Seismic Data Requirements for Eaton UPS Equipment Installation
|
|
|
- Kristian Knight
- 9 years ago
- Views:
Transcription
1 Seismic Data Requirements for Eaton UPS Equipment Installation 1.1 Introduction Eaton equipment represented in the following sections were subjected to seismic testing in accordance with the 2006 or 2012 International Building Code (IBC) and the 2007 California Building Code (CBC). The results of these tests exceeded the requirements as stated within the IBC, CBC, and OSHPD and demonstrated the ability to function after the test. All installation guidelines covered in this document as well as the instruction and operations literature provided with the equipment must be followed to ensure installation suitable for a seismic application. Certificates for various types of distribution and control equipment along with an application paper, Earthquake Requirements and Seismic Capabilities for Eaton s Electrical Distribution and Control Equipment can be found at Additionally, the California State Office of Statewide Health Planning and Development (OSHPD) pre-approval for this equipment can be found at Approval/special_seismic_cert_pre approval.html. 1.2 Eaton 9x55 UPS Foundation Plan and Mounting Requirements Proper mounting of the equipment is the single most important factor in withstanding a seismic event. The foundation must be level and continuous under the entire assembly. The foundation must be designed to withstand the reaction loads imposed on it by the equipment during a seismic event. At a minimum, the foundation must be designed to accommodate the tensile strength of the hardware indicated in Table A. The anchoring system should be put in place prior to equipment installation to reduce effort associated with anchoring. Welding to embedded steel members is acceptable provided the strength of the welds is comparable to the mounting bolts. CAUTION The user is responsible for compliance with all local seismic codes. NOTE Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition. Table A. 9x55 Unit and Fastener Requirements from Unit to Floor Type Bolt Type and Size Torque Quantity 8-15 kva UPS, 2 High Class 8.8, M10 42 Nm kva UPS, 3 High Class 8.8, M10 42 Nm kva EBC, 2 and 3 High Class 8.8, M10 42 Nm kva UPS Cabinet Class 8.8, M10 42 Nm kva Options Cabinet Class 8.8, M10 42 Nm 10 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2 1
2 1.2.1 Displacement The horizontal displacement of the top of the equipment is listed in Table B. The horizontal displacements given in Table B are plus/minus values. The equipment must be at the minimum distance listed in Table B to avoid contact with other stationary objects during a seismic event. Table B. 9x55 Unit Seismic Displacement Requirements Type Front to Back Side to Side 8-15 kva UPS, 2 High 112 mm 112 mm 8-15 kva UPS, 3 High 117 mm 117 mm 8-15 kva EBC, 2 & 3 High 153 mm 153 mm kva UPS Cabinet 127 mm 127 mm kva Options Cabinet 121 mm 121 mm Consideration must be given to attachments (conduits, bus duct, etc.) made to the top of the equipment. Attachments must have provisions to accommodate the displacement of the equipment indicated above. Entry from the bottom of the equipment eliminates the need for accommodating this motion for attachments Center of Gravity For seismic calculations, the center of gravity can be approximated using the dimensions in Table C with respect to the left side bracket's front mounting hole (x,y,z origin). UPS center of gravity dimensions are with batteries installed. Table C. 9x55 Unit Center of Gravity Specifications Type X (left to right) Y (front to rear) Z (bottom to top) 8-15 kva UPS, 2 High 81 mm 452 mm 406 mm 8-15 kva UPS, 3 High 81 mm 452 mm 610 mm 8-15 kva EBC, 2 and 3 High 81 mm 452 mm 406 mm, 2 High 610 mm, 3 High kva UPS Cabinet 178 mm 475 mm 838 mm kva Options Cabinet 178 mm 275 mm 838 mm Power Cables It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables. 2 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
3 x55 Floor Plan Securing Dimensions The following illustrations detail the measurements for attaching the 9x55 seismic brackets to the floor of the building. The following drawings are for reference only and are not to scale. Dimension are in millimeters (inches) FRONT Figure x55 Stackable Unit Seismic Mounting Detail Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2 3
4 Installing the Hold Down Brackets Installing the Seismic Gusset Front Figure x kva Cabinet Seismic Mounting Detail 4 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
5 1.3 Eaton 9390 Foundation Plan and Mounting Requirements Proper mounting of the equipment is the single most important factor in withstanding a seismic event. The foundation must be level and continuous under the entire assembly. The foundation must be designed to withstand the reaction loads imposed on it by the equipment during a seismic event. At a minimum, the foundation must be designed to accommodate the tensile strength of the hardware indicated in Table A. The anchoring system should be put in place prior to equipment installation to reduce effort associated with anchoring. Welding to embedded steel members is acceptable provided the strength of the welds is comparable to the mounting bolts. CAUTION The user is responsible for compliance with all local seismic codes. NOTE Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition. Table A Unit and Fastener Requirements from Unit to Floor Type Bolt Type and Size Torque Quantity UPS kva Class 8.8, M10 42 Nm 10 UPS kva w/sidecar Class 8.8, M10 42 Nm 11 UPS kva Class 8.8, M10 42 Nm 14 UPS kva w/sidecar Class 8.8, M10 42 Nm 15 IDC kva* Class 8.8, M10 42 Nm 14 IDC kva Class 8.8, M10 42 Nm 16 IAC-B and IAC-T Class8.8, M10 42Nm 10 IAC-D Class 8.8, M10 42 Nm 10 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2 5
6 1.3.1 Displacement The horizontal displacement of the top of the equipment is listed in Table B. The horizontal displacements given in Table B are plus/minus values. The equipment must be at the minimum distance listed in Table B to avoid contact with other stationary objects during a seismic event. Table B Unit Seismic Displacement Requirements Type Front to Back Side to Side UPS kva 30 mm 30mm UPS kva w/sidecar 30 mm 30mm UPS kva 48 mm 48mm UPS kva w/sidecar 48 mm 48mm IDC kva 140 mm 140 mm IDC kva 108 mm 108 mm IAC-B and IAC-T 36mm 36mm IAC-D 36 mm 36 mm Consideration must be given to attachments (conduits, bus duct, etc.) made to the top of the equipment. Attachments must have provisions to accommodate the displacement of the equipment indicated in Table B. Entry from the bottom of the equipment eliminates the need for accommodating this motion for attachments Center of Gravity For seismic calculations, the center of gravity can be approximated using the dimensions in Table C with respect to the left side bracket's front mounting hole (x,y,z origin). Table C Unit Center of Gravity Specifications Type X (left to right) Y (front to rear) Z (bottom to top) UPS kva 252 mm 248 mm 940 mm UPS kva w/sidecar 393 mm 248 mm 940 mm UPS kva 482 mm 248 mm 965 mm UPS kva w/sidecar 540 mm 248 mm 965 mm IDC kva 482 mm 248 mm 965 mm IDC kva 575 mm 248 mm 965 mm IAC-B and IAC-T 319mm 248mm 965mm IAC-D 319 mm 248 mm 965 mm Power Cables It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables. 6 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
7 Floor Plan Securing Dimensions The following illustrations detail the measurements for attaching the 9390 seismic brackets to the floor of the building. The following drawings are for reference only and are not to scale. Dimension are in millimeters (inches) Figure kva UPS Seismic Mounting Detail Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2 7
8 Figure kva UPS Seismic Mounting Dimensions Figure kva IDC Seismic Mounting Dimensions 8 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
9 Figure kva with Sidecar Seismic Mounting Dimensions Figure kva with Sidecar Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2 9
10 Figure kva IDC Seismic Mounting Dimensions Figure kva and 160 kva IAC (B, D, & T) 10 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
11 Foundation Plan and Mounting Requirements Proper mounting of the equipment is the single most important factor in withstanding a seismic event. The foundation must be level and continuous under the entire assembly. The foundation must be designed to withstand the reaction loads imposed on it by the equipment during a seismic event. At a minimum, the foundation must be designed to accommodate the tensile strength of the hardware indicated in Table A. The anchoring system should be put in place prior to equipment installation to reduce effort associated with anchoring. Welding to embedded steel members is acceptable provided the strength of the welds is comparable to the mounting bolts. CAUTION The user is responsible for compliance with all local seismic codes. NOTE Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition. Table A Unit and Fastener Requirements for Unit to Floor Type Bolt Type and Size Torque Quantity 275 kva UPS Class 8.8, M12 83 Nm kva UPS and FI-UPM Class 8.8, M12 83 Nm kva UPS Class 8.8, M12 83 Nm kva UPS and FI-UPM Class 8.8, M12 83 Nm kva UPS Class 8.8, M12 83 Nm kva UPS (2X-UPM) Class 8.8, M12 83 Nm kva UPS (2X-UPM and FI-UPM) Class 8.8, M12 83 Nm kva or 825 kva and FI-UPM Class 8.8, M12 83 Nm kva MBM Class 8.8, M12 83 Nm 6 MBM and 275 kva UPS Class 8.8, M12 83 Nm 12 MBM and 550 kva UPS Class 8.8, M12 83 Nm 14 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
12 1.4.1 Displacement The horizontal displacement of the top of the equipment is listed in Table B. The horizontal displacements given in Table B are plus/minus values. The equipment must be at the minimum distance listed in Table B to avoid contact with other stationary objects during a seismic event. Table B Unit Seismic Displacement Requirements Type Front to Back Side to Side 275 kva UPS 74 mm 49 mm 275 kva UPS and FI-UPM 74 mm 49 mm 550 kva UPS 39 mm 44 mm 550 kva UPS and FI-UPM 39 mm 49 mm 825 kva UPS 44 mm 44 mm 825 kva UPS (2X-UPM) 74 mm 49 mm 825 kva UPS (2X-UPM and FI-UPM) 74 mm 49 mm 1100 kva or 825 kva and FI-UPM 44 mm 49 mm kva MBM 36 mm 36 mm MBM and 275 kva UPS 74 mm 49 mm MBM and 550 kva UPS 39 mm 44 mm Consideration must be given to attachments (conduits, bus duct, etc.) made to the top of the equipment. Attachments must have provisions to accommodate the displacement of the equipment indicated in Table B. Entry from the bottom of the equipment eliminates the need for accommodating this motion for attachments Center of Gravity For seismic calculations, the center of gravity can be approximated using the dimensions in Table C with respect to the left side bracket's front mounting hole (x,y,z origin). Table C Unit Center of Gravity Specifications Type X (left to right) Y (front to rear) Z (bottom to top) 275 kva UPS 856 mm 452 mm 956 mm 275 kva UPS and FI-UPM 1063 mm 461 mm 943 mm 550 kva UPS 1140 mm 475 mm 929 mm 550 kva UPS and FI-UPM 1406 mm 475 mm 928 mm 825 kva UPS 2160 mm 460 mm 870 mm 825 kva UPS (2X-UPM) 1823 mm 455 mm 868 mm 825 kva UPS (2X-UPM and FI-UPM) 2011 mm 460 mm 882 mm 1100 kva or 825 kva and FI-UPM 2388 mm 462 mm 880 mm kva MBM 431 mm 323 mm 966 mm MBM and 275 kva UPS 1409 mm 412 mm 959 mm MBM and 550 kva UPS 1768 mm 442 mm 937 mm 12 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
13 1.4.3 Power Cables It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables Floor Plan Securing Dimensions The following illustrations detail the measurements for attaching the 9395 seismic brackets to the floor of the building. The following drawings are for reference only and are not to scale. Dimensions are in millimeters (inches). Figure kva UPS Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
14 Figure kva UPS and FI-UPM Seismic Mounting Dimensions Figure kva UPS Seismic Mounting Dimensions 14 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
15 Figure kva UPS and FI-UPM Seismic Mounting Dimensions Figure kva UPS Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
16 Figure kva UPS (2X-UPM) Seismic Mounting Dimensions Figure kva UPS (2X-UPM and FI-UPM) Seismic Mounting Dimensions 16 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
17 Figure kva UPS or 825 kva +1 UPS Seismic Mounting Dimensions Figure MBM Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
18 Figure MBM and 275 kva UPS Seismic Mounting Dimensions Figure MBM and 550 kva UPS Seismic Mounting Dimensions 18 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
19 Figure Seismic Door Securing Hardware Detail Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
20 I/O Cabinet Right Side Figure I/O Intercabinet Shim Location and Seismic Floor Bracket Attachment Detail 20 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
21 Figure FI-UPM Shim Location Detail for Seismic Kit Front Front FI-UPM Right Side I/O Cabinet Right Side Figure Attachment Detail for FI-UPM and I/O Module Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
22 1.5 Eaton 93PM Foundation Plan and Mounting Requirements Proper mounting of the equipment is the single most important factor in withstanding a seismic event. The foundation must be level and continuous under the entire assembly. The foundation must be designed to withstand the reaction loads imposed on it by the equipment during a seismic event. At a minimum, the foundation must be designed to accommodate the tensile strength of the hardware indicated in Table A. The anchoring system should be put in place prior to equipment installation to reduce effort associated with anchoring. Welding to embedded steel members is acceptable provided the strength of the welds is comparable to the mounting bolts. CAUTION The user is responsible for compliance with all local seismic codes. NOTE Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition. Table A. 93PM Unit and Fastener Requirements from Unit to Floor Type Bolt Type and Size Torque Quantity UPS 50 kw, 100 kw, and 150 kw Capacity Frames Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 UPS 50 kw, 100 kw, and 150 kw Capacity Frames with Small Left-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 12 UPS 50 kw, 100 kw, and 150 kw Capacity Frames with Small Right-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 12 UPS 100 kw and 150 kw Capacity Frames with Large Left-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 12 UPS 100 kw and 150 kw Capacity Frames with Large Right-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 12 UPS 200 kw Frame Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 UPS 200 kw Frame with Left-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 12 UPS 200 kw Frame with Right-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 12 IBC-S Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 IBC-L Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 IBC-L with Left-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 IBC-L with Right-Mounted Sidecar Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 IAC-D Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft. 8 IAC-T Class 8.8, M12 or Grade 5, 1/2 66 Nm 64 lb-ft Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
23 1.5.1 Displacement Table B. 93PM Unit Seismic Displacement Requirements The horizontal displacement of the top of the equipment is listed in Table B. The horizontal displacements given in Table B are plus/minus values. The equipment must be at the minimum distance listed in Table B to avoid contact with other stationary objects during a seismic event. Type Front to Back Side to Side UPS 50 kw, 100 kw, and 150 kw Capacity Frames 130 mm 180 mm UPS 50 kw, 100 kw, and 150 kw Capacity Frames with Small Left-Mounted Sidecar 120 mm 140 mm UPS 50 kw, 100 kw, and 150 kw Capacity Frames with Small Right-Mounted Sidecar 120 mm 140 mm UPS 100 kw and 150 kw Capacity Frames with Large Left-Mounted Sidecar 120 mm 140 mm UPS 100 kw and 150 kw Capacity Frames with Large Right-Mounted Sidecar 120 mm 140 mm UPS 200 kw Frame 130 mm 180 mm UPS 200 kw Frame with Left-Mounted Sidecar 120 mm 140 mm UPS 200 kw Frame with Right-Mounted Sidecar 120 mm 140 mm IBC-S 100 mm 160 mm IBC-L 100 mm 160 mm IBC-L with Left-Mounted Sidecar 90 mm 100 mm IBC-L with Right-Mounted Sidecar 90 mm 100 mm IAC-D 100 mm 100 mm IAC-T 100 mm 100 mm Consideration must be given to attachments (conduits, bus duct, etc.) made to the top of the equipment. Attachments must have provisions to accommodate the displacement of the equipment indicated in Table B. Entry from the bottom of the equipment eliminates the need for accommodating this motion for attachments. Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
24 1.5.2 Center of Gravity Table C. 93PM Unit Worst Case Center of Gravity Specifications For seismic calculations, the center of gravity can be approximated using the dimensions in Table C with respect to the left side bracket's front mounting hole (x,y,z origin). Type X (left to right) Y (front to rear) Z (bottom to top) UPS 50 kw Capacity Frames 538 mm 278 mm 887 mm UPS 100 kw Capacity Frames 537 mm 276 mm 921 mm UPS 150 kw Capacity Frames 530 mm 282 mm 1014 mm UPS 50 kw Capacity Frames with Small Left-Mounted Sidecar 551 mm 442 mm 888 mm UPS 100 kw Capacity Frames with Small Left-Mounted Sidecar 564 mm 402 mm 917 mm UPS 150 kw Capacity Frames with Small Left-Mounted Sidecar 534 mm 434 mm 979 mm UPS 50 kw Capacity Frames with Small Right-Mounted Sidecar 551 mm 318 mm 888 mm UPS 100 kw Capacity Frames with Small Right-Mounted Sidecar 564 mm 356 mm 917 mm UPS 150 kw Capacity Frames with Small Right-Mounted Sidecar 534 mm 332 mm 979 mm UPS 100 kw Capacity Frames with Large Left-Mounted Sidecar 552 mm 543 mm 922 mm UPS 150 kw Capacity Frames with Large Left-Mounted Sidecar 549 mm 523 mm 977 mm UPS 100 kw Capacity Frames with Large Right-Mounted Sidecar 552 mm 386 mm 922 mm UPS 150 kw Capacity Frames with Large Right-Mounted Sidecar 549 mm 402 mm 977 mm UPS 200 kw Frame 543 mm 358 mm 989 mm UPS 200 kw Frame with Left-Mounted Sidecar 566 mm 594 mm 973 mm UPS 200 kw Frame with Right-Mounted Sidecar 566 mm 522 mm 974 mm IBC-S 579 mm 262 mm 814 mm IBC-L and IBC-LH (432V) 427 mm 600 mm 1046 mm IBC-L and IBC-LH (480V) 410 mm 600 mm 1046 mm IBC-L and IBC-LH (432V) with Left-Mounted Sidecar 612 mm 600 mm 1046 mm IBC-L IBC-L and IBC-LH (480V)with Left-Mounted Sidecar 602 mm 600 mm 1046 mm IBC-L and IBC-LH (432V) with Right-Mounted Sidecar 444 mm 600 mm 1046 mm IBC-L IBC-L and IBC-LH (480V) with Right-Mounted Sidecar 421 mm 600 mm 1046 mm IAC-D 473 mm 388 mm 698 mm IAC-T 245 mm 659 mm 891 mm Power Cables It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables. 24 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
25 PM Floor Plan Securing Dimensions The following illustrations detail the measurements for attaching the 93PM seismic brackets to the floor of the building. The following drawings are for reference only and are not to scale. Dimension are in millimeters (inches) Figure PM UPS (50 kw, 100 kw, and 150 kw Capacity Frames) Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
26 Figure PM UPS (50 kw, 100 kw, and 150 kw Capacity Frames with Small Left-Mounted Sidecar) Seismic Mounting Dimensions 26 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
27 Figure PM UPS (50 kw, 100 kw, and 150 kw Capacity Frames with Small Right-Mounted Sidecar) Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
28 Figure PM UPS (100 kw and 150 kw Capacity Frames with Large Left-Mounted Sidecar) Seismic Mounting Dimensions 28 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
29 Figure PM UPS (100 kw and 150 kw Capacity Frames with Large Right-Mounted Sidecar) Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
30 Figure PM UPS (200 kw Frame) Seismic Mounting Dimensions 30 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
31 Figure PM UPS (200 kw Frame with Left-Mounted Sidecar) Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
32 Figure PM UPS (200 kw Frame with Right-Mounted Sidecar) Seismic Mounting Dimensions 32 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
33 Figure PM IBC-S Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
34 Figure PM IBC-L Seismic Mounting Dimensions 34 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
35 Figure PM IBC-L with Left-Mounted Sidecar Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
36 Figure PM IBC-L with Right-Mounted Sidecar Seismic Mounting Dimensions 36 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
37 Figure PM IAC-D Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev
38 Figure PM IAC-T Seismic Mounting Dimensions 38 Seismic Data Requirements for Eaton UPS Equipment Installation S P Rev 2
Chapter 5 FLOOR LOADING AND WEIGHTS
Chapter 5 FLOOR LOADING AND WEIGHTS Section 1.0 Floor Loading Section 2.0 Seismic Data The CT system has a total floor load of approximately 6660 lbs (3021 kg). About 5050 lbs (2291 kg), including patient
Contractors Guide Central Inverter System Installation
Contractors Guide Central Inverter System Installation Step By Step Procedures 2,200 Watt/VA 6 Step Installation 1. Mount Bottom Cabinet 2. Mount Top Cabinet 3. Install Batteries 4. Install Conduit 5.
Uninterruptible Power Supply. 500 kva - 750 kva
9 315 Uninterruptible Power Supply 500 kva - 750 kva T1 and T3 Installation Addendum 164201244-001 Rev. A ------------------------------------------------------------------------ ------------------------------------------------------------------------
FIELDPOINT BUS EXTENDER CABLE
INSTALLATION GUIDE FIELDPOINT BUS EXTENDER CABLE If you have space constraints, you can use the FieldPoint Bus Extender Cable to mount a FieldPoint bank in two or three rows. Caution You should not use
Facilities Development Division. The Building Department for California s Hospitals
OSHPD Special Seismic Certification Preapproval (OSP) Preapproval of Special Seismic Certification by OSHPD is a voluntary program for Equipment Manufacturers! Facilities Development Division The Building
Key Considerations for Selecting Server Cabinets for Seismic Areas
Key Considerations for Selecting Server Cabinets for Seismic Areas Protect Up to 1500 of Critical Network Equipment without Sacrificing Flexibility Planning a data center in a seismically active area requires
Owner's Manual & Assembly Instructions
Owner's Manual & Assembly Instructions PM01 BASE KIT Model No. FDN1014 717090311 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY
MEDIUM FLAT PANEL DISPLAY STATIC MOUNT MSR Series
INSTALLATION INSTRUCTIONS MEDIUM FLAT PANEL DISPLAY STATIC MOUNT The static mount accommodates medium flat panel displays weighing up to 125 lbs (57 kgs). The teardrop holes in the mount allow for quick
Seismic Installation for Attic Storage System
Your Performance Partner Seismic Installation for Storage System CONTENTS SSafety Precautions................................. 2 Required Tools..................................... 2 Parts and Fastener
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
ALLDATA Online - 2006 Dodge Truck RAM 2500 Truck 2WD L6-5.9L DSL Turbo VI... Service and Repair
Page 1 of 15 Home Account Contact ALLDATA Log Out Help PAUL REDEHOFT Select Vehicle New TSBs Technician's Reference Component Search: OK 2006 Dodge Truck RAM 2500 Truck 2WD L6-5.9L DSL Turbo VIN C Conversion
COMPONENTS IP 2 INSTRUMENT PANEL INSTRUMENT PANEL ASSEMBLY ASSIST GRIP RETAINER RH FRONT PILLAR GARNISH RH FRONT DOOR OPENING TRIM WEATHERSTRIP RH
INSTRUMENT PANEL INSTRUMENT PANEL INSTRUMENT PANEL PRECAUTION 1 1. PRECAUTION FOR VEHICLE WITH SRS AIRBAG AND SEAT BELT PRETENSIONER (a) Some of these operations may affect the SRS airbag system. Read
Server Chassis and Triplet Hardware v1.0
Server Chassis and Triplet Hardware v1.0 Author: Steve Furuta, Mechanical Designer 1 Scope This document describes the technical specifications for the custom chassis used in Open Compute Project servers
Workspace and storage furnishings
LISTA Compact Workspace and storage furnishings Test and inspection workstations With its modular test and inspection workstations, LISTA offers optimised solutions for modern quality assurance practices.
How To Build A T7 Rack For Information Technology
THE NEXT GENERATION RACK FOR INFORMATION TECHNOLOGY THE RACK CABINET FOR INFORMATION TECHNOLOGY T7, THE HI-TECH HEART OF THE BLADESHELTER SYSTEM The real answer to the requirements of: Safety Versatility
UPDATEUPDATEUPDATE. Converting the tower chassis to a rack-mount chassis. A - M5 13 8 To mount outer member to rack
UPDATEUPDATEUPDATE Converting the tower chassis to a rack-mount chassis Rail overview Converting your Server to Rack-Mount The rail kit includes the following: Two rail units Five packages of screws (labeled
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
Part Name/Description Part Number Quantity. Power Cable 4000950-5 1
Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number Quantity Power Cable 4000950-5 1 Raven Harness Adapter Kit 4100525 1 Installation Instructions
Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances
Page 50 of 100 Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances (Replaces A-190556) THIS CUSTOMER REFERENCE SPECIFICATION (CRS) IS PART OF THE RULES FOR
Rack Installation Instructions
Rack Installation Instructions Guidelines This publication provides information about how to install your server into a standard rack cabinet using the rail kit shipped with your server. If you no longer
Check for deteriorated, shifting or missing tie-down pads. Replace if needed.
C C 0 5 C H A S S I S F R A M E Chassis Frame Overview The Blue Bird Vision s chassis frame consists of two main C-channel rails which run the entire length of the bus, and several different kinds of cross
INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks
Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 [email protected] in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate
Rack installation instructions
Rack installation instructions Review the documentation that comes with the rack cabinet for safety and cabling information. Before you install the server in a rack cabinet, review the following guidelines:
POWER LOCK KIT GENERAL INSTALLATION -J04427 REV. 2007-12-04. Kit Number. Models. Additional Parts Required. Kit Contents
-J0 REV. 00--0 POWER LOCK KIT GENERAL Kit Number -0, 0-0 Models For model fitment information, please see the P&A Retail Catalog or the Parts and Accessories section of www.harleydavidson.com (English
2740 Whitten Rd Bldg 103 Memphis, TN 38133 Telephone 901-380-9290 Email [email protected]
Fuel Injection Pump Replacement REMOVAL Diesel Care & Performance Inc 1. Disconnect negative battery terminal. 2. Remove throttle linkage. Fuel Injection Pump Bracket 3. Remove injection pump bracket.
-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT
VISCMA 412/August 2014 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT August 2014 Developed originally by the Vibration Isolation and Seismic Control Manufacturers Association under a cooperative
1999-2010 GENERAL MOTORS 3/4 &1 TON RT3 UNDERCARRIAGE MOUNTING INSTRUCTIONS (PART NO. LTA04767B)
1999-010 GENERAL MOTORS 3/4 &1 TON MOUNTING INSTRUCTIONS (PART NO. LTA04767B) MSC04380-8 WARNING Many newer trucks are now equipped with air bags. DO NOT under any circumstances disable, remove or relocate
Parallel Redundant Uninterruptible Power Supply
9 315 Parallel Redundant Uninterruptible Power Supply Installation/Operation Manual 164202013 Rev. D ------------------------------------------------------------------------ ------------------------------------------------------------------------
1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.
MINI BIKE PLANS Page 1 INTRODUCTION Before starting to build your Mini-Bike, be sure that you have all the parts shown on the material list. You will note that tubing has been used in the construction.
BLADE S-MAX Cabinet for Blade Server
Cabinet for Blade Server 1 2 Overview Material specification Corner verticals: 1.5 mm steel End frames: 1.5 mm steel Panel mounts: 2.0 mm steel Panel mount supports: 1.5 mm steel Side panels, door and
AA Solar and Sun Power Plus
AA Solar and Sun Power Plus www.aasolar.co.nz www.sunpowerplus.co.nz -1- Contents Chapter Title Page 1 General information 3 2 Safety and Installer Responsibilities 4 3 Technical Specifications 5 4 Tools
WHEEL ALIGNMENT SPECIFICATIONS & PROCEDURES
WHEEL ALIGNMENT SPECIFICATIONS & PROCEDURES 1998 Mitsubishi Montero 1997-98 WHEEL ALIGNMENT Mitsubishi - Specifications & Procedures Diamante, Eclipse, Galant, Mirage, Montero, Montero Sport, 3000GT RIDING
Modular architecture for high power UPS systems. A White Paper from the experts in Business-Critical Continuity
Modular architecture for high power UPS systems A White Paper from the experts in Business-Critical Continuity Abstract Today, more than ever before, energy efficiency and cost-savings are among the top
Cabinets 101: Configuring A Network Or Server Cabinet
Cabinets 101: Configuring A Network Or Server Cabinet North, South and Central America White Paper May 2012 www.commscope.com Contents Background Information 3 What is a network or server cabinet? 3 What
Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions
Y Parts Included: Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions Tools Required: Power Driver Drill Bit (Determined by fastener) Driver Bit (Determined by fastener)
LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports 972-429-1963
LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports 972-429-1963 Thank you for purchasing LG Motorsports products for your Gen 5 Camaro. Parts Inventory:
WHI 90-Minute Rated Veneered Door Frame Installation Instructions
No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,
TECHNICAL NOTE. Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006 IBC. On Cold-Formed Steel Construction INTRODUCTION
TECHNICAL NOTE On Cold-Formed Steel Construction 1201 15th Street, NW, Suite 320 W ashington, DC 20005 (202) 785-2022 $5.00 Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006
F-SERIES TERAFRAME HD CABINET SYSTEM
P R O D U C T D ATA S H E E T F-SERIES TERAFRAME HD CABINET SYSTEM K E Y F E AT U R E S Safely transports up to 3,000 lb (1360 kg) of electronic equipment from a factory integration site direct to a customer
Upgrading a GainMaker Line Extender from a Line-Powered Source to a 120 V AC-Powered Source Installation Instructions
Upgrading a GainMaker Line Extender from a Line-Powered Source to a 120 V AC-Powered Source Installation Instructions Overview Audience These installation instructions are intended for all cable system
AM/FM ANTENNA RELOCATION KIT
-J0 REV. 008-09-0 AM/FM ANTENNA RELOCATION KIT GENERAL Kit Number 766-09 Models This kit is used to relocate a fender-mounted AM/FM antenna to a Detachable Tour-Pak on specific model motorcycles. For model
SFI SPECIFICATION 14.21 EFFECTIVE: FEBRUARY 26, 2014 *
SFI SPECIFICATION 14.21 EFFECTIVE: FEBRUARY 26, 2014 * PRODUCT: Screw-Type Supercharger Restraint Devices 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum
POWERS Controls No. 4 Pneumatic Damper Actuator
POWERS Controls No. 4 Pneumatic Damper Actuator Technical Instructions Document No. 155-032P25 AP 331-2 Actuator Assembly 331-2929 Typical Actuator Assembly 331-2904 Typical Actuator Assembly 331-3000
Liebert DSE. IBC Seismic Supplemental User Manual, 80-165kW, Downflow
Liebert DSE IBC Seismic Supplemental User Manual, 80-165kW, Downflow TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS................................................1 SAVE THESE INSTRUCTIONS.................................................1
CENTERLINE Motor Control Centers Splicing Horizontal Ground Buses
Instructions CENTERLINE Motor Control Centers Splicing Horizontal Ground Buses Application This publication outlines the procedure for splicing the horizontal ground bus in front mounted and back-to-back
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
DATA CENTER RACK SYSTEMS: KEY CONSIDERATIONS IN TODAY S HIGH-DENSITY ENVIRONMENTS WHITEPAPER
DATA CENTER RACK SYSTEMS: KEY CONSIDERATIONS IN TODAY S HIGH-DENSITY ENVIRONMENTS WHITEPAPER EXECUTIVE SUMMARY Data center racks were once viewed as simple platforms in which to neatly stack equipment.
SECURITY SYSTEM SMART SIREN KIT
-J00876 REV. 009-0-09 SECURITY SYSTEM SMART SIREN KIT GENERAL Kit Number 688-0 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com
Installation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For Kinetic Solar K-Rack only
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Kinetic Solar K-Rack only Please read carefully before installing. Wiley Electronics recommends that the sufficient details
RM410. Hardware Installation Guide. Quick Start Guide. Rack Mounting Kit. Version 1.00 Edition 1, 12/2012
RM410 Rack Mounting Kit Version 1.00 Edition 1, 12/2012 Quick Start Guide Hardware Installation Guide www.zyxel.com Copyright 2012 ZyXEL Communications Corporation IMPORTANT! READ CAREFULLY BEFORE USE.
LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions
LIFT-505 BMF Lift Kit Yamaha Drive Gas or Electric Installation Instructions Contents of LIFT-505 Yamaha Drive BMF Lift Kit: a (1 ea.) BMF A-Arm Assembly b (1 ea.) Driver Side Shock Tower c (1 ea.) Passenger
Installation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct
DCF Optimized Rack System
Integrated Cabinet Solutions For Business-Critical Continuity DCF Optimized Rack System User Manual IMPORTANT SAFETY GUIDELINES SAVE THESE INSTRUCTIONS This manual contains important instructions that
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
6 inch A-Arm Lift Kit WARNING: 16-018/16-019. installation instructions. will fit CLUB CAR DS. included:
Revised May 205 6-08/6-09 6 inch A-Arm Lift Kit will fit CLUB CAR DS installation instructions included: Rear Lift Blocks Main Suspension Assembly Spindles A-Arms Rear Shock Mounting Plates U-Bolts WARNING:
Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049
Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal
FiberGuide Fiber Management Systems. 4th Edition
FiberGuide Fiber Management Systems 4th Edition Table of Contents Introduction Introduction...1 A Variety of Solutions...2 Innovative Products...3 Features and Benefits... 4 Applications Combining System
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR
PS6500 Storage Arrays Rack Mount Instructions
PS6500 Storage Arrays Rack Mount Instructions Part Number: R724M Rev. A01 Copyright 2010 Dell, Inc. All rights reserved. Dell is a trademark of Dell, Inc. EqualLogic is a registered trademark. All trademarks
Low Voltage Switchboards The Best Technical Solution for Your Ship
The Best Technical Solution for Your Ship Wärtsilä SAM Electronics Optimal Power Distribution The uninterrupted supply of power to systems and consumers onboard modern ships is an extremly important matter.
FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 413/January 2004 INSTALLING SEISMIC RESTRAINTS FOR ELECTRICAL EQUIPMENT
FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 413/January 2004 INSTALLING SEISMIC RESTRAINTS FOR ELECTRICAL EQUIPMENT Notice: This guide was prepared by the Vibration Isolation and Seismic Control Manufacturers
InstaPATCH ZERO Solution Guide
SYSTIMAX Solutions InstaPATCH ZERO Solution Guide Rapid Server Deployment and Change Management North, South and Central Americas 1 As data centers face ever-increasing IT demands, growth demands and evolving
SVE BULLETIN. 2016 E-Series Wheelbase Modification Driveline Noise Reduction
Q-238 SVE BULLETIN SPECIAL VEHICLE ENGINEERING BODY BUILDERS ADVISORY SERVICE E-Mail via Website: www.fleet.ford.com/truckbbas (click "Contact Us") Toll-free: (877) 840-4338 QVM Bulletin: Q-238 Date: 03
DirectCommand Installation DirectCommand 3-Channel Spreader Kit
Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number With Switch Box Quantity With Remote Switch Display Cable Kit 4100814 1 1 Power Control Relay
data center rack Ordering & Installation Guide we simplify networksṭm
data center rack Ordering & Installation Guide we simplify networksṭm we simplify networks racks tough secure cool Applies to : DR750-84430 :: DR750-84424 :: DR-84830 :: DR-84824 :: DR-84442 :: DR-84436
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
Networking Cabinets > Part No Capacity Available Colors Height(mm) Width(mm) Depth(mm)
Wall Mount Cabinets Link IT Single Sided Wall Mount Cabinets Welded frame, reliable structure Standing or wall mounting installation Easy mounting installation 19 standard installation Removable side panels,
INSTALLATION INSTRUCTIONS. 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD IMPORTANT NOTES
INSTALLATION INSTRUCTIONS 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD Thank you for purchasing a quality Hellwig Product. PLEASE READ THIS INSTRUCTION SHEET COMPLETELY
T7 PCI-EPP Conversion
T7 PCI-EPP Conversion Field Upgrade Procedures (Models RL/FT5000/RL/RT2000) TDN 07103-00184 REV B 08/2008 Corporate Headquarters: 522 E. Railroad Street Long Beach, MS 39560 Phone: (228) 868-1317 Fax:
LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
P150SC15. Designed for 2015 Ford F150 Super-Cab and Super-Crew vehicles without Sony System. 2015 Stillwater Designs P150SC15-A2-20150813
P150SC15 Designed for 2015 Ford F150 Super-Cab and Super-Crew vehicles without Sony System Subwoofer Assembly Amplifier Assembly Amplifier Harness 2015 Stillwater Designs P150SC15-A2-20150813 M6 Bolt M6
ATTACHMENT F 050R6800016 - CABLE AND WIRING SERVICES FUNCTIONAL AREA I PRICE PROPOSAL FORM Amendment 6
050R6800016 CABLE AND WIRING SERVICES (Column A) (Column B) (Column C) (Column D) (Column E) (Column F) (Column G) (B+C+D+E)*F= G Item Description PER 100' RUN PER 150' RUN PER 200' RUN PER 300' RUN QUANTITY
INSTALLATION INSTRUCTIONS MULTI-MOUNT KIT Part Number: 75330 Application: Warn HP PowerPlant P/N 71800
INSTALLATION INSTRUCTIONS MULTI-MOUNT KIT Part Number: 75330 Application: Warn HP PowerPlant P/N 71800 Your safety, and the safety of others, is very important. To help you make informed decisions about
Section #1 Pictorial Table Of Contents. Material Strength. 25-2503 Profile. Page 662. Page 663. Phone: 260-248-8030 Fax: 260-248-8029 www.8020.
How To Order 20-2020 Profile Section # Pictorial Table Of Contents Metric Part Naming Metric Page 639 Page 64 Page 642 Page 643 Page 644 Page 645 Pages 646-649 20 Series T-Slotted Aluminum Profiles 20-2040
Installation manual Solar Tracker
Van der Valk Solar Systems TRACKNG AND FXED SOLAR MOUNTNG SYSTEMS nstallation manual Solar Tracker Version 07 EN General user instructions Solar mounting systems Congratulations on buying a Van der Valk
Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab
GOOSENECK MOUNTING KIT Equipment Required: Fastener Kit: F Wrenches: 3/4, 7/8, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers
SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair
SERVICE MANUAL US Corpus 3G Seat system for electric wheelchair How to contact Permobil Head Office of the Permobil group Produced and published by Permobil AB, Sweden Version 4, 2014-07 Item No.: 205260-US-0
2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
HP 16/18-Port Cable Management Kit Installation Guide
HP 16/18-Port Cable Management Kit Installation Guide Abstract This document describes how to attach the HP 16 Port or 18 Port Cable Management Kit to an HP rack. The cable management bracket is designed
CA-6050 Solar Power Unit. User Guide. Designed to work with the Norsonic range of sound level meters to provide a DC supply in remote locations.
CA-6050 Solar Power Unit User Guide Designed to work with the Norsonic range of sound level meters to provide a DC supply in remote locations. 1 Contents Introduction... 2 Components... 3 Solar Array Case...
Watts Spacemaker. Sa f e t y Wa t e r He a t e r. Enclosures Stands Restraints
Watts Spacemaker Sa f e t y Wa t e r He a t e r Installation Products Enclosures Stands Restraints Ta b l e o f Co n t e n t s / In t r o d u c t i o n / Seismic Zo n e s Table of Contents Seismic Zones
SIRCOVER. Manual changeover switches from 125 to 3200 A. Changeover switches. Function. Advantages. The solution for.
The solution for Changeover switches svr_099_b_1_cat > Manufacturing industry. > Power distribution. 3200 Strong points svr_059_a_1_cat > complete range. > Easy connections. > Stable positions. > mproved
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Section A. GENERAL INFORMATION
Section A. GENERAL INFORMATION I. Description The information and instructions for attaching the sidecar to the right-hand side of the motorcycle are contained in this handbook and must be carefully observed.
R O A D M A S T E R, I N C.
R O A D M A S T E R, I N C. ROADMASTER, Inc. 6110 NE 127th Ave. Vancouver, WA 98682 8 7 1 6 15 28 1 2 "± 1 2 " MOUNTING BRACKET KIT 3 2 10 14 4 5 9 360-896-0407 fax 360-735-9300 www.roadmasterinc.com Item
FLOODED BATTERY RACKS SELECTION GUIDE FOR RDB & RDC SERIES, STANDBY POwER RACKS
12-560 FLOODED BATTERY RACKS SELECTION GUIDE FOR RDB & RDC SERIES, STANDBY POwER RACKS Non-seismic and Earthquake Protected (EP1, EP2), IEEE-693,,, D, DJ, DJU, J, K, and L/XT Cell Types Heavy Gauge Steel
Galaxy VM. Three-phase power protection. schneider-electric.com
Galaxy VM Three-phase power protection schneider-electric.com 2 schneider-electric.com schneider-electric.com 3 Galaxy VM trusted partner for your business continuity Features and benefits Highly efficient,
Washer, Electrical Equipment Bond WEEB
Washer, Electrical Equipment Bond WEEB INSTALLATION INSTRUCTIONS For IronRidge Light & Standard Series Rails Only Please read carefully before installing. Burndy recommends that the sufficient details
Rating when used as a weight carrying hitch without spring bars:
BOLT-TOGETHER WEIGHT DISTRIBUTING HITCH SYSTEM Rating when used as a weight distributing hitch with spring bars: Part Number 48051 4805 48053 48054 Max Tongue Weight 550 Ibs. 750 Ibs. 1000 Ibs. 1400 lbs.
Spec Sheet. Cisco R42610 Rack CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV A.6 DECEMBER 9, 2014 WWW.CISCO.
Spec Sheet CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV A.6 DECEMBER 9, 2014 WWW.CISCO.COM Overview................................................ 3 Rack Certifications
One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148
One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148 DATE: January 2008 REVISION: B HENDRICKSON ULTRA ROD PLUS Torque Rod Bonded Bushing Provides Longer Life Bonding makes a better
Knürr Miracel. Knürr Miracel. 19 Network and Server Rack Platform 1.12 to 1.22 1.11
Knürr Miracel 19 Network and Server Rack Platform 1.12 to 1.22 1.11 19" Server Rack: Knürr Miracel Strong points 1.13 Knürr Miracel ASP ASP/Server Rack 1.16 Knürr Miracel Server Rack 1.18 Knürr Miracel
PITCHED ROOF STRUCTURES
PITCHED ROOF STRUCTURES for framed and frameless photovoltaic modules Needed tools and materials: cordless screwdriver 10mm and 13mm spanners 5mm Allen key bolts, screws and tools for fixing the system
DYNA RIDER FOOTBOARD KIT
-J0 REV. 0-0-0 DYNA RIDER FOOTBOARD KIT GENERAL Kit Number 000 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com (English