1 Dublin Institute of Technology Reports School of Surveying and Construction Management An Introduction to defining Cost Estimates for Mechanical and Electrical Services using the NRM1 Charles Mitchell Dublin Institute of Technology, Follow this and additional works at: Part of the Engineering Commons Recommended Citation Mitchel, C. (2015) An Introduction to defining Cost Estimates for Mechanical and Electrical Services using the NRM1, University of Salford 2015 (MSc. QS (M&E). This Report is brought to you for free and open access by the School of Surveying and Construction Management at It has been accepted for inclusion in Reports by an authorized administrator of For more information, please contact This work is licensed under a Creative Commons Attribution- Noncommercial-Share Alike 3.0 License
2 An Introduction to defining Cost Estimates for Mechanical and Electrical Services using the NRM1
3 Contents List of Figures 2 List of Tables 3 Executive Summary 4 Introduction 4 Task 1 Identification of HVAC services and electrical elements 5 Task 2 Development of prices for HVAC and electrical services components 8 RIBA Stage Two Concept Design 8 RIBA Stage Three Developed Design 9 RIBA Stage Four Technical Design 10 Conclusion 11 Bibliography 12 References 13 Appendix 1 Client Information required for NRM1 Order of Cost Measurement 14 Appendix 2 Architects Information required for NRM 1 Order of Cost Measurement 16 Appendix 3 NRM 2.4 Order of Cost Measurement 18 Appendix 4 Order of Cost Measurement example 20 Appendix 5 Bill of Quantities example 22 Appendix 6 Estimated Costs examples 27 Appendix 7 Schedule of Mechanical equipment 32 1
4 List of Figures Fig.1 Modular Boiler 5 Fig. 2 Earth Bonding 7 2
5 List of Tables Table 1 Elements used in preparation of Elemental Cost Plan 9 Table 2 Summary of Developed Costs 11 3
6 Executive Summary: Determining an accurate value for the supply and installation of mechanical and electrical services is a difficult task due to the level of specialisation and variance within this sector of the industry. The level of specialised knowledge and the ever changing technology has prevented the Quantity Surveyor from taking a firm hold on the cost estimation of these services. Cost estimates have previously been prepared by consultant services engineers or based on costs provided by these consultants. However, employers nowadays require more cost certainty in the estimates of costs. As a direct result the New Rules of Measurement 1 (NRM1) has been devised. This document can be used in conjunction with both the RIBA Plan of Work and the OGC Gateways. This assignment looks to identify HVAC and electrical systems which could apply to a building as described in the brief. Once these are defined prices for this installation are to be developed in line with each of the RIBA stages 2, 3 and 4. Introduction: The building in discussion within this assignment comprises of a five storey over basement. The construction shown on Drawing No. 406 shows what appears to be a cast in-situ concrete frame with in-situ concrete floors. The perimeter walls, for the purpose, of this project are deemed to be insulated cavity blockwork walls with glazed openings. This drawing shows a suspended ceiling with a 400mm depth of suspension. This should be sufficient for the distribution of the majority of mechanical and electrical services. The basement houses underground parking and 2no. plantrooms and 2no. lift pits. The ground floor consists of a retail area, a series of offices, entrance foyer, lecture rooms, stores, reception, kitchen area, lifts and male / female washroom facilities. All intermediate floors consist of a general office open plan office area, 8no. individual offices, lifts, kitchen and male / female washroom facilities All washrooms are centrally located around the lifts and each floor. A service riser is present to the left hand side of the lifts. The kitchen is located on the right hand side of the lifts. Generally all services are centrally located and can be easily accessed and distributed. The basement plantrooms are directly beneath this service core. For the basis of this project it is assumed that the basement carpark is ventilated by means of a natural ventilation via an array of grid covered openings which allows toxic gases to be replaced by fresh air. 4
7 TASK 1 Identification of Services: This section seeks to identify and briefly describe the function of the HVAC and electrical systems that would typically be found within such a building. Mechanical Services: A heat source is required to heat any building. Due to the conventional design and construction of this building it has been assumed that the building is heated by use of a gas or oil fuelled boiler. In this instance a modular boiler system is proposed. A) Modular boilers A modular boiler system is an array of boilers which are linked together. This allows for the ability to control the number of boilers in use to match for the heating load. This is more efficient than having a larger boiler working to part load. An example would be a five boiler array having only two boilers working at 40% load. Fig 1. Modular Boilers ( 2015) In order to distribute heat around the building from a heat source such as the modular boiler noted above a convector unit is required. Radiators have been chosen to distribute the heat. The temperature of these radiators will be controlled by the use of thermostatic valves. These valves can be set to regulate the temperature of the radiators. B) Radiators generally used as a component of the HVAC system to distribute heat around a building. In this instance the radiators will be used the circulation areas of the building such as the entrance foyer, reception, male / female washroom facilities and corridors. In order to further regulate both the heating and cooling of the building as a whole it may be necessary to look at a mechanical method of distributing the heat around the building in a more uniform manner. In order to achieve this it has been deemed appropriate to incorporate the use of a series of Air Handling Units (AHU) through the building. The benefit of the use of such units is the ability to actively and accurately monitor and adjust the thermal comfort of building occupants in the various areas of the building. 5
8 C) Air Handling Units (AHU) this will be used to heat and cool the functional areas of the building such as the retail area, lecture rooms, open plan offices and the smaller offices. These units will be mounted with the suspended ceiling. The treated air is distributed via a series of dusts from secondary units. The main (Primary) AHU and chiller units mounted in roof plantroom area 1. Buildings which have a large footfall through their public areas may be at risk of losing heat at designated public / major access points. This is due to the difference in the internal and external temperatures. This is more prevalent in winter and summer months. In order to overcome this a piece of plant called an air curtain can be provided which can reduce the effect of this temperature change at the point of entry. Two areas have been identified in this building. One is the entrance to the main office foyer and the other the entrance door to the retail unit. It is assumed that only one point of access is available to the retail unit for the benefit of this exercise. Doors which are not principal points of access and egress, such as emergency exits, have not been included. D) Air curtains these are provided at all primary entrances such as those to the entrance foyer and to the retail unit. The effect of the use of such items is to minimise the loss of warm air to colder air outside. Air conditioning is not only about the passage heating and cooling of air, it also caters for air purity. Within this building we note that there are centralised male and female toilet cores and kitchens on a large number of the floors. These are areas which do not require the same level of heating and cooling due to their function. In this regard it is necessary to provide for adequate ventilation to remove odours. A mechanical extract system is used to negatively charged environment which encourages the removal of odour. E) Extract systems Used in environments where air becomes directly contaminated by a particular activity or process. In the case of this building this occurs in the male / female washrooms, the kitchen areas. Electrical Services: Generally electrical services refers to the circuits for various power, DATA, IT and telecommunication services. However, these are only a small selection of the services now available in modern buildings. Mechanical services generally require power. With this in mind we will take into account the following final circuits. A) Connections to modular boiler units from the mains distribution board. B) Connection to the roof mounted AHU and chiller unit from the mains distribution board. C) Connection to individual ceiling mounted AHUs on each floor from the sub distribution board on each floor. 6
9 D) Connection to individual mechanical extracts in toilet and kitchen areas from sub distribution board on each floor. E) Connection to individual air curtains from the mains distribution board. F) Earth bonding on all pipework and plant associated with this exercise. G) Cable containment as described by the New Rules of Measurement 2 (NRM2, Electrical Services) The following assumptions have been made for the purpose pf this assignment: 1) Only the services associated with the Heating, Ventilation and Air Conditioning have been taken into account in this exercise. 2) Fire dampers within the ventilation ductwork are not electrically controlled. 3) Attenuators on ductwork are manually controlled. 4) Mains and sub distribution boards are existing and have sufficient capacity for the new units. 5) Service routes are available within the structure and so builders work in conjunction with the proposed services are minimal but will be taken into account. 6) Fire detection systems do not form part of this assignment but it is recognised that smoke detectors, heat detectors and aspiration devices and their associated control and alarm installations would be required within such a building. 7) No building management system is installed. 8) A lightening protection installation is in place and was designed with the level of plant noted within this project in mind. No alterations are required. Fig. 2 Earth Bonding ( 2015) 7
10 TASK 2 Development of prices for the building HVAC and electrical services components identified in Task 1 for each of the RIBA Plan of work stages 2013 (2, 3 and 4). RIBA Stage 2 Concept Design This stage refers to the requires the design team to prepare Concept Design, including outline proposals for building services systems, outline specifications and preliminary Cost Information (RIBA, 2013) The New Rules of Measurement 1 (NRM1, 2012) outline the purpose of an order of cost measurement in section 2.2. Specific reference is drawn to the work stage B of the Royal Institute of British Architects (RIBA) 2007 in section (b). Section further defines the purpose of the order of the cost estimate and states that it is to establish if the proposed building project is affordable and, if affordable, to establish a realistic cost limit for the building project (NRM2, 2012) and goes on to define the cost limit as the maximum expenditure the client is prepared to make in relation to the project as a whole. The RIBA work stages also provide for the preparation of a number of alternative costs in relation to alternative building types and installation scenarios. The NRM 2 also sets out the information requirements for the order of cost estimates. The NRM1 Part 2 defines the element, unit of measurement and the measurement rules for the components of the element. The information requirements for order of costs estimates are defined in paragraph (Appendix 1). This outlines the information required from the employer to allow the preparation of the order of costs estimate. Information which is required from the Architect to facilitate the preparation of the order of cost estimates is defined in paragraph (Appendix 2) Paragraph 2.4 defines the constituents of an order of cost estimate (Appendix 3). For the purpose of this assignment we have prepared the works cost estimate only. No allowance has been included for project/ design team fees as it is assumed that the design is contractor lead. All other key constituents are acknowledged but do not form part of the example. For the purpose of preparing the order of cost estimate at RIBA stage 2 we will use the floor area method. This uses the Gross internal floor area (GIFA) of the building multiplied by an appropriate cost/m2. The equation for this method is c = a x b Where, a = GIFA b = cost/m2 of GIFA for building works 8
11 c = building works estimate The GIFA for this project has been calculated as being 4,416m2 in line with the RICS Code of Measuring Practice (6 th Edition). The cost per m2 has been defined as being in the region of 160/m2 for the HVAC and associated electrical systems. All other services are deemed to be already installed. The figure of 150/m2 of the building is based on a guide figure of 180/m2 (Rawlinson and Dedman, 2010) for the installation of mechanical services generally as cited in Cost benchmarks for the installation of building services (Part 1). This figure has been adjusted to reflect the fact that only the HVAC system is being installed here at this point. Hence, 662, = 4416m2 x 150 RIBA Stage 3 Developed Design At this point it is envisaged by the RIBA Plan of works that more co-ordinated and updated proposals are being prepared. This will allow for more detailed cost information to be prepared. This more detailed cost can be developed by calculating the total cost of the building using the elemental format prescribed in the NRM1. This elemental format has a series of elemental groups which may have a series of sub-elements which allows for a more in-depth view of each of the component parts of the structure depending on complexity. The NRM notes the similarity of group pf elements used in the elemental cost planning process as defined by the NRM. The main difference is the choice and number of elements used in the cost breakdown. The choice of these elements is dependent on the level of information available. Each component is included in its relevant element and sub-element. Where sufficient cost information is available then these costs will be multiplied by the element unit quantities to ascertain an element al cost target. All quantities referred to at this point will be determined in accordance with the measurement rules of the NRM1. Where insufficient information is available for an element unit quantity then the Gross Internal Floor Area (GIFA) will be used as the alternative quantity. The total cost estimate for the building works is calculated based on the sum of all the relevant elements. NRM 1 goes into further detail regarding the measurement rules for components of the elemental cost plan. These rules enable the quantity surveyor to identify what is to be included and excluded under each heading within the cost plan. Where items are noted as excluded from a component the quantity surveyor is directed towards the relevant element or sub-element in order to provide for parity in comparison. The unit of measurement is also defined limit confusion. 9
12 For the basis of the example included in this exercise (Appendix 4) we will use Element Group (5) Services. This has a number of sub elements to it and we will be looking at those noted in the table below: Element Title Number 5.5 Heat Source 5.6 Space Heating and air conditioning 5.7 Ventilation 5.8 Electrical installations (Relating to HVAC in this example) 5.14 Builder s work in connection with services 9 Contractor s Preliminaries 10 Contractor s overheads and profit Table 1 Elements used in preparation of Elemental Cost Plan For the benefit of this exercise it has been decided to make assumptions on the percentage for preliminaries and for overheads and profits. These are stated in the workings of the example. It has also been assumed that the works are contractor designed and as such the professional design teams associated with the works are absorbed within the costs. It has also been decided to exclude the calculation of risk, inflation during the construction works and also value added tax (VAT). RIBA Stage 4 Technical Design At this stage of the design all relevant architectural, structural and building services information should be available. This will allow for the preparation of a bill of quantities for the purpose of pricing by tendering parties. An example of a bill of quantities measured in conjunction with the New Rules of Measurement 2 (NRM 2) Detailed measurement of building works is provided (Appendix 5). In order to prepare the pre-tender estimate the information used to prepare the bill of quantities will allow for the preparation of estimates on an item by item basis. Guidance on the information required is provided with the NRM 2. This information seeks to provide guidance on the content, structure and format of the bill of quantities. This guidance in provided in the form of tabulated rules divided into work sections where the rules of measurement for individual components of the structure are defined. This can then be related back to the elemental breakdown for cost comparison. In relation to the actual pricing of the items measured in the bill of quantities it must be noted that the use of a standard method of measurement such as the NRM2 allows for parity of pricing for all those tendering. A selection of estimated cost examples relating to this assignment are provided in Appendix 6. 10
13 The table below provides an overview of the cost estimates at RIBS stages 2, 3 and 4. PROJECT STAGE IN RELATION TO THE RIBA Plan of Work (2013) Stage Stage 2 -Concept Design Stage 3 - Developed Design Stage 4 - Technical Design (Initial Cost Appraisal) (Elemental Cost Plan) (Pre-tender estimate) Accuracy % <25 <15 <5 Cost 662, , , Table 2 Summary of developed costs. Conclusion: There are many ways to determine cost estimates for elements of a project. In relation to the HVAC system described in this report it has become apparent in the various estimates produced that the higher the level of specification of the system and the level of detail in relation to its integration into the building the more accurate the cost estimate provided. Furthermore the use of standard reporting systems such as the order of cost estimate detailed in the NRM1 helps to ensure the inclusion of all components and parity in reporting across the industry. 11
14 Bibliography Accessed 30 th October Royal Institute of British Architects, RIBA Plan of Work Royal Institute of Chartered Surveyors (RICS) April 2012, New Rules of Measurement 1 Order of Cost Estimating and Cost Planning for Capital Building Works. Royal Institute of Chartered Surveyors (RICS) 2012, New Rules of Measurement 2 Detailed Measurement for Building Works R. Nanayakkara and J. Fitzsimons (2000), Cost Benchmarks for the Installation of Building Services, Part 1. The Building Services Research and Information Services. S. Rawlinson and A. Dedman (2010), Building Magazine Specialist Costs M&E Services (p74-77) Spon s Mechanical and Electrical Services Price Book, (2010). Spons Press. 12
15 References (accessed 5th November 2015) (accessed 6th November 2015) (accessed 5th November 2015) (accessed 5th November 2015) (accessed 5th November 2015) Royal Institute of Chartered Surveyors, RICS Code of Measuring Practise (6th Edition) 13
16 APPENDIX 1 NRM1 Order of Cost Measurement Information required from the employer for an order of cost estimate 14
17 2.3 Information requirements for order of cost estimates To enable preparation of an order of cost estimate, information will be required from the employer as follows: (a) Location of the site and the availability of the site for commencement of the building project. (b) A statement of building use. (c) A statement of floor area (or number of functional units) and schedule of accommodation in conjunction with the architect. (d) Requirements for refurbishment (if the project comprises rehabilitation of an existing building) in conjunction with the architect. Details of the new use and any outstanding maintenance or repairs necessary to give the building fabric the required life expectancy are required. (e) Initial project/design brief, including statement of quality, sustainability requirements and fit-out requirements in conjunction with the architect. (f) Details of any enabling works, decanting or other specific requirements. (g) Indicative programme, including key dates (e.g. planning application and occupation dates). (h) Details of any particular restraints to be imposed by the employer, local planners or statutory undertakers in conjunction with the architect (e.g. work in a secure area, limitations on building position, work in a conservation area, work to a historic or listed building, external appearance and number of storeys). (i) Details of any particular site conditions in conjunction with the architect (e.g. sloping site, likelihood of contaminated ground, demolition of existing buildings, adequacy and condition of existing mains services). (j) Budget/cash flow constraints. (k) Initial views (if any) on construction procurement options and contract strategies. (l) Life span (e.g. 10 year, 25 year or 60 year target life span). (m) An indication of the proposed storey heights of the building in conjunction with the architect. The introduction of raised access floors for IT cabling or deep suspended ceiling voids for mechanical and electrical services installations could significantly increase storey height, thus increasing estimated costs. Where such requirement is known, it is recommended that this is stated. (n) Particular requirements in respect of mechanical and electrical services installations in conjunction with the architect (and mechanical and electrical services engineer if appointed). (o) Requirements in respect of: + treatment of project/design team fees; + approach to other development/project costs; + treatment of inflation; and + treatment of Value Added Tax (VAT). (p) Other considerations (e.g. approach to dealing with capital allowances, land remediation and grants). 15
18 APPENDIX 2 NRM1 Order of Cost Measurement Information required from the architect for an order of cost estimate 16
19 2.3.2 To enable preparation of an order of cost estimate, information will be required from the architect as follows: (a) Design study sketches or drawings for each alternative design/development option to a suitable scale, comprising: + floor plans (for each different floor plate configuration/shape and use); + roof plan(s); + elevations; and + sections. (b) Schedule of gross external areas (GEA), gross internal floor areas (GIFA), net internal areas (NIA) (i.e. usable area for shops, supermarkets and offices) on a floor by floor basis and site area (SA). (c) Minimum storey heights. (d) Schedule of accommodation in conjunction with the employer. (e) Number of car parking spaces and whether above ground or below ground. (f) Indicative specification/design intent for building option(s). (g) Indicative environmental/sustainability strategy in conjunction with the mechanical and electrical services engineer. (h) Advice on likely site constraints. (i) Advice on likely planning constraints. (j) Definition of fit-out. (k) Initial risk register/log. 17
20 APPENDIX 3 NRM1 Order of Cost Measurement Order of Cost Estimate Template 18
21 19
22 APPENDIX 4 Order of Cost Estimate Example 20
23 SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ORDER OF COST ESTIMATE ITEM ELEMENT QTY UNIT COST TOTAL Group Element (2) - SUPERSTRUCTURE A B (5) HEAT SOURCE BOILER (Assumed) 120 kw , (6) SPACE HEATING AND AIR CONDITIONING 4416 M , C (7) VENTILIATION 4416 M , D (8) ELECTRICAL INSTALLATION 4416 M , E (14) BWICS 4416 M , SUB-TOTAL 514, Group Element (9) - Main Contractor Preliminaries Preliminaries (assumed) 5 % 514, , Group Element (10) Main Contractor's Overheads and Profit Main Con O/H/P (assumed) 8 % 514, , TOTAL COST OF INSTALLATION EXCL. VAT 580, NOTES: 1) M2 is defined by the calculation of the gross internal floor area (GIFA) in accordance with the RICS Code of Measuring Practice 6th Edition Sum of the areas of all floors (Basement to 3rd floor) excluding service voids and lift shafts 2) The designin this installation is contractor lead 4416 M ,
24 APPENDIX 5 Bill of Quantities Example 22
25 SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD Charles Mitchell (38) Mechanical Services Student Quantity Unit Rate total Primary Equipment A Modular Boiler unit; located in basement (Store 1) Fleet Vertical - Three-High F40V-120, A-rated efficiency, load 50/30C 120kW, with proprietary casing on integrated frame and anti-vibration mountings fixed to concrete slab with M12 stainless steel bolts. 1 Nr , B Offload and position of boiler 1 Nr Terminal Equipment and fittings Heating C D Quinn Slieve horizontal double radiator, steel, white, 505x1800mm, 2941 Watt at 50 degree C, mechanically fixed to blockwork with M10 diameter stainless steel fixings incorporating wall anchors 81 Nr , Daikin Biddle recessed air curtain, overall length 2000mm 150mm wide, 80kW output, remote operated (hand held unit included), fitted withing suspended ceiling void, fixed to soffit of concrete slab above using unistrut hanger system or equal approved. 2 Nr , Pipework Qualpex flexible poyehthelene pipework in risers E 20mm diameter; fixed to concete walls M , F 15mm diameter; fixed to concete walls M , AIR HANDLING UNITS G H Primary Air Handling Unit - Roof mounted size, capacity loading and rating as per the consultant engineer's specification. Housed within a galvanised steel frame with galvanised sheeting. Fixed on anti vibration mating and secured to concrete roof slab. 1 NR , Chiller unit - Roof mounted with size and capacity and loading and rating as per the consultant engineer's specification. Housed within a galvanised steel frame with galvanised sheeting. Fixed on anti vibration mating and secured to concrete roof slab. 1 NR , To collection 248,
26 SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD Charles Mitchell (38) Mechanical Services Student Quantity Unit Rate total A Ceiling mounted AHU mounted in ceiling voids. Size, loading and rating as per the consultant engineer's specification. Finished flush with ceiling grid. 56 NR , Qualpex flexible poyehthelene pipework in risers B 20mm diameter; fixed to concete walls 524 M , C 15mm diameter; fixed to concete walls 524 M , Venitlation Ducts D 200x200mm rectangular sheet metal ducting as per Engineer's specification. Suspended in ceiling voids and in service risers on unistrut and hanger system or equal approved 524 M , Duct Ancillaries E Supply and installation of 1hr fire dampers in rectangular ducts as per engineer's requirements 38 NR , Mechanical Extracts E F Vent-axia T-Series ceiling mounted extract fan 310x303mm Model TX6PL. Mounted in suspended ceiling as per manufacturers specifications 20 NR 150 3, mm flexible PVC ducting as specified including fittings and the likes. 82 M 55 4, G Testing of mechanical systems (assumed) Item 2, H Commissioning as per specification (assumed) Item 2, J Drawing Preparation (As built) (assumed) Item To Collection 222,
27 SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD Charles Mitchell (38) Mechanical Services Student Quantity Unit Rate total Pg 38/1 248, Pg 38/1 222, To Summary Page 470,
28 SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD Charles Mitchell (38) Mechanical Services Student Quantity Unit Rate total SUMMARY PAGE Preliminaries (5% assumed) 23, (38) Mechanical Services 470, (39) Electrical Services (assumed) 8, TOTAL COST (Excluding VAT) 502,
29 APPENDIX 6 Estimated Costs Examples 27
30 EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: 15mm diameter pipework Description Unit Cost ( /m) Number Length (M) Total Pipework (Spons) , Brakets fixed to walls (2 per m) , degree elbow (male / Female) Equal tee , PAGE 1 TO COLLECTION 21, EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: 20mm diameter pipework Description Unit Cost ( /m) Number Length (M) Total Pipework (Spons) , Brakets fixed to walls (2 per m) , degree elbow (male / Female) , Equal tee , PAGE 2 TO COLLECTION 23,
31 EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: VENTILATION DUCTS 200mm Rectangular Galvanised Sheet metal Description Unit Cost ( /m) Number Length (M) Total 200 x 200 mm galvanised sheet metal , mm 90deg segmented radius bends Unistrut supports , mm Branches , Insulation 1/2 hour , PAGE 3 TO COLLECTION 79, EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: Air Handling Unit (roof mounted) 10m3@700Pa Description Unit Cost ( /m) Number Length (M) Total AHU 17, , E/O inlet and discharge attenuators 5, , Extra for external location , PAGE 4 TO COLLECTION 33,
32 EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: Air Handling Unit (ceiling mounted) Description Unit Cost ( /m) Number Length (M) Total Ceiling mounted AHU , DCC Control pack , PAGE 5 TO COLLECTION 85, EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: Air Curtains Description Unit Cost ( /m) Number Length (M) Total Air curtains 240V 2500 x 590 x 270 5, , PAGE 6 TO COLLECTION 12,
33 EXAMPLE COSTS SALFORD UNIVERSITY - ACADEMIC CONSULTANCY LTD ITEM: RADIATORS - Twin Panel Description Unit Cost ( /m) Number Length (M) Total Radiators (twin Panel) 500X2000mm 100mm deep 1, , Therostatic Valves (assumed) , PAGE 7 TO COLLECTION 116,
34 APPENDIX 7 Schedule of Mechanical Equipment 32
35 UNIVERSITY OF SALFORD Charles Mitchell MECHANICAL & ELECTRICAL QUANTITY SURVEYING Student Mechanical Services Schedule PLANT DESCRIPTION Basement Ground 1st 2nd 3rd Roof Total Boiler Modular Boiler 1 1 Radiator AHU - Ceiling unit AHU - Main Unit 1 1 Chiller 1 1 Mechanical Extract Air Curtain
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010
EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a
50 St Mary Axe London EC3
50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series
David Watkins RIBA Part 3 Course 2014. Cost Control and Management
David Watkins RIBA Part 3 Course 2014 Cost Cost Management Control and and Management_dhw_2014 Control_dhw_2014 For which of you, desiring to put up a tower, For which does of not you, first desiring give
Fire. The Fire Installers Mate. A guide to fire alarm systems design
Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects
PRE-LEASE SURVEY OF THE ENGINEERING SERVICES. XXXX London
PRE-LEASE SURVEY OF THE ENGINEERING SERVICES AT London Client: Clients Representative: For the Attention of: Telephone N o Site Address: London Report prepared by: Contact Name: FHP Engineering Services
Decree of the Ministry of the Environment on fire safety of ventilation systems
THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18
A Guide to... Home Renovation Incentive (HRI)
A Guide to... Home Renovation Incentive (HRI) About this guide This guide will tell you what you need to know if you are organising to have construction work done on your house and would like to avail
Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1
School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
Fire Safety Risk Assessment
1 Sources of ignition The main sources of ignition in Cass building are: PAF arrange for the fixed electrical installation to be tested in accordance with the British Standards. Test certificates are kept
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
CONSTRUCTION COST GUIDE
KEEPING YOUR COSTS TO A MINIMUM CONSTRUCTION COST GUIDE SECOND HALF 2012 One Lower Leeson Street, Dublin 2, Ireland Telephone 01 685 7219 Email [email protected] Website www.build.ie SCSI TENDER INDICES Building
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
Building Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
DRAFT Document valid at the date shown on the page header. DETE Facilities Design Standards and Guidelines. General Index. Planning Guidelines
DETE Facilities Design Standards and Guidelines General Index P D S R Planning Guidelines Design Guidelines Standards Reference Documents DRAFT Document valid at the date shown on the page header. * Documents
Building Control Guidance Note
Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions
PROJECT COST ESTIMATES & FEASIBILITIES
PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed
Energy Company Obligation (ECO): Technical Monitoring Questions
Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified
Comparison between Decentralised and Centralised Air Conditioning Systems
Comparison between De and Centralised Air Conditioning Systems (Summary) FassadenSystemLüftung FassadenSystemLüftung Telephone +49/ 28 45/ 2 02-711 GmbH & Co KG Telefax +49/28 45/2 02-2 25 Heinrich-Trox-Platz
Energy Efficiency HOSPITALITY. www.energia.ie
Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real
QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE
DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE AUGUST 2012 DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE POJECT DATA SHEET NOTE Bills of Quantities Stage
SECTION 11 78 13 MORTUARY REFRIGERATORS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in
Acoustic Design Practices for Sustainable Buildings
Acoustics 2008 Geelong, Victoria, Australia 24 to 26 November 2008 Acoustics and Sustainability: How should acoustics adapt to meet future demands? Acoustic Design Practices for Sustainable Buildings Danny
Heating and Hot Water Services Controls General Technical Specification
Construction Services Heating and Hot Water Services Controls General Technical Specification Version 1.0 Environment Heating and Hot Water Services Controls General Technical Specification Contents 1.
Combi Unit Genius. The energy efficient Building Service Centre
Fans Air Handling Units Air Distribution Products Fire Safety Air Curtains and Heating Products Tunnel Fans Combi Unit Genius The energy efficient Building Service Centre systemair Central Building Services
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
Glossary of HVAC Terms
Glossary of HVAC Terms Heating, Ventilation and Air Conditioning (HVAC) is a major sub- discipline of mechanical engineering. The goal of HVAC design is to balance indoor environmental comfort with other
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
Datacentre Capability March 2015
Callaghan Engineering Consul-ng Engineers Project Managers Datacentre Capability March 2015 Callaghan Engineering Multi-discipline engineering & project management company Established in 1990 Offices in
I.S. 3218 :2013 Fire Detection & Alarm Systems
I.S. 3218 :2013 Fire Detection & Alarm Systems Overview of significant changes 26 th March 2014 FPS Ltd Today s Programme Commencement Transition Competence & Qualifications System Certification System
Energy Efficiency. Bars & RestauRants. www.energia.ie
Energy Efficiency Bars & RestauRants www.energia.ie 2 Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could
EXAMPLE OF A DATA CENTRE BUILD
EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist
21.1 Functions, Basic Configuration, and Interfaces
21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES
WBCA 403 DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES A guide to assist those intending to install or who are involved in installing conservatories. Includes information about: conservatory and component
FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
RICS NEW RULES OF MEASUREMENT Bill of Quantities for Works Procurement
RICS NEW RULES OF MEASUREMENT Bill of Quantities for Works Procurement st edition RICS NEW RULES OF MEASUREMENT Acknowledgments The project stages from the RIBA Outline Plan of Work 007 (Amended November
Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2
Pollution CO CO 2 Carbonaceo us soot H 2 S, NOX, SO2 The National Building Code (NBC) contains set of minimum provisions, designed to protect the safety of the public with regard to structural sufficiency,
technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!
uality using advanced building technology UICK uality innovative progressive sustainable any design, any shape, any colour, anywhere you like! 2 NicheQ is an award winning progressive and innovative builder
Data Centres A complete solution to noise control and acoustic packages
Data Centres A complete solution to noise control and acoustic packages Introduction World class noise control. Expertise you can trust. IAC Acoustics is world-renowned for providing cost effective solutions
PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW
CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
Apartment and Communal Heating Solutions
Apartment and Communal Heating Solutions Apartment and Communal Heating Due to the increasing requirements for more energy efficient buildings and changes to the Code for Sustainable Homes Legislation,
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
OPTIONS. for. Replacing Boiler Plant. Sussex Lodge London W2 & 16 Stanhope Terrace London W2
OPTIONS for Replacing Boiler Plant Report to Tenants Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers Tel: 01932 873 653 13 JULY 2003. Replacing Boiler Plant... 1 1. Existing
MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
I.S. 3218 :2013 Fire Detection & Alarm Systems
I.S. 3218 :2013 Fire Detection & Alarm Systems Overview of significant changes 26 th March 2014 FPS Ltd Today s Programme Commencement Transition Competence & Qualifications System Certification System
Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division
Management of Asbestos Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Getting it Wrong! Asbestos What is it? With the Naked Eye! Naturally occurring silicates
Project Close Out Summary
Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As
Home Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 [email protected] Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
Case Studies Illustrating Acoustic Design Guidelines for HVAC Systems in Schools
Cleveland, Ohio NOISE-CON 2003 2003 June 23-25 Case Studies Illustrating Acoustic Design Guidelines for HVAC Systems in Schools Robert M. Lilkendey, Siebein Associates, Inc. 625 NW 60 th Street, Suite
- 5 - Table1. Maximum Compartment Volumes
- 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,
SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such
Accurate data and the whole life costing culture. Kathryn Bourke Whole Life Ltd [email protected]
Accurate data and the whole life costing culture Kathryn Bourke Whole Life Ltd [email protected] Overview Part 1 Why Bother about LCC? Standards - BS/ISO 15686-5 and UK Standardised Method
Nominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
81-91 COMMERCIAL ROAD, LONDON E1 1RD OFFICES TO LET 81-91 COMMERCIAL ROAD, LONDON E1 1RD. 3,499 ft² (325 m²) 37,222 ft² (3,458 m²)
8-9 COMMERCIAL ROAD, LONDON E RD S TO LET 3,499 ft² (325 m²) 37,222 ft² (3,458 m²) 8-9 COMMERCIAL ROAD, LONDON E RD LOCATION The premises are located on the north side of Commercial Road at the junction
The Concept. How Cassettair can benefit you. Applications. Selecting Cassettair
The Concept A Europe-wide research and development programme identified the need for a high performance cassette fan convector, powered by low pressure hot water and compatible with universal suspended
Overview of Hotel Fire Safety Requirements
Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined
1.2 Refrigerant Equipment. General
Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or
Integrated Solar Radiant Systems
Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant
CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov
CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.
BUILDING COST UPDATE: Q1 2014 COMMERCIAL FIT-OUT AND REFURBISHMENT
BUILDING COST UPDATE: Q1 2014 COMMERCIAL FIT-OUT AND REFURBISHMENT UK BUILDING CONSULTANCY COST CONSULTANCY 2014 EDITION A A 2 BUILDING COST UPDATE INTRODUCTION The construction industry is reporting activity
Date: 30 January 2014 Public
Committee: Housing Management and Almshouses Sub Committee Subject: Detailed Options Appraisal Boiler Replacement Programme 2013-14 and 2014-15 Report of: Director of Community and Children s Services.
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Engineers Edge, LLC PDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Communication
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary
RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...
BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
Directorate for the Built Environment Building Standards Division
Directorate for the Built Environment Building Standards Division Energy Management Solutions Ltd Investigation of measures to improve the energy performance of a existing building: Retail JUNE 2009 Report
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
BUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
Building Services Engineering Technician
Building Services Engineering Technician A competent Building Services Engineering Technician is expected to be able to demonstrate the following skills and competences: Systems design in the building
REFURBISHMENT OF CONCRETE BUILDINGS:
Guidance Note GN 8/99 REFURBISHMENT OF CONCRETE BUILDINGS: Structural & services options C A Gold, BCA A J Martin, BSRIA Guidance Note GN 8/99 REFURBISHMENT OF CONCRETE BUILDINGS: Structural & services
BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad
BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad PLEASE MARK TICK ON LEFT BOX WHICH EQUIPMENT YOU HAVE QUOTED PROPOSAL BASED ON CHINESE EQUIPMENT
Housing standards: evidence and research. Dwelling size survey. A report prepared by Scott Wilson for CABE in April 2010.
Housing standards: evidence and research Dwelling size survey A report prepared by Scott Wilson for CABE in April 2010. This document has been prepared in accordance with the scope of Scott Wilson s appointment
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839
AVAILABLE TO DOWNLOAD ON THE APOLLO APP a guide to Fire Alarm Systems Design BS5839 Part1:2013 The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply! What
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
Site Survey Questionnaire
Site Survey Questionnaire Site location:. Grid refereence.. Date:././. Name of company:... Address:........ Name and position of respondent:... Type of business, including specialisations:.... MCM land
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
plumbing products guide
plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Heating Systems for Low Energy Buildings
Heating Systems for Low Energy Buildings Introduction...2 The design process...4 Energy efficiency...5 Heat Generation...7 i) Combined Heat and Power (CHP)...7 ii) Multiple Boiler Arrangements...7 iii)
FIRE-FIGHTING DESIGN BRIEF REPORT
P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM
State of Connecticut Department of Public Health RADON PROGRAM
State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon
Airline. small air handlers and extract fan units. VES Airline part of a complete range of innovative, flexible products from the HVAC experts
Lo w p r o f i l e small air handlers and extract fan units Duties to 0.55m 3 /sec Available with the Electroline fitted control panel Ceiling void friendly - unit heights from 190mm to 350mm Airline VES
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement