1 Planning Guidelines SMA FLEXIBLE STORAGE SYSTEM WITH BATTERY-BACKUP FUNCTION Circuitry Overviews, Schematic Diagrams and Material Lists SI-Ersatzstrom-PL-en-21 Version 2.1 ENGLISH
2 Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in this document is the property of SMA Solar Technology AG. Publishing its content, either partially or in full, requires the written permission of SMA Solar Technology AG. Any internal company copying of the document for the purposes of evaluating the product or its correct implementation is allowed and does not require permission. SMA Warranty You can download the current warranty conditions from the Internet at Trademarks All trademarks are recognized, even if not explicitly identified as such. A lack of identification does not mean that a product or symbol is not trademarked. The BLUETOOTH word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of these marks by SMA Solar Technology AG is under license. Modbus is a registered trademark of Schneider Electric and is licensed by the Modbus Organization, Inc. QR Code is a registered trademark of DENSO WAVE INCORPORATED. Phillips and Pozidriv are registered trademarks of Phillips Screw Company. Torx is a registered trademark of Acument Global Technologies, Inc. SMA Solar Technology AG Sonnenallee Niestetal Germany Tel Fax [email protected] 2004 to 2015 SMA Solar Technology AG. All rights reserved. 2 SI-Ersatzstrom-PL-en-21 Planning Guidelines
3 SMA Solar Technology AG Table of Contents Table of Contents 1 PV Energy Despite Grid Failure SMA Flexible Storage System with Battery-Backup Function Bridging Time and Self-Consumption Quota Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function Certifications and Licenses Utility Grid Circuit Breaker in the Household Distribution Switching Times for Loads PV Inverters Suitable PV Inverters Maximum AC Power of the PV Inverters Frequency-dependent control of active power Batteries Recommendations for Battery Capacity Selection of the Battery Type Capacity of the Battery Utilized by the SMA Flexible Storage System with Battery-Backup Function Sunny Island Required in Great Britain and Northern Ireland: External Grid and PV System Protection Electrical Connection Single-Phase Battery-Backup System with All-Pole Disconnection Three-Phase Battery-Backup System with All-Pole Disconnection Single-Phase Battery-Backup System without All-Pole Disconnection Three-Phase Battery-Backup System without All-Pole Disconnection Automatic Transfer Switch Requirements of VDE Application Guide Procurement of the Automatic Transfer Switch Information on the connection of the automatic transfer switch Automatic Transfer Switch for Single-Phase Battery-Backup System with All-Pole Disconnection Automatic Transfer Switch for Three-Phase Battery-Backup System with All-Pole Disconnection Automatic Transfer Switch for Single-Phase Battery-Backup System without All-Pole Disconnection Automatic Transfer Switch for Three-Phase Battery-Backup System without All-Pole Disconnection Operating Principle of the Automatic Transfer Switch Installation Site Glossary Appendix Single-Phase Battery-Backup System in Belgium Schematic Diagram of the Automatic Transfer Switch Circuitry overview Three-Phase Battery-Backup System in Belgium Schematic Diagram of the Automatic Transfer Switch Circuitry overview Planning Guidelines SI-Ersatzstrom-PL-en-21 3
4 Table of Contents SMA Solar Technology AG 9.3 Configuration of the automatic transfer switches for Belgium Automatic Transfer Switch for Single-Phase Battery-Backup System in Belgium Automatic Transfer Switch for Three-Phase Battery-Backup System in Belgium SI-Ersatzstrom-PL-en-21 Planning Guidelines
5 SMA Solar Technology AG 1 PV Energy Despite Grid Failure 1 PV Energy Despite Grid Failure Whenever grid failures occur, the PV system will disconnect from the utility grid to ensure the safety of persons working on the utility grid. For operators of a PV system or an SMA Flexible Storage System, this disconnection means that the loads connected to their household grid are no longer supplied with energy. We do occasionally experience grid failures as the following examples show: On November 4, 2006, the utility grid failed in parts of Germany, Belgium, Italy, Spain and Austria. This grid failure was triggered by the disconnection of two high-voltage lines to enable the disembarkation of the cruise liner "Norwegian Pearl. Over ten million people were without electricity for up to 120 minutes. On November 11, 2012, the city of Munich experienced the worst grid failure in two decades. This grid failure was triggered by a technical fault in an electrical substation. It lasted for approximately one hour and around 450,000 people were affected. A severe storm on October 27, 2014 caused considerable grid failures in the southwest of Great Britain. About 6,000 households were affected. Long-term grid failures can have serious consequences for those affected: for example, households and companies have to manage without heat, light, telephones and computers, cold chains are interrupted, and in agricultural enterprises barn ventilation and heat lamps go out of service. One possible solution for bridging this supply gap would be to convert existing PV systems into battery-backup systems. Battery-backup systems with PV systems need batteries as intermediate storage units, since PV energy is not available at all times. However, many PV systems have already been converted into energy management systems with intermediate storage to enable optimized self-consumption or internal power supply. These energy management systems are already equipped with batteries which can be additionally used for the battery-backup function. An example of such a battery-backup system is the SMA Flexible Storage System with battery-backup function. With an SMA Flexible Storage System with battery-backup function, the existing PV system will be able to maintain the electricity supply throughout a grid failure. The battery of the SMA Flexible Storage System not only takes care of the intermediate storage of PV energy, but also supplies the loads during grid failure. The service life of the battery is hardly affected by this dual utilization as long as the utility grid is basically stable. Planning Guidelines SI-Ersatzstrom-PL-en-21 5
6 2 SMA Flexible Storage System with Battery-Backup Function SMA Solar Technology AG 2 SMA Flexible Storage System with Battery-Backup Function An SMA Flexible Storage System with battery-backup function takes care of the uninterrupted supply of the loads with electricity during a grid failure. An automatic transfer switch disconnects the household grid with the PV system from the utility grid. When this happens, the battery inverter Sunny Island forms a battery-backup grid and the PV system can supply the loads. When the energy demand of the active loads exceeds the current power of the PV system, the battery will provide the energy shortfall. Figure 1: Overview of an SMA Flexible Storage System with battery-backup function Devices of the SMA Flexible Storage System Device Sunny Island 3.0M/4.4M/ 6.0H/8.0H Sunny Remote Control Function The Sunny Island is a battery inverter. In the event of grid failure, the Sunny Island forms a battery-backup grid and regulates the energy distribution in this battery-backup grid. In grid-tie operation, the Sunny Island is responsible for the optimization of self-consumption or internal power supply. You can configure and control the Sunny Island via the Sunny Remote Control display. 6 SI-Ersatzstrom-PL-en-21 Planning Guidelines
7 SMA Solar Technology AG 2 SMA Flexible Storage System with Battery-Backup Function Device BatFuse Battery Sunny Home Manager SMA Energy Meter Function The battery fuse box BatFuse is an external fuse switch-disconnector which protects the battery connection cables of the Sunny Island inverter. Furthermore, the BatFuse enables DC-side disconnection of the Sunny Island inverter. The battery stores excess energy from the PV system. In grid-tie operation, this buffered PV energy is used to optimize self-consumption or internal power supply, and in the event of grid failure, it is used for supplying the loads. The Sunny Home Manager is a device for monitoring PV systems and controlling loads in households with PV systems. The SMA Energy Meter is a measuring device which detects measured values at the connection point and makes them available via Speedwire, e.g. to the Sunny Home Manager. Devices of the Automatic Transfer Switch Device Grid disconnection Phase coupling Grounding device Function The grid disconnection function is performed by the tie switch. The design of the tie switch depends on whether or not the utility grid is disconnected from the battery-backup grid at all poles (see Section 4.2 "Utility Grid", page 10). Phase coupling is an optional function for single-phase battery-backup systems if the utility grid is a three-phase system. With single-phase battery-backup systems, only one Sunny Island is connected to the automatic transfer switch. Therefore, without phase coupling only one line conductor (e.g. L1) is protected against grid failure. In this case, the other two line conductors (e.g. L2 and L3) cannot be protected. Phase coupling enables combined switching of the line conductors. As a result, the other two line conductors are also supplied with voltage in the event of grid failure. This means that in the event of grid failure a three-phase household grid is transformed into a single-phase battery-backup grid. Phase coupling can be switched on independently for the line conductors L2 und L3. In automatic transfer switches with all-pole disconnection, all poles of the battery-backup grid are disconnected from the utility grid in the event of grid failure. This disconnection does not ground the neutral conductor. Therefore, in automatic transfer switches with all-pole disconnection, a grounding device must ground the neutral conductor in the event of grid failure. The grounding device protects persons working on the system. It is configured for fail-safe operation (see Section 4.2 "Utility Grid", page 10). Planning Guidelines SI-Ersatzstrom-PL-en-21 7
8 3 Bridging Time and Self-Consumption Quota SMA Solar Technology AG 3 Bridging Time and Self-Consumption Quota This section describes a simple method by which you can estimate bridging time and self-consumption quota for an SMA Flexible Storage System with battery-backup function. For the battery capacity, an empirical value of a typical battery-backup system is assumed and verified by means of the estimate. In the example, the assumed values for the energy demand of the loads in a private household, the peak power of the PV system and the battery capacity are characteristic of a battery-backup system in a four-person single-family household in Germany. Step 1: Estimation of self-consumption quota for an SMA Flexible Storage System Input data: Peak power of the PV system: 5,000 Wp Annual energy demand: 5,000 kwh Battery capacity for the SMA Flexible Storage System: 10 kwh It can be assumed that with lead-acid batteries the Sunny Island utilizes 50% of the battery capacity for intermediate storage of PV energy. Hence, the usable battery capacity would amount to 5,000 Wh.* Peak power of the PV sytem Annual energy demand Useable battery capacity Annual energy demand = Wp = 1 Wp/kWh kwh = Wh = 1 Wh/kWh kwh Transfer the calculated values to the diagram to estimate the self-consumption quota. Figure 2: Estimation of self-consumption quota with intermediate storage The estimate results in a self-consumption quota of approximately 60%. Step 2: Estimation of energy demand in the event of grid failure The annual energy demand of the household amounts to 5,000 kwh. Annual energy demand 365 days = kwh = 13,6 kwh/day 365 days * Due to the seasonal battery operation, the use of the battery for intermediate storage is limited in winter and extended in summer. Therefore, a usable range of 50% for intermediate storage can continue to serve as the basis for the estimate (see Section "Capacity of the Battery Utilized by the SMA Flexible Storage System with Battery-Backup Function", page 16). 8 SI-Ersatzstrom-PL-en-21 Planning Guidelines
9 SMA Solar Technology AG 3 Bridging Time and Self-Consumption Quota It can be assumed that during a grid failure, electrical energy will be used sparingly, e.g. by switching off energy-intensive loads. As a result, the daily energy demand of 13.6 kwh can be reduced by 40%. In this case, the energy demand of this household will be around 8 kwh in the event of a 24-hour grid failure. Step 3: Estimation of PV generation during a grid failure The peak power of the PV system is approximately 5 kwp. In Germany in the winter, it can be assumed that 0.7 kwh/ kwp will be generated. Hence, an energy yield from PV production of 3.5 kwh between sunrise and sunset is derived. Step 4: Calculation of battery capacity required for the battery-backup function Input data: Energy demand of the household: 8 kwh Energy yield from PV production: 3.5 kwh Battery capacity = Energy demand PV generation = 8 kwh 3.5 kwh = 4.5 kwh The required battery capacity amounts to 4.5 kwh. In Step 1, a battery capacity of 10 kwh was determined. Thus, in this example 45% of the battery capacity will be needed as energy reserve for grid failure on a winter day. Result With lead-acid batteries, a default value of 45% of the Sunny Island battery capacity is reserved for the battery-backup function in winter operation, within the corresponding value range of 15% to 60% (see Section 4.6 "Batteries", page 14). Thus, the battery used for the SMA Flexible Storage System is also adequate for the battery-backup function. Planning Guidelines SI-Ersatzstrom-PL-en-21 9
10 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function SMA Solar Technology AG 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function 4.1 Certifications and Licenses The SMA Flexible Storage System with battery-backup function is licensed for use in the following countries: Australia Belgium Denmark Germany Great Britain and Northern Ireland (see Section 4.8, page 17) Austria Switzerland However, its use in other countries is not ruled out. The Sunny Island is certified in accordance with VDE-AR-N 4105 and AS4777. In certain countries, proof of these certifications is sufficient. Please consult the grid operator. 4.2 Utility Grid Only utility grid permitted as external energy source The only permitted external energy source connected to the SMA Flexible Storage System with battery-backup function is the utility grid. The SMA Flexible Storage System with battery-backup function does not support operation with a generator (e.g. diesel generator). Special conditions of use in Belgium The utility grid connected to the automatic transfer switch must generally be a TN or TT system. In Belgium, the utility grid can be designed to function as an IT system that is, however, grounded to the neutral point of the source. This results in a hybrid form of an IT and TT system. Compared with a TT system, this hybrid form is not equipped with a neutral conductor. With this installation, the following restriction applies when using the battery-backup system: If the utility grid functions as an IT system that is grounded to the neutral point of the source, the connected battery-backup system must be single-phase. Characteristics of the Battery-Backup Grid Characteristic Single-phase battery-backup grid Three-phase battery-backup grid Utility grid TN or TT system Single-phase or three-phase Three-phase Behavior of the Sunny Island inverters in the event of grid failure Recognition of grid failure Supply of the loads in the event of grid failure Grid feed-in by the PV inverters in the event of grid failure One Sunny Island supplies the battery-backup grid. Grid failure is only recognized on the line conductor which is connected to the Sunny Island (e.g. L1). Only some of the loads are supplied (e.g. the loads connected to L1). Only single-phase PV inverters can feed energy into the grid. Three Sunny Island inverters switched in parallel on the DC side supply each line conductor with the corresponding phase. Grid failure is recognized on all line conductors. All loads are supplied. Single-phase and three-phase PV inverters can feed energy into the grid. 10 SI-Ersatzstrom-PL-en-21 Planning Guidelines
11 SMA Solar Technology AG 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function Characteristic Single-phase battery-backup grid Three-phase battery-backup grid Phase coupling in the battery-backup grid Rotating magnetic field in the battery-backup grid Phase Coupling Possible No: even with phase coupling, the battery-backup grid remains single-phase. If three-phase loads are connected to a single-phase utility grid with phase coupling, SMA Solar Technology AG cannot rule out damage to the three-phase loads. With phase coupling, single-phase loads only must be connected to the battery-backup grid. Battery-Backup Grid with or without All-Pole Disconnection Mode of Operation Criterion for use Battery-backup system with all-pole disconnection In the event of grid failure, a tie switch disconnects all line conductors and the neutral conductor of the battery-backup grid from the utility grid. The tie switch is designed with built-in redundancy. If the technical connection requirements of the grid operator or the locally applicable standards and directives call for or allow all-pole disconnection, you must install the battery-backup system with all-pole disconnection. Deployment location E.g. Germany, Austria, Belgium, Denmark E.g. Australia 4.3 Circuit Breaker in the Household Distribution Not possible Yes: three Sunny Island inverters form a three-phase battery-backup grid with rotating magnetic field. Battery-backup system without all-pole disconnection In the event of grid failure, a tie switch disconnects all line conductors of the battery-backup grid from the utility grid. The neutral conductor of the battery-backup grid remains permanently connected to the utility grid. The tie switch is not designed with built-in redundancy. If the technical connection requirements of the grid operator or the locally applicable standards and directives prohibit disconnection of the neutral conductor, you must install the battery-backup system without all-pole disconnection. Only the Sunny Island can trip the circuit breakers in the household distribution in case of a grid failure. The circuit breakers in the household distribution must therefore comply with the maximum tripping characteristics listed in the following table. If a circuit breaker in the household distribution has a higher tripping characteristic, an additional residual-current device of type A must be installed. Sunny Island device type SI3.0M-11 (Sunny Island 3.0M) SI4.4M-11 (Sunny Island 4.4M) SI6.0H-11 (Sunny Island 6.0H) SI8.0H-11 (Sunny Island 8.0H) Maximum tripping characteristics B6 (B6A) B6 (B6A) B16 (B16A) B16 (B16A) Planning Guidelines SI-Ersatzstrom-PL-en-21 11
12 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function SMA Solar Technology AG 4.4 Switching Times for Loads The SMA Flexible Storage System with battery-backup function does not fulfill the requirements of an uninterruptible power supply as per IEC In the event of grid failure, an automatic transfer switch disconnects the battery-backup grid from the utility grid. After disconnection, the loads and the PV system are not supplied for approximately five to seven seconds, until the battery-backup system can provide active power and reactive power again. If any single load (e.g. a computer) requires an uninterruptible power supply in compliance with the standard or a switching time shorter than five to seven seconds, this load will need a separate uninterruptible power supply in accordance with IEC Longer Switching Periods for Phase Coupling Loads integrated in the battery-backup grid via phase coupling have a switching time of 15 seconds, as the SMA Flexible Storage System with battery-backup function connects phase coupling with a time delay. 4.5 PV Inverters Suitable PV Inverters No three-phase PV inverters in single-phase battery-backup systems Three-phase PV inverters such as the Sunny Tripower are not suitable for single-phase battery-backup systems, as they cannot feed into the battery-backup grid in the event of grid failure. Possible solutions: Replace the three-phase PV inverter by a combination of single-phase PV inverters, e.g. two Sunny Boy 4000TL inverters instead of one Sunny Tripower 8000TL. Select a sufficiently large battery capacity to ensure the supply of the loads from the battery only over the entire bridging time. Only PV inverters complying with the standards VDE-AR-N 4105 or AS 4777 are suitable for use in an SMA Flexible Storage System with battery-backup function. In the following PV inverters you can activate frequency-dependent active power limitation as of the indicated firmware version (see Section "Frequency-dependent control of active power", page 13). PV inverter Firmware version* Sunny Boy (SB) SB1.5-1VL-40/SB2.5-1VL R SB 1300TL-10/1600TL-10/2100TL SB 2500TLST-21/3000TLST R SB SB SB 2000HF-30/2500HF-30/3000HF R SB 3000TL-21/3600TL-21/4000TL-21/5000TL R Sunny Mini Central (SMC) SMC 5000A/6000A 1.50 SMC 6000TL/7000TL/8000TL 3.32 SMC 7000HV 1.81 SMC 7000HV SMC 9000TLRP-10/10000TLRP-10/11000TLRP SI-Ersatzstrom-PL-en-21 Planning Guidelines
13 SMA Solar Technology AG 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function PV inverter Sunny Tripower (STP) STP 5000TL-20/6000TL-20/7000TL-20/8000TL-20/9000TL-20 STP 8000TL-10/10000TL-10/12000TL-10/15000TL-10/17000TL-10 STP15000TLEE-10/20000TLEE-10 Firmware version* R R R * With older firmware versions, a firmware update is required (see installation manual of the PV inverter) Maximum AC Power of the PV Inverters The AC power that PV inverters are permitted to feed into the battery-backup system is limited by the rated power of the Sunny Island inverters. Type of battery-backup system Device type of the Sunny Island inverter Rated power of the Sunny Island inverters Frequency-dependent control of active power Maximum AC power of the PV inverters Single-phase SI3.0M-11 (Sunny Island 3.0M) 2.3 kw 4.6 kw SI4.4M-11 (Sunny Island 4.4M) 3.3 kw 4.6 kw SI6.0H-11 (Sunny Island 6.0H) 4.6 kw 9.2 kw SI8.0H-11 (Sunny Island 8.0H) 6.0 kw 12 kw Three-phase SI3.0M-11 (Sunny Island 3.0M) 6.9 kw 13.8 kw SI4.4M-11 (Sunny Island 4.4M) 9.9 kw 13.8 kw SI6.0H-11 (Sunny Island 6.0H) 13.8 kw 27.6 kw SI8.0H-11 (Sunny Island 8.0H) 18.0 kw 36 kw If PV inverters are to be used in an SMA Flexible Storage System with battery-backup function, they must limit their active power as a function of frequency. SMA Solar Technology AG's suggestion for implementing frequency-dependent active power limitation is described in the following diagram. Figure 3: Suggestion for frequency-dependent active power limitation by the PV inverter (the frequencies are examples for Australia) Planning Guidelines SI-Ersatzstrom-PL-en-21 13
14 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function SMA Solar Technology AG Position Description 1 As long as power frequency remains at 50 Hz, the PV inverter feeds into the grid at its maximum available power. If power frequency rises to 50.2 Hz, the PV inverter starts to reduce its active power. Setting on the PV inverter: Set the difference P-HzStr between starting frequency and power frequency to 0.2 Hz.* 2 From a power frequency of 50.2 Hz, the PV inverter reduces its active power by 77% of the available maximum power per Hz. The power frequency is monitored by the PV inverter. Setting on the PV inverter: Set active power gradient P-WGra to 77%.* 3a If the power frequency continues to rise, the PV inverter further reduces its active power, reaching the value zero at 51.5 Hz. 3b If the power frequency remains constant at a value under 51.5 Hz or continues to fall, the PV inverter stops reducing active power. The PV inverter retains the current active power value and monitors power frequency. 4 Once the power frequency has fallen as far as Hz, the PV inverter starts to increase its active power. As long as the power frequency does not start to rise again, the PV inverter increases its active power by 10% of nominal power per minute up to the available maximum power. Settings on the PV inverter: Set the difference P-HzStop between the reset frequency and the power frequency to 0.05 Hz.* Set the active power gradient depending on reset frequency P-HzStopWGra to 10%.* * The value is an example valid for Australia. Adjustment of network-relevant parameters Since the locally applicable standards and directives do not stipulate frequency-dependent active power limitation everywhere, this control setting is not stored in all country data sets of the PV inverters. If frequency-dependent active power limitation is not stored in the country data set, some parameters of the PV inverter must be adjusted. Check at the planned installation site whether parameters of the PV inverter must be adjusted for frequency-dependent active power limitation (see the Quick Reference Guide "SMA Flexible Storage System with Battery-Backup Function" of the Sunny Island inverter). Coordinate the parameter adjustment with the grid operator. Always have this parameter adjustment carried out by qualified persons (see installation manual of the PV inverter). 4.6 Batteries Recommendations for Battery Capacity SMA Solar Technology AG recommends the following minimum battery capacities: Battery-backup system Single-phase battery-backup system with SI3.0M-11 Single-phase battery-backup system with SI4.4M-11 Single-phase battery-backup system with SI6.0H-11 Single-phase battery-backup system with SI8.0H-11 Three-phase battery-backup system with SI3.0M-11 Battery capacity for a ten-hour electric discharge (C10) 100 Ah 100 Ah 120 Ah 160 Ah 300 Ah 14 SI-Ersatzstrom-PL-en-21 Planning Guidelines
15 SMA Solar Technology AG 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function Battery-backup system Three-phase battery-backup system with SI4.4M-11 Three-phase battery-backup system with 3 SI6.0H-11 Three-phase battery-backup system with 3 SI8.0H-11 Battery capacity for a ten-hour electric discharge (C10) 300 Ah 360 Ah 480 Ah The minimum battery capacity must be observed to ensure stable operation of the system Selection of the Battery Type Lead-Acid Batteries The Sunny Island supports lead-acid batteries of types FLA and VRLA as well as various lithium-ion batteries. It is possible to connect batteries with a battery capacity of 100 Ah to 10,000 Ah (C10). Lithium-Ion Batteries Lithium-ion batteries are especially suited for intermediate storage of PV energy due to their high cycle stability. Lithium-ion batteries must be compatible with the Sunny Island: The battery must comply with the locally applicable standards and directives and be intrinsically safe. The battery must be approved for use with the Sunny Island. The list of lithium-ion batteries approved for the Sunny Island is updated regularly (see the Technical Information "List of Approved Lithium-Ion Batteries" at If no lithium-ion battery approved for the Sunny Island can be used, use a lead-acid battery. Lithium-ion batteries in battery-backup systems In order to meet the requirements of battery-backup systems in the event of grid failure, the Sunny Island has a high overload capacity. This overload capacity is subject to the battery being able to supply sufficient current. With lithium-ion batteries, this ampacity cannot be taken for granted. Check with the battery manufacturer whether the battery is suitable for an SMA Flexible Storage System with battery-backup function. Pay special attention to the ampacity. Ampacity must be especially high if the battery-backup grid is supplied by the Sunny Island in the event of grid failure. Planning Guidelines SI-Ersatzstrom-PL-en-21 15
16 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function SMA Solar Technology AG Capacity of the Battery Utilized by the SMA Flexible Storage System with Battery-Backup Function In many regions, the PV energy available largely depends on the season and the hours of sunshine. The Sunny Island offers the possibility of adjusting the battery management response to the installation site and the time. Figure 4: Ranges of the battery state of charge as a function of the season for the northern hemisphere (example) Range SlfCsmp PVRes BURes BatRes ProtRes Explanation Range for intermediate storage Range for the maintenance of the battery state of charge Range for battery-backup function Range for protection against deep discharge Range for protection in the event of deep discharge Due to the seasonal battery operation of the Sunny Island inverter, a larger range is reserved for the battery-backup function in winter than in summer. This makes sense, as consumption in summer is lower and the PV yield is also much higher. The limits for the ranges of battery state of charge are predetermined for lead-acid batteries and lithium-ion batteries by the following value ranges of the Sunny Island inverter. Range Lead-acid battery Lithium-ion battery* Shortest day Longest day Shortest day Longest day SlfCsmp 65% to 100% 45% to 100% 30% to 100% 28% to 100% PVRes 60% to 65% 40% to 45% 25% to 30 % 23% to 28% BURes 15% to 60% 15% to 40% 13% to 25% 13 % to 23% BatRes 10% to 15% 10% to 15% 3% to 13% 3% to 13% ProtRes 0% to 10% 0% to 10% 0% to 3% 0% to 3% * The value ranges for lithium-ion batteries reserve a smaller proportion of battery capacity for the battery-backup function: 10% of battery capacity in summer and 12% of battery capacity in winter. Therefore, the proportion available for intermediate storage is correspondingly larger. 16 SI-Ersatzstrom-PL-en-21 Planning Guidelines
17 SMA Solar Technology AG 4 Conditions of Use of an SMA Flexible Storage System with Battery-Backup Function 4.7 Sunny Island The maximum power consumption of the loads during the day and the type of battery-backup system determine the device type and the number of Sunny Island inverters. In a single-phase battery-backup system, for example, the maximum power consumption of the loads must be less than the maximum power of the Sunny Island inverter for a duration of 30 minutes at 25 C. Type of battery-backup system Maximum power of the Sunny Island inverter for 30 minutes at 25 C Device type of the Sunny Island inverter Number of the Sunny Island inverters Single-phase 3.0 kw SI3.0M-11 (Sunny Island 3.0M) kw SI4.4M-11 (Sunny Island 4.4M) 6 kw SI6.0H-11 (Sunny Island 6.0H) 8 kw SI8.0H-11 (Sunny Island 8.0H) Three-phase 9.0 kw SI3.0M-11 (Sunny Island 3.0M) kw SI4.4M-11 (Sunny Island 4.4M) 18 kw SI6.0H-11 (Sunny Island 6.0H) 24 kw SI8.0H-11 (Sunny Island 8.0H) Short-Term Overload during Grid Failure Short-term overload peaks of the loads can be compensated by the Sunny Island within its technical power limits (see installation manual of the Sunny Island inverter at However, the DC cables from the Sunny Island inverter to the battery fuse box and to the battery must be designed to withstand this overload operation. 4.8 Required in Great Britain and Northern Ireland: External Grid and PV System Protection When using the SMA Flexible Storage System with battery-backup function in Great Britain and Northern Ireland, an external grid and PV system protection must be installed. Contact your grid operator to check which standards are locally applicable for the planned battery-backup system: G83/2: Engineering Recommendation G83, Issue 2 G59/3: Engineering Recommendation G59, Issue 3 This standard must comply with the external grid and PV system protection. Planning Guidelines SI-Ersatzstrom-PL-en-21 17
18 5 Electrical Connection SMA Solar Technology AG 5 Electrical Connection 5.1 Single-Phase Battery-Backup System with All-Pole Disconnection Schematic Diagram of the Automatic Transfer Switch Figure 5: Schematic diagram of the single-phase automatic transfer switch with all-pole disconnection (e.g. for Germany) 18 SI-Ersatzstrom-PL-en-21 Planning Guidelines
19 SMA Solar Technology AG 5 Electrical Connection Circuitry Overview Figure 6: Circuitry overview of a single-phase battery-backup system with all-pole disconnection (e.g. for Germany) Planning Guidelines SI-Ersatzstrom-PL-en-21 19
20 5 Electrical Connection SMA Solar Technology AG 5.2 Three-Phase Battery-Backup System with All-Pole Disconnection Schematic Diagram of the Automatic Transfer Switch Figure 7: Schematic diagram of the three-phase automatic transfer switch with all-pole disconnection (e.g. for Germany) 20 SI-Ersatzstrom-PL-en-21 Planning Guidelines
21 SMA Solar Technology AG 5 Electrical Connection Circuitry Overview Figure 8: Circuitry overview of a three-phase battery-backup system with all-pole disconnection (e.g. for Germany) Planning Guidelines SI-Ersatzstrom-PL-en-21 21
22 5 Electrical Connection SMA Solar Technology AG 5.3 Single-Phase Battery-Backup System without All-Pole Disconnection Schematic Diagram of the Automatic Transfer Switch Figure 9: Schematic diagram of the single-phase automatic transfer switch without all-pole disconnection (e.g. for Australia) 22 SI-Ersatzstrom-PL-en-21 Planning Guidelines
23 SMA Solar Technology AG 5 Electrical Connection Circuitry Overview Figure 10: Circuitry overview of a single-phase battery-backup system without all-pole disconnection (e.g. for Australia) Planning Guidelines SI-Ersatzstrom-PL-en-21 23
24 5 Electrical Connection SMA Solar Technology AG 5.4 Three-Phase Battery-Backup System without All-Pole Disconnection Schematic Diagram of the Automatic Transfer Switch Figure 11: Schematic diagram of the three-phase automatic transfer switch without all-pole disconnection (e.g. for Australia) 24 SI-Ersatzstrom-PL-en-21 Planning Guidelines
25 SMA Solar Technology AG 5 Electrical Connection Circuitry Overview Figure 12: Circuitry overview of a three-phase battery-backup system without all-pole disconnection (e.g. for Australia) Planning Guidelines SI-Ersatzstrom-PL-en-21 25
26 6 Automatic Transfer Switch SMA Solar Technology AG 6 Automatic Transfer Switch 6.1 Requirements of VDE Application Guide The requirements below apply only for systems for which the following properties are all applicable: The system is a self-consumption system and/or battery-backup system. The system is installed in Germany. Currently, only the grid operators in Germany require compliance with the above-mentioned Application Guide. In accordance with the scope of VDE application guide , a manufacturer's system is regarded as a complete energy storage system only if products are used that have been approved by the manufacturer (for lithium-ion batteries see the technical information "List of Approved Lithium-Ion Batteries" at If products are used that have not been approved by SMA Solar Technology AG, the installer is deemed to be the manufacturer of the system. The requirements of VDE application guide are fulfilled if the installation is carried out in the accordance with the technical documentation of the Sunny Island inverter. 6.2 Procurement of the Automatic Transfer Switch It is recommend that you order the automatic transfer switch as a complete switch cabinet unit. Technical characteristics Procurement From enwitec electronic GmbH & Co.KG: Single-phase Three-phase With all-pole disconnection X X Order from enwitec electronic GmbH & Co.KG or set up independently. X X Order from enwitec electronic GmbH & Co.KG or set up independently. * This automatic transfer switch is approved by SMA Solar Technology AG. Article number * * X Set up independently X Set up independently It is also possible to procure the required devices of the automatic transfer switch from specialist dealers and to build the switch cabinet independently. In Germany, the application guide must be observed. No connection of loads or PV system to the automatic transfer switch The automatic transfer switch is not a distribution board for the loads or the PV system. You must install the necessary protective devices for the loads and the PV system in addition. Dimensioning of the tie switch Regardless of all-pole or non-all-pole disconnection, you must adjust the ampacity of the tie switch in accordance with the local requirements (see Section 4.1 "Certifications and Licenses", page 10). The tie switch must be designed for at least the tripping range of the upstream fuse or the maximum short-circuit current of the PV system. Cable route for control cables and measuring cables in the automatic transfer switch In order to avoid quality losses during the transmission of control signals and measured values, always observe the following rule for the cable route in the automatic transfer switch: Lay the control and measuring cables at the greatest possible distance from the power cables. or Use shielded cables for the control and measuring cables. 26 SI-Ersatzstrom-PL-en-21 Planning Guidelines
27 SMA Solar Technology AG 6 Automatic Transfer Switch 6.3 Information on the connection of the automatic transfer switch Use a separate cable as a measuring cable for monitoring the tie switch. This will help prevent disturbances during the transmission of signals (see Quick Reference Guide "SMA Flexible Storage System with Battery-Backup Function" of the Sunny Island inverter). 6.4 Automatic Transfer Switch for Single-Phase Battery-Backup System with All-Pole Disconnection Material List The following table summarizes the configuration of the automatic transfer switch as suggested in the schematic diagram for a single-phase battery-backup system with all-pole disconnection (e.g. for Germany). You will need to procure the material from your distributor. Design of the devices in the automatic transfer switch The indicated values for the devices are recommended by SMA Solar Technology AG. The electrical devices must be designed in accordance with the locally applicable standards and directives. Position Material Number of units F1 F2 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Residual-current device for control and measuring cables* Description 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s 1 40 A/0.03 A, 1-pole + N, type A F3, F4 Circuit breaker for protection of phase coupling** 2 32 A, C rating, 1-pole F5 Thermal fuse for protecting the control cables and for protecting the multifunction relay in the 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s Sunny Island F6 Circuit breaker for protection of the Sunny Island 1 32 A, C rating, 1-pole F7 Residual-current device 1 40 A/0.03 A, 1-pole + N, type A Q1 Contactor for grid disconnection V, 63 A at AC-1, AC-7a, 4 no Q2 Contactor for grid disconnection V, 63 A at AC-1, AC-7a, 4 no Auxiliary switch for feedback 1 1 nc Q3 Contactor for grounding device V, 40 A at AC-1, AC-7a, 2 no 2 nc Auxiliary switch for Q1 locking mechanism 1 1 no Q4 Contactor for grounding device V, 40 A at AC-1, AC-7a, 2 no 2 nc Q6 Phase coupling contactor** V, 63 A at AC-1, AC-7a, 2 no Planning Guidelines SI-Ersatzstrom-PL-en-21 27
28 6 Automatic Transfer Switch SMA Solar Technology AG Position Material Number of units X1 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X2 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X3 3-conductor through terminal 1 10 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 10 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 10 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X4 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X5 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal (L) 1 6 mm², 1-pole, 3 contact points, gray 3-conductor through terminal (N) 1 6 mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 2 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm * Required in TT grid configuration only ** Optional Description 28 SI-Ersatzstrom-PL-en-21 Planning Guidelines
29 SMA Solar Technology AG 6 Automatic Transfer Switch Configuration Suggestion Figure 13: Configuration suggestion for single-phase automatic transfer switch with all-pole disconnection (e.g. for Germany) 6.5 Automatic Transfer Switch for Three-Phase Battery-Backup System with All-Pole Disconnection Material List The following table summarizes the configuration of the automatic transfer switch as suggested in the schematic diagram for a three-phase battery-backup system with all-pole disconnection (e.g. for Germany). You will need to procure the material from your distributor. Design of the devices in the automatic transfer switch The indicated values for the devices are recommended by SMA Solar Technology AG. The electrical devices must be designed in accordance with the locally applicable standards and directives. Position Material Number of units F1 F2 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Residual-current device for control and measuring cables* Description 3 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s 1 40 A/0.03 A, 3-pole + N, type A Planning Guidelines SI-Ersatzstrom-PL-en-21 29
30 6 Automatic Transfer Switch SMA Solar Technology AG Position Material Number of units F5 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Description 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s F6 Circuit breaker for protection of the Sunny Island 3 32 A, C rating, 1-pole F7 Residual-current device 1 40 A/0.03 A, 3-pole + N, type A Q1 Contactor for grid disconnection V, 63 A at AC-1, AC-7a, 4 no Q2 Contactor for grid disconnection V, 63 A at AC-1, AC-7a, 4 no Auxiliary switch for feedback 1 1 nc Q3 Contactor for grounding device V, 40 A at AC-1, AC-7a, 2 no 2 nc Auxiliary switch for Q1 locking mechanism 1 1 no Q4 Contactor for grounding device V, 40 A at AC-1, AC-7a, 2 no 2 nc X1 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X2 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X3 3-conductor through terminal 3 10 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 3 10 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 3 10 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm 30 SI-Ersatzstrom-PL-en-21 Planning Guidelines
31 SMA Solar Technology AG 6 Automatic Transfer Switch Position Material Number of units X4 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X5 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal (N) 1 6 mm², 1-pole, 3 contact points, gray 3-conductor through terminal (L) 1 6 mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 2 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm * Required in TT grid configuration only Description Planning Guidelines SI-Ersatzstrom-PL-en-21 31
32 6 Automatic Transfer Switch SMA Solar Technology AG Configuration Suggestion Figure 14: Configuration suggestion for three-phase automatic transfer switch with all-pole disconnection (e. g. for Germany) 6.6 Automatic Transfer Switch for Single-Phase Battery-Backup System without All-Pole Disconnection Material List The following table summarizes the configuration of the automatic transfer switch as suggested in the schematic diagram for a single-phase battery-backup system without all-pole disconnection (e.g. for Australia). You will need to procure the material from your distributor. Design of the devices in the automatic transfer switch The indicated values for the devices are recommended by SMA Solar Technology AG. The electrical devices must be designed in accordance with the locally applicable standards and directives. 32 SI-Ersatzstrom-PL-en-21 Planning Guidelines
33 SMA Solar Technology AG 6 Automatic Transfer Switch Position Material Number of units F1 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Description 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s F3, F4 Circuit breaker for protection of phase coupling* 2 32 A, C rating, 1-pole F5 Thermal fuse for protecting the control cable and for protecting the multifunction relay in the 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s Sunny Island F6 Circuit breaker for protection of the Sunny Island 1 32 A, C rating, 1-pole F7 Residual-current device 1 40 A/0.03 A, 1-pole + N, type A Q2 Contactor for grid disconnection V, 63 A at AC-1, AC-7a, 4 no Auxiliary switch for feedback 1 1 nc Q6 Phase coupling contactor* V, 63 A at AC-1, AC-7a, 2 no X1 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X2 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X3 3-conductor through terminal 1 10 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 10 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 10 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm Planning Guidelines SI-Ersatzstrom-PL-en-21 33
34 6 Automatic Transfer Switch SMA Solar Technology AG Position Material Number of units X4 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X5 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal (L) 1 6 mm², 1-pole, 3 contact points, gray 3-conductor through terminal (N) 1 6 mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 2 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm *Optional 6.7 Automatic Transfer Switch for Three-Phase Battery-Backup System without All-Pole Disconnection Material List The following table summarizes the configuration of the automatic transfer switch as suggested in the schematic diagram for a three-phase battery-backup system without all-pole disconnection (e.g. for Australia). You will need to procure the material from your distributor. Design of the devices in the automatic transfer switch The indicated values for the devices are recommended by SMA Solar Technology AG. The electrical devices must be designed in accordance with the locally applicable standards and directives. Position Material Number of units F1 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Description Description 3 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s F6 Circuit breaker for protection of the Sunny Island 3 32 A, C rating, 1-pole F7 Residual-current device 1 40 A/0.03 A, 3-pole + N, type A Q2 Contactor for grid disconnection V, 63 A at AC-1, AC-7a, 4 no Auxiliary switch for feedback 1 1 nc X1 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm 34 SI-Ersatzstrom-PL-en-21 Planning Guidelines
35 SMA Solar Technology AG 6 Automatic Transfer Switch Position Material Number of units Description X2 3-conductor through terminal 3 16 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 1 16 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X3 3-conductor through terminal 3 10 mm², 1-pole, 3 contact points, gray 3-conductor through terminal 3 10 mm², 1-pole, 3 contact points, blue 3-conductor through terminal 3 10 mm², 1-pole, 3 contact points, yellow-green End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X4 3-conductor through terminal mm², 1-pole, 3 contact points, gray 3-conductor through terminal mm², 1-pole, 3 contact points, blue End plate for through terminal, 3-conductor 1 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm X5 3-conductor through terminal mm², 1-pole, 3 contact points, gray End plate for through terminal, 3-conductor 2 Group marker carrier for end clamp 1 End clamp 1 Width: 10 mm 6.8 Operating Principle of the Automatic Transfer Switch Differences between automatic transfer switches for single-phase and three-phase battery-backup systems This section describes the operating principle of the automatic transfer switch as exemplified by the single-phase battery-backup system with all-pole disconnection (see Section 5.1, page 18). The function of the tie switch and grounding device of a three-phase automatic transfer switch is analogous to that of the single-phase automatic transfer switch. In battery-backup systems without all-pole disconnection, no grounding device is required. Phase coupling is only suitable for battery-backup grids with single-phase PV inverters and single-phase loads. Planning Guidelines SI-Ersatzstrom-PL-en-21 35
36 6 Automatic Transfer Switch SMA Solar Technology AG Tie Switch with All-Pole Disconnection (e.g. for Germany) The tie switch with all-pole disconnection comprises the contactors Q1 and Q2. The tie switch disconnects the battery-backup grid from the utility grid in the event of grid failure or if the utility grid has breached the thresholds for voltage and frequency. The control voltage of the contactors Q1, Q2 and Q3 is equal to the voltage at the line conductor L1 of the utility grid. This means that the tie switch can only be activated when grid voltage is present. Contactor Q3 controls contactor Q1. Contactors Q3 and Q2 are controlled by the multifunction relay Relay 1 of the Sunny Island inverter. When the multifunction relay Relay 1 is in non-operative mode, contactors Q2 and Q3 will be activated. If contactor Q3 is in non-operative mode, contactor Q1 will also go into non-operative mode and be locked. In the event of grid failure, contactors Q1, Q2 and Q3 go into non-operative mode due to lack of control voltage and disconnect the battery-backup grid from the utility grid at all poles. The Sunny Island also measures the voltage of the utility grid. When a deviation from country-specific voltage and frequency thresholds of the utility grid occurs, the multifunction relay Relay 1 is activated. The contactors Q1, Q2, and Q3 remain in non-operative mode or go into non-operative mode. When the utility grid is restored, this is detected by the Sunny Island. The Sunny Island synchronizes the battery-backup grid with the utility grid. Following successful synchronization, Relay 1 goes into non-operative mode and the contactors Q2 and Q3 are activated. Contactor Q3 unlocks contactor Q1 and Q1 is activated. The battery-backup grid is again connected to the utility grid. Tie Switch without All-Pole Disconnection (e.g. for Australia) The tie switch without all-pole disconnection consists of contactor Q2. The tie switch disconnects the battery-backup grid from the utility grid in the event of grid failure or if the utility grid has breached the thresholds for voltage and frequency. The control voltage of contactor Q2 is the voltage at the line conductor L1 of the utility grid. This means that the tie switch can only be activated when grid voltage is present. Contactor Q2 is controlled by the multifunction relay Relay1 of the Sunny Island inverter. When Relay 1 is in non-operative mode, contactor Q2 is activated. In the event of grid failure, contactor Q2 is deactivated due to lack of control voltage and disconnects the battery-backup grid from the line conductors of the utility grid. The Sunny Island also measures the voltage of the utility grid. When a deviation from the country-specific voltage and frequency thresholds of the utility grid occurs, the multifunction relay Relay 1 is activated. Contactor Q2 remains in non-operative mode or goes into non-operative mode. When the utility grid is restored, this is detected by the Sunny Island. The Sunny Island synchronizes the battery-backup grid with the utility grid. Following successful synchronization, Relay 1 goes into non-operative mode and contactor Q2 is activated. The battery-backup grid is again connected to the utility grid. Grounding Device Contactors Q3 and Q4 form the grounding device. Contactors Q3 and Q4 are controlled by the two multifunction relays of the Sunny Island inverter. Triggering of contactor Q3 occurs simultaneously with contactor Q2 of the tie switch. When the tie switch is closed, contactor Q3 connects the neutral conductor in the battery-backup grid to the grounding conductor. In addition, the Sunny Island uses the multifunction relay Relay 2 to control contactor Q4. When the multifunction relay Relay 2 is activated, the contactor Q4 is activated and also connects the neutral conductor to the grounding conductor. This arrangement ensures that the neutral conductor of the battery-backup grid is always connected to ground. Phase coupling Contactor Q6 is the phase coupler. When the multifunction relay Relay 2 is activated on the Sunny Island, this activates contactor Q6 and connects the unsupplied line conductors via circuit breakers F3 and F4 with the supplied line conductor. 36 SI-Ersatzstrom-PL-en-21 Planning Guidelines
37 SMA Solar Technology AG 7 Installation Site 7 Installation Site The following products within the SMA Flexible Storage System with battery-backup function impose requirements on the installation site which must be taken into account at the planning stage. Sunny Island 3.0M/4.4M/6.0H/8.0H with battery Sunny Remote Control BatFuse B.01/B.03 SMA Energy Meter Sunny Home Manager The requirements made on the installation site of the automatic transfer switch are listed in the manufacturer documentation of the switch cabinet and its components. With reference to the entire battery-backup system, the following requirements should be taken into account from the initial planning stage: The minimum clearances to walls, objects, SMA products or other technical devices must be complied with. The ambient conditions must meet the requirements of the individual products towards the installation site. The maximum cable routes and radio ranges between the installed SMA products to one another and to other devices must be feasible. The cable cross-sections and the conductor materials of the cables used must meet the requirements of the specified products. The battery room must meet the requirements of the battery manufacturer. Links to additional information can be found at Document title Sunny Island 3.0M/4.4M/6.0H/8.0H Sunny Remote Control BatFuse SMA Energy Meter Sunny Home Manager Document type Installation Manual Mounting Instructions Installation Manual Installation Manual Installation Manual Planning Guidelines SI-Ersatzstrom-PL-en-21 37
38 8 Glossary SMA Solar Technology AG 8 Glossary Automatic transfer switch with battery-backup function The automatic transfer switch with battery-backup function disconnects the battery-backup grid from the utility grid. Battery-Backup Grid A battery-backup grid is that part of a household grid which is supplied by the battery-backup system in the event of grid failure. Battery-Backup System A battery-backup system provides an electricity supply for loads in case of grid failure. In this case, the battery-backup system switches automatically from the utility grid to the alternative energy source. In this document, the SMA Flexible Storage System with battery-backup function is referred to as battery-backup system. Battery Charging Battery charging is the power that is currently being charged to the battery. Battery Discharging Battery discharging is the power that is currently being drawn from the battery. Battery discharging takes place when the energy demand of the loads exceeds the current power of the PV system. Bridging Time The bridging time is the time from the grid failure until restoration of the utility grid which is bridged by the battery-backup system. Grid Failure A grid failure is an outage of the utility grid. If the utility grid deviates from the country-specific thresholds for voltage and frequency, the Sunny Island will react in the same way as if a utility grid failure has occurred. Intermediate Storage Intermediate storage in a battery is a means of energy management. It enables the consumption of PV energy irrespective of the time of generation, e.g. in the evening or during bad weather. This allows to operate even time-controlled electrical appliances with PV energy. Internal Power Supply With internal power supply, the loads in your household cover their energy demand with PV energy generated on site. Internal power supply is made up of direct consumption and battery discharging. Self-Consumption Self-consumption is a measure of the amount of PV energy used at the point of generation or in the immediate vicinity. Self-consumption is made up of direct consumption and battery charging. Self-Consumption Quota The self-consumption quota is the current ratio of self-consumption to PV generation. Switching Time The switching time is the time needed by the battery-backup system to restore the supply of the loads in case of grid failure. 38 SI-Ersatzstrom-PL-en-21 Planning Guidelines
39 SMA Solar Technology AG 9 Appendix 9 Appendix 9.1 Single-Phase Battery-Backup System in Belgium Schematic Diagram of the Automatic Transfer Switch Figure 15: Schematic diagram of the single-phase automatic transfer switch with all-pole disconnection for Belgium Planning Guidelines SI-Ersatzstrom-PL-en-21 39
40 9 Appendix SMA Solar Technology AG Circuitry overview Figure 16: Connection of the single-phase automatic transfer switch with all-pole disconnection for Belgium 40 SI-Ersatzstrom-PL-en-21 Planning Guidelines
41 SMA Solar Technology AG 9 Appendix 9.2 Three-Phase Battery-Backup System in Belgium Schematic Diagram of the Automatic Transfer Switch Figure 17: Schematic diagram of the three-phase automatic transfer switch with all-pole disconnection Planning Guidelines SI-Ersatzstrom-PL-en-21 41
42 9 Appendix SMA Solar Technology AG Circuitry overview Figure 18: Connection of the three-phase automatic transfer switch with all-pole disconnection for Belgium 42 SI-Ersatzstrom-PL-en-21 Planning Guidelines
43 SMA Solar Technology AG 9 Appendix 9.3 Configuration of the automatic transfer switches for Belgium Automatic Transfer Switch for Single-Phase Battery-Backup System in Belgium The following table summarizes only the configuration of the automatic transfer switch as suggested in the schematic diagram for the use in Belgium. You will need to procure the material from your distributor. Design of the devices in the automatic transfer switch The indicated values for the devices are recommended by SMA Solar Technology AG. The electrical devices must be designed in accordance with the locally applicable standards and directives. Position Material Number of units F1 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Description 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s, all poles F2, F3, F4 (see Section 6.4, page 27) F5 Thermal fuse for protecting the control cables and for protecting the multifunction relay in the 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s, all poles Sunny Island F6 Circuit breaker for protection of the Sunny Island 1 32 A, C rating, all poles F7 (see Section 6.4, page 27) F8 Residual-current device 1 63 A/0.3 A, 3-pole + N, type A Q1 Q6 (see Section 6.4, page 27) X1 X Automatic Transfer Switch for Three-Phase Battery-Backup System in Belgium The following table summarizes only the configuration of the automatic transfer switch as suggested in the schematic diagram for the use in Belgium. You will need to procure the material from your distributor. Design of the devices in the automatic transfer switch The indicated values for the devices are recommended by SMA Solar Technology AG. The electrical devices must be designed in accordance with the locally applicable standards and directives. Position Material Number of units F1 Thermal fuse for protecting the control cables and measuring cables and for protecting the multifunction relay in the Sunny Island Description 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s, all poles F2 (see Section 6.5, page 29) F5 Thermal fuse for protecting the control cables and for protecting the multifunction relay in the 1 1 A, cold resistance of at least 0.2 Ω, melting integral of max. 1 A²s, all poles Sunny Island F6 Circuit breaker for protection of the Sunny Island 1 32 A, C rating, 1-pole, all poles F7 (see Section 6.5, page 29) F8 Residual-current device 1 63 A/0.3 A, 3-pole + N, type A Q1 Q4 (see Section 6.5, page 29) X1 X5 Planning Guidelines SI-Ersatzstrom-PL-en-21 43
44 SMA Solar Technology
sma FlexIble storage system
sma FlexIble storage system now even more attractive with the german incentive program for storage systems easy to use efficient Flexible Future-proof Comprehensive and easy-to-understand visualizations
Criteria for Selecting a Residual-Current Device
Criteria for Selecting a Residual-Current Device Use of Residual-Current Devices for SUNNY BOY, SUNNY MINI CENTRAL and SUNNY TRIPOWER Content When installing inverters, there are often uncertainties when
Three phase connection
Three phase connection with SUNNY MINI CENTRAL Contents The inverters of the Sunny Mini Central product family have been especially conceived for their use in threephase feed-in systems. This technical
SUNNY TRIPOWER 5000TL 12000TL
SUNNY TRIPOWER 5000TL 12000TL STP 5000TL-20 / STP 6000TL-20 / STP 7000TL-20 / STP 8000TL-20 / STP 9000TL-20 / STP 10000TL-20 / STP 12000TL-20 NEW available as 10 kva and 12 kva versions Economical Flexible
Operating Manual SUNNY ISLAND 3.0M / 4.4M / 6.0H / 8.0H SUNNY REMOTE CONTROL
Operating Manual SUNNY ISLAND 3.0M / 4.4M / 6.0H / 8.0H SUNNY REMOTE CONTROL SI30M-44M-60H-80H-BE-en-32 Version 3.2 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained
Medium-voltage Transformers
Technical Information Medium-voltage Transformers Important requirements for medium-voltage transformers for SUNNY BOY, SUNNY MINI CENTRAL and SUNNY TRIPOWER Contents This document describes the requirements
Accessories SUNNY REMOTE CONTROL
Accessories SUNNY REMOTE CONTROL Mounting Instructions SRC20-MO-IEN121010 IMEN-SRC20 Version 1.0 EN SMA Solar Technology AG 1 Information on this Document 1 Information on this Document Validity This
Technical Information Short-Circuit Currents Information on short-circuit currents of SMA PV inverters
Technical Information Short-Circuit Currents Information on short-circuit currents of SMA PV inverters Content During grid failures as for example voltage dips, all PV inverters may generate currents that
PV And Storage: Solutions with Potential
EN PV And Storage: Solutions with Potential Energy on demand with the Sunny Central Storage Large-scale storages... support the growth of renewable energies complete diesel and solar diesel hybrid systems
Sunny Family 2012 PRODUCT CATALOG
Sunny Family 2012 PRODUCT CATALOG » Although each PV plant is unique, SMA has the right solution for all demands. SUNNY BOY 1.6 to 5 kw SUNNY MINI CENTRAL 5 to 11 kw SUNNY TRIPOWER 10 to 20 kw SUNNY CENTRAL
Communication Interface for SMA Inverters SMA BLUETOOTH PIGGY-BACK
Communication Interface for SMA Inverters SMA BLUETOOTH PIGGY-BACK Installation Guide BTPB-IEN112112 98-0014212 Version 1.2 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Notes on this
instabus KNX / EIB System System E F G H
Product name: Uninterruptible power supply (USV) 640 ma Design: REG (rail-mounted device) Article-no.: 1079 00 ETS search path: Gira Giersiepen / system components / power supply / power supply 640mA DRA
BETA Switching. Switching Devices. 5TT5 8 Insta contactors, AC technology. Overview
BETA Switching Siemens AG 200 5TT5 Insta contactors, AC technology Overview The 5TT5 Insta contactors are equipped with an AC magnetic system and are ideal for use under harsh conditions. The auxiliary
Technical Information Battery Management of the Sunny Island Gentle charging control for lead-acid batteries based on current state of the battery
Technical Information Battery Management of the Sunny Island Gentle charging control for lead-acid batteries based on current state of the battery Content Exact determination of the state of charge is
Electronic overload relay EF65, EF96 and EF146
Data sheet Electronic overload relay EF65, EF96 and EF146 Electronic overload relays offer reliable protection in case of overload and phase-failure. They are the alternative to thermal overload relays.
Anti-blackout system for grid connected solar installations (Solsafe concept)
Anti-blackout system for grid connected solar installations (Solsafe concept) General description The Solsafe concept is a system which will automatically switch from a grid feeding inverter connected
ABB central inverters PVS800 100 to 1000 kw
Solar inverters ABB central inverters PVS800 100 to 1000 kw ABB central inverters raise reliability, efficiency and ease of installation to new levels. The inverters are aimed at system integrators and
Electronic overload relay EF19 and EF45
Data sheet Electronic overload relay EF19 and EF45 Electronic overload relays offer reliable protection in case of overload and phase-failure. They are the alternative to thermal overload relays. Motor
Operating Manual POWER PLANT CONTROLLER
Operating Manual POWER PLANT CONTROLLER PPC-BE-P7-en-13 98-113900.02 Version 1.3 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in this document is the property
/ The personal storage solution for 24H Sun. / Dynamic Peak Manager. / Smart Grid Ready THREE-PHASE
Perfect Welding Solar Energy Perfect Charging FRONIUS ENERGY PACKAGE The personal storage solution for 24H Sun. PC board replacement process SnapINverter technology Integrated data communication Dynamic
4KVA/5KVA Parallel Installation Guide
4KVA/5KVA Parallel Installation Guide 1. Introduction This inverter can be used in parallel with two different operation modes. 1. Parallel operation in single phase with up to 4 units. The supported maximum
User s Manual Before using the inverter, you need to read and save the safety instructions.
User s Manual Before using the inverter, you need to read and save the safety instructions. STI SERIES (STI200, STI300, STI500, STI700, STI1000) Power Frequency Pure Sine Wave Inverter The information
Bimetallic Overload Relay Specifications
Technical Data Bimetallic Overload Relay Specifications Bulletin Number 193K, 193T1 Topic Page Product Overview 2 Standards compliance and Certifications 2 General Specifications 193K 3 Approximate Dimensions
Technical Information POWER PLANT CONTROLLER
Technical Information POWER PLANT CONTROLLER Content The Power Plant Controller offers intelligent and flexible solutions for the control of all PV power plants in the megawatt range. It is suitable for
Thyristor-controlled power supplies and battery chargers
Thyristor-controlled power supplies and battery chargers Input voltage: 115 / 230 VAC, single phase, 50 / 60 Hz or 208 / 400 / 480 VAC, three phases, 50 / 60 Hz Output voltage: 12 / 24 / 48 / 60 / 72 /
APPLICATION NOTE USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS. Abstract.
USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS Abstract This application note describes the necessary procedure to use a standard Pacific Power Source Model
User Manual. Hybrid 1KW-5KW INVERTER / CHARGER. Version: 1.1
User Manual Hybrid 1KW-5KW INVERTER / CHARGER Version: 1.1 Table of Contents ABOUT THIS MANUAL... 1 Purpose... 1 Scope... 1 SAFETY INSTRUCTIONS... 1 INTRODUCTION... 2 Product Overview... 3 INSTALLATION...
Photovoltaic Solar Energy Unit EESFB
Technical Teaching Equipment Photovoltaic Solar Energy Unit EESFB Products Products range Units 5.-Energy Electronic console PROCESS DIAGRAM AND UNIT ELEMENTS ALLOCATION Worlddidac Member ISO 9000: Quality
Sunny Boy Accessories SMA POWER BALANCER
Sunny Boy Accessories SMA POWER BALANCER Installation Guide SBUS-PowBal-IUS102810 IMUS-SBUS-PBL Version 1.0 US SMA America, LLC Legal Restrictions Copyright 2010 SMA America, LLC. All rights reserved.
Firmware Update with SD Card SUNNY BOY WINDY BOY SUNNY TRIPOWER
Firmware Update with SD Card SUNNY BOY WINDY BOY SUNNY TRIPOWER Technical Description NG_UpdSD-TB-en-32 Version 3.2 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Information on this
Grid Connected Storage Various Applications Realised with Proven Technologies. Wilhelm van Butselaar Clean Energy Week 2013, Brisbane July 2013
Grid Connected Storage Various Applications Realised with Proven Technologies Wilhelm van Butselaar Clean Energy Week 2013, Brisbane July 2013 Disclaimer IMPORTANT LEGAL NOTICE This presentation does not
Catalog. Modular DIN rail components Installation contactors
Catalog Modular DIN rail components Installation contactors 0 CDC00C00 Installation contactors Benefits and features Overview Ordering details ESB installation contactors ESB0 ESB ESB0 ESB 7 EN installation
PID - The Problem and How to Solve It
Technical Information PID - The Problem and How to Solve It Module Regeneration with the PV Offset Box Content Potential Induced Degradation (PID) is a phenomenon which affects some PV modules with crystalline
46120-F0 Solar Energy Training System
46120-F0 Solar Energy Training System LabVolt Series Datasheet Festo Didactic en 120 V - 60 Hz 06/2016 Table of Contents General Description 2 List of Equipment 2 List of Manuals 3 Table of Contents of
Quick Connect. quick - simple - efficient. www.g-mw.de
Quick Connect quick - simple - efficient www.g-mw.de Phone: +49 9103 7129-0 Fax: +49 9103 7129-207 Innovative connection technology to plug three single-phase current transformers to multifunctional power
Installation Manual SMA CLUSTER CONTROLLER
Installation Manual SMA CLUSTER CONTROLLER ClusterController-IA-en-15 Version 1.5 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in these documents is property
ACS-30-EU-EMDR-10-MOD
Multi-application heat tracing Control and Monitoring in commercial and residential buildings Roof & Gutter de-icing sensor module Technical Information Approvals Module IP rating Ambient operating temperature
Fronius IG Plus. The next generation grid-connected PV inverter
Fronius IG Plus The next generation grid-connected PV inverter Maximum energy harvest cloudy or clear The first complete inverter solution. Reliable. Proven. Smart. An outstanding addition to the family:
Technical Description. Transistor D.C. Chopper Controller Type GS 24 S
Technical Description Transistor D.C. Chopper Controller Type GS 24 S Table of contents 1. Getting started guide 2. General information 2.1. Characteristics 2.2. Accessories 3. Information about the Machine
SP 4K/5K Efecto & SP 5K Brilliant Parallel Installation Guide 1. Introduction
SP 4K/5K Efecto & SP 5K Brilliant Parallel Installation Guide 1. Introduction This inverter can be used in parallel with two different operation modes. 1. Parallel operation in single phase with up to
Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity
Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more
Manual. Solar Fountain Mobile Phone Charger
EN Manual Solar Fountain Mobile Phone Charger Copyrights 2008 Victron Energy B.V. All Rights Reserved This publication or parts thereof may not be reproduced in any form, by any method, for any purpose.
Bulletin 150 Smart Motor Controllers SMC-3 Smart Motor Controller
Overview/Modes of Operation Bulletin 150 Smart Motor Controller The SMC-3 is a compact, simple to use, solid-state motor controller designed to operate 3-phase motors. It features a built-in overload relay
Monitor Simply and Securely
Monitor Simply and Securely Solar Monitoring Systems from SMA Solar Monitoring Systems from SMA MONITORING, INFORMING, PRESENTING Securing yield easily for small, large and very large solar power systems
SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS
SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE S By Jack Farrow, May, 2004 WELDING TECHNOLOGY CORPORATION ABSTRACT Information on how to select the correct size of substation transformer and 480V bus to
Technical Information Requirement for MV transformers and transformer for internal power supplies for SUNNY CENTRAL
Technical Information Requirement for MV transformers and transformer for internal power supplies for SUNNY CENTRAL SC_Trafo-TI-en-62 Version 6.2 ENGLISH Table of Contents SMA Solar Technology Table of
Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated. Ordering information
Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated Ordering information Connection technique Description Description Rated operational current Screw terminals 3 pole AC
PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS
PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS Michael Müller 1, Roland Bründlinger 2, Ortwin Arz 1, Werner Miller 1, Joachim Schulz 2, Georg Lauss 2 1. STECA ELEKTRONIK GMBH, Mammostr.
How can a charging station for electric vehicles be set up simply and safely?
SB18 Building > Electromobility > Charging Station Design How can a charging station for electric vehicles be set up simply and safely? Requirement In order to supply electric vehicles with electric power,
Positive-guided relay outputs: 3 safety contacts (N/O), instantaneous. 1 auxiliary contact (N/C), instantaneous
Safety relay for monitoring E-STOP pushbuttons. Approvals Unit features Positive-guided relay outputs: 3 safety contacts (N/O), instantaneous 1 auxiliary contact (N/C), instantaneous Safe separation of
Inverter / Charger Installation General Operations and AC and DC Connections
Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better
Power transformers. Special transformers Railway
Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together
CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN
CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN 5.1 Introduction So far in the development of this research, the focus has been to estimate the available insolation at a particular location on the earth s surface
A Solar Powered Cellular Base Station
Technical Whitepaper SolarConnect Energy management solution for Base Stations A Solar Powered Cellular Base Station Many people in emerging markets like India live in rural areas with limited access to
ABB 1 NEW. Three-phase monitoring relay for grid feeding CM-UFS.1. Data sheet. Features. Approvals. Marks. Order data. Order data - Accessories
2CDC 251 014 F0t09 Features Monitoring of three-phase mains for grid feeding Type-tested in accordance with DIN V VDE V 0126-1-1: February 2006 Neutral conductor connection configurable Can also be used
Simple and secure monitoring
Simple and secure monitoring SMA Solar Monitoring Systems SMA Solar Monitoring Systems Monitoring, informing, presenting Easily securing yield for small, large and very large solar power systems Sunday
Technical catalogue. Modular DIN rail components Installation contactors
Technical catalogue Modular DIN rail components Installation contactors Installation Contactors Overview... ESB Installation Contactors 0 A / AC-/AC-7a ESB0...4 4 A / AC-/AC-7a ESB4...5 40 A / AC-/AC-7a
Brake module AX5021. Documentation. Please read this document carefully before installing and commissioning the brake module!
Documentation Brake module AX5021 Please read this document carefully before installing and commissioning the brake module! Version : 1.2 : 2012.03.05 Date Article-no. : TDmlAX-5021-0000-0200 Page 2/8
/ Our accessories complement all PV systems, simplify installation and ensure that the system meets the required safety standards.
56 / Accessories for inverters Accessories for inverters / Our accessories complement all PV systems, simplify installation and ensure that the system meets the required safety standards. FRONIUS STRING
ADM1TE 5/30A DIN rail single phase two wire energy meter
ADMTE 5/30A DIN rail single phase two wire energy meter. Safety instruction.2 Foreword.3 Performance criteria.4 Specifications.5 Basic errors.6 Description.7 Dimensions.8 Installation.9 Operating.0 Troubleshooting.
12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting
12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.
> Executive summary. The Role of Isolation Transformers in Data Center UPS Systems. White Paper 98 Revision 0. Contents.
The Role of Isolation Transformers in Data Center UPS Systems White Paper 98 Revision 0 by Neil Rasmussen > Executive summary Most modern UPS systems do not include the internal s that were present in
AC COUPLED HYBRID SYSTEMS AND MINI GRIDS
, Michael; Hermes, Matthias SMA Technologie AG Hannoversche Str. 1-5 34266 Niestetal GERMANY E-mail: [email protected] E-mail: [email protected] 1. INTRODUCTION Distributed supply based on renewable
R.C.C.B. s two-pole LEXIC
87045 LIMOGES Cedex Telephone : (+33) 05 55 06 87 87 Fax : (+ 33) 05 55 06 88 88 R.C.C.B. s two-pole LEXIC 089 06/09/10/11/12/15/16/17/18/ 27/28/29/30/35, CONTENTS PAGES 1. Electrical and mechanical characteristics...
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
DRM75A 230V 20/100A DIN rail single phase two wire energy meter
DRM75A 230V 20/100A DIN rail single phase two wire energy meter 1.1 Safety instruction 1.2 Foreword 1.3 Performance criteria 1.4 Specifications 1.5 Basic errors 1.6 Description 1.7 Dimensions 1.8 Installation
Achat 115MA full-range speaker. user manual
Achat 115MA full-range speaker user manual Musikhaus Thomann Thomann GmbH Hans-Thomann-Straße 1 96138 Burgebrach Germany Telephone: +49 (0) 9546 9223-0 E-mail: [email protected] Internet: www.thomann.de
System Solutions for Reliable Off-Grid Power Supply
System Solutions for Reliable Off-Grid Power Supply Simple system design with system solutions from SMA With the Sunny Island battery inverters developed by SMA, off-grid systems can easily be set up,
Product and Applications Description. Application Programs. Example of Operation. GAMMA instabus Technical Product-Information.
Product and Applications Description The power supply units N 125/x2 can supply DC 24 V power from an additional pair of terminals (yellowwhite). This DC 24 V output voltage can be used to power e.g. an
SolarEdge Export Limitation Guide
SolarEdge Export Limitation Guide Europe and APAC Version 2.0 Disclaimers Disclaimers Important Notice Copyright SolarEdge Inc. All rights reserved. No part of this document may be reproduced, stored in
Connection of micro-generation to the electricity distribution network
Connection of micro-generation to the electricity distribution network Network recommendation YA9:09 Sivu 1(20) CONTENTS INTRODUCTION...3 1. MARKINGS AND DEFINITIONS...3 2. DEFINITION OF MICRO-GENERATION
ABB i-bus KNX Fan Coil Actuator, MDRC FCA/S 1.1M, 2CDG 110 084 R0011
, 2CDG 110 084 R0011 2CDC 071 112 F0008 The Fan Coil Actuator is a modular installation device (MDRC) in pro M design. It is intended for installation in the distribution board on 35 mm mounting rails.
USER MANUAL CHARGING STATIONS FOR ELECTRIC VEHICLES
USER MANUAL CHARGING STATIONS FOR ELECTRIC VEHICLES 204.CAxxx 204.CBxxx 204.UBxxx 204.WBxxx MP36289 1 ZP90856-GB-6 INDICE 1 SYSTEM DESCRIPTION... 4 1.1 MODES OF OPERATION... 4 2 USER INTERFACE... 6 2.1
Connecting and operating storage units in low voltage networks
Connecting and operating storage units in low voltage networks June 2013 Publication Information Forum Network Technology / Network Operation in the VDE (FNN) Bismarckstr. 33, 10625 Berlin, Germany Phone:
4.0 UPS dedicated to ICT for unmatched energy savings
4.0 UPS dedicated to ICT for unmatched energy savings Introducing UPSaver by Borri, a new modular UPS series for the ICT industry, totally configurable, quickly scalable, with high efficiency and low TCO.
Safety technique. Emergency stop module BO 5988 safemaster
Safety technique Emergency stop module BO 5988 safemaster 0221562 Function diagram Pushbutton on Mains or emergencystop () K1 According to EC Directive for machines 98/37/EG According to IEC/E 60204-1
EssPro Energy Storage Grid Substation The power to control energy
EssPro Energy Storage Grid Substation The power to control energy EssPro Grid gives you the power to control energy helping to keep smart grids in balance Maximizing the value and performance of energy
YSmart Technology Co.,Ltd
YSmart Technology Co.,Ltd GWV Series Grid Tie Microinverter User Manual The copyright of this user manual belong to YSmart TechnologyCompany Limited. Without the written permission of the copyright holder,
Distributed Power, Renewables, Stored Energy and the Grid Blinkless Synchronous Inverter System
Distributed Power, Renewables, Stored Energy and the Grid Blinkless Synchronous Inverter Go Electric Inc. www.goelectricinc.com 1 Distributed Power, Renewables, Stored Energy and the Grid Blinkless Synchronous
SRS2025. Home & small Business. Energy Storage Solution
SRS2025 Home & small Business Energy Storage Solution Leclanché Lithium-ion complete system The ideal energy storage system for Home & Small Business Lithium-ion battery storage systems Home & Small Business
User Manual of Grid Tie Inverter with Limiter
User Manual of Grid Tie Inverter with Limiter Grid Tied Inverter With Limiter (GTIL) 1 www.chinesegrid.com 2014-8-1 All rights reserved Why we produced the GTI-L --- It is in response to the overwhelming
Mini Motor Contactor J7KNA Main contactor Accessories Approved Standards Standard Guide No (US,C) Ordering Information tage Model Number Legend gear
Mini Motor Contactor J7KNA ) Main contactor AC & DC operated Integrated auxiliary contacts Screw fixing and snap fitting (35 mm DIN-rail) Range from 4 to 5.5 (AC 3, 380/415V) 4 -main pole version (4 AC
RM4TG20 three-phase network control relay RM4-T - range 200..500 V
Characteristics three-phase network control relay RM4-T - range 200..500 V Complementary [Us] rated supply voltage Output contacts Setting accuracy of time delay Delay at power up Measuring cycle Marking
How To Understand The Electrical Power Supply Of A Power Supply System
17 Circuit diagram symbols E 18 CIRCUIT DIAGRAM SYMBOLS electrical network elements three-phase line or cable single-phase line or cable short circuit earth electrode outgoing feeder supply incoming feeder
D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.
SECTION 263354 STATIC UPS TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. System start-up services. 2. Battery charging. 3. Load bank testing. 4. Battery load testing. 5.
LS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL
EPSOLAR LS1024B / LS2024B/ LS3024B Solar Charge Controller USER MANUAL Thank you very much for selecting our product! This manual offers important information and suggestions with respect to installation,
PCS0100en 02.2008. Persy Control Services B.V. Netherlands
P-Bus Gateway PBGW2.128 Universal gateway between the P-bus protocol and open standard protocols. The variety of available electrical interfaces on the gateway offers a wide range of possibilities for
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
A project to optimise quality and energy efficiency must include metering
EMDX 3 : Energy Metering A project to optimise quality and energy efficiency must include metering Metering upstream identifies the critical points and ensures optimum targeting of the actions to be taken,
Installation Contactors. Technical Catalogue. Type ESB. abb. ABB STOTZ-KONTAKT GmbH 1 2CDC 103002 C0201
Technical Catalogue Installation Contactors Type ESB abb ABB STOTZ-KONTAKT GmbH 1 CDC 10300 C001 ABB STOTZ-KONTAKT GmbH CDC 10300 C001 Low Voltage Products and Systems We ensure safety and comfort for
UPS Applications and VRLA Battery Sizing
TECHNICAL BULLETIN 41-7334 UPS Applications and VRLA Battery Sizing 41-7334/0213/CD www.cdtechno.com The uninterruptable power system (UPS) is used to protect critical equipment and processes from the
SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original
SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original A motor starter is a combination of devices to allow an induction motor to start, run and stop according
Emergency stop As an emergency switching off/emergency stop device. Standards According to IEC/EN 60204-1, VDE 0113 Part 1
MainswitchSurfacemounting Partno. P3-63/I4/SVB Articleno. 207343 CatalogNo. SP3-063-I4CRQ IP65 Deliveryprogramme Product range Switch-disconnectors Basic function Main switches Maintenance switches Manual
Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply. www.siemens.com/siestorage
Totally Integrated Power SIESTORAGE The modular energy storage system for a reliable power supply www.siemens.com/siestorage Totally Integrated Power (TIP) We bring power to the point. Our products, systems,
23/11/2015 TASK 4 REPORT - TECHNICAL ANALYSIS. Use of Task 4 analyses. Introduction and approach - Task 4 objective
Preparatory study analysing the technical, economic, environmental, market and societal aspects with a view to a broad introduction of smart appliances and developing adequate policy approaches Under multiple
TechnologyCompendium 3.4. PV Grid Integration. Backgrounds, requirements, and SMA solutions
TechnologyCompendium 3.4 PV Grid Integration Backgrounds, requirements, and SMA solutions 4th revised edition, last revised: May 2012 CONTENT Introduction 4 1. The general conditions in Germany 6 1.1
System Monitoring SMA Safety and Password Concept for Password-protected PV Plants with Bluetooth Wireless Technology
System Monitoring SMA Safety and Password Concept for Password-protected PV Plants with Bluetooth Wireless Technology Technical Description Sicherheit-TEN103010 Version 1.0 EN SMA Solar Technology AG
The Basics of Solar Power for Producing Electricity An excellent place to start for those just beginning. The basics of solar power: 1000 W/m²
The Basics of Solar Power for Producing Electricity Learn the essential basics of using solar power so you can understand your project. Planning your project begins with understanding the basics found
AF09-30-22-.. / AF09Z-30-22-.. 2-stack 3-pole Contactors AC / DC Operated - with Screw Terminals
Technical Datasheet 1SBC101403D0201 24/03/11 AF09-30-22-.. / AF09Z-30-22-.. 2-stack 3-pole Contactors AC / DC Operated - with Screw Terminals AF09(Z) contactors are used for controlling power circuits
Fundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At