1 FLAT ROOF DESIGN CONSIDERATIONS
2 bauder.ie 02
3 CONTENTS 1 Flat Roof Types 04 2 Insulation and Condensation 06 3 Deck Construction Types 07 4 Fire Protection 08 5 Wind Load Design 09 6 Falls and Drainage 10 7 Locating Equipment 11 8 Safe Access 12 Refurbishment Roof 9 Assessing Requirements Improving Drainage Falls Improving Thermal Properties bauder.co.uk
4 1 FLAT ROOF CONSTRUCTION TYPES Thermal Design Thermal design is concerned with the flow of both heat and water vapour through the roof construction and their subsequent effect on the performance of the roof and the various components in the system. The designer therefore needs to consider the amount of insulation required to control both heat loss and condensation. In the case of a flat roof, insulation is usually in the form of either a rigid board above the deck, or a fibrous quilt immediately above the ceiling, depending on the type of roof construction. There are three recognised designs of flat roof construction; warm, cold and inverted. Manchester University Warm Roof In a warm roof construction the principal thermal insulation layer is located above the structural decking, resulting in the structural deck and support structure being at a temperature close to that of the interior of the building. It is necessary to incorporate a vapour control layer beneath the insulation in order to prevent moisture vapour being forced into the insulation through thermal pressure from within the building. The waterproofing membranes are placed over the insulation to completely encapsulate it There is no requirement for roof void ventilation, and cold bridging through the system is easier to eliminate because there are no interruptions from the structural supports as there is in a cold roof construction. Although this type of construction is normally continuously supported, it can also provide a flat and stable structure directly over most profiled metal decking and is generally recommended for all flat roof applications due to the simplicity of its design. 1. Waterproofing 2. Rigid Insulation 3. Vapour Control Layer 4. Structural Deck (eg plywood) 5. Roof Void 6. Ceiling 7. Support Structure 6 bauder.ie 04
5 Cold Roof In cold roof construction, the principal thermal insulation layer is located below the structural decking. The concept for this type of design is usually associated with roof constructions having independent ceilings to support the insulation. Adequate ventilation must be provided between the insulation and the underside of the roof deck to prevent the risk of interstitial condensation forming within the construction. A cold roof design is not generally recommended for new build flat roof applications due to the added requirement for roof void ventilation and the difficulties in preventing cold bridging through the system. Inverted Roof (Upside Down Roof) In an inverted roof construction, the principal thermal insulation layer is located not only above the roof structure but also above the waterproofing, resulting in the waterproofing, structural deck and support structure being at a temperature close to that of the interior of the building. No vapour control layer is required. This type of construction is generally only used for flat roof applications to concrete support structures due to the weight loading of the ballast that becomes necessary to restrain the insulation against wind uplift and flotation. If an existing cold roof is to be refurbished, consideration should be given to converting the design to a warm roof, or incorporating new insulation into the roofing system to improve thermal performance. However, if the latter is the case, thermal calculations will be required in order to analyse the likelihood of condensation formation Surfacing / Ballast (eg paving or pebbles) Waterproofing 2. Structural Deck (e.g. plywood) 2. Filtration Layer / Vapour Permeable Membrane 3. Inverted Roof Insulation Boards (eg extruded polystyrene) 4. Waterproofing System 5. Structural Deck (eg concrete) 3. Support Structure 4. Ventilated Ceiling Void 5. Quilt Insulation 6. Ceiling 7. Cross Ventilation 05 bauder.co.uk
6 2 INSULATION & CONDENSATION Thermal Design Insulation The designer should determine the type of insulation required for the construction by consideration of the factors listed below: Required thermal performance ( U value ) of the roof. The build-up thickness that can be accommodated at roof level. Imposed weight loading to the deck structure. Compressive strength required (the ability of the insulation to withstand loads applied directly onto the roof system surface). The level and type of traffic that the roof will experience both during and after construction. Compatibility with other roofing components. Required fire resistance. Required acoustic performance. Environmental properties. Bauder manufactures rigid urethane foam insulation products for use within Bauder warm roof systems to provide a totally compatible system. This product has been specifically chosen for the benefits it provides, however, we are able to provide certain other insulation materials as part of the system should this be considered preferable. When inverted design is required, we can provide Bauder XPS or BauderJFRI insulation along with their associated Vapour Permeable Membrane. Condensation The temperature at which air becomes fully saturated with moisture (100% RH) is called the dew point. When warm moist air meets a cold surface it is cooled, and if its temperature drops below the dew point it will give up moisture in the form of surface condensation. The air within a building normally contains more water vapour than the external air and so therefore has a higher vapour pressure. This creates a vapour drive from the areas of high pressure to areas of low pressure and water vapour will try to escape by all available routes to the low pressure conditions outside the building. Moisture vapour is also present in all the permeable materials of a building, including the roof construction, and as the vapour pressure inside a building is continually changing, there is a constant flow of water vapour in and out of the roofing materials. In cold weather the temperature under the waterproofing will fall and can create a zone in the roof structure where the temperatures are below the dew point. Moisture will condense in this zone to form interstitial condensation. The incorporation of adequate insulation and ventilation in the roof void of a cold roof construction, or sufficient insulation and vapour barrier in a warm roof construction, will prevent the formation of interstitial condensation in the normal range of environmental conditions experienced. The Bauder Technical Services Team is always available for free U value and condensation risk calculations, or for advice on any particular project. Building Regulations Minimum levels of insulation required in flat roof constructions is governed by Building Regulations. These levels are rising on an ever increasing scale as the Government strives to meet its targets for reducing CO 2 emissions. Along with increased insulation levels is a requirement for attention to construction details in order to reduce thermal bridging and air leakage where the various elements of a building meet. Guidance on detail design is given by Accredited Construction Details which is available from bauder.ie 06
7 DECK TYPES 3 Materials used for the roof deck should be selected from those listed in the latest version of BS 6229:2003. It is important to refer to this document for design guidance, but, for convenience, the various materials are outlined below: Reinforced Concrete Suitable for all Bauder waterproofing systems, this includes both in-situ and pre-cast forms, which can be covered with a cementitious screed if required. The surface should be wood float finished and the slab allowed to cure thoroughly and dry out to provide a suitable surface to which the membranes can be applied. Profiled Metal Metal decking constructed to support built-up waterproofing systems should be of a suitable profile, i.e. featuring crowns that are wider than the respective troughs. The trough span should not exceed 150mm, otherwise the vapour barrier may sag at the laps and adequate support will not be provided for the insulation. Suitably profiled decking is available in either aluminium or galvanised steel, however consideration should be given to the fact that many systems are applied using intense heat, in which case aluminium is best avoided as it is more likely to distort at high temperatures. Similarly, plastic or painted soffit types of decking may become damaged by the heat used when installing torch-applied membranes. This type of decking is not suitable for cold roof design unless it is subsequently overlaid with plywood or OSB. Timber Boarding Timber boarding suitable for roof decks should be a minimum 19mm nominal thickness, planed and closely clamped together, tongued and grooved or closely butted. When using this type of deck in conjunction with bonded vapour barriers, it will be necessary to first install a random nailed isolating layer prior to the installation of the main roofing system to cover the joints between adjacent boards. This decking is not suitable for hot melt or cold liquid applied systems. Plywood Plywood used for roof decks is generally 18mm thick, but it is possible to specify a minimum 15mm if the supporting structure is more closely spaced. The plywood is normally squareedged. Longitudinal joints should occur on the centre line of supporting joists. Cross joints should be staggered and will require additional support, e.g. by noggins. A joint gap of 1 mm per metre of panel should be allowed at all edges. The plywood should comply with BS EN1995 to be suitable for structural use. Materials suitable for flat roofing would be marked BS EN or BS EN and must be suitable for exterior use. Plywood is suitable for all Bauder waterproofing systems. Oriented Strand Board (OSB) OSB used for flat roof decking should be type OSB/3 or OSB/4, conforming to BS EN 300:1997. Thickness and fixing recommendations are similar to those for plywood. Suitable for use with all Bauder systems. Woodwool Slabs When using this type of decking, slabs must conform to BS EN and be at least 50mm thick. They should have a prescreeded top surface and have channel reinforced sides. Please note that this type of decking is now classed as fragile in the UK and therefore not recommended by Bauder for new build construction. Wood Particle Board (Chipboard) This type of deck is no longer recommended for use in flat roof applications due to its long term structural instability, especially if contaminated by moisture. SPECIFICATION SUPPORT TECHNICAL DOWNLOADS TECHNICAL HELPLINE T: E: [email protected] 07 bauder.co.uk
8 4 FIRE PROTECTION The design and construction of flat roofs needs to take into consideration resistance against fire outbreak on both the inside and the outside of the building. Building Regulations set requirements that have to be met in order to provide a level of safety in fire for persons in and around buildings and also give guidance on how to achieve the required standard of safety. Guidance can also be sought from the Loss Prevention Council Design Guide for the Fire Protection of Buildings. Resistance against fire on the outside of the roof is largely provided by the roofing system specified. Current UK Building Regulation Part B refers to a minimum designation of AC for a roof covering when tested in accordance with BS476 Part 3 (ENV 1187 test 4), if any part of the roof is within 6 metres of a relevant boundary. The British Standard test classifies a roof covering in terms of its ability to resist penetration from an external fire and its ability to control flame spread over the surface. An explanation of the designation given above is as follows: Testing a Bauder bitumen membrane in accordance with BS476 Part in a UCAS accredited laboratory First Letter Penetration classifications A Specimens not penetrated within 1 hour B Specimens penetrated in not less than half hour C Specimens penetrated in less than half hour D Specimens penetrated in the preliminary flame test Second Letter Spread of flame classifications A Specimens with no spread of flame B Specimens with not more than 533mm spread of flame C Specimens with more than 533mm spread of flame D Specimens which continue to burn for 5 minutes after the withdrawal of the test flame or spread more than 381mm in the preliminary test All Bauder bituminous systems (except BauderTHERM Stripes) and synthetic Single Ply Systems have been tested to BS476 Part 3 and have achieved fire ratings that either meet or exceed Building Regulation requirements, please contact us for further information. SPECIFICATION SUPPORT TECHNICAL DOWNLOADS TECHNICAL HELPLINE T: E: [email protected] bauder.ie 08
9 WIND LOAD DESIGN 5 When wind strikes a building it is deflected to generate a positive pressure on the windward face. As it accelerates around the side of the building and over the roof it creates a reduced or negative pressure in its trail. The greatest pressures are experienced at the windward corners and edges of the roof, where the negative pressure exerted on the roof can be several times that experienced in the central areas. Bauder Technical Department can provide Wind Load Calculations on request in accordance with the UK National Annex to Eurocode 1 - Actions on structures Part 1-4: General actions - Wind actions (BS EN Wind direction High negative pressure 100kN/m 2 100kN/m 2 High negative pressure Moderate negative pressure The Critical Layer When there is no wind, the air pressure on the upper surface of a roof system is the same as that on the underside. Wind changes this equilibrium by reducing the atmospheric pressure on the surface of the roof system. The atmospheric pressure acting on the underside of the roof will remain the same or may be increased if windows or doors are open on the windward side of the building. The result is a net upward push acting on the underside of the roof. This upward thrust will be exerted on the lowest air impermeable layer in the roof construction, which will be required to stop air flowing further into the system. In most roof constructions there is one layer that provides the dominant barrier against the upward thrusting flow of air and this is referred to as the critical layer. In roof constructions where the deck is continuous (e.g. screeded concrete) it will be deemed to be the critical layer, but for air permeable decks (i.e. those with joints) the critical layer will occur somewhere in the roof system itself. In the case of bituminous membrane systems where the deck is permeable, the critical layer will be the vapour barrier (in a warm roof construction) or the underlayer (in a cold or inverted roof). When these membranes are properly installed, the bond achieved will be far stronger than the loading imposed by wind uplift. In the case of refurbishment overlays, the critical layer will be the existing roof system and its suitability to perform adequately will need to be given careful consideration. Single Ply membranes can be restrained against wind up lift by either being mechanically fastened or adhered, both methods of attachment provide effective resistance to wind uplift forces. Both hot melt and cold liquid applied systems are fully bonded to the deck and wind uplift is not considered to be a problem. Inverted Roofs With an inverted roof specification, the insulation is laid loose and its security will be provided by a loading coat, typically gravel ballast or paving slabs. Edge Detailing Damage caused to flat roofs during severe gales usually starts at exposed windward corners and edges. It is therefore important to make sure that fascias, cappings, trims, and drips are adequately fixed. As a rough guide trims should be screw fixed at 250 mm centres with extra fixings added under conditions of extreme exposure. 09 bauder.co.uk
10 6 FALLS & DRAINAGE It is a requirement of Building Regulation Part H that adequate provision is made for rainwater to be carried from the roof of the building. It is generally considered good practice for flat roofs to be designed to clear surface water as rapidly as possible. According to BS6229 & BS8217, flat roofs should be designed with minimum falls of 1:40 to ensure a finished fall of 1:80 can be achieved, allowing for any inaccuracies in the construction. Water ponding on membrane roofs should be avoided because: 1. It encourages the deposition of dirt and leaves which can be unsightly, may obstruct outlets and /or become a slip hazard. 2. In the event of damage, the interior may suffer greater water ingress. 3. It increases the dead load and may cause progressive deflection of the deck. 4. Ice may be a slip or wind hazard during the winter months. 5. Roofs with extensive ponding require increased maintenance input. Although all Bauder systems are capable of withstanding ponding water for long periods of time, their ultimate life expectancy will undoubtedly be affected. Falls in the structure can be achieved by adjusting the height of the supporting beams or purlins, by using tapered supports, or by the addition of firring pieces before the deck is laid. In the case of a cast in-situ concrete slab, falls are normally provided by use of a screed. Tapered insulation systems are a lightweight, convenient and cost effective alternative method of providing falls to the roof and can be used with our reinforced bitumen membrane (RBM) and synthetic single ply roof systems. Our Technical Department can design bespoke insulation schemes for individual projects and provide advice on roof fall design. Drainage Drainage needs to be provided via internal rainwater outlets and downpipes or via external guttering systems or hoppers. Even if a roof is very small, it is recommended there are at least two drainage points in case one becomes blocked. Internal gutters linking internal outlet positions should be at least 500mm wide. BS EN and the Building Regulations Approved Document Part H contain relevant design information to enable rainfall calculations to be undertaken and give design principles for gutters and downpipes. Alternatively, most drainage component manufacturers will make recommendations regarding the type, size and location of their products for any given roof project. Typical Bauder Tapered Insulation Scheme bauder.ie 10
11 LOCATING EQUIPMENT 7 Locating Equipment on the Roof From an integrity point of view, it is far better to site equipment directly onto a finished waterproofing system, as the less interruptions or penetrations to the membranes, the less likely the system is to allow water ingress. Plant is typically supported by paving slabs with a suitable protection layer beneath. Most Bauder warm roof systems (i.e. those using PIR insulation) are capable of supporting permanently sited plant with a weight of up to 2000 kg/m², avoiding the need for penetrations through the waterproofing. Walkways Whenever there is a requirement for regular foot traffic across a roof, for example to provide maintenance to rooftop plant or a fire escape route, it will be necessary to provide protection to the surface of the waterproofing. It is normally sufficient to provide an extra layer of capping sheet in a contrasting colour to denote the walkway and provide sufficient protection. In cases of extreme traffic, promenade tiles can be bonded to the surface of the capping sheet using hot bitumen or a suitable cold applied adhesive. If the plant is either too heavy for the waterproofing to support, or requires fixing down to the structure, then it will be necessary to introduce a support system that can be easily waterproofed. For example, hollow section beams should be used in preference to section beams, and the larger the section, the easier it is to waterproof. Additionally, any fixings used should be of the flush head design to allow successful waterproofing. Another satisfactory way to provide support to plant is to cast concrete plinths, which can be waterproofed with Bauder membranes and capped with leadwork. Note the cable tray system employed in this picture, supported by proprietary freestanding adjustable feet with loose laid pieces of capsheet beneath, to provide protection to the waterproofing. Rooftop equipment mounted on a steel framework fixed to an adjacent wall is an excellent solution. It allows any future work required to the roof to be carried out without interfering with the plant. 11 bauder.co.uk
12 8 SAFE ACCESS All flat roofs will have a requirement for a certain amount of pedestrian access, whether this is for maintenance of the roof and any rooftop plant or as a fire escape route. It is therefore necessary to design any flat roof to allow for safe access. Careful design can eliminate hazards and make the risks associated with roof access easier to manage. Under the CDM Regulations, designers have a duty to ensure that their designs give adequate regard to health and safety. Foreseeable risks should be avoided. If it is not reasonably practicable to avoid them, they should be combated at source. Priority should be given to design solutions providing general rather than individual protection. For example: Bauder supply rooflights for use in conjunction with our systems that are classified non-fragile. These rooflights are guaranteed for the same duration as the roof system that they accompany. Access to flat roofs is often simple and because they are flat it is easy to walk around on them. Accidents happen not just to roof workers but also to engineers, surveyors, children, and caretakers etc. The first priority is to design out the risk at source; for example, by specifying adequate inbuilt edge protection. Designers should consider the alternatives available in terms of their effectiveness in preventing falls, as well as cost, aesthetics and buildability. 1. Eliminate unprotected fragile materials. 2. Minimise inspection and maintenance requirements for the completed roof structure. 3. Consider carefully the siting of plant which will require maintenance. Are there alternatives to placing it on the roof? If not, is it in the optimum position on the roof where safe access can most easily be provided? 4. When incorporating rooflights, always specify nonfragile and consider carefully their location. 5. Provide clear and unambiguous specifications for safety critical elements of the design. 6. Provide information relevant to maintenance for inclusion in the Health and Safety file. Rooflights Where rooflights are used the following should be considered: 1. The specification of rooflights that are non-fragile. 2. Specifying rooflights that project above the plane of the roof and which cannot be walked on. 3. Specifying rooflights with a design life that matches that of the roof. Edge protection provided by free-standing handrail system Edge Protection The options for edge protection in order of effectiveness are: 1. Designed parapet 2. Guard rail at the roof edge 3. Permanent protected walkway for access to plant on the roof 4. Preformed sockets to support temporary edge protection guard rails 5. Running line systems designed, installed and tested to the relevant standards bauder.ie 12
13 REFURBISHMENT ROOFS 9 Assessing Requirements The following factors should be taken into consideration when undertaking the refurbishment of an existing flat roof system; Condition and Nature of the Existing Deck The first thing to examine when considering a refurbishment of a flat roof is the condition of the deck and supporting structure. If this is at all questionable, a structural survey should be commissioned. Generally speaking, decks made from chipboard or strawboard should always be replaced as their lifespan is limited and any water ingress that may have occurred will have reduced their load bearing strength. These products would normally be replaced with a suitable grade plywood or OSB. Metal decks should be checked for signs of corrosion and deflection; and concrete for cracks and movement. Woodwool is now classed as a fragile material and should be treated in accordance with the latest Health and Safety guidelines. Condition and Nature of the Existing Waterproofing It is important to determine the condition of the roof so that the correct remedial action can be taken. There are three main methods of diagnostics available: Core samples - Investigative core samples assess your current roof construction and the condition of the substrate. This diagnostic method can be completed by your area technical manager and is included as part of our no obligation survey. Moisture mapping - Non-destructive method of testing for trapped water within a flat roof build up. A moisture gauge is used to pinpoint the presence of dampness within the roof structure to depths of 200mm with the results delivered as a topographical map Thermographic imaging - Non-destructive testing method that identifies defective roof areas currently allowing water ingress, which could remain undetected using standard inspection techniques. Thermographic surveys are conducted using infrared technology to identify thermal irregularities, with recordings converted into a clear image of the roof s condition. Bauder area technical managers are available to undertake this service free of charge as part of our no obligation survey and report package. Overlay or Strip the Existing Waterproofing? If the intention is to overlay the existing roof system, the following basic criteria should apply: 1. The existing roof system should be generally sound, dry, free from water damage and suitable to take an overlay system. 2. Overlay materials must be compatible with existing materials. In the case of Bauder bituminous systems generally means asphalt and in some cases other bituminous membranes. Bauder Liquid systems can be used to overlay almost all types of roof membrane. Synthetic single ply can also be used for refurbishment applications in some circumstances. Other points to consider when proposing to overlay: 1. Waterproofing upstands and details should generally always be stripped and replaced. 2. There will be additional weight imposed on the structure by the installation of a new system. 3. An increased surface level will be imposed by the new system (especially when upgrading insulation) and its effect on adjacent detailing must be considered. Upstand heights should not be compromised and it may be necessary to raise DPC s, cavity trays, edge kerbs and fascia boards etc. 4. Products being overlaid may well have a shorter life expectancy than the new system and ultimately cause premature failure of the overlay system. For this reason, Bauder generally recommend that existing systems incorporating insulation are stripped rather than overlaid. 5. Building Regulations now require insulation to be upgraded in most overlay situations. The existing roof coverings should always be removed if there is any doubt over their long term integrity or if moisture is present; this may even include any underlying screed. Consideration must be given as to whether stripping the roof will also mean removing the drainage falls, if so, it will be necessary to incorporate new screed, or more conveniently tapered insulation to re-introduce new falls and maintain adequate drainage of the roof. Image courtesey of IRT Surveys Limited Thermographic image showing thermal loss through mechanical insulation fasteners and around the base of a parapet wall. 13 bauder.co.uk
14 10 REFURBISHMENT ROOFS Improving Drainage Falls A common fault with flat roofs is their inability to shed rainwater efficiently. This can be due to deficient original design, poor workmanship, deflection of the deck or a combination of all three. During refurbishment, the opportunity should be taken to address any ponding that exists, as this will have negative effects on the roof. If the problem is due to a lack of rainwater outlets, consideration should be given to the possibility of adding some, although this may often be impractical due to connecting to the existing drainage system. Tapered insulation can be used as a convenient and cost effective way of improving surface drainage, although it is not viable on every project and we advise that you utilise the experience of your Bauder area technical manager for further advice. Tapered insulation will ultimately create a thicker build-up to the roof system at certain points and may encroach on recommended upstand heights or create a necessity to raise perimeter detailing, cavity trays, clerestory windows etc. and therefore may prove to be financially prohibitive. Typical Bauder tapered insulation scheme Bauder tapered insulation schemes can be designed to suit any particular project following a site survey by your Bauder Area Technical Manager and should this product be considered beneficial, this will be offered as an option. Bauder tapered system to alleviate ponding water between outlets. bauder.ie 14
15 REFURBISHMENT ROOFS 11 Improving Thermal Properties Building Regulations Building Regulations state that when refurbishing or replacing an existing flat roof covering, the replacement system must also make provision for an upgrade to the thermal properties of the roof. Bauder can advise on the latest Building Regulation requirements, and make provision for the correct amount of insulation for your project within the bespoke specification that we provide. However, we would recommend that you seek confirmation of our advice from Local Authority Building Control before submitting the specification for tender. Cold Roof Construction If the refurbishment project in question is a cold roof design, upgrading the insulation in the ceiling void is often difficult as it will be necessary to remove either the ceiling or the roof deck in order to achieve this. Once exposed, it may be discovered that the existing void is too small to take the volume of insulation required whilst continuing to maintain an adequate cross flow of ventilation above it. Even if it is possible to upgrade the insulation in the ceiling void, it will be impossible to provide a continuous uniform thickness, due to the presence of structural supports. Therefore a certain amount of thermal bridging will occur. Warm Roof Construction In the case of refurbishment of a warm roof, it is likely that the level of existing insulation will not be enough to satisfy current Building Regulations. There are commonly two options, either to overlay the roof and introduce additional insulation, or to strip the existing system and start again. The first option should only be considered if the existing roof is deemed suitable and compatible for an overlay. Detail Design Particular attention should be paid to the design of the new roof system to ensure that thermal bridging at perimeters and details is reduced as much as possible. Guidance on detail design is given by Accredited construction details which is availalbe from It is often preferable to convert an existing cold roof to a warm roof construction, as this greatly reduces the problem of thermal bridging. However, this will mean that any existing ventilation provision below the deck will need to be sealed off and there may be a requirement to remove any existing insulation from the void, as this could cause condensation problems. The Bauder Technical Department is always available to provide specialist advice or undertake thermal analysis calculations should this be required. 15 bauder.co.uk
16 UNITED KINGDOM Bauder Limited 70 Landseer Road, Ipswich, Suffolk IP3 0DH, England T: +44 (0) E: bauder.co.uk IRELAND Bauder Limited O Duffy Centre, Carrickmacross, Co. Monaghan, Ireland T: +353 (0) E: [email protected] bauder.ie
Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5. 1. Purpose
Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5 1. Purpose The purpose of this practice note is to address the incidence of deck and roof membrane
Section 2.3. Flat Roofs. Warm deck single ply membrane. Warm deck single ply membrane. Warm deck built-up felt/ mastic asphalt. Protected membrane
Section Flat Roofs Warm deck single ply membrane Product: Rocksilk Krimpact Flat Roof Slab Fl01 Warm deck single ply membrane Product: Polyfoam ECO Roofboard Fl02 Warm deck built-up felt/ mastic asphalt
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Site Inspection Report
Site Inspection Report Project Title: 1 Canada Square Location: 1 Canada Square, Canary Wharf, London Date of Inspection: 16/05/12 System / Products: TBA (suggested flame free application) Attendees: G
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5
Cl Sfb (27-9) Rn7 M2 December 2004 Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5 Fesco, Fesco S, Retrofit, Retrofit S, Fesco Fillet, PF,
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.
Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice
Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in
REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
1 DESIGN FACTORS THE RUBEROID BLUE BOOK 1
1 DESIGN FACTORS 1.1 FALLS AND DRAINAGE 1.2 THERMAL DESIGN 1.3 VAPOUR CONTROL DESIGN GUIDE 1.4 TRAPPED MOISTURE 1.5 MOVEMENT AND MEMBRANES 1.6 WIND 1.7 WIND ATTACHMENT DESIGN GUIDE 1.8 FIRE 1.9 ROOF RENEWAL
September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
0845 0098 980 www.nicholsonsts.com
0845 0098 980 www.nicholsonsts.com ROOFTRAK The IFP is revolutionising the way we fix things to roofs. Technical Director of a leading UK roofing system manufacturer The ROOFTRAK-IFP A revolutionary solution
FireSmart IRS Insulating Roof Screed
Insulating Roof Screed CI/SfB January 2004 CI/SfB January 2004 M2 P M2 P Icopal Ltd Barton Dock Road Stretford, Manchester M32 0YL Telephone: 0161 865 4444 Fax: 0161 866 9859 Technical Fax: 0161 865 8433
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
BAUDER BITUMINOUS ROOFING SYSTEMS BAUDERFLEX ROOF WATERPROOFING SYSTEMS
Bauder Ltd 70 Landseer Road Ipswich Suffolk IP3 0DH Tel: 01473 257671 Fax 01473 230761 e-mail: [email protected] website: www.bauder.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS
Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems
Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology Modern Efficient Performance Cost Effective Flat Roofing Systems Introduction A complete range of Memtec Roofing and Waterproofing Single
CHESTERFLEX ROOF WATERPROOFING MEMBRANES
CI/SfB (47) Ln2 Chesterfelt Ltd CHESTERFLEX ROOF WATERPROOFING MEMBRANES Certificate No 94/3062 DETAIL SHEET 2 Product THIS DETAIL SHEET RELATES TO CHESTERFLEX ROOF WATERPROOFING MEMBRANES, POLYESTER REINFORCED
Energy Company Obligation (ECO): Technical Monitoring Questions
Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified
Retrofitting an Insulated Cold Roof
Retrofitting an Insulated Cold Roof As a metal-roofing contractor in the Upper Peninsula of Michigan, I am frequently asked to fix roof leaks that have less to do with roofing than with the way poorly
Low Energy Low Carbon Buildings
I n s u l a t i o n CI/Sfb (27.9) Rn7 M2 Eighth Issue March 2011 TR27 LPC/FM INSULATION FOR FLAT ROOFS WATERPROOFED WITH FULLY ADHERED SINGLE PLY, PARTIALLY BONDED BUILT UP FELT, MASTIC ASPHALT AND COLD
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
The formation of roof waterproofing details calls for
3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design
Low-slope reroofing guidelines
Low-slope reroofing guidelines by Thomas Bollnow and Joan P. Crowe, AIA The NRCA Roofing and Waterproofing Manual, Fifth Edition, contains reroofing guidelines for steep- and low-slope roofing. The August
BLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
Triflex system: Triflex ProDetail. Solution type: Roof detail and repair waterproofing. Application: Overlay of existing substrate
CAD details Triflex ProDetail Triflex system: Triflex ProDetail Solution type: Roof detail and repair waterproofing Application: Overlay of existing substrate CAD details CAD S: CAD details Triflex ProDetail
BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance
Multi-layer Insulation Blanket for Roofs
Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof
Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.
Roofing Systems There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. BUR (Built-Up Roofing) Built-Up-Roofing, BUR is a roof that
When considering Roof drainage design the following should be taken into account:
Roof Drainage Design The primary objective of a gutter or spouting system is to remove water from the roof catchment area and channel that water to the ground drainage. Water ingress can have detrimental
!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035
Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí
Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with
Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
System 5000 FLAME-FREE, FELT SYSTEM, INSTALLED USING HOT AIR, TOTALLY ELIMINATING FIRE RISK AND PROVIDING A BITUMEN ALTERNATIVE TO SINGLE PLY
CI/SfB Oct 12 (47) Ln Uniclass L524 FLAME-FREE, FELT SYSTEM, INSTALLED USING HOT AIR, TOTALLY ELIMINATING FIRE RISK AND PROVIDING A BITUMEN ALTERNATIVE TO SINGLE PLY Bailey Flame-free felt roofing Bailey
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
Part 7. Roofs. 7.1 Flat roofs and balconies. 7.2 Pitched roofs
Part 7 Roofs 7.2 Pitched roofs Part 7 Roofs Chapter CONTENTS DESIGN Clause Page Design standards D1 1 Statutory requirements D2 1 Loadbearing structure D3-D4 1 Principles of design D5 2 Structural deck
TR21. I n s u l a t i o n. Low Energy Low Carbon Buildings
I n s u l a t i o n CI/Sfb (27.9) Rn7 M2 Fourth Issue March 2011 TR21 INSULATION FOR FLAT ROOFS WATERPROOFED WITH PARTIALLY BONDED BUILT UP FELT AND MASTIC ASPHALT High performance rigid thermoset insulation
CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd
CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed
Including. Rubershield-Pro. Breather Membrane
Including RubershieldPro Breather Membrane 2 Ruberoid produces a wide range of underslating membranes, primarily to be installed below tiles, slates or metal roofing providing a secondary barrier against
LANGLEY S ROOF WATERPROOFING MEMBRANES PARADIENE/PARAFOR ROOF WATERPROOFING SYSTEMS
Langley Waterproofing Systems Ltd Bishop Crewe House North Street Daventry Northants NN11 4GH Tel: 01327 704778 Fax: 01327 704845 e-mail: [email protected] website: www.langley.co.uk APPROVAL INSPECTION
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
THE HOUSEHOLDER S GUIDE TO FLAT ROOFING
THE HOUSEHOLDER S GUIDE TO FLAT ROOFING CONTENTS INTRODUCTION 2 BASIC DESIGN 3 WARM AND COLD ROOFS 3 ESSENTIALS FOR A SUCCESSFUL FLAT ROOF 4 MAINTENANCE 5 INSPECTION CHECKLIST 5 WILL A REPAIR BE SUFFICIENT?
APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET
Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing
CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -
CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b
Low Energy Low Carbon Buildings
I n s u l a t i o n CI/Sfb (27.9) Rn7 M2 Seventh Issue March 2011 TR26 LPC/FM INSULATION FOR FLAT ROOFS WATERPROOFED WITH MECHANICALLY FIXED SINGLE PLY WATERPROOFING High performance rigid thermoset insulation
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
ALUMASC ROOF WATERPROOFING MEMBRANES EUROROOF MASTERGOLD ROOF WATERPROOFING MEMBRANE
Alumasc Exterior Building Products Ltd White House Works Bold Road Sutton St Helens Merseyside WA9 4JG Tel: 01744 648 400 e-mail: [email protected] website: www.alumascroofing.co.uk APPROVAL
Bituminous Sheet Flat Roofs: Their repair and maintenance
Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and
TR31. I n s u l a t i o n. Low Energy Low Carbon Buildings
I n s u l a t i o n CI/Sfb (27.9) Rn7 M2 Sixth Issue March 2011 TR31 STRUCTURAL INSULATION / FSC CERTIFIED PLYWOOD COMPOSITE FOR FLAT ROOFS WATERPROOFED WITH PARTIALLY BONDED BUILT UP FELT High performance
Sample Drawing Package for One and Two Family Dwelling Applications
Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx
Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)
Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01
Section Built-up Metal Roofs Rail and bracket system Product: Earthwool FactoryClad range Bu01 Standing seam system Product: Earthwool FactoryClad range and Earthwool Universal Slab Bu02 Built-up Metal
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new
INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING
Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY
Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded
GigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
Roof Inspection. Summary Report
www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,
Timber Decks. Technical Note. March 2007
Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
COMMERCIAL BUILDING APPLICATIONS
EXPANDED POLYSTYRENE FOR COMMERCIAL BUILDING APPLICATIONS www.falconfoam.com Commercial Building Ap Expanded Polystyrene Insulation Falcon Foam leads the commercial building industry with products that
Services Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
Rockwool Flexi Insulation Application Guide
Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed
SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES
Building and Construction Industry A joint industry initiative produced by BSA Supershow logo.indd 1 30/01/2008 9:43:29 AM EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES FAILING WATERPROOFING
Avoiding Air Barrier Pitfalls
Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
Building Regulations for the Conservation of Fuel and Power
Insulation CI/SfB Rn7 M2 First Issue April 2014 Building Regulations for the Conservation of Fuel and Power ENGLAND EXISTING DWELLINGS 2013 EDITION Low Energy Low Carbon Buildings Contents Page Introduction
CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS
TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes
Rooflight INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary
Proteus Waterproofing roof systems are tested to the most rigorous international standards, ensuring they will easily deal with our climate.
INTRODUCTION Manufactured in the UK, the Proteus Waterproofing range of high performance roof & balcony systems has been engineered to meet the harshest of weather conditions and provide a lasting and
Monocouche Best Practice Guide. New-Build Housing Managing movement to avoid cracking
Monocouche Best Practice Guide New-Build Housing Managing movement to avoid cracking Avoiding Cracking For The Designer Visible cracks in render are unsightly and although not hazardous to the construction
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
Roof Insulation Building. Energy. Environment friendly e-library
Roof Insulation Building Codes & Energy Efficiency Environment friendly e-library Building Code Driver Buildings consumer almost 50% of all energy. Experts believe that a 30% increase in building efficiency
STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 8: Building Envelope
STEEL BUILDINGS IN EUROPE Single-Storey Steel Buildings Part 8: Building Envelope Single-Storey Steel Buildings Part 8: Building Envelope 2 - ii Part 8: Building Envelope emissions
Commercial Roof Management
Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading
Technology at its best. Benefits
Protecting what s under your roof from the elements is simplicity itself with Ruberoid Roofing Shingles. Roofing Shingles make ideal roofing; they are attractive, easy to install and are perfect for use
Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades
Construction Sika For Sealing and Waterproofing Construction Gaps in Building Façades Waterproof and Airtight Flexible Seal Controlled Vapour Diffusion Bonds to any Building Substrate Prevents Interstitial
Preventing Ice Dams on Roofs
Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the
How To Repair A Boat Landing Deck With A Boat Bed
RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing
PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
GREEN ROOF SYSTEMS ADVANCED LIQUID ROOFING SYSTEMS GREEN ROOF INFORMATION AND DESIGN GUIDE GREEN ROOF SYSTEMS
Sfb () Ln 0/ ADVANCED LIQUID ROOFING SYSTEMS GREEN ROOF INFORMATION AND DESIGN GUIDE ADVANCED SEAMLESS ROOFING SYSTEMS CONTENTS INTRODUCTION TO GREEN ROOFS TYPES OF GREEN ROOF POLYROOF SYSTEMS & SERVICES
Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap
Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet
Post and Beam Construction
Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
Renovating Your Basement
building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
Mechanically Fastened
Mechanically Fastened System Document MECHANICALLY FASTENED SYSTEM Product Information AlkorPlan F 35170 Calendered unreinforced membrane of flexible PVC. Conforms to UEAtc guidelines. Application Used