Zenbot CNC User s guide
|
|
|
- Julius Francis
- 9 years ago
- Views:
Transcription
1 Zenbot CNC User s guide Note: If at any point you are unsure what to do or would like assistance, don t hesitate to [email protected], or call Customer satisfaction is very important to us. Please call between 8 AM, and 5PM pacific standard time. Safety IMPORTANT! This manual is intended to help with setup and operation of the Zenbot CNC router. The information included is not intended to replace a thorough knowledge and understanding of CNC programming and safe operation. CNC is a very complex endeavor with too many variables to be included in this user s guide. It is up to the user to be proficient in his/her chosen software packages, and to be proficient in the safe operation of CNC machines. Proper safety procedures must be followed at all times. User assumes all liability for his/her own safety and the safety of those around them while operating the machine. Safety Tips- Always wear proper personal protective equipment, including but not limited to: Safety glasses/ Face shield Ear protection/ muffs Never put hands on or near machine while machine is in operation Always be sure to adequately tighten the cutting bit into the spindle Always use the proper feed rate, depth of cut, and chip load for the machine, chosen material, and cutting bit Never leave the machine unattended Always be sure the work piece is properly fastened Replace chipped or dull cutting bits Always follow the safety recommendations of the cutting tool manufacturer (Dremel, etc.)!! Do not unplug the motors from the drive box while the power is on or you will destroy the driver!! Machine setup 1) Unbox the machine base and set it on a stable, flat surface. 2) Position the gantry so the spindle mount faces the front of the machine (the end with the motor) 3) Spread the gantry uprights over the gantry under portion and position the tabs into the slots in the gantry uprights
2 4) Insert and tighten the 8 bolts that attach the gantry upper to the gantry lower. 5) Unpack the control box and connect the control box cables to the motor cables. A) Y axis is toward you and away from you, x axis is left to right, z axis is up and down B) On the 4848, there are 2 motors on the front of the machine. The one on the left (while looking at the front of the machine plugs into the y axis connector on the driver box. The one on the right plugs into the a axis connector 6) Connect parallel cable (printer cable) from the control box to the computer 7) Connect the power supply to the control box 8) Download mach 3 from 9) Download the mach 3 configuration file attached to my and paste it into the mach 3 program folder. local disk c: mach 3 folder. 10) Use the mach 3 loader on the desktop to open the g540 profile. 11) Turn on the control box. 12) Use the arrow keys to jog the machine in the x and y directions, and use page up, page down) to jog the z axis up and down. 13) See basic CNC process guide When you unpack your machine you are going to be anxious to get started, but there are a few things you need to know so you don t damage your machine. Configuration This table is for your knowledge. The wiring has already been done for you on the ready-to-run model. Motor wire color red blue green black Stepper driver connection A A# B B# Configuring the steps/inch in Mach-3 The drive pulley diameter on this machine is.458 inches. The circumference of the drive pulley is This means that the motor rotates.695 turns per inch (1/1.439). The stepper motors on this machine are.9 degree per step motor, which means that there are 400 steps per revolution. Now you just need to know the micro-step settings on your drivers. The formula for calculating the steps per inch is.695 x 400 x micro-steps/step. For a 1/10 micro-step driver, the formula would be.695 x 400 x 10 = 2780 steps per inch.
3 s Steps/ inch chart Micro-step setting Steps per inch 1/ / / /2 556 whole step 278 Motor Tuning Final acceleration and speed settings will be found through experimentation, but a good starting point is 800 Inches/minute Maximum for the speed, and inches/sec./sec. for the acceleration. We recommend setting the max speed slower (200 inches per minute or lower) until you become more familiar with the machine. The Mach-3 web site ( has a great deal of information regarding the setup and operation of their software so I won t go into specifics here. Speed Acceleration Recommended tuning starting points 500 Inches/minute Max inches/sec/sec Note: We recommend tuning to 200 inches per minute, or slower, until you are familiar with the machine. Machine Operation All CNC machines require that you operate them within their limits. Your Zenbot router is medium duty, and you must consider this when programming. The best strategy for this machine is to take many medium cuts at higher speeds. How light of cuts to take depends on the material and cutting bit and will come with some experimentation and experience. If cuts are attempted that are too aggressive, the machine may miss steps and the spindle will rattle and chatter, ruining your work piece, and possibly creating a dangerous situation. Its best to follow the cutting bit manufacturers rpm and federate suggestions, and starting with a light depth of cut. Maintenance Your Zenbot router should require very little maintenance. All bearings are sealed and the rails are electro zinc plated and do not require any lubrication. After some use, wear marks will begin to appear on the rails. This is a normal part of machine run-in and does not affect the operation of the machine. Eventually the bearings and the rail will be matched and the wear will stop.
4 Maintenance procedures: Belt tensioning. Periodically check the tension of the belts. They should be snug, but not overly tight. You will get no performance advantage from over-tightening the belts, and could cause premature motor wear. The motors are rated for 12 pounds of radial force. -To tighten the belts, loosen the motor bolts and pull the motor away from the machine while retightening the bolts. Cleaning the rails. You will need to clean the rails periodically to remove build-up. This is done with a plain rag or a rag with some non-etching cleaner on it. Some materials (such as wax, or oily woods) will cause the build-up to form faster and the machine should be inspected more frequently when cutting these materials. It is best to inspect the rails before and after each use. Adjusting squareness There are holes in the table top at the front of the machine that provide access to the gantry plating bolts to adjust the squareness of the gantry. First, loosen the gantry plating bolts on the bottom of the gantry. Then, move the gantry forward so those holes line up with the upper gantry plating bolts and loosen those bolts. Then, you will notice 2 extra bolts on the front of the under portion of the gantry. There is a rocker mechanism inside that adjusts the squareness when you tighten one and loosen the other. once it is square, retighten the bolts from the top. The bolts on your machine have been installed with the ends of the bolts being threaded into an un-threaded portion of the hole which has the same effect as a lock nut, so they should not come loose. However, it is best to check them for looseness periodically. DO NOT OVER TIGHTEN THE BOLTS OR THE THREADS WILL STRIP. They won t come loose so there is no need to over tighten them. If you need further assistance, feel free to ask for help at [email protected].
5 Basic CNC process Create design create Toolpaths setup and run machine 1)create CAD (Computer Aided Design) drawing and save as.dxf file (standard cad format) Affordable (or free) CAD programs. Let me know if you have any CAD recommendations. Draftsight (free) ViaCad ($39) Bobcad CAD/CAM Autocad 2)Open.DXF file in CAM (Computer Aided Machining) software and creat toolpath from.dxf drawing. -a toolpath is simply you telling the machine how to cut the part. You choose the cutting bit you will use, the speed you want to cut, how deep you want to cut per pass, etc. you will choose these parameters based on the material you are cutting. Post (save) toolpath as g-code (cnc programming language). Affordable CAM software: (basic cut 2-d is $149) Cut 3-d is $299 Click here for Vectric cut -2d tutorials 3) Set up machine and run g-code with mach-3 (pc-based machine control Software)
6 Mach 3 Download : A) Home the machine 1) Choose a location you would like to call Home (where the machine will go when it is done cutting, or for tool changes. 2) Jog the machine to this spot and hit ref all home B) Zero the axes on the part origin 1) Remember the origin as programmed in your CAM program. If you programmed the origin at the bottom left corner of the part, then jog the machine to the bottom left corner of your workpiece and jog the z axis to where the tip of the bit is almost touching the top of your work piece. Zero each axis (zero x, zero y, zero z). Jog the z axis up and out of the way C) Make sure your work piece is secure and you bit is tight in your router. Make sure to wear all proper safety equipment (safety glasses/face shield, ear muffs). Make sure any observers are also wearing protection and are clear of the machine. At this point you can Turn the router head on and hit cycle start.
5. Tutorial. Starting FlashCut CNC
FlashCut CNC Section 5 Tutorial 259 5. Tutorial Starting FlashCut CNC To start FlashCut CNC, click on the Start button, select Programs, select FlashCut CNC 4, then select the FlashCut CNC 4 icon. A dialog
SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS
SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS README FIRST: Thank you for purchasing your MyDIYCNC Desktop CNC Machine Kit. We hope this versatile and innovative machine brings you many
Control Box Wiring For PRSstandard Tool
888-680-4466 ShopBotTools.com Control Box Wiring For PRSstandard Tool Copyright 2016 ShopBot Tools, Inc. page 1 Copyright 2016 ShopBot Tools, Inc. page 2 Table of Contents Introduction:...5 Installation:...5
Splitting the feed screw nuts and adjusting backlash on a Bridgeport Milling Machine.
Splitting the feed screw nuts and adjusting backlash on a Bridgeport Milling Machine. Bridgeport manufactures their milling machines with 0.005 backlash in the feedscrews, which increases over time due
CNC Turning Training CNC MILLING / ROUTING TRAINING GUIDE. www.denford.co.uk Page 1
CNC Turning Training www.denford.co.uk Page 1 Table of contents Introduction... 3 Start the VR Turning Software... 3 Configure the software for the machine... 4 Load your CNC file... 5 Configure the tooling...
LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions
LORTONE LU6X-130 Item # 061-092 LU6X Basic Item # 061-090 LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions Introduction The LU6X is one the most versatile pieces of equipment
OSCILLATAP SIEVE SHAKER MANUAL
OSCILLATAP SIEVE SHAKER MANUAL Thank you for purchasing the OSCILLATAP sieve shaker. You and your company will enjoy many years of use from this quality testing system. The Oscillatap sieve shaker has
Table of Contents. www.hunterfan.com. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.
www.hunterfan.com Table of Contents What to Expect with Your Installation 30 inches Hanging the Fan Wiring 8 Maintenance, Operation & Cleaning Light Kit 13??? 14 1 9 Troubleshooting 11 5 Blades Motor Housing
How to re-string & re-cable the Genesis Compound bow. Step by step, picture by picture Right hand models ONLY
How to re-string & re-cable the Genesis Compound bow. Step by step, picture by picture Right hand models ONLY Introduction and Terminology Inspect all bows prior to use. Once a string or cable has become
TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2
BAL Accu-Slide System I. Table of Contents TABLE OF CONTENTS I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 II. GETTING STARTED... 5 - Section 2.01: Tools You Will Need... 5 - Section
Table of Contents Getting Started... 3 The Motors... 4 The Control Board... 5 Setting up the Computer with Mach3... 6 Starting up the Equipment...
User Manual Table of Contents Getting Started... 3 The Motors... 4 The Control Board... 5 Setting up the Computer with Mach3... 6 Starting up the Equipment... 12 G-Code Example... 13 2 Getting Started
Creator Start-up Guide
www.ff3dp.com Creator Start-up Guide Zhejiang Flashforge 3D Technology Co., Ltd. www.ff3dp.com Contents Precautions:... 1 1. What's in the box?...1 2. Unboxing... 2 3. Initial Hardware Installation...5
Volume PRECISION PLASMA LLC. CNC Plasma Gantry Manufacturer. Plasma Gantry Selection Guide
Volume 1 PRECISION PLASMA LLC CNC Plasma Gantry Manufacturer Plasma Gantry Selection Guide Plasma Gantry Selection Guide Precision Plasma LLC [email protected] Chapter 1 Mechanical Components
Fading Red Tones on Color LaserJet 2600s
Procedures Fading Red Tones on Color LaserJet 2600s HP Color LaserJets 2600n, 1600, and 2605 share the same basic Canon engine design. One aspect of the design brings the common problem of scanner optic
CNC MILLING. University for Applied Arts, Vienna Studio Prof. Lynn Compiled by Nathalie Rinne With special thanks to David Erdman
CNC MILLING GL Form Manufacturing Lab, photo: Stefan Hörner University for Applied Arts, Vienna Studio Prof. Lynn Compiled by Nathalie Rinne With special thanks to David Erdman Rules & Safety guidlines:
Auto Sentry-eXP Maintenance
Auto Sentry-eXP Maintenance Maintenance Procedures for Auto Sentry exp Bill Dispenser Credit Card Reader Bill Acceptor Bill Dispenser Maintenance Bill Dispenser Problem / Cause Bill Dispenser Error Codes
PRS X-axis E-chain installation: For tools with a 12 Z-Axis
PRS X-axis Energy Chain (Echain) Installation Page -1- PRS X-axis E-chain installation: For tools with a 12 Z-Axis This kit is compatible with PRS Shopbots that have an X-axis cutting area of 96 to 144.
Setting up the DeskCNC controller.
1) Determine the steps to linear motion ratios for each axis. 2 2) Determine Maximum velocity (speed). 3 3) Setting up the software Machine Tab 4 4) Setting up the software DeskCNC Setup Tab 5 5) Setting
Technical Information
tapping Technical Information Troubleshooting Guide 115 TAP DOES NOT START Program depth: Tap drill size: Tap sharpness: Compression stroke may use up the entire program depth. Check for tap drill size.
Mach3 Tutorial Setting up a basic three axis milling machine. Based on Mach3 2.0
Mach3 Tutorial Setting up a basic three axis milling machine. Based on Mach3 2.0 Purpose. The purpose of this tutorial is to help and to guide the user to, step by step, set up and tune the Mach3 CNC controller
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
RadianceRail Installation Guide
RadianceRail Installation Guide Installing RadianceRail with CableRail by Feeney... 2 Installing CableRail by Feeney for RadianceRail... 7 Installing RadianceRail Stairs with CableRail by Feeney... 10
Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement
Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement This work instruction describes the methods and means for which to remove and reinstall optional scanner cable configurations
Building A Computer: A Beginners Guide
Building A Computer: A Beginners Guide Mr. Marty Brandl The following was written to help an individual setup a Pentium 133 system using an ASUS P/I- P55T2P4 motherboard. The tutorial includes the installation
MET 306 Activity 6. Using Pro/MFG Milling Operations Creo 2.0. Machining a Mast Step
Using Pro/MFG Milling Operations Creo 2.0 Machining a Mast Step If the Trim option is grayed out when trimming the mill volume, Save (making sure the.asm file is going to the correct subdirectory), Exit
1.8 CRANKSHAFT OIL SEALS
SERIES 60 SERVICE MANUAL 1.8 CRANKSHAFT OIL SEALS An oil seal is fitted between each end of the crankshaft and the bores of the flywheel housing and gear case cover to retain the lubricating oil in the
OWNER S MANUAL Table Tennis Table Patent Pending
OWNER S MANUAL Table Tennis Table Patent Pending Be sure to write your model number and serial number here for future reference. You can find these numbers printed on the bottom of the table. MODEL # T8179
INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10
VERTICAL BAND SAWS INSTRUCTION MANUAL AND PARTS LIST MODEL 1-10 DAKE/PARMA WHEN ORDERING PARTS GIVE COMPLETE SERIAL NUMBER OF MACHINE GIVE PART NUMBER AND NAME GIVE AMOUNT REQUIRED Unless the above data
Step 1. Item 6. Item 1
Voltage Regulators QD3/T350 Motor Replacement Kit Kit Number 57A63675100B Service Information S225-50-35 Contents General..................................... 1 Parts Supplied...............................
SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY
SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY 82-13-1 O-Ring (Rear) The Lead Screw Assembly is shipped separately. Note: Install Electrical and Pneumatic Circuitry. Be Sure electrical and pneumatic
Overview. Milling Machine Fundamentals. Safety. Shop Etiquette. Vehicle Projects Machine Shop
Overview Milling Machine Fundamentals Wayne Staats, UW-Madison FSAE Safety Shop Etiquette Before Machining Indicating Calculating Feeds and Speeds Machining Maintenance Safety Respect the machines Common
Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE
NG0M Triple Threat 3-in- Game Table 3 IN GAME TABLE Thank 3 in Y Game Table Thank you for your purchase of our product. We work around the clock and around the globe to ensure that our products maintain
Extra Tall Wide Span Gate
Extra Tall Wide Span Gate MODEL NO: 1154 Owner s Manual 11/19/2013_BL READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE. www.regalo-baby.com... Regalo International,
SALEEN SPEEDLAB SERIES VI STANDARD SC UPGRADE KIT
SALEEN SPEEDLAB SERIES VI STANDARD SC UPGRADE KIT INSTALLATION MANUAL: 2005 MUSTANG 4.6 3V MANUAL P/N: 10-8002-C14338C SUPERCHARGER KIT P/N: 10-1607-B14083* Saleen Performance, Inc. 1225 East Maple Rd.,
To Purchase This Item, Visit BMI Gaming www.bmigaming.com 1-800-746-2255 + 1-561-391-7200
Table of Contents General Description and Play 2 Game Set Up 2 Loading Balloons 2 Technical Operation-General 3 Adjusting Balloon Sensor Wire 4 Programming Instructions 4 Default Settings Troubleshooting
MBSAW. Meat Cutting Band Saw With Meat Grinder Assembly & Operating Instructions
06/2011 MBSAW Meat Cutting Band Saw With Meat Grinder Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper
Guide for Modified Assembly: Lightning McQueen. By: Collin Patterson, University of Delaware. Materials and Tools:
Guide for Modified Assembly: Lightning McQueen By: Collin Patterson, University of Delaware Materials and Tools: PVC o 40 inches of 1 in diameter PVC o 25 inches of ¾ in PVC o 4 x 1 in elbows o 2 x ¾ in
3. Loosen 3 x grub screws in the Dec end cap and unscrew the cap and counterweight shaft. NEQ6 Belt Modification Kit.
NEQ6 Belt Modification Kit. Thank you for your purchase. Please read these instructions fully before fitting. Your package should contain 2 off 47 & 2 off 12 tooth aluminium pulleys 2 off belts 6mm wide
Router. A. Identify the major parts of the router. B. Complete a written test on safety and operating procedures of the router with 100% accuracy.
Router I. Competencies Given a properly adjusted router, instruction and demonstration of use, each student will be able to: A. Identify the major parts of the router. B. Complete a written test on safety
AZEK Rail Install Guide
TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail
20000068 WIRELESS REMOTE ASSEMBLY, 24VDC, 1 TRANS,1 REC
20000068 WIRELESS REMOTE ASSEMBLY, 24VDC, 1 TRANS,1 REC Fitment to MP-25 620 CR 4841, Haslet, TX 76052 Ph 817.439.1108 Fax 817.636.5675 www.machine-technologies.com Kit contents 1 Transmitter 2 button,
C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S
C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S January 2009 Issue 6 Valu Guide Brackets The Ultimate in Adjustability and Cost Savings Valu Guide brackets are part of a family
Fire Hydrant Troubleshooting
Fire Hydrant Troubleshooting Pulsation or chatter during opening and flow of water from hydrant. Loose condition in stem at lower valve plate nut. Tighten lower valve plate nut and secure with SS lock
Andersen Electric Window Opener for Andersen Awning and Roof Windows
W A Electric Window Opener Electric Window Opener for Awning and Roof Windows Congratulations! You have just purchased one of the many fine products. For ease of installation and continued enjoyment of
Operating Manual. Los Angeles Abrasion Machine HM-70A & HM-70AF
Operating Manual Los Angeles Abrasion Machine HM-70A & HM-70AF Rev: 07/19/2012 PHONE: 800-444-1508 P.O. Box 200, Lewis Center, Ohio 43035-0200 FAX: 800-255-5314 740-548-7298 E-mail: [email protected]
Mastercam Instructions. KTH School of Architecture Digital Fabrication Lab - CNC Router Version 2.1 2014-02-06
Mastercam Instructions KTH School of Architecture Digital Fabrication Lab - CNC Router Version 2.1 2014-02-06 CONTENTS: 1. Setup in Rhino and Mastercam 2. Creating A Drilling Operation 3. Creating A Contour
INSTRUCTION. Industrial Sewing Machines. No. 010012. First published : June 1997 Second edition : March 2001
INSTRUCTION Industrial Sewing Machines First published : June 1997 Second edition : March 2001 No. 010012 INTRODUCTION Thank you for your purchasing Kansai Special's DLR Series. Read and study this instruction
cbperformance.com Please read this entire brochure prior to installing your CB Performance Products MAGNASPARK II distributor.
- Easy -wire installation with no external spark box necessary, but can be used with one. - Precision CNC machining and hand assembled construction. This is a premium product. - Accurate super hot spark
Multi Axis Engraver. Operations Manual. Vision Engraving & Routing Systems 17621 N. Black Canyon Hwy. Phoenix, AZ 85023 www.visionengravers.
Multi Axis Engraver Operations Manual Vision Engraving & Routing Systems 17621 N. Black Canyon Hwy. Phoenix, AZ 85023 www.visionengravers.com Copyright 2005 Vision Computerized Engraving & Routing Systems
Complete Dovetail Jig Instructions
Complete Dovetail Jig Instructions 18 15 1 12 13 8 (22818) 19 17 16 4 3 6 14 5 9 9 11 10 2 PARTS LIST - COMPLETE DOVETAIL JIG Introduction Your new dovetail jig will cut Full Through Dovetails and three
Just-Like-Mine! Doll or Stuffed Toy. Car Seat. Instruction Manual. These instructions are for the following Joovy Style # s: 002, 003
Just-Like-Mine! Doll or Stuffed Toy Car Seat Instruction Manual These instructions are for the following Joovy Style # s: 002, 003 Please read this instruction manual completely before using your doll
Remote Head REMO ONE. Code 5750. Manual
Remote Head REMO ONE Code 5750 Manual by sachtler. All rights reserved Version: 1.2/09/05 Issue date: September 2005 Order no.: srh20t010a We want you to receive Sachtler products that are always state
The Basics of a Rotary Table with Cross Slide mounted on a Mill Table, Version 2
The Basics of a Rotary Table with Cross Slide mounted on a Mill Table, Version 2 by Gerry Goldberg as told to Rick Sparber 08/21/2008 Copyleft protects this article. On 08/16/2008 the Valley Metal Club
DO NOT OPERATE LANCELOT OR SQUIRE WITHOUT FIRST ADJUSTING THE SAFETY GUARD. ( See Below)
Assembly Instructions - Lancelot and Squire King Arthur s Tools (KAT) is pleased to present the first tandem mounted saw chain accessories whereby differing combinations of Lancelot and Squire may be paired
Multi-Pitch Pitching Machine USER MANUAL
Multi-Pitch Pitching Machine USER MANUAL TABLE OF CONTENTS Thank you for purchasing the Cimarron Multi-Pitch Pitching Machine. The Cimarron Multi-Pitch Pitching Machine is a high performance pitching machine
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
FRONT WINDSHIELD SEAL INSTALLATION
FRONT WINDSHIELD SEAL INSTALLATION Tech Article From Newsletter 16.1-1st Quarter of 2010 Replacing your Front Windshield Seal ISN T AS HARD AS YOU MAY THINK! Recently, we retooled our front window seal
CNC Shark TM Family 1
CNC Shark TM Family 1 Copyright Next Wave Automation All Rights Reserved. Version 1.5.0.9 12 January 2012 Updates of this manual may be available at www.nextwaveautomation.com. CNC Shark, CNC Shark Pro,
AUTHORISED SERVICE AGENTS: CARBA-TEC Pty. Ltd. 40 Harries Road Coorparoo, QLD 4151 Ph: (07) 3397 2577 Fax: (07) 3397 2785
UTHORISED SERVICE GENTS: CR-TEC Pty. Ltd. 40 Harries Road Coorparoo, QLD 4151 Ph: (07) 3397 2577 Fax: (07) 3397 2785 CR-TEC (NSW) Pty. Ltd. 32 Percy Street uburn, NSW 2144 Ph: (02) 9649 5077 Fax: (02)
Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual
Range Road RR Series Semi-Automatic Firewood Processor Crated Unit Assembly Manual 1 1) Undo 8-18mm x 19mm Nuts and bolts, 2 on each leg of top frame 2) Lift top of Metal crate off and move out of work
UPLIFT Height Adjustable Standing Desk (T-Frame) DIRECTIONS FOR ASSEMBLY AND USE - - ALSO - - Watch our assembly video
UPLIFT Height Adjustable Standing Desk (T-Frame) DIRECTIONS FOR ASSEMBLY AND USE - - ALSO - - Watch our assembly video http://bit.ly/9ywwh! CAUTION MAKE SURE NO OBSTACLES ARE IN THE DESK S PATH AND ALL
SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A
PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510
Air Hockey Training Camp Care and repair of your Air Hockey Playfield
The playfield is the single most expensive part of your Dynamo Air Hockey table. Proper care will keep your table attractive and functional for your players, and bring them back for more games. CLEAN YOUR
Traditional Sonar and DSI Sonar Installation
Traditional Sonar and DSI Sonar Installation This document covers the installation of the transducer and display unit installation, which includes connecting the unit to power and installing the unit on
SYSTEM 4C. C R H Electronics Design
SYSTEM 4C C R H Electronics Design SYSTEM 4C All in one modular 4 axis CNC drive board By C R Harding Specifications Main PCB & Input PCB Available with up to 4 Axis X, Y, Z, A outputs. Independent 25
Vision Engravers and Routers PRE-Installation Guide. 2015 Vision Engraving & Routing Systems
Vision Engravers and Routers PRE-Installation Guide Revised: 8/19/2015 Vision Engravers and Routers PRE-Installation Guide All rights reserved. No parts of this work may be reproduced in any form or by
Lathe Milling Attachment
Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,
Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the A325 structural bolt. Rev.
Structural Bolting ASTM A325 and ASTM A490 are the two U.S. standard structural bolts. When looking at the mechanical requirements of bolts it appears that an ASTM A325 and SAE J429 Grade 5 are identical
Original Assembly Guide
TCT Multipurpose Single Bevel Sliding Compound Mitre Saw Original Assembly Guide Read instructions before assembling this tool. Table of Contents GB Assembly Guide Read instructions before assembling this
ShopBot Quick-Start Guide For PRS Alpha and Standard Tools
Quick Start Guide Page -1- ShopBot Quick-Start Guide For PRS Alpha and Standard Tools Software versions 3.8 and above Quick Start Guide Page -2- About this guide This document is intended as a helpful
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family
Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family Part of the Kiva Lighting Family Custom Lighting and Fans Since 1992 1312 12th St NW Albuquerque,
UNPACKING AND ASSEMBLY
UNPACKING AND ASSEMBLY Assembly Instructions Step 1. Open the two boxes and remove all the parts. Lay out the parts as shown below and read through the assembly instructions before beginning assembly.
CNC Applications Speed and Feed Calculations
CNC Applications Speed and Feed Calculations Photo courtesy ISCAR Metals. Turning Center Cutters What types of cutters are used on CNC turning Centers? Carbide (and other hard materials) insert turning
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F
Checking the Package Contents. Installing the Printer Software. Connecting. Unpacking the. the Printer. Printer. Attaching
Installing the Printer Software Checking the Package Contents Connecting the Printer Unpacking the Printer Installing the Ink Cartridges Plugging in the Printer Attaching the Printer Parts 4032216-00 EUL
TeamPoS 2000 Installation Instructions Upgrade to M Motherboard
TeamPoS 2000 Installation Instructions Upgrade to M Motherboard Fujitsu Transaction Solutions Inc. endeavors to ensure that the information in this document is correct and fairly stated but does not accept
220V CNC 3020T-DJ upgrade from 3020T 3020 Router with 230W 11000RPM spindle
Experiments with CNC In april 2013 I decided to buy a CNC machine. I did not need it for serious production, I just wanted to learn something new. I was looking around for the cheapest CNC available and
INSTALLATION MANUAL MODEL RP-100
INSTALLATION MANUAL FOR 24 VALVE 5.9L CUMMINS POWERED DODGE TRUCKS 2003 THROUGH 2004.5 MODEL RP-100 READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION 5400 BUSINESS 50 WEST SUITE 8 573 635-0555
Instruction Manual VB7000. CarbonMax and CarbonPro II Composite Volleyball Systems ( Either in packages or components ordered separately )
Instruction Manual VB7000 CarbonMax and CarbonPro II Composite Volleyball Systems ( Either in packages or components ordered separately ) P A R T S L I S T Item Qty Description Item Qty Description A 2*
GUTTER MACHINE CONTROLS STANDARD
GUTTER MACHINE CONTROLS STANDARD Note: determine what type of control package is installed on the machine. --more-- All operators should familiarize themselves with the appropriate controls prior to any
Cable Drum Installation
20 Cable Drum Installation COUNTERBALANCE None Shake the TorqueMaster spring tube gently to extend the winding shafts out about 5" on each side. For single spring applications, there will be no left hand
Installation Instructions Avalanche XUV Cap IMPORTANT! IMPORTANT!
Installation Instructions Avalanche XUV Cap IMPORTANT! Read all instructions carefully before commencing any work. Always wear safety equipment. Some installation steps will require two or more installers.
WL-400 Milling Machine Operator s Manual
WL-400 Milling Machine Operator s Manual. www.levil.com [email protected] (407) 542-3971 Introduction This manual covers the safety, usage and maintenance of the tabletops CNC milling machines manufactured
MODEL T200-F18 MODEL T125-F18 Finish Nailers
P MODEL T200-F18 MODEL T125-F18 Finish Nailers IMPORTANT! DO NOT DESTROY It is the customer s responsibility to have all operators and service personnel read and understand this manual. OPERATING MANUAL
RS232/DB9 An RS232 to TTL Level Converter
RS232/DB9 An RS232 to TTL Level Converter The RS232/DB9 is designed to convert TTL level signals into RS232 level signals. This cable allows you to connect a TTL level device, such as the serial port on
Auto-belay Cable Replacement Process
Auto-belay Cable Replacement Process Version 2.00 WARNING: The air pressure in the auto-belay system is what causes the cable to be retracted when releasing the cable or climbing the wall with the cable
jbs nfb INSTALLATION INSTRUCTIONS AND OWNERS MANUAL Mechanical Steering for Inboard, Outboard, and Sterndrive Powered Vessels
MEMBER INSTALLATION INSTRUCTIONS AND OWNERS MANUAL Part # IS-SH5094, Rev 3, 04/204 www.seastarsolutions.com SH5294 DUAL SH5094 SINGLE jbs nfb Mechanical Steering for Inboard, Outboard, and Sterndrive Powered
Removing memory and option cards
These instructions can help you remove memory or option cards. Use the following illustration to locate the connector for the card you want to remove. Hard disk connector 1 Option card connector Firmware
18974 (736) Singer No. 20-2. SINGER No. 20-2 ELECTRIC SEWING MACHINE INSTRUCTION MANUAL
SINGER No. 20-2 ELECTRIC SEWING MACHINE INSTRUCTION MANUAL Next Page Main Parts Accessories To start the Motor To Stop the Motor To Change the Speed Needles and Thread Relative Sizes of Needle and Thread
ATS Overhead Table Shelf System INSTRUCTION MANUAL
ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship
1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.
1 1. SAFETY RULES 1. To reduce the risk of electric shock, insure electricity has been turned off at the circuit breaker or fuse box before beginning. 2. All wiring must be in accordance with the National
INSTALLATION INSTRUCTIONS FOR 2006-2009 VW MK5
CI100018 INSTALLATION INSTRUCTIONS FOR 2006-2009 VW MK5 Rabbit, Jetta 2.5L These instructions are applicable to vehicles equipped with either manual or automatic transmissions Thank you for choosing to
758 Heavy-duty Ratchet Guy Wire Cutter
INSTRUCTION MANUAL 758 Heavy-duty Ratchet Guy Wire Cutter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product
1. SAFETY RULES WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR PERSONAL INJURY, MOUNT FAN TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT".
1 1. SAFETY RULES 1. To reduce the risk of electric shock, insure electricity has been turned off at the circuit breaker or fuse box before beginning. 2. All wiring must be in accordance with the National
TECHNICAL MANUAL FOR THE STAND ALONE BELT DRIVE ENCODER SYSTEM
INTERNATIONAL LIFT EQUIPMENT LTD London Office Leicester Office Units 1&2 Wanlip Road Highams Park Ind Estate Syston Larkshall Road Leicester London Leicestershire E4 9JD LE7 1PD Telephone 0208 5279669
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
GENUINE PARTS INSTALLATION INSTRUCTIONS
GENUINE PARTS INSTALLATION INSTRUCTIONS DESCRIPTION: Illuminated Kick Plate APPLICATION: Rogue (2011) PART NUMBER: 999G6 GX010 KIT CONTENTS: Item A B C G H QTY 1 1 1 D 1 E 1 F 3 15 6 Description Kick Plate,
SIGN UP FOR THE LIFETIME WARRANTY AT REGISTERYOURBOW.COM LIFETIME WARRANTY (CONT.) QUALITY CUSTOMER SERVICE LIFETIME WARRANTY
THANK YOU Congratulations on your recent purchase! We at Diamond know that you have a choice when it comes to your archery equipment, and we want to thank you for choosing us as your hunting partner. Your
PRS Y-axis EChain Installation
PRS Y-axis Energy Chain Installation Page -1- PRS Y-axis EChain Installation This document shows how to install the Energy chain (Echain) on the Y-axis on ShopBot PRS and PRS BT models. Note that the dust
