SFI SPECIFICATION EFFECTIVE: FEBRUARY 26, 2014 *
|
|
|
- Avis Parsons
- 9 years ago
- Views:
Transcription
1 SFI SPECIFICATION EFFECTIVE: FEBRUARY 26, 2014 * PRODUCT: Screw-Type Supercharger Restraint Devices 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for evaluating and determining performance capabilities for Screw-Type Supercharger Restraint Devices used by individuals engaged in competitive motorsports. 1.2 The procedures, test evaluations and standards contained herein, are intended only as minimum guidelines for construction and evaluation of products. Certification that products meet such minimum standards is made by the product manufacturer and products are not certified, endorsed or approved by SFI under this program. 1.3 Use of the "This Manufacturer Certifies That This Product Meets SFI Specification 14.21" logo/designation, the authorized artwork style, or conventional lettering by a manufacturer, on a subject product, is intended only to indicate that the manufacturer of the product has represented that they have submitted the product to the recommended tests, with positive results, in compliance with the standards established herein. 1.4 This SFI Specification requires a demonstration that the product of a manufacturer meets or exceeds the requirements when the manufacturer enters the program; and on a periodic basis thereafter. Any manufacturer may participate in the program by providing Screw-Type Supercharger Restraint Devices that meet or exceed the SFI Specification test standards, by complying with the requirements of the SFI Specification program, and by signing a licensing agreement with the SFI Foundation, Inc. 1.5 Compliance with this specification is entirely voluntary. However, when a manufacturer provides Screw-Type Supercharger Restraint Devices in SFI Specification Page 1 Effective: February 26, 2014
2 compliance with all requirements of the SFI Specification and enters into the licensing agreement with the SFI Foundation, Inc., they may certify that compliance with such standards is in accordance with the guidelines established herein. 1.6 Manufacturers wishing to participate in the program, in addition to the other requirements of this specification, must label each of their products with the manufacturer's name, trademark or symbol as well as the date of manufacture of the product. 1.7 No manufacturer may display the SFI logo/designation on their product unless the manufacturer has signed a licensing agreement with SFI and has successfully complied with all the requirements of this specification and the self-certification program. 2.0 DEFINITIONS 2.1 Screw-Type Supercharger Restraint Devices are used to constrain the supercharger, injector and resultant explosive fragments in the event of an explosion or mechanical failure of a screw-type supercharger. 2.2 Screw-Type Supercharger Restraint Devices shall be inspected every two years by the manufacturer for recertification. Any strap made from material that is sensitive to ultraviolet light shall be replaced at that time. 2.3 Any restraint device pertaining to this specification shall remain as constructed by the original manufacturer and not modified. 3.0 CONSTRUCTION The restraint device shall incorporate a containment configuration to restrict the release of explosive fragments from the supercharger and the injector. This shall be called the enclosure segment(s). The restraint device shall have engine attachment straps used to constrain the supercharger enclosure in the event of detachment from the engine. The attachment straps shall be secured to the engine with each strap having its own attachment. A minimum of five attachment straps shall be used, one on each corner of the supercharger and one on the rear. 3.1 ATTACHMENT STRAPS Straps shall be made of a material with a minimum elongation of 20 percent at the test load. If the strap material used is subject to fire damage, the straps shall have sheathing, completely covering the otherwise exposed straps, which the manufacturer represents to be fire retardant. SFI Specification Page 2 Effective: February 26, 2014
3 3.2 ATTACHMENT STRAP ENGINE ATTACHMENTS The bracket for each separation strap attachment shall be connected to the engine by a minimum of two inch (10 millimeter {mm}) bolts or studs (SAE Grade 5 or Class 9.8). The strap attachments can also be integral to a one piece flange running the full length of the exhaust header. This method shall use all header bolts or studs through the flange for connection to the engine. Any strap attachment hardware shall be separate from the exhaust header. Welding of attachments to the exhaust header is not acceptable. 3.3 TYPE TYPE 1 - FULL BLANKET This type shall consist of a blanket of ballistic material formed into a sack which completely covers the injector body and supercharger except for openings for air intake, injector/throttle linkage and the housing for the drive pulley shaft. A. LOWER ANCHOR PLATE The restraint device shall utilize an anchor plate between the lower surface of the supercharger and the upper surface of the supercharger manifold. The plate shall be made of a material capable of withstanding a minimum load of 7,500 lbs (3,400kg) and must be provided by the manufacturer of an SFI 34.1 screw-type supercharger. B. CONTAINMENT STRAPS Containment straps shall be used to connect the full blanket to the lower anchor plate and the blanket shall be attached to the containment straps. Straps shall be made of a material with a minimum elongation of 20 percent at the test load. C. BLANKET The blanket shall be constructed of ballistic material. The ballistic material shall cover 95 percent of each side and rear of the supercharger housing and 40 percent of the front of the supercharger housing. The blanket shall also cover 95 percent of the projected opening of the top of the supercharger. The blanket shall be permanently secured to the lower anchor plate by containment straps at a minimum of one place on each side and a minimum of one in the SFI Specification Page 3 Effective: February 26, 2014
4 rear. The blanket shall fit snugly around the supercharger and injector body to limit the release of explosive fragments. D. BLANKET STRAPS The purpose of the blanket straps are to maintain the blanket around the supercharger in the event of an explosion. The blanket shall be connected to itself with a minimum of two straps. One strap shall be located at the top of the supercharger and one at the bottom. The straps shall encompass the length of the blanket around the supercharger in the horizontal plane. The strap connection device shall be capable of sustaining the load imposed on the strap TYPE 2 - DUAL ANCHOR PLATES This type shall have a second anchor plate between the lower surface of the injector body and the upper surface of the supercharger case. The enclosure segment shall be between the upper and lower anchor plates connected with the containment straps. A. ANCHOR PLATES The upper plate shall have a minimum of five individual attachment points for the engine attachment straps described in paragraphs ; a minimum of three individual attachment points for the containment straps between the plates (one on each side and one in the rear). The lower plate shall have three attachment points (one on each side and one in rear), and must be provided by the manufacturer of an SFI 34.1 screw-type supercharger. B. CONTAINMENT STRAPS Containment straps shall be used to connect the upper and lower anchor plates. Straps shall be made of a material with a minimum elongation of 20 percent. (See Figure A) C. SUPERCHARGER BLANKET The supercharger blanket shall be constructed of ballistic material. The ballistic material shall cover 95 percent of each side and rear of the supercharger housing and 40 percent of the front of the supercharger housing. The ballistic material shall be a continuous blanket that encompasses the supercharger and is connected at the ends. The blanket shall be permanently secured to the anchor plates at a minimum of one place on each side and a minimum of one in the SFI Specification Page 4 Effective: February 26, 2014
5 rear. The blanket shall fit snugly around the supercharger to limit the release of explosive fragments. D. SUPERCHARGER BLANKET STRAPS The purpose of the straps is to maintain the blanket around the supercharger in the event of a failure. The blanket shall be connected to itself with a minimum of two straps. The straps shall encompass the length of the blanket around the supercharger. The strap connection device shall be capable of sustaining the load imposed on the strap. E. INJECTOR BLANKET For a standard-placement injector cover, the injector blanket shall consist of ballistic material and cover 95 percent of the projected opening of the top of the supercharger. The blanket shall be permanently secured to the injector strap assembly. F. INJECTOR STRAP ASSEMBLY For a standard-placement OR forward-placement injector cover, the injector strap assembly is used to constrain the injector body in the event of a failure. The injector strap assembly shall confine the injector by coverage across the top. There shall be a minimum of four attachment points on the upper plate TYPE 3 - RIGID ENCLOSURE This type shall encase the supercharger and injector. It shall consist of rigid walls on the sides, rear and top. The anchor plate can be integral with the walls. This case must have a minimum of five attachment straps as described in Paragraph The material covering the injector may be a separate container from the supercharger enclosure. A. LOWER ANCHOR PLATE The restraint device shall utilize an anchor plate between the lower surface of the supercharger and the upper surface of the supercharger manifold. The plate shall be made of a material capable of withstanding a minimum load of 7,500 lbs (3,400kg) and must be provided by the manufacturer of an SFI 34.1 screw-type supercharger. SFI Specification Page 5 Effective: February 26, 2014
6 4.0 MODEL CLASSIFICATION B. SUPERCHARGER CONTAINMENT MATERIAL The supercharger containment shall be constructed of rigid ballistic material. The ballistic material shall cover 95% of each side and the rear of the supercharger housing and 40% of the front of the supercharger housing. The ballistic material shall be continuous and connected at the two open ends by means of a metal strap. The material shall fit snugly around the supercharger to limit the release of explosive fragments. The supercharger enclosure segment shall be secured to the lower anchor plate at a minimum of one place on each side and a minimum of one in the rear. C. INJECTOR CONTAINMENT MATERIAL The injector enclosure shall consist of ballistic material and cover 95% of the projected opening of the top of the supercharger. The injector shall be permanently secured to the supercharger enclosure so as to prohibit separation. Any variation of the original design, i.e. construction, anchor plate, ballistic material, straps or mounting method is considered a model change. 5.0 TESTING 5.1 TENSILE STRENGTH SAMPLES Test samples shall be fully processed new restraint devices which are representative of restraint devices currently produced or to be produced. All necessary mounting hardware along with mounting instructions shall be supplied with the restraint device APPARATUS A. TEST MACHINE The test machine shall be capable of applying a minimum tensile load of 36,000 pounds {lb} (16,330kg) with an excursion travel of four to five inches per minute {ipm} ( cm/min), and shall have adequate instrumentation to verify the test load. The test machine SFI Specification Page 6 Effective: February 26, 2014
7 shall also be in calibration and traceable to the National Bureau of Standards. B. TEST FIXTURE The test fixture shall duplicate the mounting method of the restraint device and be capable of withstanding the applied load PROCEDURES A. ATTACHMENT STRAPS (Type 1, 2, 3) 1. The restraint device shall be mounted to the test fixture per manufacturer's instructions with the supplied attachment hardware. The side attachment straps shall be connected and subjected to the load. 2. The test fixture shall be installed into the test machine. The strap attachments shall be mounted and oriented in the same position and connected as in an actual vehicle. 3. Using an excursion rate between four and five ipm ( cm/min), apply an increasing load to the restraint device. Continue until a load of 24,800 lb (11,250kg) is applied. Hold at that level for ten seconds, then release the load. B. REAR ATTACHMENT STRAP (Type 1, 2, 3) This test is only necessary if the rear attachment strap is not identical to the side attachment straps or if it utilizes a different connection device or adjustment hardware. 1. In each head of the test machine, mount one end of the rear strap. If the strap has a connection device and/or adjustment hardware, connect and adjust per manufacturer's instructions. The strap, strap hardware and heads shall be in axial alignment. 2. Using an excursion rate between four and five ipm ( cm/min), apply an increasing load to the strap. Continue until a load of 6,200 lb (2,800kg) is applied. Hold at that level for ten seconds, then release the load. SFI Specification Page 7 Effective: February 26, 2014
8 C. ENCLOSURE SEGMENT (Type 2) 1. The enclosure segment of the supercharger restraint device shall be mounted to the test fixture per manufacturer's instructions with the supplied attachment hardware. 2. The test fixture shall be installed into the test machine. The fixture shall fix either the top or bottom of the enclosure segment. The opposite end shall be connected to, or supported against, the moving head of the test machine. 3. Using an excursion rate between four and five ipm ( cm/min), apply an increasing load to the free end of the enclosure segment. Continue until a load of 7,500 lb (3,400kg) is applied. Hold at that level for ten seconds, then release the load. D. INJECTOR STRAP ASSEMBLY (Type 2) 1. The upper anchor plate shall be connected to the test fixture. The injector strap assembly shall be mounted to the upper anchor plate per manufacturer's instructions with the supplied attachment hardware. 2. The test fixture shall be installed into the test machine. 3. Using an excursion rate between four and five ipm ( cm/min), apply an increasing load to the injector strap assembly. Continue until a load of 2,500 lb is applied. Hold at that level for ten seconds, then release the load. E. BLANKET STRAP (Type 2 & 3) If more than one variation of blanket strap is used, then all variations shall be tested. 1. In each head of the test machine, mount one end of the blanket strap. If the strap has a connection device and/or adjustment hardware, connect and adjust per manufacturer's instructions. The strap, strap hardware and heads shall be in axial alignment. 2. Using an excursion rate between four and five ipm ( cm/min), apply an increasing load to the strap. Continue SFI Specification Page 8 Effective: February 26, 2014
9 5.2 PENETRATION RESISTANCE until a load of 2,500 lb (1,130kg) is applied. Hold at that level for ten seconds, then release the load. This test is based on Military Standard 662D, "Ballistic Test for Armor" (MIL-STD- 662D) SAMPLES One sample of the ballistic material used in the containment section and the injector cover, 11 by 14 _+1 inch (27.9 by 35.6 _+2.5 centimeters) shall be supplied. The sample shall have the identical construction of the supercharger restraint device that is being evaluated APPARATUS The apparatus shall be as specified in MIL-STD-662D. A. PROJECTILE Caliber.22 - Type 2, fragment simulators conforming to MIL-P A shall be used PROCEDURES (TYPE 1, 2, 3) The sample shall be testing in accordance with MIL-STD-662D for the Ballistic Limit, V 50 BL(P). The maximum velocity span shall be 150 feet per second {fps} (46 meters per second {mps}). The ballistic resistance of the sample shall be greater than or equal to a V 50 BL(P) of 1385 fps INTERPRET RESULTS The V 50 BL(P) shall be calculated by taking the arithmetic mean of the two highest partial, and the two lowest complete, penetration impact velocities within the allowable velocity span. 6.0 PROOF OF COMPLIANCE Screw-Type Supercharger Restraint Device manufacturers are required to provide the following information to enroll in this program: 6.1 TEST RESULTS Test results shall be documented in a test report. SFI Specification Page 9 Effective: February 26, 2014
10 7.0 TEST REPORTS TENSILE STRENGTH The restraint device shall pass all applicable tensile strength tests to be acceptable. Each component shall pass the tensile strength test if it is able to maintain the test load for ten seconds PENETRATION RESISTANCE The restraint device shall pass all applicable penetration resistance tests to be acceptable. Each component will be required to pass the designated test requirement. A separate test report, or set of test reports if required, shall be submitted for each product model. If more than one test facility is required to complete all necessary tests, then a separate test report shall be submitted from each one. A test report shall be submitted for each component, if tested separately. The test facility shall assign a unique number to each test report. This number along with the report date and page number shall appear on each page. Each test report shall include: 7.1 RELEVANT INFORMATION 7.2 TESTS Manufacturer's name, contact name, address and telephone number Name, address and telephone number of the test facility Name and signature of the responsible test supervisor Actual date of the test Specification number and effective date Product name, description and model designation Component name and description. Each test conducted shall be listed showing the test name, apparatus used, procedure used and test results obtained along with any other appropriate information. SFI Specification Page 10 Effective: February 26, 2014
11 7.3 AUTHENTICATION Test reports shall be authenticated and stamped by a Professional Engineer who is registered in the state in which the testing is conducted. If necessary, SFI may allow an equivalent entity to provide authentication. 8.0 INITIAL DESIGN VALIDATION To receive initial recognition from SFI as a participant in the SFI Specification Program, the manufacturer must submit to SFI all information delineated in the Proof of Compliance section. This information shall be provided for each Screw-Type Supercharger Restraint Device model offered by the applicant that is to be included in the program. Any change in design, materials and/or methods of manufacturing not specifically excluded is considered a model change and, therefore, requires initial design validation. 9.0 PERIODIC REVALIDATION Test reports with successful test results must be submitted to SFI at least once every 24 month period following the date of the initial design validation test for each model of Screw-Type Supercharger Restraint Device manufactured by the participant. If multiple test reports are required to obtain all test results, then the earliest test date shall be used to determine when the periodic revalidation reports are due. Also, SFI shall retain the option to conduct random audit reviews. SFI shall purchase the product on a commercial basis and test for compliance to the specification. The submitting manufacturer shall reimburse SFI for all audit costs CERTIFICATION OF COMPLIANCE Upon demonstration of successful compliance with all the requirements of the specification and the self-certification program and upon entering the licensing agreement with SFI, the manufacturer may advertise, present and offer the Screw-Type Supercharger Restraint Devices for sale with the representation that their product meets the SFI Specification Continuing certification is contingent upon the following additional considerations: (1) the product shall be resubmitted for testing following any change in design, materials and/or methods of manufacturing not specifically excluded, and (2) periodic revalidation test reports are submitted when due to SFI CONFORMANCE LABELS The conformance label is a patch. A patch shall be attached to each attachment strap and blanket, facing outward. The month and year of manufacturer shall appear on each patch. For recertification, the old labels shall be removed and the foregoing procedure shall be followed using new labels. SFI Specification Page 11 Effective: February 26, 2014
12 12.0 DECERTIFICATION Participating manufacturers are subject to decertification when not in compliance with the requirements of this program or when their products are not in compliance with the requirements of this specification. Decertification will provide SFI the right to effect any and all remedies which are available to SFI in the licensing agreement APPEAL PROCEDURE In the event of decertification, the manufacturer is entitled to an appeal of the decision of SFI. Requests for appeal must be received by SFI no later than thirty days following receipt of the notice of decertification. Appeals of such decisions will be heard at the next meeting of the Board of Directors of SFI STATEMENT OF LIMITATIONS Testing procedures and/or standards contained in this specification are intended for use only as a guide in determining compliance with the minimum performance requirements as defined herein. The granting and assignment of the "This Manufacturer Certifies That This Product Meets SFI Specification 14.21" logo/designation is in no way an endorsement or certification of product performance or reliability by SFI. SFI, its officers, directors and/or members assume no responsibility, legal or otherwise, for failure or malfunctions of a product under this program COSTS All costs involved in this program will be absorbed by the submitting manufacturer COMPLIANCE PERIOD As this specification is revised to reflect changes in technology and/or field conditions, to remain current, participating manufacturers in the SFI Specification 14.21, Screw-Type Supercharger Restraint Device, Program, must demonstrate full compliance with the requirements of this specification within ninety (90) days of the latest effective date. * Original Issue: June 18, 1991 Revised: February 9, 2006 Reviewed: February 19, 1993 Reviewed: December 8, 2007 Reviewed: February 17, 1995 Reviewed: December 12, 2009 Reviewed: January 31, 1997 Reviewed: December 3, 2011 Revised: June 27, 1997 Reviewed: December 12, 2013 Reviewed: February 4, 1999 Revised: February 26, 2014 Reviewed: August 30, 2001 Reviewed: December 6, 2003 SFI Specification Page 12 Effective: February 26, 2014
SFI SPECIFICATION 4.1 EFFECTIVE: MARCH 27, 2013 *
SFI SPECIFICATION 4.1 EFFECTIVE: MARCH 27, 2013 * PRODUCT: Automatic Transmission Shields 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for
SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014
SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014 PRODUCT: Turbochargers 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for evaluating and
SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *
SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * PRODUCT: Polymer (Foam-Filled) Fuel Cells 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards
SFI SPECIFICATION 16.5 EFFECTIVE: DECEMBER 29, 2014 *
SFI SPECIFICATION 16.5 EFFECTIVE: DECEMBER 29, 2014 * PRODUCT: Stock Car Driver Restraint Assemblies 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards
Architect/Contractor Information Package
Architect/Contractor Information Package 3M SelfCheck System C-Series C1 Model 877 This package provides architects and contractors with the information necessary for the successful installation of the
TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE
TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE A. GENERAL NOTES: Service entrance line and load conductors, conduit straps, weatherhead, lock nuts, bushings, connectors, and
4.3.5 - Breakaway Walls
4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free
SAN25 (6904-002001 <00>)
SAN25 () Wood 002752.eps Concrete 13mm (1/2 in.) 5mm (3/16 in.) Sanus Systems 2221 Hwy 36 West Saint Paul, MN 55113 USA Customer Service Americas: 800-359-5520 651-484-7988 [email protected] Europe, Middle
Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn
Safety.. Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Description: Technical: Zinc plated forged heat treated steel,
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35
Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013
AMF112 Instruction Manual
AMF112 Instruction Manual Scan here to view product demo and install videos or visit san.us/103 Milestone AV Technologies 6436 City West Parkway Eden Prairie, MN 55344 USA Customer Service Americas: 800-359-5520
UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL
S 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 CUSTOMER RESPONSIBILITY FOR TOTAL TEMPORARY SERVICE 4.0 CUSTOMER RESPONSIBILITY FOR TEMPORARY SERVICE IN PERMANENT LOCATION 5.0 NVE RESPONSIBILITIES 6.0 GROUNDING
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
PivotLoc Ladder Systems
N25 ACCESS AND SAFETY EQUIPMENT SPECIFICATION CLAUSES PivotLoc Ladder Systems To be read with The Main Contract Preliminaries, General Conditions, Sub-Contract Preliminaries. MINIMUM CONTRACTOR STANDARD
AMF112 (6904-002010 <00>) 13mm (1/2 in.)
AMF112 () Concrete Wood 13mm (1/2 in.) 5.5mm (7/32 in.) 10mm (3/8 in.) Sanus Systems 2221 Hwy 36 West Saint Paul, MN 55113 USA Customer Service Americas: 800-359-5520 651-484-7988 [email protected] Europe,
Please check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
Hollow or Cinder Block Wall Mount Job Aid
Summary This Job Aid covers: Hollow or Cinder Block Wall Mount Job Aid Hollow or Cinder Block wall Mount Bracket Installing the Mount Bracket into Cinder Block This Job Aid supports the Technician audience.
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
Chapter 5 FLOOR LOADING AND WEIGHTS
Chapter 5 FLOOR LOADING AND WEIGHTS Section 1.0 Floor Loading Section 2.0 Seismic Data The CT system has a total floor load of approximately 6660 lbs (3021 kg). About 5050 lbs (2291 kg), including patient
VW Caddy W21-760-3503 INSTALLATION INSTRUCTIONS
Unit 626 Kilshane Avenue, North West Business Park, Ballycoolin, Dublin 15, Ireland Telephone: +353 1 8612 632, Fax: +353 1 8612 647, email: [email protected] www.driveriteltd.com VW Caddy W21-760-3503
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
Testing guideline. "special protected vehicles"
"" ( Sondergeschützte Fahrzeuge ) bullet resistance Englische Übersetzung; es gilt immer die deutsche Originalfassung! English translation; however the original German version always prevails! Publisher:
Installation. Smart-UPS VT MGE Galaxy 3500. Maintenance Bypass Panel. 10-40 kva 400 V
Installation Smart-UPS VT MGE Galaxy 3500 Maintenance Bypass Panel 10-40 kva 400 V Contents Safety.................................................. 1 Save these instructions...................................
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
Ordering Drums for Hazardous or Non Hazardous Material Transportation
Ordering Drums for Hazardous or Non Hazardous Material Transportation Introduction Selecting the proper steel drum for your company s needs requires a thorough understanding of the product(s) to be shipped,
NLECTC-National Ballistic-resistant Body Armor Inspection Scheme
Subject: 24 June 2015 1 Scope The National Law Enforcement and Corrections Technology Center-National (NLECTC-National) is a program of the U.S. Department of Justice (DOJ), Office of Justice Programs
STANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist
One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148
One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148 DATE: January 2008 REVISION: B HENDRICKSON ULTRA ROD PLUS Torque Rod Bonded Bushing Provides Longer Life Bonding makes a better
SPECIFICATIONS FOR COLD WATER METERS DISPLACEMENT TYPE REVISED March 2013
30-01 SAN ANTONIO WATER SYSTEM SAN ANTONIO, TEXAS SPECIFICATIONS FOR COLD WATER METERS DISPLACEMENT TYPE REVISED March 2013 1. SCOPE This specification covers cold-water displacement meters one and one-half
Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996
CITY OF SAN JOSE BUILDING DIVISION POLICY Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996 All new and replacement water heaters installed
Specifications, Product Testing and Terminology
Specifications, Product Testing and Terminology The following synopsis provides a review of various material and final product testing, which is performed on our products, as well as, many of our competitors.
Charter Township of Shelby Harry Reese Building Director
Charter Township of Shelby Harry Reese Building Director Phone: (586) 731-5969 52700 Van Dyke Fax: (586) 803-2099 Shelby Township, MI 48316-3572 E-mail: [email protected] OUTLINE PROCEDURES FOR PRIVATE
It should be noted that this revised standard does not address the construction industry, window cleaning belts, and sports-related activities.
ANSI Z359 OVERVIEW INTRODUCTION ANSI Z359.1 was introduced in 1992 when standards for common fall protection equipment and methods in the workplace did not exist. That year 600 work-related falls resulted
SELF-STEERING AXLE TABLE OF CONTENTS
SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -
International Convention for Safe Containers
International Convention for Safe Containers (Geneva, 2 December 1972) THE CONTRACTING PARTIES, PREAMBLE RECOGNIZING the need to maintain a high level of safety of human life in the handling, stacking
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
PS6500 Storage Arrays Rack Mount Instructions
PS6500 Storage Arrays Rack Mount Instructions Part Number: R724M Rev. A01 Copyright 2010 Dell, Inc. All rights reserved. Dell is a trademark of Dell, Inc. EqualLogic is a registered trademark. All trademarks
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
BOOTH DESIGN RULES NEW! [email protected]
BOOTH DESIGN RULES All exhibits must conform to the dimensions outlined below in order to assure ease of movement of participants and clear lines of visibility in the exhibit hall. For more information
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
MOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
THE DOW CHEMICAL COMPANY Issued: August 1, 2008 200 LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN 48674 (989) 638-8655 www.dowbuildingmaterials.
ICC EVALUATION SERVICE, INC. EvaluateP InformP Protect Los Angeles Business/Regional OfficeP 5360 Workman Mill RoadP Whittier, CA 90601 (562) 699-0543 phonep (562) 695-4694 fax DIVISION: Section: 6 WOOD
ELEVATED WORK POLICY
ELEVATED WORK POLICY 1.0 BACKGROUND The purpose of this program is to prevent accidents and injuries to workers from falls and to provide employees with the information for the safe use of fall protection
LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
Explosion proof enclosures
1 of 7 Explosion proof enclosures DE8 C 2 of 7 The Ex d enclosures are rugged and designed for harsh environment like: Oil and gas industry Chemical industry Pharmaceutical industry Agribusiness Without
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
Field Application Note
Field Application Note Reverse Dial Indicator Alignment RDIA Mis-alignment can be the most usual cause for unacceptable operation and high vibration levels. New facilities or new equipment installations
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE
OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE Scaletron Industries, Ltd. Bedminster Industrial Park 53 Apple Tree Lane P.O. Box 365 Plumsteadville, PA 18949 USA Toll Free: 1-800-257-5911 (USA &
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
19 DYNAmax Free Standing Server C A B I N E T s
9 DYNAmax Free Standing Server C A B I N E T s 9 DYNAmax Free Standing Server Cabinets FAMILY W=mm and W=800mm DYNAmax Series Free Standing Server Cabinets DYNAmax series Servering Enclosures, provide
19 DYNAmax Free Standing Server C A B I N E T s
9 DYNAmax Free Standing Server C A B I N E T s 9 DYNAmax Free Standing Server Cabinets FAMILY W=600mm and W=800mm DYNAmax Series Free Standing Server Cabinets DYNAmax series Servering Enclosures, provide
Rear Impact Guard TEST METHOD 223. Standards and Regulations Division. Issued: December 2003
Transport Canada Safety and Security Road Safety Transports Canada Sécurité et sûreté Sécurité routière Standards and Regulations Division TEST METHOD 223 Rear Impact Guard Issued: December 2003 Standards
MEDIUM FLAT PANEL DISPLAY STATIC MOUNT MSR Series
INSTALLATION INSTRUCTIONS MEDIUM FLAT PANEL DISPLAY STATIC MOUNT The static mount accommodates medium flat panel displays weighing up to 125 lbs (57 kgs). The teardrop holes in the mount allow for quick
User Guide MTD-3. Motion Lab Systems, Inc.
User Guide MTD-3 Motion Lab Systems, Inc. This manual was written by Motion Lab Systems using ComponentOne Doc-To-Help. Updated Tuesday, June 07, 2016 Intended Audience This manual is written to provide
Cabinets 101: Configuring A Network Or Server Cabinet
Cabinets 101: Configuring A Network Or Server Cabinet North, South and Central America White Paper May 2012 www.commscope.com Contents Background Information 3 What is a network or server cabinet? 3 What
Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
PART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
Trillium 63 Instruction Manual
Trillium 63 Instruction Manual We ll Make It Stress-Free If you have any questions along the way, just give us a call. 1-800-359-5520. We re ready to help! IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS
EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS 1. SCOPE 1.1 This specification covers the type, physical properties and dimensions of Expanded Polystyrene Insulation Board intended for use
A701 (6904-002018 <01>)
A70 () Wood Stud mm (7/6 in.).4 mm (3/3 in.) 6 mm (5/64 in.) 3 mm (/8 in.) Sanus Hwy 36 West Saint Paul, MN 553 USA Customer Service Americas: 800-359-550 65-484-7988 [email protected] Europe, Middle East,
Cooktop Low-Profile Ventilation Hoods
INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............
CHAPTER 7 BUILDING ARTICLE 7-1 UNIFORM CODES 1. 7-1-1 Adoption. Board of Appeals. Annual Review
CHAPTER 7 BUILDING ARTICLE 7-1 UNIFORM CODES 1 7-1-1 Adoption 7-1-2 Board of Appeals 7-1-3 Annual Review Section 7-1-1 Adoption A. Those certain documents known as the 1997 Uniform Building Code, Volumes
Bracing Webs in Trusses that have Dissimilar Configurations
Bracing Webs in Trusses that have Dissimilar Configurations Released April 25, 2006 Issue: Truss Design Drawings (TDD) that are prepared in accordance with ANSI/TPI 1, National Design Standard for Metal
DEPARTMENT OF PLANNING AND DEVELOPMENT
DEPARTMENT OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION FOR NON-RESIDENTIAL DEVELOPMENT Property Owner Telephone Street/P.O. Box City State ZIP Agent (if any) Relationship to Property
WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS
WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS Instruction Booklet 18 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN POWERFUL LIFTING COMPONENTS. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE
INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Video Conference Shelf for Low Profile Flat-Panel Mounts NORTH AMERICA 3130 East Miraloma Avenue Anaheim, CA 92806 USA USA and Canada Phone: 1.800.368.9700 Fax: 1.800.832.4888
WINDOW AND DOOR REPLACEMENT REQUIREMENTS
WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.
ARROWHEAD GENERAL INSURANCE AGENCY RESIDENTIAL EARTHQUAKE INSURANCE PROGRAM UNDERWRITING GUIDELINES & RATE MANUAL
UNDERWRITING GUIDELINES & RATE MANUAL Arrowhead General Insurance Agency, Inc. Page 1 of 8 Producers Manual June 2001 UNDERWRITING GUIDELINES A. BINDING AUTHORITY/ELIGIBILITY Binding and risk approval
Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049
Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal
SWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
Working at Heights and Fall Protection
Standard Operating Procedures Working at Heights and Fall Protection Last Modified: JAN 2013 1 of 6 Working at Heights and Fall Protection I Purpose Serious accidents can result from falls. All employees
Product Notice. Safety Notice: Sales Hold
Product Notice Ariens Company 655 W. Ryan St. Brillion, WI 54110 www.ariens.com Product Family: Ariens and Gravely 36 Power Brushes Subject: Sales Hold Inspect and Repair Dealer Action: SALES HOLD Do not
Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5
INSTALLATION GUIDE Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5 Take every precaution to make this installation a safe procedure. Make safety the number
2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
Unpacking, Installation, and Customization
Unpacking, Installation, and Customization NetShelter WX Enclosure AR100 AR100HD Contents Unpacking... 1 How to Unpack the Enclosure............................... 1 Please Recycle..........................................
FIX TURE CARRI ERS. 140(a) MPB-2011-USA
FIXTURE CARRIERS STRUCTURAL FEET The feet are heavy duty cast ductile iron and invertible. No distinction is necessary between right and left hand. Each foot wraps around the specially formed edge of the
Wisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria
Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards
GEH6290. Mechanism Circuit Breaker. Handle Operating Mechanism Cat. No. Type NEMA 1, 3R, 12, 13 NEMA 4/4X Cat. No. Cat. No. Series Instruction
GEH6290 g Cable Operator Mechanisms for E150, SE150, SF250, and SG600 Spectra RMS Circuit Breakers Type SCH1/1X, SCH2/2X Flange-Mounted Handle Assemblies, Cable Series SC3L SC10L and Type SC0M1A, SCOM1EF,
TYPICAL PATIO COVERS 111
City of Laguna Niguel Building Division 30111 Crown Valley Pkwy Laguna Niguel, CA 92677 (949) 362-4360 FAX 362-4369 www.cityoflagunaniguel.org TYPICAL PATIO COVERS 111 PLEASE NOTE: This information Bulletin
1 Flexitank/Container Combination Rail Impact Test Criteria
1 Flexitank/Container Combination Rail Impact Test Criteria 1.1 General 1.1.1 This test method is intended to prove the ability of Flexitanks and their installations in ISO shipping containers to withstand
1 RCNY 101-07 CHAPTER 100
1 RCNY 101-07 CHAPTER 100 Subchapter A Administration 101-07 Approved Agencies. (a) Definitions. For the purposes of this section, all terms used herein shall have the same meanings as set forth in the
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
TECHNICAL NOTE. Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006 IBC. On Cold-Formed Steel Construction INTRODUCTION
TECHNICAL NOTE On Cold-Formed Steel Construction 1201 15th Street, NW, Suite 320 W ashington, DC 20005 (202) 785-2022 $5.00 Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006
Seismic Data Requirements for Eaton UPS Equipment Installation
Seismic Data Requirements for Eaton UPS Equipment Installation 1.1 Introduction Eaton equipment represented in the following sections were subjected to seismic testing in accordance with the 2006 or 2012
19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.
19" Data Racks Attractive design and high quality are characteristic. Basic framework is welded from multiple bent metal plate, which assures great rigidity suitable for heavier equipment. All profile
ECM-D70T / ECM-D70T1.5
Elliptical Ceiling Dual Mount for 37 to 50 Flat Panels INSTALLATION INSTRUCTIONS CREATING POSITIVE CUSTOMER EXPERIENCES 9531-041-001-01 Contents ECM-D70T / ECM-D70T1.5 Installation Tools... 3 Parts List...
BLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
Retardants Inc. The Decision You Make May Save A Life! 123 Columbia Court North Suite 201 Chaska, MN 55318
Fire Barrier Moldable Putty+ Pads 123 Columbia Court North Suite 201 Chaska, MN 55318 952-448-7377 FAX:952-448-2613 e-mail: [email protected] Visit Our Web Site at www.fireretardantsinc.com Protecting
