THE SALGINATOBEL BRIDGE
|
|
|
- Tabitha Shepherd
- 9 years ago
- Views:
Transcription
1 Bridge Engineering 2 Conference May 2007, University of Bath, Bath, UK THE SALGINATOBEL BRIDGE Andrew J Tapping Abstract: This article is based upon the author s findings of the Salginatobel Bridge in Schiers, Switzerland. It is a reinforced concrete, hollow box, three pinned arched designed by Robert Malliart. Built in across the Salgina valley ravine, it connects 2 small villages. Keywords: Three-pinned-arch, hollow box, reinforced concrete, centring. 1 Introduction. A competition was launched some time after World War I for the design and construction of a bridge to connect two villages, Schiers and Schuders in Switzerland, across the Salginatobel valley. 19 entries were submitted for tender. Malliart s design won through a combination of design and price and resulted in a world renowned bridge. Reinforced concrete has proved to be a marvellous construction material. Taking the strength of concrete in compression and the strength of steel in tension. It can be formed to nearly any shape, and have good weather resistance. Because of these properties it has proved to be very cost effective. Malliart s design for the Salgina crossing was the lowest of all the tenders. The design evolved through his clever use of materials, and simple but accurate calculation. Making use of high quality, expensive materials sparingly this at this time was the steel for the reinforcement. Fig 1: Salginatobel Bridge. From [1]
2 2 Bridge Components Salginatobel Bridge is 135m long, the arch spanning 90m and rising 13.5m. The deck is at a slight angle rising from Schiers to Schuders by 3.97m or at a 3% gradient. 3 Choice of Bridge It was the choice of bridge which lead to its design. The inhabitant s of the villages either side of the valley had requested a more accessible route over the valley rather than the existing rough and rocky path. The Salginatobel valley walls were relatively weak and sharp angles. The flaky walls and numerous loose rocks from a number of rock slides are proof of this relative weakness. 2.1 Foundations Fig 2. Bridge Components 1: Foundations for supporting columns and for arch springing point. Schiers is situated this side of the bridge. 2.2 Approach Road 2: Approach Road labelled as such for simplicity, and a pin point at 5 makes this continuous deck separate from the main bridge deck. Approach roads are traditionally labelled for roads leading up to a bridge and not on the bridge. 2.3 Support Columns 3: Support columns for bridge deck. This are spaced at 6m centres (except at mid-span of arch) and continue behind arch walls, where then cannot be seen. 2.4 Foundations 4: Foundation for springing point of arch. A hinge also occurs at this point. 2.5 Road Deck 5: Road deck. The concrete deck is not connected either side of this hinge, making two continuously supported decks. 2.6 Arch plate 6: Arch plate which decreases in thickness towards the centre and arch supported walls, which increase in length towards the quarter-span point. 2.7 Road deck/arch Plate 7: Here the arch plate becomes the road deck. Another concrete hinge occurs at this point. 2.8 Foundations 8: Foundation for second springing point and a third hinge completes the 3-pinned-arch. Schuders is situated this side of the bridge. Fig. 3 The rocky valley walls Because of this, a deeper arch would have been inappropriate as this would require greater strength from the foundations and therefore unnecessary deep rock excavations. 3.1 Three-pinned-arch A three-pinned-arch was chosen for its ability to move and adjust to the slight movements of the mountain. Whereas a fixed arched would experience massive stress from the movement, would crack and possibly fail. Stresses also build up from temperature changes within the structure. The three-pinned-arch is unaffected by these temperature changes. A three-pinned-arch is also statically determinant and therefore analyse of the bending moments is easier, simpler and more accurate, allowing Malliart to minimise material used as forces calculated are lower than other methods which require amplifying factors to make up for the uncertainty. Malliart used his experiences from previous bridges he had constructed to help make choices in designing Salginatobel. Malliart believed that full scale loading was better than any calculations. A bridge he had constructed in Zuoz, also in Switzerland, was of similar design to the
3 Salginatobel. It was a three-pinned- arch, hollow box design constructed from reinforced concrete. The bridge spanned 38m and a difference with the Salginatobel was that the supporting arch walls connected to the deck for the whole length of the bridge. [2] Reports that a couple of years after construction was completed Malliart was called back to assess some cracks that had formed in the supporting arch walls near the supports. He concluded that they were not serious; they had been caused by differential temperature changes in the bridge. The arch had been wetted by the close flowing river underneath, and the deck wetted by the weather. The arch walls had received no such wetting, and in the sun (the cracks had only appeared on the sunny side) had dried and contracted causing the cracks. The cracks were not structurally serious, but it was this experience which aided the Salginatobel design of having the supporting arch wall not connected to the deck at the supports. In this way the arch is left free to rotate on the hinges. 3.2 Hinges The hinge design was a controversial issue. They are difficult to analyse, they need to strong enough to carry the entire bridge load (at the springing points) and need to be flexible to rotate. [2] Reports how Roš, a fellow engineer and friend, was hired as a consultant to the consol and required extra reinforcing steel in the hinges. The following figures 4 and 5 show cross sections of both the hinges used, at the crown and spring point. Fig 5 Hinge at crown One can see how Malliart has made use of cork plates to allow movement. If he were to have left the gaps as open movement joints they would be prone to clog, and therefore be useless is function, providing no movement. The steel is designed to take all the forces, and as it is ductile, it is possible for small movements to occur without damage to the structure. Concrete is a brittle material and very pour in tension. Two approach designs were submitted for tender: Fig. 6 Alternative approach designs. [3] The more traditional masonry approach was priced at Fr. 144,000, and the continuation of concrete columns at Fr. 135,000. The masonry arches look very out of place with the rest of the structure, being in slender concrete. The concrete continuation definitely looks much more fitting with the overall scheme and aesthetically pleasing. 4 Aesthetics Fig. 4 Hinge at springing point. Taken from [2] No one can deny the beauty of this bridge. It setting most defiantly helps. Spanning the valley, surrounded by green alpine trees with clouds flowing over the top of the mountain it creates a picturesque scene. The grey/white of the concrete shines through the foliage drawing attention to the rightly so awarded most beautiful bridge in the world [4]. Following Fritz Leonhardt 10 steps to being beautiful Salginatobel fulfils its function. Clearly the arch provides support to the thin deck, and the valley walls provide
4 substantial foundation for the arch. The mountain walls provide the necessary horizontal and vertical support needed for an arch. The structure defiantly shows the observer how it works. This is not a complex structure, and the simplicity of the bridge is one of its greatest appeals. David Billington reported that discipline of structural efficiency is the primary basis for creation [5]. This is mirrored brilliantly in Malliart s bridge, it was the nature of the arch structure which lead to the design and complemented through the most efficient dimensions creating the overall structure. The proportions of the bridge follow the efficiency of the structure. The arch walls widen at the centre where maximum bending occurs. The columns are spaced at uniform distances and look the correct size. They are neither giant, drawing unduly attention, nor are they match-stick in appearance, looking insubstantial to the structure. Fig. 7 Appearance of columns. Malliart actually widened the columns to appear more in proportion with the deck. Structurally they only need to be as thick as their centre cross section. This was just one of Malliart s clever refinements. As the columns do not extend to the valley floor, only to the arch, the spacing has been keep uniform, rather than shortening the span at abutments as in many viaducts. The bridge deck is constant and creates a sharp shadow accentuating the slenderness. The surroundings has already been touched upon, but the suitability of Salginatobel to it s surroundings cannot be appreciated until other choices are considered. A suspension or cantilever bridge would look imposing and heavy within the scenic landscape. The thin deck and arch of Salginatobel appear to flow out of the mountain wall as though part of the landscape itself. Leonhardt commented that a bridge should be incorporated into nature. When the bridge was built in 1929 masonry walls were popular for arch bridges among other façade detailing. [5] Using just the concrete as a finish was radically different from the current trend but proved to be a success; the white standing out from the green of the trees and complementing the snow in the winter. It should be noted that your viewpoint of the bridge changes its appearance. From far away, the slenderness is apparent and concrete gives the all white clean look. From the viewing platform below the bridge, and also up close, the greyness of the concrete and also the layers in which it has been poured, are noticeable. However matched against the rocky walls of the valley it fits in and makes one appreciate that all the concrete for the bridge was mixed by hand and wheel-barrowed into place! This adds to the character of the bridge. Overall the bridge looks beautiful and it follows that it obeys Leonhardt s rules. Beauty does not come with a price and it is surprising that this bridge that has drawn so much attention from round the globe serves two, low populated villages as a simple valley crossing. 5 Construction The bridge was constructed using centring. The erected scaffolding looks impressive on its own. Fig. 8 Showing how column and arch widen at support. The arch is 3.6m wide at the centre and this increases to 6m at the abutments (See fig. 8) to give a more robust and stable appearance to an otherwise exceptionally narrow structure. The vertical columns at the supports also widen at the base, in balance with the arch, accentuating the feeling of stability and tying the whole structure together. The order of the bridge is good, as it is not too busy. The bridge is made up of the deck, arch and columns which are all plain in appearance. Everything is necessary on the bridge; there are no extra detailing or structures. Fig 9. Centring
5 The wooden scaffolding was constructed over the summer of 1929 by six men. It was proposed to be finished late summer, so concrete pouring could begin in the relative temperate summer/autumn period, but an accident to one of the scaffolders (he fell 35m and survived!) set back the finished date till late October so concreting did not begin until the following year. The scaffolding cost an additional 45,000 to the project budget, making it a third of the total costs. It was constructed by the highly regarded [5] Richard Coray. The design of the formwork must have taken into account that the wood would move somewhat with the weight of the concrete and so would have been a heavily engineered structure itself. (Rough scaling, 15m rise on scaffold. 13m on final bridge) The arch walls increase in length but decrease in thickness from the springing points to the centre. This is because the greatest moment is experienced at the quarterspan points. The arch walls join to the deck from the quarter point. Reference [3] talks how Malliart calculated the most efficient design to increase the length of the gap in between the arch and deck further into the bridge, keeping the arch and deck separate for all but the centre key and hinge. Clearly, from a construction point of view, the formwork to create such a gap (around 10-30mm) is very timely and expensive and so Malliart choose the cheaper option, even though this contradicts his design that uses least materials. 5.1 Cantilever construction Where the arch walls connect with the deck the familiar cross section of a hollow box is created. Cantilever construction makes use of the hollow box, starting at a pier or abutment sections are cast in situ or precast segments rose into place and then connected back using steel tension wires. This technique is now widely used, but would have been unsuitable for Salginatobel for many reasons. Cantilever construction uses a lot of tension wires to hold up the bridge during construction. Once the bridge is completed, and either side connected, the tension wires no longer perform a purpose. This is a very wasteful and expensive process and the council, and Malliart himself, were looking for an economical option. Also cantilever construction requires a balance of two sides over a pier, although ballast could have been used to start the cantilever at the abutments and to perform this method of construction. Alternatively a pier could have been erected mid-span in the valley, creating two 45m spans. The depth to the valley floor at Salginatobel is 80m, which would make the pier substantial in size. This would be costly in time and money, but also would look out of place in such a steep valley (as in fig. 10 ) Temporary supports could have been utilised to support the bridge during construction and allowing the pier to be of a more slender construction. Fig. 10 Possible alternative using a pier mid-span. 5.2 Centring In modern day centring performed on such grand formwork is uncommon by not unheard of. Formwork is incredibly expensive, due to the materials and expertise required and because of stringent safety checks. In many projects it would also be a massive inconvenience to block up the area below, for example on a motorway crossing. The cost of the Salginatobel formwork today would defiantly exceed the Fr. 45,000 in relative terms. The thin arch plate was cast continually and symmetrically from both sides in 40 hours; an amazing feet [6]. It is likely that once the arch plate was cast more formwork would have been erected to cast the supporting columns and arch wall. The approach road and associated columns may have been cast first so the deck over the arch could be construction symmetrically from either side, so the arch doesn t experience non-uniform loading when it is not at full strength. Concrete takes a time to cure before it reaches full strength. Temperature and moisture content are the main factors. If the temperature is too hot, i.e. in the height of summer, then concrete reaches stiffness earlier. However, the stiffness reached is not it s highest possible value. There is also a high chance of cracking. Concrete should be kept cool and moist whilst curing to reach its optimum strength. As the formwork for Salginatobel was not finished till late October, the weather would have become too cold to mix concrete and so the concrete was started in the spring of The deck is a continuous beam over the columns supports with hinges at each end, and at point 5 and 7 (Mentioned in Bridge Components), the edge of the arch and mid-span of the arch. It is likely in-situ centring continued for this. Formwork is erected and the deck cast above. If it was possible to cast in one go, like the arch, then this would surpass the need for any construction joints. In modern construction is it very possible for concrete to be held up and casting stopped. In Switzerland they may have had a more efficient system (like they do for most things!) but this would still require a lot of effort to pour as one. Construction joints may have been formed, so the deck needn t be poured as one. Also the support columns and deck would have been poured incrementally in conjunction.
6 Fig. 11 Showing how columns and deck would be built in conjunction. The deck would be taken out to a fifth span in between supports which is where the joint would occur. This point is used because dead weight bending moment is approximately zero here. The formwork is tied to the first casting to avoid differential movement. Concrete is then poured from the next section towards the joint. If poured from the joint then increased strain is experienced in the joint and cracking would likely occur. To build the bridge, the way it was back in 1929, today would not happen: the scaffolding would be so incredibly expensive and dangerous. 5.3 Pre-cast Pre-cast steel and concrete sections span about 40m. It may be possible to construct an arch out 3 pre-cast sections, and then craned out. However the joints would most likely be around the quarter span point, which receives the greatest bending moments. If it were feasible to pre-cast larger segments then a three-pinned-arch could be created to mirror the current bridge. Casting a section over 40m is not impossible, but finding the space and then transportation is the difficult part. 5.4 Casting girder A casting girder could be used as an alternative. This is often used when a deck is high up, and centring cannot be used, and the spans are medium to long, i.e. greater than 40m. The casting girder acts as temporary formwork. Only a few companies in the world own girders of this length so this process is very expensive. They are typically around 50m in length, so a temporary support would be required. These require solid reinforced foundations as the support has to take some bending moment. This cannot be re-used so is a very costly and wasteful process. 5.5 Launching girder Alternative to the casting girder is the launching girder, which may be more suitable for the Salginatobel crossing as the girder is placed above the deck. Both precast and in-situ is possible in this form of construction. Some girders reach 80m, and there is a possibility that one maybe able to span the whole Salginatobel valley. This is unlikely, so a pier or temporary support could be utilised. One of the main disadvantages with both the casting girder and the launching girder is that for cast in-situ concrete the concrete needs to be pumped along way which often results in a inferior concrete, as it can separate or bleed. Pre-cast units result in higher quality but transport to site is expensive and hazardous. The Salginatobel valley is situated in the mountains and would be very difficult to deliver parts to site, let alone a 50/80m girder! All the concrete for the Salginatobel bridge was hand mixed near to site, and then wheel-barrowed into place which is a fantastic performance but crazy to duplicate today. 5.6 Incremental launching Setting up a factory type site next to the valley and performing incremental launching could be a possibility for constructing the Salginatobel Bridge today. Pre-cast transportation costs and difficulties can be avoided. Sectioned can be cast and pushed out making space for more to be cast and set. A steel nose is added to the end to reduce hogging moments. No scaffolding or falsework under the bridge in the valley would be required for this process. Just the one set of formwork could be used reducing costs further. An arch bridge could be created, mimicking the original bridge as long as the curve was kept constant, however it would be easier to construct straight. The bridge would be of high quality due to the factory conditions. A span to depth ratio of 1:15 is normally required and kept constant. This would make the bridge around 6 metres deep, and defiantly this would not have the same aesthetic appeal as the current bridge. Strict control is required of the formwork, and the whole set up requires a lot of room. The mountain plateaus either side of the bridge, so this would be possible. Heavy pre-stressing would be needed throughout the whole bridge, much more than would be required in the finished bridge, because every-section experiences the maximum hogging and sagging moments. Tendons would be needed at the top and bottom of the section to take this hogging and sagging, and once the bridge is completed further tendons are required to take service loading. This is wasteful and expensive. To launch the bridge, the section must be either pushed or pulled. Pushing is the easier option, but not as safe as pulling. VSL developed a system which could be utilised. Using stainless steel sheets, in conjunction with teflon, and a cable the sections are pulled towards the jack near the support and out into the valley span. Also pulling from the lower ground, i.e. on the Schuders side, would be safer than pulling from the higher ground and risking the bridge sliding. 5.7 Suspended Cantilever
7 It is possible to combine suspended cantilever construction with launching, to reduce the hogging mo Arches still seem most favourable for valley crossings, and this are most commonly constructed with centring. Some bridges make use of launching girders over columns, supported on an arch. It is even possible to supported a section of an arch using cables, while it is suspended like a cantilever over a valley. Fig. 12 Using cable stay to support an arch during construction. This would be a good solution to building the bridge today, and it would relieve the need for centring. However the cost of the cables and the towers that support them are large. Cable-stay bridges are very cost effective because there method of construction remains as part of the bridge structure. 5.8 Malliart s Construction Malliart s Construction is so material efficient, aesthetically pleasing and cost effective, that it seems unlikely to be able to build a bridge to revile it today. Even with the humungous advance in methods and technology, most methods of construction lead to a vast waste of materials. A cable-stay bridge does do this, but would likely look out of place in the Salginatobel valley. 6 Loading The British Standards for Bridge loading are possibly the most conservative in the world. When Malliart designed Salginatobel it is unlikely he designed for 40 tonne trucks to come bombarding down his bridge (the equivalent loading of the British Standards!). Bridges need to be checked for ultimate limit state (ULS), to check that the material can resist the bending moments and shear force from the loading. This is to prevent collapse. Serviceability also needs to be checked, making sure the bridge doesn t deflect too much, or if creep has an effect. 6.1 Loads 1. Dead Load; This is the structure of the bridge, in this case the reinforced concrete. Except in construction it is always present, but different factors can be applied depending on whether the load is relieving, i.e. reducing bending moment in the structure at some point. 2. Super-imposed dead; This is any dead weight not performing a structural function, such as road surfacing, lighting and railings. This are present most of the time, but not always, so can be apply in different combinations to achieve the worst case. 3. Live Traffic; British Standards have two forms of traffic loading, HA and HB. HA is for general traffic and HB is for abnormally large vehicles. Various other loadings can be applied, such as skidding and braking loads. Abnormally large vehicles, such as mobile cranes, were not around when the Salginatobel was built. With more demands from the construction industry, among others, vehicles are getting bigger and bigger, increasing the loads that bridges have to take. HB loading is considered over a 3.5m width. Salginatobel is 3.5m centre to centre of the parapets, plus it is unlikely for such a large abnormal truck to be up the mountain 4. Wind; Wind is intermittent, and generally short term, but it can appear at any time and it often causes most problems during construction when a structure is not completed, and it s full strength is not achieved. In the Salginatobel valley wind would be an increased problem as the valley shape causes gusting, increasing wind flow. If a bridge has a particularly low or high natural frequency then wind can become an increased problem also. 5. Temperature. Temperature affects materials as it can change their volume, creating large stresses to build up within a structure. As discussed before the Salginatobel Bridge is a three-pinned-arch and so is free to rotate eliminating these forces. Stresses can also build up from the constant warming and cooling effects of temperature change, causing fatigue and in concrete leading to cracking. The arch is separate from the deck at the supports, so these fatigue mechanism is avoided such as in the bridge at Zuoz (1903). 6.2 Factors of safety Once loads have been defined, then they are applied in different combinations and with different factors to calculate the worst possible load the bridge may have to resist. Factors are applied for the load (γ fl ), and also for possible inaccuracies in analysis (γ f3 ). In concrete the current factor for the analysis method (γ f3 ) is 1.10 for elastic analysis and 1.15 for plastic analysis. 6.3 Load Combinations There are five different load combinations, and each needs to be checked for ULS and SLS. 1. All permanents loads and primary live loads. This includes all dead weight (including super-imposed) and HA/HB loading. HA/HB loading will be discussed later. 2. Everything from combination 1, plus wind load and possible temporary loads. As centring is used, I will assume there are no extra loads on the bridge during construction (except wind).
8 3. Combination 1, plus temperature, and possible temporary loads. As temperature does not effect Salginatobel this loading will be the same as combination All permanent loads and secondary live loads such as skidding and collision loads. Centrifugal loads need not be considered as the bridge is straight. Also associated live loads. 5. All permanent loads, plus loads due to friction at supports. 6.4 Dead Weight The total dead load for the bridge is reported as 9.5 tonnes/ m. [8] This is includes superimposed dead weight of the road surface. 6.5 Live Weight Bridge carriageways are divided into notional lanes. If it is less than 4.6m wide it is divided by 3 to give the number of lanes. In Salginatobel case it has one notional lane (3/3=1). HA loading is then spread over this notional lane in a uniformly distributed manner. A knife edge load (KEL) is also placed in a maximum impact position. The un-factored load is calculated from a graph, table or formula, whichever is easiest. Using the table found in [9] the load for a 90m span loaded length is 17.8kN/m. The KEL is defined as 120KN. Full HA is normally applied to two notional lanes, and other lanes loaded with 1/3 of the full HA. In Salginatobel calculations would be performed with full HA loading over the one lane. HB loading is applied over a 3.5m width. As mentioned before Salginatobel deck is just shy of 3.5m, and realistically abnormally large trucks would not be expected to cross the bridge, so it will not be calculated for. 6.6 Loading the deck. As the bridge is symmetrical through the arch, loading one have of the bridge would suffice, especially as there is a hinge in the middle. The following diagram shows how the different loads would be applied. Fig. 13 Combination 1 loading on beam. 6.7 Loading the Arch Arches are used as it is possible to construct an arch with dimensions resulting in zero bending moment. Calculating the forces on an arch are shown below
9 Fig. 16 Arch deformation. Placing two KEL loads at quarter span, leads to the most adverse effect. Fig. 14 Calculation of forces. Dead weight is approximate to 41kN/m and applying factors of 1.15 gives 48kN/m. Live load is 17.8 and applying factors of 1.3 and 1.1 gives 25.5kN/m. Applying the moments is now shown below: Horizontal forces are then 5509kN. Fig. 17 Max-moments at quarter span. Malliart made the arch supporting walls deepest at quarter span because of this maximum moment occurring here. The hollow box section is of sufficient dimensions to resist this. 7 The Future Fig. 15 Zero Moment in arch. The worst case however comes from loading the bridge on one side. This leads to the following deformation. The bridge currently is only one lane wide. It is unlikely the population of the surrounding villages is likely to reach such a level that requires widening the bridge to encase more lanes, or whether a new bridge would be needed to be built. In any case The Salginatobel Bridge still remains a marvellous bridge, in looks, structural performance and cost.
10 References [1] Salginatobelbruecke_suedwest.jpg [2] Robert Malliart s bridges: The art of engineering. D Billington. Princeton University Press [3] /03a00060/11?frame=noframe&[email protected] c.uk/01cce bca917&dpi=3&config=jstor [4] Almost ten years later, after a worldwide survey, the renowned British trade journal "Bridge - design & engineering" voted the Salginatobel Bridge the most beautiful bridge of the century [5] Robert Malliart. Max Bill. Pall Mall Press, London [6] The most delicate phase was casting the thin arch plate, which had to be done absolutely symmetrically from both sides without interruption. After 40 hours of strenuous work, it was completed. [7] [8] Robert Malliart and The Art of Reinforced Concrete. D.P.Billington 1990 The Mit press [9] Bridge Engineer Handbook Tim Ibell. University of Bath. [10]The World s Greatest Bridges. H. Shirley smith C.Tinling & Co [11] [12] ID=s [13] bel_bridge.html [14] [15] dt=1280&scrwdt=1280
Optimum proportions for the design of suspension bridge
Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
Truss. are both simple and A Matsuo Example continuous trusses. The
Girder Bridge A girder bridge is perhaps the most common and most basic bridge. A log across a creek is an example of a girder bridge in its simplest form. In modern steel girder bridges, the two most
Preliminary steel concrete composite bridge design charts for Eurocodes
Preliminary steel concrete composite bridge 90 Rachel Jones Senior Engineer Highways & Transportation Atkins David A Smith Regional Head of Bridge Engineering Highways & Transportation Atkins Abstract
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia
DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements
Optimising plate girder design
Optimising plate girder design NSCC29 R. Abspoel 1 1 Division of structural engineering, Delft University of Technology, Delft, The Netherlands ABSTRACT: In the design of steel plate girders a high degree
REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:
HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
INTRODUCTION TO LIMIT STATES
4 INTRODUCTION TO LIMIT STATES 1.0 INTRODUCTION A Civil Engineering Designer has to ensure that the structures and facilities he designs are (i) fit for their purpose (ii) safe and (iii) economical and
EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS
ENGINEERING COMPONENTS EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS Structural members: struts and ties; direct stress and strain,
Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber
Fifteen years experience of design, production and assembling of pre-stressed Bridge decks in Timber P. Jacobsson 1 Fifteen years experience of design, production and assembling of prestressed Bridge decks
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS
MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS This is the second tutorial on bending of beams. You should judge your progress by completing the self assessment exercises.
MECHANICS OF SOLIDS - BEAMS TUTORIAL 1 STRESSES IN BEAMS DUE TO BENDING. On completion of this tutorial you should be able to do the following.
MECHANICS OF SOLIDS - BEAMS TUTOIAL 1 STESSES IN BEAMS DUE TO BENDING This is the first tutorial on bending of beams designed for anyone wishing to study it at a fairly advanced level. You should judge
PRESTRESSED CONCRETE. Introduction REINFORCED CONCRETE CHAPTER SPRING 2004. Reinforced Concrete Design. Fifth Edition. By Dr. Ibrahim.
CHAPTER REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition Fifth Edition PRESTRESSED CONCRETE A. J. Clark School of Engineering Department of Civil and Environmental
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
Statics of Structural Supports
Statics of Structural Supports TYPES OF FORCES External Forces actions of other bodies on the structure under consideration. Internal Forces forces and couples exerted on a member or portion of the structure
2.0 External and Internal Forces act on structures
2.0 External and Internal Forces act on structures 2.1 Measuring Forces A force is a push or pull that tends to cause an object to change its movement or shape. Magnitude, Direction, and Location The actual
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the
INTRODUCTION TO BEAMS
CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis
CH. 2 LOADS ON BUILDINGS
CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the
ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P
ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P This material is duplicated in the Mechanical Principles module H2 and those
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: [email protected] Ainars
CRITICAL ANALYSIS OF THE LUPU BRIDGE IN SHANGHAI
CRITICAL ANALYSIS OF THE LUPU BRIDGE IN SHANGHAI L J H Ellis Dept. Civil & Architectural Engineering, University of Bath Abstract: This article provides a critical analysis of The Lupu Bridge in Shanghai.
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth Bulk deformation forming (rolling) Rolling is the process of reducing
The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.
9.2 One-way Slabs This section covers the following topics. Introduction Analysis and Design 9.2.1 Introduction Slabs are an important structural component where prestressing is applied. With increase
Steel and composite bridges in Germany State of the Art
Steel and composite bridges in Germany State of the Art Univ.-Prof. Dr.-Ing. G. Hanswille Institute for Steel and Composite Structures University of Wuppertal Germany Univ.-Prof. em. Dr.-Ing. Dr. h.c.
SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver
Steel joists and joist girders are
THE STEEL CONFERENCE Hints on Using Joists Efficiently By Tim Holtermann, S.E., P.E.; Drew Potts, P.E.; Bob Sellers, P.E.; and Walt Worthley, P.E. Proper coordination between structural engineers and joist
EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES AND APPLICATIONS NQF LEVEL 3 OUTCOME 1 - LOADING SYSTEMS TUTORIAL 3 LOADED COMPONENTS
EDEXCEL NATIONAL CERTIICATE/DIPLOMA MECHANICAL PRINCIPLES AND APPLICATIONS NQ LEVEL 3 OUTCOME 1 - LOADING SYSTEMS TUTORIAL 3 LOADED COMPONENTS 1. Be able to determine the effects of loading in static engineering
King Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:
SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the
Overhang Bracket Loading. Deck Issues: Design Perspective
Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple
SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED
SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams
16. Beam-and-Slab Design
ENDP311 Structural Concrete Design 16. Beam-and-Slab Design Beam-and-Slab System How does the slab work? L- beams and T- beams Holding beam and slab together University of Western Australia School of Civil
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
How To Write An Analysis System For Bridge Test
Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China ([email protected], [email protected]) Summary Analysis System for Bridge Test (Chinese
Technical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
Bending, Forming and Flexing Printed Circuits
Bending, Forming and Flexing Printed Circuits John Coonrod Rogers Corporation Introduction: In the printed circuit board industry there are generally two main types of circuit boards; there are rigid printed
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
Basics of Reinforced Concrete Design
Basics of Reinforced Concrete Design Presented by: Ronald Thornton, P.E. Define several terms related to reinforced concrete design Learn the basic theory behind structural analysis and reinforced concrete
ARCHITECTURE. Asst. Prof. Meltem VATAN KAPTAN [email protected]
STRUCTURES IN ARCHITECTURE Asst. Prof. Meltem VATAN KAPTAN [email protected] Istanbul Aydin University, Faculty of Engineering and Architecture ISTANBUL, TURKEY December 15, 2011 - GAZIANTEP If
Elevated Roads for Sri Lanka
Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University
In-situ Load Testing to Evaluate New Repair Techniques
In-situ Load Testing to Evaluate New Repair Techniques W.J. Gold 1 and A. Nanni 2 1 Assistant Research Engineer, Univ. of Missouri Rolla, Dept. of Civil Engineering 2 V&M Jones Professor, Univ. of Missouri
Reinforced Concrete Design
FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
PTFE Slide Bearings 04/10 149
04/10 149 1.0 GENERAL INFORMATION In a wide range of applications, PTFE Slide bearings are superior to conventional expansion plates, rollers and rocker arm type supports. They support petrochemical plant,
SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:
Reading Assignment SLAB DESIGN Chapter 9 of Text and, Chapter 13 of ACI318-02 Introduction ACI318 Code provides two design procedures for slab systems: 13.6.1 Direct Design Method (DDM) For slab systems
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES Yang-Cheng Wang Associate Professor & Chairman Department of Civil Engineering Chinese Military Academy Feng-Shan 83000,Taiwan Republic
Numerical modelling of shear connection between concrete slab and sheeting deck
7th fib International PhD Symposium in Civil Engineering 2008 September 10-13, Universität Stuttgart, Germany Numerical modelling of shear connection between concrete slab and sheeting deck Noémi Seres
Eurocode 2: Design of concrete structures
Eurocode 2: Design of concrete structures Owen Brooker, The Concrete Centre Introduction The transition to using the Eurocodes is a daunting prospect for engineers, but this needn t be the case. Industry
FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1
FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with
1.2 Advantages and Types of Prestressing
1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
GUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05
Dimensional and Structural Data for Elliptical Pipes 21/09/05 Page 1 of 15 1. Foreword This document details a method for the structural design of Stanton Bonna Elliptical pipes for the common conditions
Design rules for bridges in Eurocode 3
Design rules for bridges in Eurocode 3 Gerhard Sedlacek Christian üller Survey of the Eurocodes EN 1991 EN 1990 Eurocode: Basis of Design EN 1992 to EN 1996 Eurocode 1: Actions on Structures Eurocode 2:
Approximate Analysis of Statically Indeterminate Structures
Approximate Analysis of Statically Indeterminate Structures Every successful structure must be capable of reaching stable equilibrium under its applied loads, regardless of structural behavior. Exact analysis
MECHANICAL PRINCIPLES HNC/D PRELIMINARY LEVEL TUTORIAL 1 BASIC STUDIES OF STRESS AND STRAIN
MECHANICAL PRINCIPLES HNC/D PRELIMINARY LEVEL TUTORIAL 1 BASIC STUDIES O STRESS AND STRAIN This tutorial is essential for anyone studying the group of tutorials on beams. Essential pre-requisite knowledge
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT Troy Oliver 1, Mark Rea 2 ABSTRACT: This paper provides an overview of the work undertaken in the design of multiple buildings for one of
ENGINEERING COUNCIL CERTIFICATE LEVEL
ENGINEERING COUNCIL CERTIICATE LEVEL ENGINEERING SCIENCE C103 TUTORIAL - BASIC STUDIES O STRESS AND STRAIN You should judge your progress by completing the self assessment exercises. These may be sent
DESIGN: (SUBSTRUCTURES, SPECIAL STRUCTURES AND MATERIALS) PART 12 BD 31/01 THE DESIGN OF BURIED CONCRETE BOX AND PORTAL FRAME STRUCTURES SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 2 SECTION 2 HIGHWAY STRUCTURE DESIGN: (SUBSTRUCTURES, SPECIAL STRUCTURES AND MATERIALS) SPECIAL STRUCTURES PART 12 BD 31/01 THE DESIGN OF BURIED CONCRETE BOX
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE
SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: TREY HAMILTON, UNIVERSITY OF FLORIDA NOTE: MOMENT DIAGRAM CONVENTION In PT design,
Beam bridges are the oldest known bridges and tend to be the simplest to design and build. Roughly half of all bridges
Beam Bridges Beam bridges are the oldest known bridges and tend to be the simplest to design and build. Roughly half of all bridges in the United States are beam bridges. They consist of vertical s and
Bridge Type Selection
Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when
5 Steel elements. 5.1 Structural design At present there are two British Standards devoted to the design of strucof tural steel elements:
5 Steel elements 5.1 Structural design At present there are two British Standards devoted to the design of strucof steelwork tural steel elements: BS 449 The use of structural steel in building. BS 5950
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
PROPERTIES OF MATERIALS
1 PROPERTIES OF MATERIALS 1.1 PROPERTIES OF MATERIALS Different materials possess different properties in varying degree and therefore behave in different ways under given conditions. These properties
SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS
Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-79104 Freiburg, Germany SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS H.
Chapter 5 Bridge Deck Slabs. Bridge Engineering 1
Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid
Section 5A: Guide to Designing with AAC
Section 5A: Guide to Designing with AAC 5A.1 Introduction... 3 5A.3 Hebel Reinforced AAC Panels... 4 5A.4 Hebel AAC Panel Design Properties... 6 5A.5 Hebel AAC Floor and Roof Panel Spans... 6 5A.6 Deflection...
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
ALLOWABLE LOADS ON A SINGLE PILE
C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity
A transverse strip of the deck is assumed to support the truck axle loads. Shear and fatigue of the reinforcement need not be investigated.
Design Step 4 Design Step 4.1 DECK SLAB DESIGN In addition to designing the deck for dead and live loads at the strength limit state, the AASHTO-LRFD specifications require checking the deck for vehicular
Structural Integrity Analysis
Structural Integrity Analysis 1. STRESS CONCENTRATION Igor Kokcharov 1.1 STRESSES AND CONCENTRATORS 1.1.1 Stress An applied external force F causes inner forces in the carrying structure. Inner forces
Solid shape molding is not desired in injection molding due to following reasons.
PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which
Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina
Analysis of the Interstate 0 Twin Bridge s Collapse During Hurricane Katrina By Genda Chen, Emitt C. Witt III, David Hoffman, Ronaldo Luna, and Adam Sevi The Interstate 0 Twin Span Bridge over Lake Pontchartrain
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to
