1 Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11
2 IN BRIEF Background Legislation What have we done? What are we doing? What can you do? Questions and Answers 2
3 Background Flooding occurs when large amount of water accumulates on previously dry land. Historical Flooding Widespread flooding in 2004 Also affected Southwark Surface water flooding a National issue 3 Again, summer of 2007 Yorkshire, Gloucestershire and others Southwark, lesser extent Total cost of 3.2 billion Average cost, businesses k Average cost, households 23-30k
4 LET S BRING THE POINT HOME April 2004 Mainly South of borough Cost 1million Other minor events; in 2006 &
5 Local flooding in Borough & Bankside (history) 5 BOROUGH & BANKSIDE COMMUNITY COUNCIL BOUNDARY GROUNDWATER FLOOD INCIDENT (Environment Agency records) GROUNDWATER FLOOD INCIDENT (Other records) SURFACE WATER FLOODING INCIDENTS
6 Future flooding could get worse! Climate Change Wetter winters More intense rainfall Rising water table (winter) Increased interaction between flooding sources Increased likelihood of flooding London clay; little infiltration, more run off 6
7 The Response Legislation EU Flood Directive (2007/60/EC) Flood Risk Regulations 2009 Flood and Water Management Act 2010 Pitt Review 7
8 Legislation LLFA duties Southwark is now Lead Local Flood Authority Responsible for Flood Risk from Ordinary water courses Surface water Ground water Sewer flooding Thames Water Tidal Flooding Environment Agency Reservoir Flooding Owner/Environment Agency 8
9 Actions - What have we done? Preliminary Flood Risk Assessment Significant flood risk Critical Drainage Areas Consequences of past and future flooding Surface Water Management Plan Flooding - sources and mechanisms Investment reduce likelihood of flooding Community engagement reduce impact 9
10 Local flooding in Borough & Bankside 10 BOROUGH & BANKSIDE COMMUNITY COUNCIL BOUNDARY POTENTIAL AREAS OF FLOODING
11 Actions - What are we doing? Set up internal and external partnerships Detailed investigations Develop flood mitigation solutions Source funding and implement Improve drainage maintenance Engaging the community 11
12 Approach Reducing flood risk Source Reduce flows entering the system Pathway Manage overland flow paths Ensure existing capacity is utilised Receptor Improve flood resilience and awareness 12 Who? The Council Specialist consultants Working partnerships Communities/Individuals
13 Interventions Ideas Source - new pervious paving Permeable Block Paving 2. Self-Binding Gravel 3. Reinforced Gravel
14 Pathway interventions retrofitting SuDS in streets 14
15 Receptor interventions - rainwater harvesting & green roofs On-site collection system (above) 2. Waterbutts (below) 3. Retro-fit existing roof (above) 4. Layered approach (below)
16 Examples of intervention ideas 16
17 Actions - What can you do? Individual flood plan Water conservation Rain water harvesting More greening Community Flood Plans (volunteers needed) 17
18 Next Steps Capture your experiences of flooding Incorporate in our evidence base Submit ideas to EA for funding Initiate detailed consultation Develop and implement 18
19 Questions? 19
20 For more information on Flood Risk Management in Southwark John Kissi Flood Risk Manager
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services
London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough
Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership
WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
London Borough of Croydon Local Flood Risk Management Strategy
London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has
Guidance Notes: GARDEN FLOODING
Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water
Development at 2 St Albans Road, Kingston, London, KT25HQ
Development at SuDS Report. Prepared for: Report prepared by: Dave Alonso Divine Ideas (UK) ltd Date: August 2015 Project/Issue number: Appendices Attached: 1510/01/SuDS A, B & C Divine Ideas (UK) Ltd
Climate Change Adaptation in London. Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority
Climate Change Adaptation in London Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority Why adapt? We are not very well adapted to our existing climate
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN
Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:
ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3
NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL
Newbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
Flood Risk & Surface Water Management. Page 1 of 20
Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of
Strategic Flood Risk Assessment Update 2015
Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
Sewer Flooding Alleviation in the Counters Creek Catchment
Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda
Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH
Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result
Chapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
Homes and Environment Scrutiny Committee. (Environment & Transport)
REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)
SURFACE WATER MANAGEMENT PLAN
SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF LEWISHAM Document Information Document Information Title: Surface Water Management Plan for London Borough of Lewisham Owner: Bo Quatresols
SURFACE WATER MANAGEMENT PLAN
SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF CROYDON Executive Summary Executive Summary This document forms the Surface Water Management Plan (SWMP) for the London Borough of Croydon which
PRELIMINARY FLOOD RISK ASSESSMENT
PRELIMINARY FLOOD RISK ASSESSMENT DRAIN LONDON LONDON BOROUGH OF ISLINGTON Document Information Document Information Title: Preliminary Flood Risk Assessment for London Borough of Islington Owner: Bevan
SURFACE WATER MANAGEMENT PLAN
SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF RICHMOND UPON THAMES Quality Management Quality Management DOCUMENT INFORMATION Title: Owner: Version: Status: Project Number: File Name: Surface
Storm water strategy of Turku City Citywater Storm water expert meeting 11.12.2014 Turku
Storm water strategy of Turku City Citywater Storm water expert meeting 11.12.2014 Turku 17.12.2014 Olli-Pekka Mäki 1 Background of storm water strategy Strategy is based on Baltic Sea Challenge Action
PRELIMINARY FLOOD RISK ASSESSMENT
PRELIMINARY FLOOD RISK ASSESSMENT DRAIN LONDON LONDON BOROUGH OF NEWHAM Revision Schedule Revision Schedule DOCUMENT INFORMATION Title: PFRA for London Borough of Newham Owner: John East Version: 1.1 Status:
DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council
DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy
Strategic Flood Risk Assessment
local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning
London Underground Comprehensive Review of Flood Risk (LUCRFR)
London Underground Comprehensive Review of Flood Risk (LUCRFR) Nick Bean Mott MacDonald Anthony Fernihough London Underground Ian Uttley London Underground 23 rd February 2016 LUCRFR To undertake a comprehensive
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011
Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Information for Editors What is the reason for this initiative? 1. Legal Requirements The main drivers are the Flood Risk Regulations
Taylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
Essex County Council Flood Investigation Report
Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.
ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0
Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator
Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148
Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S
Littleport Co-located Schools
Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2
SURFACE WATER MANAGEMENT PLAN Volume 1
SURFACE WATER MANAGEMENT PLAN Volume 1 DRAIN LONDON LONDON BOROUGH BRENT OF Hyder Consulting (UK) Limited 2212959 Aston Cross Business Village 50 Rocky Lane Aston Birmingham B6 5RQ United Kingdom Tel:
SUFFOLK FLOOD RISK MANAGEMENT JOINT SCRUTINY PANEL ANNUAL REPORT 2010. Working in Partnership with
SUFFOLK FLOOD RISK MANAGEMENT JOINT SCRUTINY PANEL ANNUAL REPORT 2010 Working in Partnership with Suffolk Flood Risk Management Joint Scrutiny Panel Foreword by Councillor Gary Green, Chairman of the Suffolk
London Borough of Hammersmith and Fulham. Updated Surface Water Management Plan. April 2015 UNITED KINGDOM & IRELAND.
London Borough of Hammersmith and Fulham Updated Surface Water Management Plan UNITED KINGDOM & IRELAND Prepared for: 47065080 REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 1 December
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page
Climate Change Adaptation for London s Transport System
Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
FLOOD RISKS IN LONDON
Environment Committee FLOOD RISKS IN LONDON Summary of findings April 2014 About this summary 2 This is a summary of the findings of the Environment Committee s investigation into flood risk. In January
Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer
Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Novatech 2010, the 7th international conference on sustainable techniques and strategies in urban
SURFACE WATER MANAGEMENT PLAN Volume 1
SURFACE WATER MANAGEMENT PLAN Volume 1 DRAIN LONDON LONDON BOROUGH OF HARROW Quality Page DOCUMENT INFORMATION Title Surface Water Management Plan Owner AECOM Ltd Version 02 Status Final Project Number
Brighton & Hove City Council
Brighton & Hove City Council On behalf of Project Ref: 23301/005 Rev: E Date: April 2014 Office Address: Caversham Bridge House, Waterman Place, Reading, Berkshire RG1 8DN T: +44 (0)118 950 0761 F: +44
Sustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
Managing flood risk in Camden The London Borough of Camden flood risk management strategy
Managing flood risk in Camden The London Borough of Camden flood risk management strategy Contents 1. Foreword 3 2. Executive summary 4 3. Glossary 6 4. Introduction 8 4.1 Strategy objectives 8 4.2 Guiding
Kirklees Surface Water Management Plan
2011 Kirklees Surface Water Management Plan An evidenced statement on the surface water flood risk in Kirklees and a delivery plan for reduction of the risk across the district Tom Ghee Kirklees Council
Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk
Household customer Wastewater flooding guidelines www.thameswateruk.co.uk We are very sorry that you have recently suffered wastewater flooding to your property. This leaflet has been designed to answer
London Borough of Newham. Local Flood Risk Management Strategy
London Borough of Newham Local Flood Risk Management Strategy Version 5, September 2015 Local Flood Risk Management Strategy for the London Borough of Newham Document Management: Version Control Title:
East Riding of Yorkshire Council
East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee
Home Drainage & Causes of Basement Flooding. Water
Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House
Click to edit Master title style
Click to edit Master title style Sewer System Improvement Program (SSIP) Karen Kubick, PE Wastewater Enterprise Capital Program Director San Francisco Public Utilities Commission Construction Managers
PRELIMINARY FLOOD RISK ASSESSMENT
PRELIMINARY FLOOD RISK ASSESSMENT DRAIN LONDON LONDON BOROUGH OF LAMBETH Executive Summary Quality Management DOCUMENT INFORMATION Title: London Borough of Lambeth PFRA Owner: Owen Davies Version: 1.0
Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services
Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
Vital Earth Composting Facility Flood Risk and Drainage Statement
Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by
Introduction to sustainable drainage. www.ciria.org/suds
Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary
1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year
Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
PRELIMINARY FLOOD RISK ASSESSMENT
PRELIMINARY FLOOD RISK ASSESSMENT DRAIN LONDON LONDON BOROUGH OF SUTTON Quality Management Quality Management DOCUMENT INFORMATION Title: Owner: Version: Status: Project Number: File Name: London Borough
(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment
Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 [email protected] jppuk.net Proposed Residential Development Land
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Groundwater Flooding: a UK Perspective
Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition
Groundwater Flooding in Brighton and Hove City (February 2014)
Section 19 Flood Investigations Report Groundwater Flooding in Brighton and Hove City (February 2014) May 2014 Revision Schedule Rev Date Details Author Checked and Approved by 1 April 2014 M Moran N Fearnley
Flooding Matters. Introduction
Flooding Matters 19/07/2013 Issue 1 Introduction Hello and welcome to the 1 st Essex County Council flood and water management newsletter, Flooding Matters. As a Lead Local Flood Authority we now have
Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter
Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater
Sustainable Urbanism with Green Roofs Natural Stormwater Management Wolfgang Ansel, Alfred Diem
Wolfgang Ansel, Alfred Diem (Dipl. Wirt.-Biol. Wolfgang Ansel, International Green Roof Association (IGRA), PO Box 2025, 72610 Nürtingen, Germany, [email protected]) (Dipl. Ing.(FH) Alfred Diem, diem.baker
Creating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
SURFACE WATER MANAGEMENT PLAN
SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF LAMBETH Quality Management Quality Management DOCUMENT INFORMATION Title: SWMP for London Borough of Lambeth Owner: Owen Davies Version: 1.0