding & Flood Types 4. Flood Mitigation

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

FLOOD RISK ASSESSMENT

FLOOD RISK ASSESSMENT SEVERN ROAD RESOURCE RECOVERY CENTRE FLOOD RISK ASSESSMENT REF 402.0036.00374 September 2009 Severn Road Resource Recovery Centre Ref: 402-0036-00374 Viridor Waste Management i PPS25 Flood Risk Assessment

More information

HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats

HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats Drainage design on M25 motorway widening project (J16 - J23) 76 Brijesh Vats Drainage Engineer Highways & Transportation Abstract Drainage design on the M25 motorway comprises complex drainage networks

More information

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE This page is intentionally left blank Contents 1 Introduction 1 11 Background 1 12 Requirements for Managing Peak Runoff at Source 1 13 On-site

More information

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012 Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable

More information

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels.

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels. Glossary of Common Stormwater Terms Baffle means a device to check, deflect, or regulate flow. Beneficial Uses means uses of waters of the states which include but are not limited to - use for domestic,

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Cole Easdon Consultants Limited

Cole Easdon Consultants Limited FLOOD RISK ASSESSMENT FOR PROPOSED EXPANSION OF WHITEHALL GARDEN CENTRE CORSHAM ROAD, LACOCK ON BEHALF OF WHITEHALL GARDEN CENTRES LTD. OCTOBER 2015 [ISSUE 2] Head Office: Unit 2 York House Edison Park

More information

Strategic Flood Risk Assessment Update 2015

Strategic Flood Risk Assessment Update 2015 Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...

More information

September 8, 2008 City of Modesto Community and Economic Development Department and Public Works Department

September 8, 2008 City of Modesto Community and Economic Development Department and Public Works Department September 8, 2008 City of Modesto Community and Economic Development Department and Public Works Department STORM DRAINAGE DESIGN INTERIM POLICY FOR INFILL/REDEVELOPMENT PENDING THE ADOPTION & IMPLEMENATATION

More information

BMP #: Dry Wells / French Drains

BMP #: Dry Wells / French Drains Structural BMP Criteria BMP #: Dry Wells / French Drains A Dry Well, or French Drain, is a variation on an Infiltration Trench that is designed to temporarily stores and infiltrate rooftop runoff. Key

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

BMP 6.4.6: Dry Well / Seepage Pit

BMP 6.4.6: Dry Well / Seepage Pit BMP 6.4.6: Dry Well / Seepage Pit A Dry Well, or Seepage Pit, is a variation on an Infiltration system that is designed to temporarily store and infiltrate rooftop runoff. Key Design Elements Fllow Infiltration

More information

Council Strategy DOC/15/86752

Council Strategy DOC/15/86752 Council Strategy Council strategy title: Council strategy owner: Adopted by: Date adopted: July 2015 Document Reference no: Drainage Upgrade Strategy Director Infrastructure Services Bayside City Council

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

ORCHARD WAY / BROOM GROVE Knebworth

ORCHARD WAY / BROOM GROVE Knebworth ORCHARD WAY / BROOM GROVE Knebworth Technical Assessment Report to support Section 19 Flood Investigation Project No: Date: Reviewed By: Approved By: 0469 October 2014 Tom Butler Neil Harding NHTB Consultancy

More information

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology

More information

DECEMBER 2008 [ISSUE 2]

DECEMBER 2008 [ISSUE 2] PROPOSED DEVELOPMENT WEST SUSSEX FLOOD RISK ASSESSMENT CLIENT: ARORA MANAGEMENT SERVICES LIMITED [ISSUE 2] Warrington Office Cinnamon House Cinnamon Park Crab Lane Fearnhead Warrington Cheshire WA2 0XP

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding. Background & Issues To provide guidelines and requirements for Developers, the Community and the Shire s Planning and Sustainability officers for connection to the Shire s Stormwater Drainage Disposal

More information