Causes and effects of delays in Malaysian construction industry

Size: px
Start display at page:

Download "Causes and effects of delays in Malaysian construction industry"

Transcription

1 International Journal of Project Management 25 (2007) INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT Causes and effects of delays in Malaysian construction industry Murali Sambasivan *, Yau Wen Soon Graduate School of Management, Universiti Putra Malaysia, UPM, Serdang Selangor, Malaysia Received 21 April 2006; received in revised form 27 June 2006; accepted 21 November 2006 Abstract The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. A questionnaire survey was conducted to solicit the causes and effects of delay from clients, consultants, and contractors. About 150 respondents participated in the survey. This study identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay. Ten most important causes were: (1) contractor s improper planning, (2) contractor s poor site management, (3) inadequate contractor experience, (4) inadequate client s finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Six main effects of delay were: (1) time overrun, (2) cost overrun, (3) disputes, (4) arbitration, (5) litigation, and (6) total abandonment. This study has also established an empirical relationship between each cause and effect. Ó 2006 Elsevier Ltd and IPMA. All rights reserved. Keywords: Delay causes; Delay effects; Construction industry; Malaysia; Correlational analysis 1. Introduction * Corresponding author. Tel.: ; fax: address: [email protected] (M. Sambasivan). The problem of delays in the construction industry is a global phenomenon. In Saudi Arabia, Assaf and Al-Hejji [6] found that only 30% of construction projects were completed within the scheduled completion dates and that the average time overrun was between 10% and 30%. In Nigeria, Ajanlekoko [2] observed that the performance of the construction industry in terms of time was poor. Odeyinka and Yusif [16] have shown that seven out of ten projects surveyed in Nigeria suffered delays in their execution. Ogunlana and Promkuntong [17] conducted a study on construction delays in Thailand. Al-Momani [5] carried out a quantitative analysis on construction delays in Jordan. Frimpong et al. [10] conducted a survey to identify and evaluate the relative importance of the significant factors contributing to delay and cost overruns in Ghana groundwater construction projects. Chan and Kumaraswamy [8] studied delays in Hong Kong construction industry. They emphasized that timely delivery of projects within budget and to the level of quality standard specified by the client is an index of successful project delivery. Failure to achieve targeted time, budgeted cost and specified quality result in various unexpected negative effects on the projects. Normally, when the projects are delayed, they are either extended or accelerated and therefore, incur additional cost. The normal practices usually allow a percentage of the project cost as a contingency allowance in the contract price and this allowance is usually based on judgment [3]. Although the contract parties agreed upon the extra time and cost associated with delay, in many cases there were problems between the owner and contractor as to whether the contractor was entitled to claim the extra cost. Such situations, usually involved questioning the facts, causal factors and contract interpretation [4]. Therefore, delays in /$30.00 Ó 2006 Elsevier Ltd and IPMA. All rights reserved. doi: /j.ijproman

2 518 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) construction projects give rise to dissatisfaction to all the parties involved and the main role of the project manager is to make sure that the projects are completed within the budgeted time and cost. The construction sector in Malaysia, a fast developing country in South-East Asia has not escaped the problem of delays. In 2005, about 17.3% (of 417 government contract projects in Malaysia) were considered sick (more than 3 months of delay or abandoned). The Construction Sector is one of the important sectors that contribute to Malaysia s economic growth. The sector accounted for nearly 3.3% of GDP in the year 2005 and employed about 600,000 workers including 109,000 foreign workers (MALBEX [12]). The huge volume and complexity of projects in Malaysia s construction sector pose a great challenge and provide a wealth of opportunities to various companies in the construction industry. The construction sector in Malaysia can be divided into four broad categories: office, retail, residential and infrastructure. This sector suffered a temporary crisis between 1997 and 2000 (ASEAN crisis) and now it has started to improve. However, the delays in the projects continue to occur. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. Some causes and effects of delays in construction projects can be country-specific. The logical question at this point is: Why is it necessary to link the causes and effects of delays and how can the link help the practitioners to prevent or remedy future delays? In this research, we identified major causes of delay and categorized them as client-related, contractor-related, consultant-related, material-related, laborrelated, contract-related, contract relationship-related, and external factors. We have also identified major effects of delay as: time overrun, cost overrun, dispute, arbitration, litigation, and total abandonment. Identification of causes and effects alone does not help the project managers to take appropriate remedial or preventive steps. The project managers need to understand, for example, what causes or factors result in time overrun or cost overrun. Once these factors become clear, the managers can take proactive steps to avoid such situations. For example, if it is known that time overruns are predominantly caused by client-related factors, the project manager can: (1) make sure that payments for the completed work are paid on time, (2) reduce owner interference, (3) speed up the decision-making process, and (4) avoid unrealistic contract duration and requirements. Therefore, the link between causes and effects of delays need to be established. This paper is organized as follows. Section 2 deals with the previous studies on causes and effects of delays in projects. Section 3 explains the methodology of research. Section 4 discusses the analysis the data using statistical procedures. Section 5 discusses the results. Section 6 presents the strategies for reducing delays in construction projects and Section 7 presents the conclusions. 2. Previous studies Many researchers have studied the causes and few researchers have studied the effects of project delays in the construction industry. We have broken the studies into two parts: (1) Studies on causes of delay and (2) Studies on effects of delay Studies on causes of delay Mansfield [14] identified 16 major factors that caused delays and cost overruns in Nigeria. A questionnaire survey was carried out with contractors, consultants and client organizations in Nigeria. They presented that the causes of delay and cost overruns in Nigerian construction projects were attributed to finance and payment arrangements, poor contract management, shortages in materials, inaccurate estimation, and overall price fluctuations. Assaf et al. [7] identified 56 main causes of delay in Saudi large building construction projects and their relative importance. Based on the contractors surveyed the most important delay factors were: preparation and approval of shop drawings, delays in contractor s progress, payment by owners and design changes. From the view of the architects and engineers the cash problems during construction, the relationship between subcontractors and the slow decision making process of the owner were the main causes of delay. However, the owners agreed that the design errors, labor shortages and inadequate labor skills were important delay factors. Ogunlana and Promkuntong [17] conducted a study on construction delays in Thailand. They found that the problems faced by the construction industry in developing economies like Thailand could be: (a) shortages or inadequacies in industry infrastructure (mainly supply of resources); (b) caused by clients and consultants and (c) caused by contractor s incompetence/inadequacies. They recommended that there should be concerted effort by economy managers and construction industry associations to provide the necessary infrastructure for efficient project management. Chan and Kumaraswamy [8] conducted a survey to determine and evaluate the relative importance of the significant factors causing delays in Hong Kong construction projects. They analyzed and ranked main reasons for delays and classified them into two groups: (a) the role of the parties in the local construction industry (i.e. whether client, consultants or contractors) and (b) the type of projects. Results indicated that five major causes of delays were: poor site management and supervision, unforeseen ground conditions, low speed of decision making involving all project teams, client initiated variations and necessary variations of works. Odeyinka and Yusif [16] have addressed the causes of delays in building projects in Nigeria. They classified the causes of delay as project participants and extraneous factors. Client-related delays included variation in orders, slow decision-making and cash flow problems. Contrac-

3 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) tor-related delays identified were: financial difficulties, material management problems, planning and scheduling problems, inadequate site inspection, equipment management problems and shortage of manpower. Extraneous causes of delay identified were: inclement weather, acts of nature, labor disputes and strikes. Al-Momani [5] carried out a quantitative analysis on construction delays in Jordan. The result of his study indicated that the main causes of delay in construction of public projects were related to designers, user changes, weather, site conditions, late deliveries, economic conditions and increase in quantity. Similarly, Odeh and Battaineh [15] also conducted a survey aimed at identifying the most important causes of delays in construction projects with traditional type of contracts from the viewpoint of construction contractors and consultants. Results of the survey indicated that contractors and consultants agreed that owner interference, inadequate contractor experience, financing and payments, labor productivity, slow decision making, improper planning, and subcontractors were among the top ten most important factors. Frimpong et. al., [10] conducted a survey to identify and evaluate the relative importance of significant factors contributing to delay and cost overruns in Ghana groundwater construction projects. A questionnaire with 26 factors was carefully designed from preliminary investigations conducted in groundwater drilling projects between 1970 and 1999 in Ghana. The questionnaire was directed towards three groups in both public and private organizations: owners of the groundwater projects, consulting offices, and contractors working in the groundwater works. The questionnaire was distributed to a random sample of 55 owners, 40 contractors and 30 consultants. The result of the study revealed the main causes of delay and cost overruns in construction of groundwater projects: monthly payment difficulties from agencies; poor contractor management; material procurement; poor technical performance; and escalation of material prices. Assaf and Al-Hejji [6] conducted a survey on time performance of large construction projects in Saudi Arabia. The survey had 73 different causes of delay. He studied the importance of various causes from the viewpoint of contractors, consultants, and owners. The most common cause of delay identified by all the parties was change order. He also found that about 70% of the projects experienced time overruns Studies on effects of delay Aibinu and Jagboro [1] studied and evaluated the effects of construction delays on project delivery in Nigerian construction industry. They found that the six effects of construction delay were: time overrun, cost overrun, dispute, arbitration and litigation and total abandonment. The questionnaires were sent to three groups of construction practitioners: quantity surveyors, architects and engineers, and contractors. Manavazhia and Adhikarib [13] conducted a survey to investigate material and equipment procurement delays in highway projects in Nepal. Delay in the delivery of materials and equipment to construction sites is often a contributory cause to cost overruns in construction projects in developing countries. An assessment of the causes of the delays and the magnitude of their impact on project costs were also made. The survey method was used in conducting this research involving 22 highway projects. The main causes of material and equipment procurement delays were found to be (in rank order) organizational weaknesses, suppliers defaults, governmental regulations and transportation delays. However, the actual impact of these delays on project costs was found to be on average, only about 0.5% of the total budgeted cost of the projects. Among materials, delays in the supply of aggregates and equipment were found to occur most frequently. Chan and Kumaraswamy [9] explored strategies of compressing construction durations of various types of building projects on the basis of the lessons learned from Hong Kong based surveys and other research findings. The literature from different countries on the factors affecting construction durations, reasons for project delays and existing statistical models for duration forecasts were reviewed. A regression-based model developed from Hong Kong public housing construction project data was used for predicting the durations of the primary work packages in the building process and the overall completion period. And finally, a survey was conducted by the researchers to explore the construction time performance of projects in three building sub-sectors (i.e. public housing, public non-residential and private sector). Based on the factors identified as significant from the above research, specific technological and managerial strategies for reducing construction periods in particular building sub-sectors were formulated in order to improve the construction time performance of Hong Kong building projects. Terry Williams [19] studied the standard methods currently available for assessing extension of time delays on major projects, and issues around such assessment. He used network causal mapping and system dynamics approach to study the impact of delays on a project. Based on the above studies, it can be inferred that the earlier studies concentrated on either the causes or the effects. However, some studies have alluded to the probable link between the causes and effects of delays without a systematic analysis. Manavizha and Adhikarib [13] linked the material-related causes to the probable cost overruns in construction projects in Nepal. Assaf and Al-Hejji [6] linked the contractor-related and labor-related causes to the probable time overruns in construction projects in Saudi Arabia. Odeh and Battaineh [15] linked the contract-linked causes to the probable disputes occurring in construction projects in Jordan. Chan and Kumaraswamy [8] linked the consultant-related and client-related causes to the probable time overruns in construction projects in Hong Kong. Mansfield et al. [14] and Frimpong et al. [10] linked the client-related,

4 520 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) consultant-related, and material-related factors to the probable cost and time overruns. In this research, we take an integrated approach and attempt to link the causes and the effects of delays in Malaysian construction industry through a systematic analysis. 3. Methodology A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes and effects of delay in Malaysian construction industry. The questionnaire was divided into three parts. The first part requested background information about the respondents. The second part of the questionnaire focused on causes of construction delay. The respondents were asked to indicate their response category on 28 well-recognized construction delay factors identified by Odeh and Battaineh [15]. These causes were categorized into the following eight major groups: 1. Client related factors: finance and payments of completed work, owner interference, slow decision making and unrealistic contract duration imposed by owners. 2. Contractor related factors: delays caused by subcontractor, site management, improper construction methods, improper planning and errors during construction, and inadequate contractor experience. 3. Consultant related factors: contract management, preparation and approval of drawings, quality assurance and waiting time for approval of test and inspection. 4. Material related factors: quality of material and shortage in material. 5. Labor and equipment related factors: labor supply, labor productivity and equipment availability and failure. 6. Contract related factors: change orders and mistakes or discrepancies in contract document. 7. Contract relationship related factors: major disputes and negotiations, inappropriate overall organizational structure linking to the project and lack of communication between the parties. 8. External factors: weather condition, regulatory changes, problem with neighbors and unforeseen site condition. The respondents were asked to highlight their recommendations to improve the performance of Malaysian construction industry through an open-ended question at the end of second part of the questionnaire. Third part of the questionnaire focused on the effects of construction delay in Malaysian construction industry. The six effects of construction delay identified were: time overrun, cost overrun, dispute, arbitration, litigation, and total abandonment [1]. Similar to the second part of the questionnaire, the respondents were asked to highlight their recommendation to minimize the effects of construction delays through an open-ended question. A five-point Likert scale ranging from 1 (not important) to 5 (extremely important) was adopted to capture the importance of causes and effects of delays. Before distributing the questionnaire, a small pilot study was conducted using 10 consultants, 10 clients, and 10 contractors. The basic purpose of the pilot study was to verify the completeness of the questionnaire in capturing the factors relevant for Malaysia. All the respondents agreed that the questionnaire was sufficient to capture the causes and effects of delays. Therefore, we did not make any modification to the causes of delay identified by Odeh and Battaineh [15] and effects of delay identified by Aibinu and Jagboro [1]. The sampling method used in this study was convenience and snowball sampling. This sampling comes under the class of non-probability sampling techniques. As the name implies, sample elements are identified by convenience (friends) and through referral networks. This method of sampling is preferred when it is difficult to get response from sample elements selected at random [18]. We distributed the questionnaires through our friends working in Public Works Department of Malaysia, developers, consultants and construction firms. Our friends in turn distributed to their friends. This sampling method enabled us to obtain a large number of completed questionnaires quickly and economically. Two hundred sets of questionnaires were distributed to the potential respondents at all levels in the organizations within the construction industry. One hundred sets were distributed to clients (50 sets to Public Works Department of Malaysia and 50 sets to private developers), 50 sets to consultants and 50 sets to the contractors. Of the 200 questionnaires, 150 sets (75%) were returned and there were 67 sets (67%) from clients, 48 sets (96%) from consultants and 35 sets (70%) from contractors Calculation of relative importance of factors Kometa et al. [11] used the relative importance index method to determine the relative importance of the various causes and effects of delays. The same method was adopted in this study within various groups (i.e. clients, consultants or contractors). The five-point scale ranged from 1 (not important) to 5 (extremely important) was adopted and transformed to relative importance indices (RII) for each factor as follows: P W RII ¼ ð1þ A N where W is the weighting given to each factor by the respondents (ranging from 1 to 5), A is the highest weight (i.e. 5 in this case), and N is the total number of respondents. The RII value had a range from 0 to 1 (0 not inclusive), higher the value of RII, more important was the cause or effect of delays. The RII was used to rank (R) the different causes. These rankings made it possible to cross-compare the relative

5 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) importance of the factors as perceived by the three groups of respondents (i.e. clients, consultants and contractors). Each individual cause s RII perceived by all respondents were used to assess the general and overall rankings in order to give an overall picture of the causes of construction delays in Malaysian construction industry. The same procedure was adopted for ranking the effects. The indices (RII) were then used to determine the rank of each item (effect). These rankings made it possible to cross compare the relative importance of the items as perceived by the three groups of respondents. The weighted average for each item for the three groups of respondents was determined and ranks (R) were assigned to each item representing the perception of the three groups. 4. Analysis of data The demographic characteristics of the respondents are given in Table Causes of delay The primary data collected from the second part of the questionnaire was analyzed from the perspective of clients, consultants and contractors. Each individual cause s RII perceived by all respondents was computed for overall analysis. The relative importance index, RII, was computed for each cause to identify the most significant causes. The causes were ranked based on RII values. From the ranking assigned to each cause of delays, we were able to identify the most important factors or causes of delays in Malaysian construction industry. Based on the ranking, the five most important causes of construction delays as perceived by clients were: (1) contractor s improper planning (RII = 0.821); (2) contractor s site management (RII = 0.779); (3) inadequate contractor experience (RII = 0.770); (4) labor supply problems (RII = 0.770) and (5) subcontractor problems (RII = 0.758). The five most important causes of construction delays as perceived by consultants were: (1) contractor s improper planning (RII = 0.842); (2) contractor s site management (RII = 0.821); (3) shortage in material (RII = 0.804); (4) inadequate contractor experience (RII = 0.770), and (5) inadequate client s finance and payments of completed work (RII = 0.792). The five most important causes of construction delays as perceived by contractor were: (1) contractor s poor site management (RII = 0.869); (2) inadequate client s finance and payments of completed work (RII = 0.823); (3) subcontractors (RII = 0.789); (4) inadequate contractor experience (RII = 0.783), and (5) equipment availability and failures (RII = 0.777). From the above list, it is interesting to compare the causes as perceived by clients and contractors. Most of the disputes that arise in the construction industry in Malaysia are between clients and contractors, most often, one party blaming the other. Three of the causes perceived common between Table 1 Demographic characteristics of respondents Demographic characteristic Frequency Percent Age Less than and above Sex Male Female Education Lower secondary (Form 1 3) Upper secondary (Form 4 5) Pre-university (Form 6) University Post graduate Type of organization Clients (government or developer) Consultants Contractors Occupational level Non-executive Executive Managerial Number of years working experience Less than 2 years years years More than 10 years Fields of specializations Building Infrastructure Mechanical and electrical Others Largest project involved based on contract sum Less than RM 10 millions RM 10 millions RM 50 millions More than RM 50 millions clients and contractors are: contractor s site management, inadequate contractor experience, and subcontractors. The clients blame contractor s improper planning and labor supply as other important causes of delay. The contractors inability to plan can be attributed to contractor s inexperience. A significant portion of the labor force in the construction industry is from neighboring countries like Indonesia. It is quite difficult to prevent the movement of these laborers from one construction company to another causing disruption of work. The contractors blame client s inability to pay for the completed work and equipment availability and failures as other important causes of delay. These causes can be attributed to the client s financial position and contractor s improper planning. In government related projects, payments to the contractors take relatively longer time. It is the responsibility of the contractors to factor in this time during the planning process. Table 2 gives

6 522 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) Table 2 Ranking of causes (based on overall) Causes of delays Percentage of respondents scoring RII Rank Client related causes Finance and payments of completed work Owner Interference Slow decision making Unrealistic contract duration and requirements imposed Contractor related causes Subcontractors Site management Construction methods Improper planning Mistakes during construction stage Inadequate contractor experience Consultant related causes Contract management Preparation and approval of drawings Quality assurance/control Waiting time for approval of tests and inspection Material related causes Quality of material Shortage in material Labor and equipment category causes Labor supply Labor productivity Equipment availability and failure Contract related causes Change orders Mistakes and discrepancies in contract document Contract relationships related causes Major disputes and negotiations Inappropriate overall organizational structure linking to the project Lack of communication between the parties External causes Weather condition Regulatory changes Problem with neighbors Unforeseen site condition the ranking of causes based on response of all respondents (clients, contractors and consultants). Table 3 summarizes RII and ranking of the categories of causes of delay as perceived by all respondents. In order to test the degree of agreement between the three groups of respondents as to the causes of delays, a correlation analysis using Spearmen s rank correlation coefficient was done [6]. Table 4 gives the results of the analysis. High correlation indicates that there is a high degree of agreement between the respondents Effects of delay The primary data collected from the third part of the questionnaire was analyzed from the perspective of clients, consultants and contractors. The calculation of RII and ranking were done as explained in the previous section. Based on the ranking, the important effects of construction delays as perceived by clients were: time overrun (RII = 0.821), cost overrun (RII = 0.782), dispute (RII = 0.687), arbitration (RII = 0.621), litigation (RII = 0.591), and total abandonment (RII = 0.585). The important effects of construction delays as perceived by contractors and consultants were exactly the same as those of clients and therefore, a separate analysis using Spearmen s Rank correlation was not done to test the agreement between the three groups of respondents. Table 5 gives the ranking of effects based on response of all respondents (clients, contractors and consultants). The next step in the analysis was to identify the empirical relationships between the causes and the effects. Empirical relationships are based on observations and propositions that are based on sense experience and are derived from methods of inductive logic, including mathematics and statistics [18]. In short, empirical relationships

7 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) Table 3 RII and ranking of categories of causes of delay Category Clients Consultants Contractors Overall RII Rank RII Rank RII Rank RII Rank Client-related Contractor-related Consultant-related Material-related Labor and equipment-related Contract-related Contract relationships-related External-related Table 4 Spearman s rank correlation coefficients of the ranking of clients, consultants and contractors for causes of delay (28 causes) Ranking Client Consultant Contractor Client q a a Significance probability N (number of causes) Consultant q a a Significance probability N (number of causes) Contractor q a a Significance probability N (number of causes) a Correlation is significant at the 0.01 level of significance if significance probability is lesser than the level of significance, correlation is significant. Table 5 Ranking of effects (based on overall) Effects of delays Percentage of respondents scoring RII Rank Time overrun Cost overrun Dispute Arbitration Litigation Total abandonment Table 6 Correlation between the categories of causes and effects of delays Effects Causes of delay Client Contractor Consultant Material Labor Contract related Contract relationship External Time overrun Cost overrun Dispute Arbitration Litigation Total abandonment Highlighted coefficients are significant at 0.05 significance level. attempt to describe, explain, and make predictions through observation. In this research, we attempt to establish relationship between causes and effects through observable data. Since the data we have collected through survey is based on Likert-scale, it can be considered as interval data. Correlation analysis is a powerful method to study the relationship between variables that have interval data [18]. Therefore, a correlation analysis was done to study the empirical relationships between the categories of causes and effects. Table 6 gives the results of the analysis.

8 524 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) Discussion of results This section discusses the results obtained in the earlier section. First, we discuss the results obtained by analyzing the causes of delays. Second, we discuss the results obtained by analyzing the effects of the delays. Third, we link each of the effect with the causes of delay. The ten most important causes of delays (based on all respondents) as shown in the Table 2 were: (1) contractor s improper planning (RII = 0.815), (2) contractor s poor site management (RII = 0.813), (3) inadequate contractor experience (RII = 0.783), (4) inadequate client s finance and payments for completed work (RII = 0.792), (5) problems with subcontractors (RII = 0.771), (6) shortage in material (RII = 0.771), (7) labor supply (RII = 0.757), (8) equipment availability and failure (RII = 0.755), (9) lack of communication between parties (RII = 0.755), and (10) mistakes during the construction stage (RII = 0.753) Contractor s improper planning Local contractors often fail to come out with a practical and workable work program at the initial planning stage. This failure is interrelated with lack of systematic site management and inadequate contractor s experience towards the projects. The consultant only checks and reviews the work program submitted by the contractors based on experience and intuitive judgment. Improper planning at the initial stages of a project manifests throughout the project and causes delays at various stages. Only a project that is well planned can be well executed Contractor s poor site management Contractor s poor site management is one of the most significant causes in causing the construction delays. The results of this research indicate that local contractors face deficiency in site planning, implementation and controls. A poor site management results in delays in responding to the issues that arise at the site and causes negative impact on the overall work progress Inadequate contractor experience Odeh and Battaineh [15] indicated that inadequate contractor experience was an important factor and this could be linked to the contract awarding procedure where most projects were awarded to the lowest bidder. A contractor with inadequate experience cannot plan and manage the projects properly and this can lead to disastrous consequences Client s finance and payments for completed work Construction works involve huge amounts of money and most of the contractors find it very difficult to bear the heavy daily construction expenses when the payments are delayed. Work progress can be delayed due to the late payments from the clients because there is inadequate cash flow to support construction expenses especially for those contractors who are not financially sound Problems with subcontractors Typically in huge projects, there are many subcontractors working under main contractors. If the subcontractor is capable, the project can be completed on time as planned. The project can be delayed if the subcontractor under performs because of inadequate experience or capability. High degree of subcontracting in Malaysia leads to high risk of delays and this leads to inefficiencies in the Malaysian construction industry Shortage in material Shortages in basic materials like sand, cement, stones, bricks, and iron can cause major delays in projects. Since Malaysia is a country that is developing very fast, often times demand exceeds the supply and this causes prices to increase. The contractors postpone the purchase activities until the prices decrease. Manavazhia and Adhikarib [13] investigated material and equipment procurement delays in highway projects in Nepal and found these delays to cause cost overrun Labor supply The quality and quantity of labor supply can have major impact on the projects. About 20% of the workers in the Malaysian construction industry are foreign workers, mainly from Indonesia and Vietnam (MALBEX [12]). A few of them are illegal workers and their work quality is relatively low when compared to local laborers. The low quality and productivity of the foreign workers have impact on the project progress and efficiency. The illegal workers are frequently caught by the Malaysian immigrant officials and deported and this causes shortage of labor pool in the construction industry Equipment availability and failure Many of the contractors do not own equipments that are required for the construction work. They rent the equipments when required. During the season when there are many construction projects, the equipments are in short supply and are poorly maintained. This leads to failure of the equipments causing the progress to be hampered Lack of communication between parties Since there are many parties involved in a project (client, consultant, contractor, sub-contractors), the communication between the parties is very crucial for the success of the project. Proper communication channels between the

9 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) various parties must be established during the planning stage. Any problem with communication can lead to severe misunderstanding and therefore, delays in the execution of the project Mistakes during the construction stage The mistakes during the construction stage can be due to accidents, inadequate planning, or miscommunication between the parties. Whatever the reason, the mistakes can have impact on the progress of the project. While analyzing the effects of delays, all respondents were unanimous in ranking the effects. The time and cost overruns were ranked highly by the respondents. Any delay in a project can lead to cost and time overruns and these two are linked. Whenever there are delays, there are disputes as to who should bear the responsibility and the cost. These disputes often lead to an arbitration process by third parties and failure in this process leads to litigation where the disputes are settled by the court. In extreme cases, some projects might be totally abandoned. About 17% of the projects in Malaysia are abandoned (MALBEX [12]). In the following paragraphs, we analyze the impact of causes on each effect of delay. Correlation analysis results given in Table 6 establish the link between them. From the table, we can identify the causes for each of the effects of delay Time overrun Client-related and contractor-related factors have impact on the time overrun. Out of the ten most important causes of delay discussed earlier, six causes belong to clientrelated and contractor-related factors. Factors such as inadequate planning by the contractors, improper site management by the contractors, inadequate project handling experience of contractors, and delay in the payments for the work completed directly affect the completion of the project and cause time overrun Cost overrun Contract-related factors such as change orders (changes in the deliverables and requirements) and mistakes and discrepancies in the contract document result in cost overrun. Mistakes and discrepancies in the contract document can be in scope, deliverables, resources available and allocated, payment terms, achievement of various milestones, and the project duration. In most of the instances, time overrun leads to cost overrun. Correlation analysis between cost and time overruns indicated a strong linkage (correlation coefficient = 0.487, significant at 0.01 level of significance) Disputes Client-related, contract-related, contract relationshiprelated, and external factors have impact on the disputes that arise during the course of the project. Factors such as delay in the payments for completed work, frequent owner interference, changing requirements, lack of communication between the various parties, problems with neighbors, and unforeseen site conditions give rise to disputes between the various parties. The disputes, if not resolved amicably, can lead to arbitration or litigation Arbitration Client-related and contract relationship-related factors escalate disputes to be settled by arbitration process. A competent third-party can settle the disputes amicably without going to the court Litigation Client-related, labor-related, contract-related, contract relationship-related, and external factors escalate disputes to be settled by the litigation process. The parties involved in the projects use litigation as a last resort to settle disputes Total abandonment Client-related, consultant-related, labor-related, contract-related, and external factors contribute to the total abandonment of the projects. In Malaysia, many projects were temporarily abandoned during the financial crisis between 1997 and Promoters of various projects backed out because of poor cash flow and economic conditions. Many of these projects have now become so prohibitive that they have been abandoned permanently (MALBEX [12]). Based on the discussions above, the next step is to provide suggestions to clients, contractors, and consultants to reduce delays. These suggestions, we hope, will alleviate the problems faced by the construction industry in Malaysia. 6. Prescriptions to reduce delays We divide the prescriptions to adopted into three groups: (1) prescriptions for the clients, (2) prescriptions for the consultants, and (3) prescriptions for the contractors Prescriptions for the clients (1) While selecting the contractors, clients have to make sure that the contractors are not selected based only on the lowest bid. The selected contractor must have sufficient experience, technical capability, financial capability, and sufficient manpower to execute the project, (2) clients should not interfere frequently during the execution and keep making major changes to the requirements. This can cause inordinate delays in the project, (3) clients should have the finances in time to pay the contractors after com-

10 526 M. Sambasivan, Y.W. Soon / International Journal of Project Management 25 (2007) pletion of a work. Therefore, clients should work closely with the financing bodies and institutions to release the payment on schedule, and (4) clients must make quick decisions to solve any problem that arise during the execution Prescriptions for the consultants (1) While drawing the contract between the client and contractor, the consultant must include items such as duration of contract, mechanism to solve disputes, mechanism to assess the causes of delay, if there are any and risk management plans, (2) consultants should prepare and approve drawings on time, and (3) consultants should monitor the work closely by making inspections at appropriate times Prescriptions for the contractors (1) Contractors should not take up the job in which they do not have sufficient expertise, (2) contractors should have able site-managers for the smooth execution of work, (3) contractors must plan their work properly and provide the entire schedule to the clients, and (4) contractors must make sure they have a sound financial backing. 7. Conclusions We investigated the causes and effects of delays facing in the Malaysian construction industry. A questionnaire was designed and distributed among the three major groups of participants (clients, consultants and contractors). We identified main causes of delay and ten most important causes were: (1) contractor s improper planning, (2) contractor s poor site management, (3) inadequate contractor experience, (4) inadequate client s finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. We identified main effects of delay and they were: (1) time overrun, (2) cost overrun, (3) disputes, (4) arbitration, (5) litigation, and (6) total abandonment. As an important contribution, we also studied the empirical relationships between the causes and effects of delays. We isolated the causes of delay for each of the six effects. We believe that the results of this study can be of immense help to the practitioners (clients, contractors and consultants) and academicians. The practitioners can better understand the dynamics of project management and make efforts to reduce the incidences of delays. The academicians can conduct similar studies in other parts of world and identify causes and effects of delays. As mentioned earlier, some causes and effects may be unique to certain countries. References [1] Aibinu AA, Jagboro GO. The effects of construction delays on project delivery in Nigerian construction industry. Int J Project Manage 2002;20: [2] Ajanlekoko JO. Controlling cost in the construction industry. Lagos QS Digest, Lagos 1987;1(1):8 12. [3] Akinsola AO. Neural network model for predicting building projects contingency. In: Conference: proceedings of association of researchers in construction management, ARCOM 96, Sheffield Hallam University, England, September p [4] Alkass S, Mazerolle M, Harris F. Construction delay analysis techniques. Construction Manage Econ 1996;14(5): [5] Al-Momani A. Construction delay: a quantitative analysis. Int J Project Manage 2000;20:51 9. [6] Assaf SA, Al-Hejji S. Causes of delay in large construction projects. Int J Project Manage 2006;24(4): [7] Assaf SA, Alkhalil M, Al-Hazmi M. Causes of delay in large building construction projects. J Manage Eng, ASCE 1995;11(2): [8] Chan DWM, Kumaraswamy MM. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage 1997;15(1): [9] Chan DWM, Kumaraswamy MM. Compressing construction durations: lessons learned from Hong Kong building projects. Int J Project Manage 2002;20: [10] Frimpong Y, Oluwoye J, Crawford L. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage 2003;21: [11] Kometa ST, Olomolaiye PO, Harris FC. Attributes of UK construction clients influencing project consultants performance. Construction Manage Econ 1994;12: [12] MALBEX, Market watch construction industry, Kuala Lumpur Exhibition Center Report. p [13] Manavazhia MR, Adhikarib DK. Material and equipment procurement delays in highway projects in Nepal. Int J Project Manage 2002;20: [14] Mansfield NR. Causes of delay and cost overruns in Nigerian construction projects. Int J Project Manage 1994;12(4): [15] Odeh AM, Battaineh HT. Causes of construction delay: traditional contracts. Int J Project Manage 2002;20: [16] Odeyinka HA, Yusif A. The causes and effects of construction delays on completion cost of housing project in Nigeria. J Financial Manage Property Construction 1997;2(3): [17] Ogunlana SO, Promkuntong K. Construction delays in a fast growing economy: comparing Thailand with other economies. Int J Project Manage 1996;14(1): [18] Sekaran Uma. Research methods for business: a skill building approach. 3rd ed. New York: John Wiley; [19] Terry Williams. Assessing extension of time delays on major projects. Int J Project Manage 2003;21:19 26.

Causes, Effects and Minimization of Delays in Construction Projects

Causes, Effects and Minimization of Delays in Construction Projects Causes, Effects and Minimization of Delays in Construction Projects Divya.R 1, S.Ramya 2 Assistant Professor Department of Civil Engineering Bharathiyar Institute of Engineering for Women, Deviyakurichi

More information

Causes and Effects of Delays in Large Construction Projects of. Pakistan

Causes and Effects of Delays in Large Construction Projects of. Pakistan Causes and Effects of Delays in Large Construction Projects of Pakistan M. Haseeb 1, a, Xinhai-Lu 1, Aneesa Bibi 1, Maloof-ud-Dyian 2, Wahab Rabbani 3 1 College of Public Administration, Huazhong University

More information

Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria

Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria Journal of Construction in Developing Countries, 18(1), 53 72, 2013 Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria Olajide Timothy Ibironke, Timo Olugbenga

More information

PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN

PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN M. Haseeb College of Public Administration, Huazhong University of Science and Technology, Wuhan, P.R. China, 430074.

More information

Study of Delay in Project Planning and Design Stage of Civil Engineering Projects

Study of Delay in Project Planning and Design Stage of Civil Engineering Projects International Journal of Engineering and Advanced Technology (IJEAT) ISSN: 2249 8958, Volume-2, Issue-3, February 2013 Study of Delay in Project Planning and Design Stage of Civil Engineering Projects

More information

Delay Analysis in Construction Project

Delay Analysis in Construction Project Delay Analysis in Construction Project Abstract Delay of a construction project is defined as late completion of the project as compared to the planned schedule. Construction delays are often result of

More information

Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study

Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study International Journal of Project Management 21 (2003) 321 326 www.elsevier.com/locate/ijproman Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana

More information

Construction Delays Causing Risks on Time and Cost - a Critical Review

Construction Delays Causing Risks on Time and Cost - a Critical Review Construction Delays Causing Risks on Time and Cost - a Critical Review Chidambaram Ramanathan, SP Narayanan and Arazi B Idrus, (Universiti Teknologi Petronas, Malaysia) Abstract There is an increase in

More information

Fatemeh Akbari* Master of Industrial Engineering Islamic Azad University, Zahedan Brench, Iran

Fatemeh Akbari* Master of Industrial Engineering Islamic Azad University, Zahedan Brench, Iran To Design and to Present a Tool to Prevent Extra Expense Incurring in School Reconstruction Projects (A case study: Reconstruction Department affiliated to School Equipment and Development Unit in Sistan

More information

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS: INHIBITING FACTORS AND MITIGATING MEASURES IN PRACTICE

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS: INHIBITING FACTORS AND MITIGATING MEASURES IN PRACTICE COST AND TIME CONTROL OF CONSTRUCTION PROJECTS: INHIBITING FACTORS AND MITIGATING MEASURES IN PRACTICE Yakubu Adisa Olawale, Ph.D., MCIOB and Ming Sun, Ph.D. (Professor) Abstract Despite the availability

More information

QUT Digital Repository: http://eprints.qut.edu.au/

QUT Digital Repository: http://eprints.qut.edu.au/ QUT Digital Repository: http://eprints.qut.edu.au/ Al-Kharashi, Adel and Skitmore, Martin (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics,

More information

Assessment of Critical Success Factors for Construction Projects in Pakistan

Assessment of Critical Success Factors for Construction Projects in Pakistan First International Conference on Construction In Developing Countries (ICCIDC I) Advancing and Integrating Construction Education, Research & Practice August 4-5, 2008, Karachi,, Pakistan Assessment of

More information

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes

More information

CAUSES OF DELAY IN NIGERIA CONSTRUCTION INDUSTRY

CAUSES OF DELAY IN NIGERIA CONSTRUCTION INDUSTRY CAUSES OF DELAY IN NIGERIA CONSTRUCTION INDUSTRY KASIMU ALHAJI MOHAMMED DEPT OF QUANTITY SURVEYING, FEDERAL POLYTECHNIC, BIDA. NIGERIA ABUBAKAR DANLADI ISAH DEPT OF ARCHITECTURE, FEDERAL UNIVERSITY OF

More information

Central African Republic Country Profile 2011

Central African Republic Country Profile 2011 Central African Republic Country Profile 2011 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Region: Sub-Saharan Africa Income Group:

More information

A REVIEW ON FACTORS AFFECTING CONTRACTOR PERFORMANCE IN CONSTRUCTION WORK

A REVIEW ON FACTORS AFFECTING CONTRACTOR PERFORMANCE IN CONSTRUCTION WORK A REVIEW ON FACTORS AFFECTING CONTRACTOR PERFORMANCE IN CONSTRUCTION WORK Mihirkumar B. Naik 1, Dr. Neerajkumar D. Sharma 2, Prof. Bhavin K. Kashiyani 3 PG. Student, S.N. Patel Institute of Technology

More information

QUANTITATIVE ANALYSIS OF TIME OVERRUNS IN TRANSPORT INFRASTRUCTURE PROJECTS

QUANTITATIVE ANALYSIS OF TIME OVERRUNS IN TRANSPORT INFRASTRUCTURE PROJECTS QUANTITATIVE ANALYSIS OF TIME OVERRUNS IN TRANSPORT INFRASTRUCTURE PROJECTS João Guedes de Miranda Extended abstract Examination Committee Chairperson: Prof. Ana Paula Patrício Teixeira Ferreira Pinto

More information

Avoiding Claims in Egyptian Construction Projects: A Quantitative Survey

Avoiding Claims in Egyptian Construction Projects: A Quantitative Survey Avoiding Claims in Egyptian Construction Projects: A Quantitative Survey Hesham A. Bassioni 1, Mohamed E. Abd El-Razek 2 and Wael A. Abd El-Salam 3 Abstract Construction claims are considered by many project

More information

Study of Delay Management in a Construction Project - A Case Study

Study of Delay Management in a Construction Project - A Case Study Study of Delay Management in a Construction Project - A Case Study B. Indhu 1, P. Ajai 2 1 M.tech, Student, 2 Assistant professor, Dept of Civil Engineering, SRM University Abstract The problem of delays

More information

For more information, please contact: W. David Lee, Administrator, Statewide Planning and Policy Analysis Florida Department of Transportation 605

For more information, please contact: W. David Lee, Administrator, Statewide Planning and Policy Analysis Florida Department of Transportation 605 For more information, please contact: W. David Lee, Administrator, Statewide Planning and Policy Analysis Florida Department of Transportation 605 Suwannee Street MS 28 Tallahassee, Florida 32399 (850)

More information

Relationship between Factors of Construction Resources Affecting Project Cost

Relationship between Factors of Construction Resources Affecting Project Cost Modern Applied Science; Vol. 7, No. 1; 2013 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Relationship between Factors of Construction Resources Affecting Project

More information

Cost Deviation in Road Construction Projects: The Case of Palestine

Cost Deviation in Road Construction Projects: The Case of Palestine Cost Deviation in Road Construction Projects: The Case of Palestine Ibrahim Mahamid and Amund Bruland, (Norges Teknisk-Narurvitenskapelige Universitet, Norway) Abstract This paper investigates the statistical

More information

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts 11 AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff Risk Allocation in Construction Contracts Risks 2 In the absence of a contract, all risks are the owner's Contracting is

More information

Procurement Management Challenges in Gas Projects of Iran

Procurement Management Challenges in Gas Projects of Iran Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management Dhaa, Bangladesh, January 9 10, 2010 Procurement Management Challenges in Gas Projects of Iran Mohammad

More information

DESIGN IS GOOD BUSINESS

DESIGN IS GOOD BUSINESS COMPENSATING YOUR ARCHITECT The creature comforts are one thing, but for a house to become a home it s got to be elevated to the point that it s about raising one s spirits as well. SAMUEL MOCKBEE Building

More information

A Long-term Forecast of Demographic Transition in Japan and Asia

A Long-term Forecast of Demographic Transition in Japan and Asia A Long-term Forecast of Demographic Transition in Japan and Asia Takao Komine Professor, Hosei University Why is the Population Problem Important for Asia Today? 1. The uncertainty of population forecasts

More information

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG [email protected]

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG [email protected] CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement

More information

STRATEGIC DATA FOR EMPLOYERS CONSTRUCTION CLAIMS

STRATEGIC DATA FOR EMPLOYERS CONSTRUCTION CLAIMS STRATEGIC DATA FOR EMPLOYERS CONSTRUCTION CLAIMS KONGKOON TOCHAIWAT and VISUTH CHOVICHIEN Department of Civil Engineering, Chulalongkorn University, 254 Phyathai Road, Patumwan, Bangkok 10330, Thailand.

More information

CONTRACTOR DEFAULT & SURETY PERFORMANCE:

CONTRACTOR DEFAULT & SURETY PERFORMANCE: CONTRACTOR DEFAULT & SURETY PERFORMANCE: A PRACTICAL GUIDE FOR UNDERSTANDING AND NAVIGATING A BOND DEFAULT SITUATION TEXAS CITY ATTORNEYS ASSOCIATION SUMMER CONFERENCE JUNE 9-11, 2010 SOUTH PADRE ISLAND,

More information

Comparing Procurement Methods for Design-Build Projects

Comparing Procurement Methods for Design-Build Projects Comparing Procurement Methods for Design-Build Projects by Marwa A. El Wardani Technical Report No. 45 Copyright May 2004 Computer Integrated Construction Research Program Department of Architectural Engineering

More information

Chapter 8: Quantitative Sampling

Chapter 8: Quantitative Sampling Chapter 8: Quantitative Sampling I. Introduction to Sampling a. The primary goal of sampling is to get a representative sample, or a small collection of units or cases from a much larger collection or

More information

NON-PROBABILITY SAMPLING TECHNIQUES

NON-PROBABILITY SAMPLING TECHNIQUES NON-PROBABILITY SAMPLING TECHNIQUES PRESENTED BY Name: WINNIE MUGERA Reg No: L50/62004/2013 RESEARCH METHODS LDP 603 UNIVERSITY OF NAIROBI Date: APRIL 2013 SAMPLING Sampling is the use of a subset of the

More information

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Dr. Rashad Zakieh (PMP) 27 April, 2010 Copyright Saudi Aramco, 2010. All rights reserved.

More information

Using Risk Assessment to Improve Highway Construction Project Performance

Using Risk Assessment to Improve Highway Construction Project Performance Using Risk Assessment to Improve Highway Construction Project Performance Mohamed F. Diab, MBA, Ph.D. and Amiy Varma, Ph.D., PE North Dakota State University Fargo, ND Khaled Nassar, Ph.D. American University

More information

The Television Shopping Service Model Based on HD Interactive TV Platform

The Television Shopping Service Model Based on HD Interactive TV Platform , pp. 195-204 http://dx.doi.org/10.14257/ijunesst.2014.7.6.17 The Television Shopping Service Model Based on HD Interactive TV Platform Mengke Yang a and Jianqiu Zeng b Beijing University of Posts and

More information

GETTING (BACK TO) BUSINESS INTERRUPTION INSURANCE. Section 1: Lost property and lost earnings are treated separately

GETTING (BACK TO) BUSINESS INTERRUPTION INSURANCE. Section 1: Lost property and lost earnings are treated separately GETTING (BACK TO) BUSINESS INTERRUPTION INSURANCE Section 1: Lost property and lost earnings are treated separately Business interruption insurance (also known as business income protection, profit protection,

More information

PROJECT PROCUREMENT MANAGEMENT

PROJECT PROCUREMENT MANAGEMENT 12 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes required to acquire goods and services from outside the performing organization. For simplicity, goods and services,

More information

Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan

Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan International Journal of Business and Management; Vol. 8, No. 23; 2013 ISSN 1833-3850 E-ISSN 1833-8119 Published by Canadian Center of Science and Education Factors Affecting Time Overruns in Public Construction

More information

Auditing Capital Projects and Project Controls. March 2013

Auditing Capital Projects and Project Controls. March 2013 Auditing Capital Projects and Project Controls March 2013 Internal Audit Perspective Oversight Insight Foresight Is the process operating as planned? Are controls, resources, and performance measures adequate

More information

Final Draft Guidance on Audit Committees

Final Draft Guidance on Audit Committees Guidance Corporate Governance April 2016 Final Draft Guidance on Audit Committees The FRC is responsible for promoting high quality corporate governance and reporting to foster investment. We set the UK

More information

(AA12) QUANTITATIVE METHODS FOR BUSINESS

(AA12) QUANTITATIVE METHODS FOR BUSINESS All Rights Reserved ASSCIATIN F ACCUNTING TECHNICIANS F SRI LANKA AA EXAMINATIN - JULY 20 (AA2) QUANTITATIVE METHDS FR BUSINESS Instructions to candidates (Please Read Carefully): () Time: 02 hours. (2)

More information

Multiproject Scheduling in Construction Industry

Multiproject Scheduling in Construction Industry Multiproject Scheduling in Construction Industry Y. Gholipour Abstract In this paper, supply policy and procurement of shared resources in some kinds of concurrent construction projects are investigated.

More information

A Guide to Small Works. A brief explanation

A Guide to Small Works. A brief explanation A Guide to Small Works A brief explanation A Guide to House Extensions/Small Works - a brief explanation Small works are an ongoing, cherished part of DDC's activity and restricted only by distance. Here

More information

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ).

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ). COMMERCIAL CONSTRUCTION AGREEMENT This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between ( Owner ) and ( Contractor ). A. Contractor wishes to enter into the following Contract with

More information

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344 Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 3 TITLES... 6 EVALUATING

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Lecture - 41 Value of Information In this lecture, we look at the Value

More information

What went wrong? Unsuccessful information technology projects

What went wrong? Unsuccessful information technology projects Brenda Whittaker Senior Consultant, KPMG Consulting, Toronto, Canada words Computer software, Information technology, Project control, Project management, Software development Abstract Information technology

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7 INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically

More information

CAPITAL PROJECTS IMPLEMENTATION

CAPITAL PROJECTS IMPLEMENTATION CAPITAL PROJECTS IMPLEMENTATION 2.4 Over the years, I have been reporting on the shortcomings encountered during implementation of projects. These include, among others, excessive delays, variation costs,

More information

How To Write A Short Form Prime Prime Prime Contract Between A Contractor And Owner

How To Write A Short Form Prime Prime Prime Contract Between A Contractor And Owner SHORT FORM PRIME CONTRACT BETWEEN OWNER & CONTRACTOR This Agreement ( Contract ) is made this day of, 20, between ( Contractor ) and ( Owner ) at The work described in Section 1 below shall be performed

More information

Newsletter No. 194 (EN) Directors and Officers (D&O) Liability Insurance in Hong Kong

Newsletter No. 194 (EN) Directors and Officers (D&O) Liability Insurance in Hong Kong Newsletter No. 194 (EN) Directors and Officers (D&O) Liability Insurance in Hong Kong December 2015 All r ig ht s r e ser ved Lo r e nz & P art ner s 2015 Although Lorenz & Partners always pays great attention

More information

Mr and Mrs Sample and future owners or occupants of the Property and Your/their mortgage lender(s).

Mr and Mrs Sample and future owners or occupants of the Property and Your/their mortgage lender(s). Contingent Buildings Insurance Indemnity Policy This Policy is the contract between You and the Insurer and it includes the Schedule and any endorsement, extension, plan or appendix issued with it. We

More information

Market Research Methodology

Market Research Methodology Market Research Methodology JANUARY 12, 2008 MARKET RESEARCH ANALYST Market Research Basics Market research is the process of systematic gathering, recording and analyzing of data about customers, competitors

More information

An Evaluation of Bank Customer Satisfaction in Pakistan, Case of Conventional Banks

An Evaluation of Bank Customer Satisfaction in Pakistan, Case of Conventional Banks An Evaluation of Bank Satisfaction in Pakistan, Case of Conventional Banks Haroon Rasheed Management School, Wuhan University of Technology 205-Loushi Road, Wuhan P.R China 4300070 Wang Aimin Management

More information

A Study On Factors Influencing Construction Contract Claim Management

A Study On Factors Influencing Construction Contract Claim Management A Study On Factors Influencing Construction Contract Claim Management K.Sundhar #1, N.Nandhini #2 #1 PG Student (M.E Construction Engineering and Management), #2 Assistant Professor ( Department of civil

More information

Terms of Reference for consulting services financed under a World Bank executed Trust Fund

Terms of Reference for consulting services financed under a World Bank executed Trust Fund Terms of Reference for consulting services financed under a World Bank executed Trust Fund Design and Procurement of long-term pilot contracts for the Performance-based Management and Maintenance of Roads

More information

STUDY ON THE COST OVERRUNS IN ROAD CONSTRUCTION PROJECTS IN SRI LANKA

STUDY ON THE COST OVERRUNS IN ROAD CONSTRUCTION PROJECTS IN SRI LANKA STUDY O THE COST OVERRUS I ROAD COSTRUCTIO PROJECTS I SRI LAKA Eng. S.B. Wijekoon Faculty of Engineering, University of Peradeniya (email: [email protected]) Eng. A.M.C.T.K. Attanayake Anuradhapura Provincial

More information

MDB Harmonised Particular Conditions

MDB Harmonised Particular Conditions FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st

More information

LOCAL GOVERNMENT SERVICES JOB EVALUATION SCHEME:

LOCAL GOVERNMENT SERVICES JOB EVALUATION SCHEME: LOCAL GOVERNMENT SERVICES JOB EVALUATION SCHEME: TECHNICAL NOTE NO. 14: CONSISTENCY CHECKING OF JE OUTCOMES (formerly issued as Quality Assurance NJC circular dated 14Apr03) 1. Introduction 1.1 The NJC

More information

CHAPTER 3.0: PROCUREMENT AND CONTRACTING

CHAPTER 3.0: PROCUREMENT AND CONTRACTING CHAPTER 3.0: PROCUREMENT AND CONTRACTING This chapter outlines the requirements for using Federal funds to purchase materials, products, or services under the CDBG Entitlement program. Whether you are

More information

ROADMAP TO A SUCCESSFUL TERMINATION FOR DEFAULT

ROADMAP TO A SUCCESSFUL TERMINATION FOR DEFAULT ROADMAP TO A SUCCESSFUL TERMINATION FOR DEFAULT By: Frank E. Riggs, Jr. [email protected] 404.885.3353 One of the most difficult, and potentially costly, decisions facing a project owner

More information

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10)

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10) CRITICAL PATH METHOD SCHEDULE (Revised 03-24-10) The Standard Specifications are revised as follows: SECTION 108, BEGIN LINE 177, INSERT AS FOLLOWS: 108.04.1 Critical Path Method Schedule (a) General Requirements

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Characteristic of Construction Industry One of the biggest sector as * total turnover is more than $3,9 trillion annually * 7 million employee (USA) Affects vast and different industries:

More information

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February

More information

Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach

Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach Journal of Construction in Developing Countries, 19(1), 35 52, 2014 Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach 1* Dubem I. Ikediashi, Stephen

More information

Project Risk Management in Oman: A Survey of Risk Practices in the Construction Industry

Project Risk Management in Oman: A Survey of Risk Practices in the Construction Industry CIB World Building Congress 2007 549 CIB2007-370 Project Risk Management in Oman: A Survey of Risk Practices in the Construction Industry Dr Tabarak Ballal 1, Dr Taha Elhag 2 and Mr Salim Ambusaidy 3 1

More information

Procedia - Social and Behavioral Sciences 197 ( 2015 ) 2080 2085

Procedia - Social and Behavioral Sciences 197 ( 2015 ) 2080 2085 Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Sciences 197 ( 2015 ) 2080 2085 7th World Conference on Educational Sciences, (WCES-2015), 05-07 February 2015,

More information

Contract Administration

Contract Administration Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306

More information

Building Capital Projects in Tough Times John Lynch, State of Washington

Building Capital Projects in Tough Times John Lynch, State of Washington Building Capital Projects in Tough Times John Lynch, State of Washington Published as a joint effort of the National Association of State Facilities Administrators (NASFA) and the Associated General Contractors

More information

Agreed-Upon Procedures Engagements

Agreed-Upon Procedures Engagements Agreed-Upon Procedures Engagements 1323 AT Section 201 Agreed-Upon Procedures Engagements Source: SSAE No. 10; SSAE No. 11. Effective when the subject matter or assertion is as of or for a period ending

More information

Research of Female Consumer Behavior in Cosmetics Market Case Study of Female Consumers in Hsinchu Area Taiwan

Research of Female Consumer Behavior in Cosmetics Market Case Study of Female Consumers in Hsinchu Area Taiwan usiness, 2010, 2, 348-353 doi:10.4236/ib.2010.24045 Published Online December 2010 (http://www.scirp.org/journal/ib) Research of Female Consumer Behavior in Cosmetics Market Case Study of Female Consumers

More information

Procurement Performance Measurement System

Procurement Performance Measurement System Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance

More information

Construction Delay Analysis under Multiple Baseline Updates

Construction Delay Analysis under Multiple Baseline Updates Construction Delay Analysis under Multiple Baseline Updates By Wail Menesi A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of Master of Applied

More information

Factors Affecting The Contractor s Cost Overrun Of Building Project In Kano State, Nigeria.

Factors Affecting The Contractor s Cost Overrun Of Building Project In Kano State, Nigeria. ISSN: - Vol. Issue, January - Factors Affecting The Contractor s Cost Overrun Of Building Project In Kano State, Nigeria. Abdulrahman Haruna, Sani Usman Kunya, Musa Mohammed Department of Building Technology

More information

Construction Bond Audit Report. Office of Auditor General

Construction Bond Audit Report. Office of Auditor General Construction Bond Audit Report (This page was left blank) TABLE OF CONTENTS Executive Summary 5 Background, Scope and Objectives, and Methodology....7 Audit Findings, Recommendations, and Management s

More information

Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information

Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document

More information

Mexico Country Profile 2010. Region: Latin America & Caribbean Income Group: Upper middle income Population: 105,280,515 GNI per capita: US$8,340.

Mexico Country Profile 2010. Region: Latin America & Caribbean Income Group: Upper middle income Population: 105,280,515 GNI per capita: US$8,340. Mexico Country Profile 2010 Region: Latin America & Caribbean Income Group: Upper middle income Population: 105,280,515 GNI per capita: US$8,340.00 Contents Introduction Business Environment Obstacles

More information

Management Accounting 303 Segmental Profitability Analysis and Evaluation

Management Accounting 303 Segmental Profitability Analysis and Evaluation Management Accounting 303 Segmental Profitability Analysis and Evaluation Unless a business is a not-for-profit business, all businesses have as a primary goal the earning of profit. In the long run, sustained

More information

Effective Front-End Project Management A Key Element in Achieving Project Success in Developing Countries

Effective Front-End Project Management A Key Element in Achieving Project Success in Developing Countries Effective Front-End Project Management A Key Element in Achieving Project Success in Developing Countries O O FANIRAN School of Civil and Environmental Engineering The University of New South Wales Sydney

More information

OBSERVATIONS FROM 2010 INSPECTIONS OF DOMESTIC ANNUALLY INSPECTED FIRMS REGARDING DEFICIENCIES IN AUDITS OF INTERNAL CONTROL OVER FINANCIAL REPORTING

OBSERVATIONS FROM 2010 INSPECTIONS OF DOMESTIC ANNUALLY INSPECTED FIRMS REGARDING DEFICIENCIES IN AUDITS OF INTERNAL CONTROL OVER FINANCIAL REPORTING 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org OBSERVATIONS FROM 2010 INSPECTIONS OF DOMESTIC ANNUALLY INSPECTED FIRMS REGARDING DEFICIENCIES

More information

Guidelines for Financial Institutions Outsourcing of Business Activities, Functions, and Processes Date: July 2004

Guidelines for Financial Institutions Outsourcing of Business Activities, Functions, and Processes Date: July 2004 Guidelines for Financial Institutions Outsourcing of Business Activities, Functions, and Processes Date: July 2004 1. INTRODUCTION Financial institutions outsource business activities, functions and processes

More information

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION CONTENTS

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION CONTENTS INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION (Effective for assurance reports dated on or after January 1,

More information

EMPLOYMENT-RELATED PRACTICES LIABILITY ENDORSEMENT

EMPLOYMENT-RELATED PRACTICES LIABILITY ENDORSEMENT POLICY NUMBER: CL CG 04 57 07 09 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. EMPLOYMENT-RELATED PRACTICES LIABILITY ENDORSEMENT This endorsement modifies insurance provided under the

More information

Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program

Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program 458 برنامج إدارة العقود الھندسية وعقود التشييد المتكامل معتمد عالميا 10 October

More information

GUIDANCE NOTE ON OUTSOURCING

GUIDANCE NOTE ON OUTSOURCING GN 14 GUIDANCE NOTE ON OUTSOURCING Office of the Commissioner of Insurance Contents Page I. Introduction.. 1 II. Application...... 1 III. Interpretation.... 2 IV. Legal and Regulatory Obligations... 3

More information

Chapter 4: Contractor Quality Control

Chapter 4: Contractor Quality Control Chapter 4: Contractor Quality Control Seattle District, NWS Last updated: 05FEB14 Chapter 4 Contractor Quality Control 1. GENERAL. Contractor is responsible for quality control and shall establish and

More information

Characteristics of the Participants

Characteristics of the Participants 3 Financial Analysis for Replacement of Construction Equipment in Saudi Arabia Ali A. Shash (Center for Engineering Research, Research Institute, King Fahd University of Petroleum & Minerals, Saudi Arabia)

More information

Power Sector. Managing EPC Power Project

Power Sector. Managing EPC Power Project Power Sector Managing EPC Power Project ABSTRACT Engineering, procurement and construction (EPC) Contract are the most common form of Project used to undertake construction works by the Public and private

More information

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge Page 1 of 5 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK November 1990 Transport No. PS-2 THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE John R. Lethbridge The use of outside

More information

27Forecasting cash flows 27Activity 27.1 open-ended question.

27Forecasting cash flows 27Activity 27.1 open-ended question. 27Forecasting cash flows 27Activity 27.1 open-ended question. Activity 27.2 (page 497): April cash flow 1 Draw up a revised cash-flow forecast for April assuming: cash sales are forecast to be $1,000 higher

More information

The importance of using marketing information systems in five stars hotels working in Jordan: An empirical study

The importance of using marketing information systems in five stars hotels working in Jordan: An empirical study International Journal of Business Management and Administration Vol. 4(3), pp. 044-053, May 2015 Available online at http://academeresearchjournals.org/journal/ijbma ISSN 2327-3100 2015 Academe Research

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

Knowledge and Technical Skills of Project Managers and Time Performance of Power Plant Construction Projects in Iran

Knowledge and Technical Skills of Project Managers and Time Performance of Power Plant Construction Projects in Iran Middle-East Journal of Scientific Research 16 (8): 1141-1151, 2013 ISSN 1990-9233 IDOSI Publications, 2013 DOI: 10.5829/idosi.mejsr.2013.16.08.11938 Knowledge and Technical Skills of Project Managers and

More information

HACC, Central Pennsylvania s Community College Harrisburg, Pa.

HACC, Central Pennsylvania s Community College Harrisburg, Pa. RFP15-03 Integrated Marketing Communications Services HACC, Central Pennsylvania s Community College Harrisburg, Pa. Request for Proposal RFP15 03 For Integrated Marketing Communications Services Issued:

More information

Creating and Maintaining a Professional Practice

Creating and Maintaining a Professional Practice Creating and Maintaining a Professional Practice Provided by The AIA Trust in coordination with Victor O. Schinnerer & Company, Inc. Starting your own firm is a challenge; structuring it to survive is

More information