1 CROSSRAIL MOVING LONDON FORWARD Simon Pain Principal Programme Supply Chain Manager Zena Christie Supply Chain Assistant
2 Crossrail Route
3 Current Stage Project 70% complete Tunnelling is now complete Focus on fitting out stations and tunnels
4 C422 Tottenham Court Road Laing O Rourke
5 C422 Upcoming Packages 2015 C422 Lighting Control (Framework) UPS (Framework) Thermal Insulation &Trace Heating A/C Splits LV Switchgear (Includes ATSs & Busbar) BMS Controls (Non Framework) Air Handling Units (AHUs) Lightning Protection & Earthing Distribution Boards Chillers Luminaries (Includes connections & drums) Dampers Smoke
6 C422 Upcoming Packages 2015 (Continued) 2016 C422 Armoured & Sub mains Cables Fans (Extract & Supply) Attenuators Grilles/Diffusers/Louvres Small Transformers AV Mountings Heaters (Electric panel & Water) Cable Pulling/installation Water Treatment Plant (Shift & lift ) Sanitary ware Various Pumps (Water/foul/sewage) Peter Martin - [email protected]
7 C435 Farringdon BFK NG Bailey procuring MEP
8 C435 Upcoming Packages
9 C435 Upcoming Packages
10 C512 Whitechapel BBMV
11 C512 Upcoming Packages Subcontract packages will be sought for the following: Fire Systems Detection and Suppression Busbar Installation Rainwater Harvesting PV Array LV Switch gear Lightning Protection Water Treatment Mechanical Commissioning Sub main cable installation
12 C512 Upcoming Packages Supply Only contract will be sought for the following: Luminaires Automatic Transfer Switches Pressurisation Units Water Treatment Plant Chillers Pumps Chilled water, foul water & sump pumps Air Handling Units Extract fans
13 C512 Timing MEP Procurement for the main station does not begin in earnest until the design is complete. This is substantially finished and is now in the final stages of sign off. BBMV will then be procuring these packages over an 8 month period with the majority being procured in the first 4 months. [email protected]
14 Women into Construction Funded by the CITB to support gender diversity in construction. Support for women: Outreach, advice and guidance, training, work-placements and brokerage into jobs. Support for contractors: Assisting them to engage with trained women wishing to enter the construction industry Free supported work-placements and jobs brokerage. Help with meeting CSR targets and addressing skills gaps. Recognition of their achievements
15 Women into Construction Contact us: Kath Moore
16 C610 Systemwide ATC
17 C610 Current Status 70% of packages awarded so far, worth c 48m, based on current instructed scope Remaining business opportunities worth c 5 million
18 C610 Upcoming Packages Done Tunnel walkways Tunnel Ventilation Steelwork Attenuators Tunnel drainage pumping system Tunnel lighting & Power Panels Tunnel Ventilation System Ventilation Control Systems Variable Speed Drives Cable Management Systems Cross passages doors M&E Labour Supply Lighting and LV Cables Supply Transitions and TVS Installation Signage, labelling, asset tagging Hit and Miss dampers Tunnel Fire Mains brackets Tunnel Fire Mains fire protection Trace heating and thermal insulation TVS Environmental Sensors MCC s for Pumps Cross-passage sump lifting and access equipment Points heating system Accelerated Life Testing [email protected]
19 CompeteFor Opening the supply chain for Local and SME Suppliers Adam Compton Key Accounts Manager
20 Introduction CompeteFor is an online portal designed to publicise contract opportunities for capital buying programmes Service created for the London 2012 Olympic and Paralympic Games, to match buyers and suppliers, encouraging equality and transparency of opportunities Commitment from Major Buying Programmes to procure responsibly CompeteFor has expanded beyond its original remit, to incorporate additional supply chains: Crossrail TfL s Northern Line Extension Thames Tideway Tunnel Transport for London HS2
21 Service Delivery The CompeteFor service is operated on behalf of the Mayor of London through Transport for London The service is provided by a partnership between BiP Solutions and London Business Network (LBN).
22 CompeteFor - What we do UK wide supply chain development portal, designed to open up major supply chains Deliver sustainable and measurable economic growth Community benefits, via visibility of opportunities Enable local and SMEs to take advantage of these B2B opportunities
23 Opening Supply Chains
24 Opening Supply Chains
25 Supplier Features Register FREE to register AND respond to CompeteFor supply chain opportunities Additionally, FREE geographical area of Researched Opportunities Self Certified More business categories based on CPV codes Supply Chain Opportunities Alert and Business Profiles Promote your business
26 CompeteFor Opportunities
27 Crossrail and CompeteFor Crossrail have adopted CompeteFor to help ensure that these opportunities are opened up to the widest possible market Crossrail s contractors are required to advertise all appropriate opportunities on CompeteFor, to drive innovation in the supply chain Over 2,250 Crossrail Supply Chain opportunities posted to date on CompeteFor
28 Crossrail and CompeteFor Example: Live Opportunities Opportunity Tier 1 CompeteFor Response Deadline C512 Whitechapel Station - Copper and Brass Cladding Works BBMV joint venture 12/12/15 C610 - Trace Heating, Lagging and Fire Stopping C512 Whitechapel Station Station Architectural Metalwork ATC joint venture 27/11/15 BBMV joint venture 10/01/16
29 Users
30 Tips / Hints
31 Tips / Hints Business Profile and Alert Profile The alert profile sets up the automated alerts, providing you business relevant leads and opportunities on a daily basis. Business profile enables buyers to see your business details when sourcing companies
32 CompeteFor Helpdesk Adam Compton Tel: [email protected] Key Accounts Manager
33 Contacts Crossrail Crossrail CompeteFor C512 Whitechapel C435 Farringdon C530 Woolwich C610 Systemwide C502 Liverpool Street C422 Tottenham Court Road C405 Paddington C412 Bond Street Women Into Construction
34 Links Webinar will be made available on the Crossrail website
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
QATAR RAIL DOHA METRO PROJECT BUSINESS OPPORTUNITIES FOR LOCAL MARKET Daniel Leckel Chief Program Officer. 7 May, 2015
QATAR RAIL DOHA METRO PROJECT BUSINESS OPPORTUNITIES FOR LOCAL MARKET Daniel Leckel Chief Program Officer 7 May, 2015 AGENDA I. PROJECT OVERVIEW II. III. OVERVIEW OF POTENTIAL BUSINESS OPPORTUNITIES FOR
CROSSRAIL MOVING LONDON FORWARD. Simon Bennett
CROSSRAIL MOVING LONDON FORWARD Simon Bennett Introduction Europe s largest infrastructure project 14.8bn funding 38 stations 9 new stations 42 km new tunnels 8 million cubic metres of spoil 140 main works
About LLC SpecCityStroy
About LLC SpecCityStroy Our company is a system integrator and focuses on design engineering, production, and implementation of a variety of innovative products in the areas of automation at large-scale
The Enhanced Capital Allowance Scheme for energy saving plant and machinery
CIBSE Briefing The Enhanced Capital Allowance Scheme for energy saving plant and machinery An cash incentive for your clients to invest in energy and tax efficiency What are Capital Allowances? Capital
Mechanical &Electrical Services Modernisation. Presentation to The Commons & Lords Management Boards 26 th November 2008
Mechanical &Electrical Services Modernisation Presentation to The Commons & Lords Management Boards 26 th November 2008 M&E Services Modernisation Context M&E Modernisation Overview Next Steps M&E Modernisation
About us. Eugensa is an ISO 9001:2008 certified company. CERT
About us CERT Eugensa JSC was established in Lithuania in 1996 and since then has become one of the regions largest electrical contractors specialising in the design, installation and maintenance of electrical,
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
Getting the most from Contracts Finder
Getting the most from Contracts Finder A guide for businesses and the public May 2012 What s in this guide What s this guide for?...2 What s on Contracts Finder...2 Searching for notices the basics...2
PRE-LEASE SURVEY OF THE ENGINEERING SERVICES. XXXX London
PRE-LEASE SURVEY OF THE ENGINEERING SERVICES AT London Client: Clients Representative: For the Attention of: Telephone N o Site Address: London Report prepared by: Contact Name: FHP Engineering Services
Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator
Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL
AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the
MECHANICAL, ELECTRICAL AND PLUMBING SERVICES
MECHANICAL, ELECTRICAL AND SERVICES Greenwich Millenium Village Photographer: John Starns Photography ABOUT US TRADING FOR OVER 50 YEARS WATKINS IS ONE OF THE LEADING PROVIDERS OF MECHANICAL, ELECTRICAL,
Data Centre Testing and Commissioning
Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units
EXAMPLE OF A DATA CENTRE BUILD
EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist
National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook
National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction
Capital Expenditure. The common definition of capital expenditure is
Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local
Fundamentals of HVAC Control Systems
ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong
Climate Change Adaptation for London s Transport System
Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation
Project Close Out Summary
Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As
Datacentre Capability March 2015
Callaghan Engineering Consul-ng Engineers Project Managers Datacentre Capability March 2015 Callaghan Engineering Multi-discipline engineering & project management company Established in 1990 Offices in
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled
RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary
RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...
Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan
Preliminary Environmental Information Report: Appendix 16.C Flood Warning and Evacuation Plan THIS PAGE IS LEFT INTENTIONALLY BLANK Page 2 of 30 Contents SUMMARY 1. INTRODUCTION... 9 1.1 Background...
KIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General
DASNY MWBE FORUM The event that will change your business
DASNY MWBE FORUM The event that will change your business CUNY & CUCF + MWBE = Partners in Success Public Procurement Opportunities OCTOBER 13-14, 2011 CUCF The City University Construction Fund www.cuny.edu/constructionsolicitations
for Revit MEP The professional s choice for Building Services
for Revit MEP The professional s choice for Building Services The professional s choice for Building Services With MagiCAD, all modelling is highly automated, fast and accurate. Checking the model and
Buildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
CROSSRAIL The Midtown Business Club. Ian Lindsay Land and Property Director
CROSSRAIL The Midtown Business Club Ian Lindsay Land and Property Director Crossrail Header here enabling max London 30 characters to grow High Capacity Metro Railway 14.8bn cost 42bn net benefit 118 km
tap into opportunities to develop your business
Find out more about the Green Deal, ECO and renewable energy markets and how your business can benefit tap into opportunities to develop your business Background and overview Over recent years, the UK
Building Services Engineering Technician
Building Services Engineering Technician A competent Building Services Engineering Technician is expected to be able to demonstrate the following skills and competences: Systems design in the building
MANAGING AGENTS, PROPERTY AND REAL ESTATE SECTOR. Exceptional FM for managing agents & tenants. Exceptional Service, Exceptional People
MANAGING AGENTS, PROPERTY AND REAL ESTATE SECTOR Exceptional FM for managing agents & tenants Exceptional Service, Exceptional People One building: many cultures Norland works with leading property developers
12 Things Facility Managers Need to Know About Critical Power System Installation
12 Things Facility Managers Need to Know About Critical Power System Installation Are you considering managing your next power system installation in-house? As a facilities manager or other facility professional,
WFBSC Policy Position: Employment, outsourcing and the cleaning sector
Introduction WFBSC Policy Position: Employment, outsourcing and the cleaning sector Until recently cleaning employers have been under represented in the global institutions that legislate and/or set the
High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance
Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety
EXPRESSION OF INTEREST
EXPRESSION OF INTEREST Contractor: WorleyParsons Canada Services Ltd. Project: Hebron Topsides Project Package: 2001 Switchgear and MV MCC s Category: XXXXX-XXXXX Closing Date: 31 October 2011 General
Ecodesign Directive 2009/125/EC & Energy Labelling Directive 2010/30/EU State of Play. Eurovent General Assembly
Ecodesign Directive 2009/125/EC & Energy Labelling Directive 2010/30/EU State of Play Eurovent General Assembly 1 June 2012 Energy efficiency policy Europe 2020 Strategy: objectives on employment, innovation,
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
HS2 Supply Chain FAQs
HS2 Supply Chain FAQs As part of our ongoing market engagement activity, High Speed Two (HS2) Limited contacted four key umbrella, industry and trade associations. Our aim was to poll a sample of their
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
Steel procurement in major projects: Guidance on the application of social issues. Purpose
Steel procurement in major projects: Guidance on the application of social issues Purpose 1. This is a practical guide on how to incorporate social issues in major projects with a significant steel component.
Overview of Fire Alarm Systems and Maintenance
Overview of Fire Alarm Systems and Maintenance By Mr. David Goh Vice President Fire Safety Managers Association Convener of Working Group for CP 10 : 2005 Er. Matthew Kwek Committee Member Fire Safety
Facilities Management in Kuwait. Opportunities, challenge and added value. Kuwait Municipality
Kuwait Municipality Facilities Management in Kuwait Opportunities, challenge and added value Presented by: Osama Alduaij Daputy Director General Kuwait Municipality Facilities Management A PROVEN PROCESSFOR
Glossary of HVAC Terms
Glossary of HVAC Terms Heating, Ventilation and Air Conditioning (HVAC) is a major sub- discipline of mechanical engineering. The goal of HVAC design is to balance indoor environmental comfort with other
www.denhamconstruction.co.uk
www.denhamconstruction.co.uk Denham Electrical & Building Services Ltd is a national company based in Essex. We offer a variety of services from design, installation, servicing and maintenance carried
Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP
Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency Randy Mead, C.E.M, CMVP Introduction Chilled water plant efficiency refers to the total electrical energy it
Electrical safety Dwellings
The Electrical safety Dwellings APPROVED DOCUMENT P1 P Design and installation of electrical installations 2013 edition for use in England* Main changes in the 2013 edition This approved document supports
What Is a Smart Building? p. 1 Brief History p. 1 What Is a Smart Building? p. 3 The Foundations of a Smart Building p. 7 Overview p.
Preface p. xiii What Is a Smart Building? p. 1 Brief History p. 1 What Is a Smart Building? p. 3 The Foundations of a Smart Building p. 7 Overview p. 7 The Framework for Referencing Integration p. 8 Physical
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /
CONDUIT MAYFAIR READY FOR OCCUPATION SPRING 2014 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD
12 CONDUIT S T R E E T MAYFAIR READY FOR OCCUPATION SPRING 2014 020 7495 2728 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD 12 CONDUIT STREET The entire building is undergoing a
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission
MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing
MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing Release: 1 MEM10019 Select circuit protection devices by type and rating, fit to switchboards and
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
FIRE ALARM AND DETECTION SYSTEMS SECTION 16721
PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected
Ethical Sourcing Policy
Ethical Sourcing Policy Index 1.0 Policy Statement... 2 2.0 Organisational Scope and Compliance... 2 3.0 Policy Purpose... 3 4.0 The ETI Base Code... 3 5.0 Guiding Principles... 4 6.0 Identify suitable
Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work
21.1 Functions, Basic Configuration, and Interfaces
21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
TRANSPORT FOR LONDON CORPORATE PANEL
AGENDA ITEM 4 TRANSPORT FOR LONDON CORPORATE PANEL SUBJECT: EMPLOYEE ENGAGEMENT DATE: 17 NOVEMBER 2009 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this report is to advise the Panel on TfL s approach
INTRODUCTION INDUSTRIAL INSTALLATIONS AND ERECTIONS QUALITY THAT EXCELS
QUALITY THAT EXCELS INTRODUCTION Established in July 1996, aiming at attending market needs, Munhoz positively has taken charge of supplying high standard solutions, in the projects, civil constructions,
Archant London Environmental Awards
Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has
Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities
At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA
Frequently Asked Questions
Frequently Asked Questions Although Roy Homes can manage the entire build process from our first meeting with you to the day you move into your new home, we still like to work closely with our customers
What can we learn from the commercial sector and building modelling
What can we learn from the commercial sector and building modelling Chris Twinn FRSA HonFRIBA FCIBSE MEI CEng BSc(Hons) Founder & CEO of Buildings that do not cost the Earth 2 This is how energy efficient
LONDON STANSTED MEET THE BUYERS 2015
Thursday 15th October 2015 INFLITE HANGAR, STANSTED AIRPORT Preview Catalogue Confirmed buyer requirements have been received by the following: Airport Lettings Luggage-Point Amalga Andrew Page Braintree
Guidance for Electrical Contractors on Emergency Lighting Legislation
Guidance for Electrical Contractors on Emergency Lighting Legislation Issued in the interests of safety by in conjunction with the Industry Committee for Emergency Lighting ECA / ICEL Guidance For Electrical
Sedex Supplier Ethical Data Exchange. Driving a collaborative approach to supply chain management
Sedex Supplier Ethical Data Exchange Driving a collaborative approach to supply chain management What is Sedex? Sedex was established as a not for profit, membership organisation in 2004, it is dedicated
Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)
1. ADDITION & ALTERATION TO THE MAIN WAREHOUSE 1.1 ELECTRICAL WORKS 1.1.1 The Contractor shall provide into the AFT1 building with 2 x 1000Amp power supply to be terminated with a main isolator. The power
Cable Network Transparency Unified Monitoring System UMS
Cable Network Transparency Unified System UMS Fault recognition, localisation and reporting UMS Universal cable network and equipment monitoring cable networks and associated equipment used to be considered
More efficiency in office buildings with HVAC, lighting and security
The worldwide standard for home and building control More efficiency in office buildings with HVAC, lighting and security Simply more productive: Higher energy efficiency and more flexibility thanks to
Case Study. Cool and green: Citigroup s Frankfurt Data Center
Zug, April 16, 2015 Cool and green: Citigroup s Frankfurt Data Center In Frankfurt, Siemens helps optimize Citigroup s data center. When it comes to building automation, security technology and power supply,
Direct Fresh Air Free Cooling of Data Centres
White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The
The Future of Workforce Management and Buyer Perspectives
The Future of Workforce Management and Buyer Perspectives Bryan T. Peña, CCWP Vice President, Contingent Workforce Strategies and Research [email protected] What is the future of work? 2015 by
How To Claim Capital Allowance In The Uk
Capital Allowances An Essential Guide for claiming Tax Relief on Plant & Machinery What are Capital Allowances? Capital allowances are a tax relief available to a tax payer on certain capital expenditure
Data Center Commissioning: What you need to know
Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,
Emirates Aluminium starts up World s first fully integrated power distribution system from ABB
Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s
BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0
BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 To achieve GREEN MARK Award Pre-requisite Requirement All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE 380/415/690 Volt AC 50/65/80/100 ka 1. Product Guide Low Voltage Motor Control Centre CONTSTRUCTION Continuous "poured in place" gasket
From COBie to Asset Management
BIM Prospects Conference: From COBie to Asset Management 27 th March 2015 - RIBA, London Jeff Stephens, Head of BIM [email protected] 1 Experiences creating COBie data for Asset Management
CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality
CONTE NT DESIGN PROCESS First Issue 02 Revision A 03 Revision B 04 Co-ordination 05 Panel Thicknesses 06 Panel Surface Quality 07 CNC Timber Processing 08 Panel Standard Sizes 09 Glulam Standard Sizes
A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly
Cheshunt Fabrications Ltd
Cheshunt Fabrications Ltd Unit 9a & 9b, Quickbury Farm Hatfield Heath Road Sawbridgeworth Hertfordshire CM21 9HY Phone: 01279 600866 Fax: 020 8609 0050 01279 600868 www.fabber.co.uk Quality in the making
Accurate data and the whole life costing culture. Kathryn Bourke Whole Life Ltd [email protected]