OXBOW RESTORATION PROJECT RECONNECTING TO OUR RIVER AND OUR HABITAT
|
|
|
- Priscilla Newman
- 10 years ago
- Views:
Transcription
1 OXBOW RESTORATION PROJECT RECONNECTING TO OUR RIVER AND OUR HABITAT John O Meara, Jane Tesner, Razik Alsaigh Environmental Consulting & Technology, Inc Washington Blvd., Suite 3500 Detroit, MI And Tilton & Associates, Inc. 501 Avis Dr., Suite 5C Ann Arbor, MI ABSTRACT The Rouge Oxbow Restoration Project is located at the Henry Ford Museum & Greenfield Village (HFMGV) adjacent to the Rouge River in Dearborn, Michigan. Until recently, the water quality of the Rouge River had degraded significantly as a result of pollutant loadings from various sources. In addition, development within the watershed had resulted in a significant reduction in the percentage of pervious area tributary to the River. A flood control project on the River was constructed in the 1970s to prevent flooding in the river basin. One of the main features of the project was the enlargement and concrete realignment of the approximately 9 miles of the original river. Consequently, a number of river meanders were cut off, creating several shallow oxbow wetlands. The main objective of the Oxbow Restoration Project is to enhance the ecological viability of this western-most Oxbow by creating valuable fish and wildlife habitat, restore functioning riverine wetlands that have been lost due to channelization and improve water quality. Secondary objectives include additional flood storage, providing educational/interpretative opportunities and improved aesthetics of the channel and upland island. The project will be completed in three phases: Phase I - Oxbow Restoration; Phase II - Combined Sewer Overflow (CSO) Modifications; and, Phase III - Open Cut Connection to the Rouge. An existing storm sewer will provide river water to the Oxbow during Phase I and a siphon will connect the wetlands on both sides of the existing CSO until Phase II. Phase I will provide restoration of the Oxbow Wetlands similar to riverine wetlands common in southeast Michigan rivers. The restoration will provide a 2,200-ft channel that will vary in width from 15 to 105 feet and depths of 3 to 6 feet. The channel will be surrounded by 3 acres of submergent and emergent wetland systems that provide habitat for various fish and aquatic species. Aquatic habitat will be enhanced by appropriate placement of woody material (shelter) and submergent plant species in and near deeper pool areas with plants such as Pickerel Weed, Arrow Arum, Water Lily, and Water Plantain. The wetland will transition to 10 acres of existing and proposed upland woodlands and open areas and will be planted with various tree, shrub, grass and wildflower species. Bioengineering techniques will provide stabilization of slope areas. Plant species have been chosen to reflect historic southern Michigan riverine wetland and floodplain systems, as well as including species that were utilized by the indigenous people (primarily Potowatomi and Chippewa) for food, medical and cultural materials. Upon
2 stabilization, certain fish species will be introduced to the oxbow wetlands, including bass, channel catfish and bowfin. Various wildlife anticipated to use these habitat areas include macroinvertebrates, amphibians, reptiles, waterfowl and small mammals such as black crowned night heron, wood duck, frogs, turtles, mink, and muskrat. Upon completion of construction, the oxbow upland will have a new educational program based on the people that originally occupied the area and their use of the river, developed and implemented by HFMGV. It is anticipated that project will also be utilized by the adjacent Henry Ford Academy for biological/ecological studies, including water quality/quantity monitoring, botanical and wildlife surveys. Phase I restoration is estimated to take 6 to 9 months to construct with an additional 2 years establishment period prior to Phases II & III. This time shall allow the wetland system to stabilize and be maintained accordingly. Phase I construction will begin in May 2001 and therefore the restoration, less establishment, should be completed by the end of KEYWORDS River restorations, wetlands, ecology restoration, habitat restoration BACKGROUND The Rouge Oxbow Restoration Project is located at the Henry Ford Museum & Greenfield Village (HFMGV) adjacent to the Rouge River in Dearborn, Michigan. HFMGV STUFF. Figure 1: Rouge River Location Map Figure 2: Site Location Map Until recently, the water quality of the Rouge River had degraded significantly as a result of pollutant loadings from various sources. Additionally, because of its characteristics and its watershed, the lower reaches of the Rouge River had always been susceptible to flooding. The flat river slope and the meandering channel could not pass the large flows associated with major precipitation events. Upstream urbanization continued to exacerbate this problem culminating in the floods of the local communities. The tremendous financial impact from these floods caused the communities to seek help from the federal government. The resulting flood control project
3 was authorized by the Flood Control Act of 1962 to prevent flooding of the Dearborn/Melvindale area of the Rouge River. The project was completed in the mid The basis of design for the project was to enlarge the cross sectional area of the river channel, to reduce the flow resistance through the use of concrete, and to realign (straighten) the main channel of the river from the navigation turning basin at the Detroit-Dearborn city limit to Michigan Avenue in Dearborn. The channel realignment reduced the channel length from 5.8 miles to 4.2 miles by straightening the meandering channel. Consequently, a number of oxbow bends were cut off from the realigned channel. Figure 3 shows the United States Army Corps of Engineers (USACOE) channelized plan drawing of the area. Figure 4 and 5 show the channelized portion of the Rouge River. In addition, development within the watershed had resulted in a significant reduction in the percentage of pervious area tributary to the River. Figure 3: USACOE Channelization Plan (From USACOE Rouge River Flood Control Project The resulting concrete channel was hydraulically efficient and cost effective. Unfortunately, it also destroyed the aquatic habitat and all but precluded the passage of most fish from the abundant Detroit River to the upper reaches of the Rouge River. In an effort to provide habitat, resting locations for potential migratory fish, recreational opportunities and to restore wetland area, Wayne County, Michigan and the Henry Ford Museum & Greenfield Village (HFMGV) have undertaken the restoration of the Oxbow. The Project discussed in this paper retains the flood control characteristic of the original project while helping to restore some of the habitat destroyed by channelization
4 PRE-RESTORATION CONDITIONS General Conditions The width of the oxbow bend prior to the channel improvement ranged from 75 to 150 feet (ft), and the preconstruction oxbow bottom elevation ranged from 568 to 570 ft-ngvd. The length of the oxbow was about 2,980 ft. Figure 6 provides an aerial view of the oxbow area prior to any construction activities. A major Combined Sewer Overflow (CSO) outlet owned and operated by the City of Dearborn also transects the oxbow. The construction of the CSO discharge required to transect the oxbow island was performed as part of the original flood control project. Fill material has been placed in the oxbow on several occasions since the channel was constructed. The former oxbow channel area has been filled in to various elevations ranging from 573 to 579. The typical fill elevation was about 576 ft-ngvd. The type of fill materials in the oxbow, include earth, bricks, concrete, steel bars, tree branches, coal piles, refrigerators and other urban debris, including the paverbial kitchen sink. Wetlands Conditions Two major features contribute to the conditions of the preconstruction wetlands. First, the Figure 6: Aerial View of Oxbow Area water input for the wetland was limited to precipitation events and surface water flow, including storm water discharge from culvert outlets. The second feature was the presence of construction debris and fill material within various portions of the channel. These two factors combined to influence the wetland conditions. The water input encouraged the oxbow to become a forested wetland including large deciduous trees and shrub material. There was little groundcover vegetation to provide food and shelter for wildlife. There were areas of standing water especially during the spring months, but the areas were vulnerable to drying out towards the end of the summer. The water depths in these wetlands were shallow and variable and therefore did not provide suitable habitat for fish and amphibians. The fill material
5 had interrupted contiguous portions of the wetland, thus creating smaller wetlands throughout the oxbow channel. Due to the nature of some of the fill material, vegetation was unable to establish in these areas. Figure 7: Pre-Construction Oxbow Channel Figure 8: Pre-Construction Oxbow Channel Some of the wetland vegetation species included the following: Silver maple (Acer saccharinum), FACW Green Ash (Fraxinus pensylvanica), FACW Cottonwood (Populus deltoids), FAC+ Wildlife within the oxbow channel potentially included woodland species such as opossum (Didelphis virginiana), chipmunk (Tamias striatus), fox squirrel (Sciurus niger), raccoon (Procyon lotor), and various bird species such as downy woodpecker (Picoides pubescens) and white-breasted nuthatch (Sitta carolinensis). Hydroperiod Conditions The flood flows and flooding levels expected for a range of return periods in the Rouge River at HFMGV are given below. The long-term average Rouge River level of feet (Dearborn datum) was to be used for the design.
6 Table 1: Flood Flows and Flooding Levels Return Period Flood Flow (cfs) Flooding Level (feet- Dearborn datum) (Years) 1 1, , , , , Return Period Flood Flow (cfs) Flooding Level (feet- Dearborn datum) (Years) , , , RESTORATION PLAN The main objective of the Oxbow Restoration Project was to enhance the ecological viability by creating valuable fish and wildlife habitat, restoring functioning riverine wetlands that have been lost due to channelization and improving water quality. Secondary objectives included additional flood storage, providing educational/interpretative opportunities and improved aesthetics of the channel and upland island. The project is being completed in three phases: Phase I - Oxbow Restoration; Phase II - Combined Sewer Overflow (CSO) Modifications; and, Phase III - Open Cut Connection to the Rouge. An existing storm sewer will provide river water to the Oxbow during Phase I and a siphon will connect the wetlands on both sides of the existing CSO until Phase II. The final conceptual plan and cross sections of the oxbow are shown in Figure 9, 10, and 11. Figure 9: Final Design Layout
7 Figure 9: Final Design Layout Figure 11: Conceptual Cross-Sections
8 Phase I Restoration Ecology Phase I will provide restoration of the Oxbow Wetlands similar to riverine wetlands common in southeast Michigan rivers. The restoration is providing a 2,200-ft channel that will vary in width from 15 to 105 feet and depths of 3 to 6 feet, with some deeper holes for fish habitat. The channel is be surrounded by 3 acres of submergent and emergent wetland systems that provide habitat for various fish and aquatic species. Aquatic habitat is being enhanced by appropriate placement of woody material (shelter) and submergent plant species in and near deeper pool areas with plants such as Pickerel Weed, Arrow Arum, Water Lily, and Water Plantain. The wetland will transition to 10 acres of existing and proposed upland woodlands and open areas and will be planted with various tree, shrub, grass and wildflower species. Figure 11: Conceptual Cross-Sections Figure 10: Conceptual Cross-Sections Figure 12: Water Lily Bioengineering techniques are being used to provide stabilization of slope areas. Plant species have been chosen to reflect historic southern Michigan riverine wetland and floodplain systems, as well as including species that were utilized by the indigenous people (primarily Potowatomi and Chippewa) for food, medical and cultural materials. Figure 13: Water Plantain Upon stabilization of the wetland, certain fish species will be introduced to the oxbow wetlands, including bass, channel catfish and bowfin. Various wildlife anticipated to use these habitat areas include macroinvertebrates, amphibians, reptiles, waterfowl and small mammals such as black crowned night heron, wood duck, frogs, turtles, mink, and muskrat.
9 Phase I Restoration Hydraulics Prior to channelization of the Rouge River, most of the HFMGV property drained into the oxbow through several 12 to 24 inch diameter storm drain outlets. When the Rouge River channel was constructed in the early 1970's, most of the storm drainage was rerouted to the Suwanee Lagoon (another former oxbow) on the HFMGV property. The Suwanee Lagoon overflows into a storm water pump station which is located near the lagoon on the Greenfield Village side of the oxbow. The pump station lifts overflow from the Suwanee Lagoon into a discharge manhole, then flows by gravity from the discharge manhole into a junction chamber and then into a 60 inch storm drain which outlets to Rouge River channel. A section of the 60 inch diameter storm drain in the bottom of the oxbow channel is being removed to provide the hydraulic connection. Two headwalls are being constructed on the 60 inch diameter storm drain: a headwall for discharges into the oxbow wetland from the Suwanee Lagoon pump station; and headwall for discharges from the oxbow to the Rouge River channel. The storm water pump station will remain in-service when the oxbow is restored. Drainage from HFMGV will be pumped into the oxbow, flow through the wetland oxbow, and subsequently flow to the Rouge River by gravity through a portion of the existing 60 inch diameter drain outlet which is to remain. The water level in the oxbow will be equalized to the river level through this 60 inch diameter connection. The City of Dearborn has a Combined Sewer Overflow (CSO) outfall which crosses Greenfield Village. Prior to the Rouge River channelization, this CSO outfall discharged into the oxbow. When the Rouge River was channelized, the outfall was extend about 970 feet with a 12 foot diameter conduit from the Greenfield Village side of the oxbow to the river channel. The CSO outfall is directly in the way of restoring the oxbow channel. In Phase I, the oxbow is still divided into two sections by the CSO outfall. In order to provide to provide a water supply to the east section of the oxbow, a 36- inch diameter siphon conduit under the CSO outfall is being constructed The 36-inch siphon under CSO outfall will connect two 4 foot diameter manholes risers which will always be underwater. Phase I Educational/Recreational Programming Upon completion of construction, the oxbow upland will have a new educational program based on the people that originally occupied the area and their use of the river, developed and implemented by HFMGV. It is anticipated that project will also be utilized by the adjacent Henry Ford Academy for biological/ecological studies, including water quality/quantity monitoring, botanical and wildlife surveys. The oxbow restoration provides a unique opportunity within the HFMGV to provide passive recreational and educational opportunities. The structure of activities at the HFMGV provides a forum for experiencing a variety of natural ecosystems. Passively, the restoration efforts can be viewed from the rail cars on the passenger railroad as well as from observation areas on the upland area interpretive displays. The educational opportunities arise from historical interpretations that can be drawn from the setting including utilizing signage, activities, and
10 specialized displays (i.e. a Native American birch canoe anchored at the shore of the oxbow channel). Educational opportunities also exist with the close proximity of the Henry Ford Academy in the village. Students and educators may elect to participate in monitoring the growth and success of the restoration project via vegetation monitoring, water quality sampling, water flow monitoring, wildlife monitoring, etc. Many subjects can make use of the various natural areas in the channel area to enhance learning, such as math, science, art, history, engineering and music. Phase I Construction Conventional excavation equipment is being used to remove the fill material within the oxbow channel. Using such equipment as backhoes and dozers makes this much more of a straight forward grading project and allowed a wider range of qualified contractors to bid on the project. Initial construction activities began in July 2001, with an extensive clearing and grubbing operation. This was intended to not only reestablish the limits of the channel but to also provide for specified forested habitat zones. Figure 14: Clearing & Grubbing Figure 15: Habitat Half of the fill that was removed was used to structure areas within the upland area. However, soils/sediment that was mixed in with the urban fill (debris, brick, concrete, mortar and tree branches) was hauled off to a landfill for disposal, avoiding the difficult and costly task of separating out the urban material. Figure 16: Excavation
11 At the time that this paper was being written the following construction activities were still to be completed: Construction of the siphon with manhole risers under the 12-foot diameter Dearborn CSO outfall. Removal and disposal of approximately 160 feet, 60-inch RCP storm sewer. The hydraulic connection to the Rouge River. Placement of habitat augmentation and wetland seeding and plantings. Stocking the oxbow with fish. Wetland Maintenance Phase I restoration is estimated to take 3 to 6 months to construct with an additional 2 years establishment period prior to Phases II & III. This time shall allow the wetland system to stabilize and be maintained accordingly. Phase I construction began in July 2001 and therefore the restoration, less establishment, should be completed by the end of ACKNOWLEDGEMENTS Wayne County Department of Environment would like to thank Environmental Consulting & Technology, Inc. of Detroit, Michigan and Tilton & Associates of Ann Arbor, Michigan for their leadership, design, and construction oversight for this project. Additionally, this project has been funded in part by grants, from the State of Michigan under its Clean Michigan Initiative and from the USEPA. REFERENCES U.S. Army Engineers District, Detroit, CORPS of Engineers (1972) Rouge River Flood Control Project I:\PROJECTS\Oxbow Construction\Public\WEF Watershed 2002 paper.doc
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Prepared By: Tom Parker Geum Environmental Consulting, Inc.
Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop
Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Welcome to the Mission Reach! The Mission Reach Ecosystem Restoration and Recreation Project is transforming
Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
Muddy River Restoration Project Project Description
Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
Background Information: The Mamquam River Floodplain Restoration Project
Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries
GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS
RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline
San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
Michigan Wetlands. Department of Environmental Quality
Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about
The Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
Mosquito Control Guidelines
Appendix G Mosquito Control Guidelines This appendix presents the guidance for designing and maintaining stormwater treatment measures to control mosquitoes from ACCWP s Vector Control Plan. Project sponsors
Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.
Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
Neversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
The Muddy River: A Century of Change
The Muddy River: A Century of Change Tom Brady, Brookline Conservation Administrator, Tree Warden, Town Arborist 617-730-2088 or [email protected] Muddy River Flood Damage Reduction and Environmental
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
September 7, 2011 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction
DID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER
DID YOU KNOW... THE IMPAT OF ON-SITE SEWAGE SYSTEMS AND ILLIIT DISHARGES ON THE ROUGE RIVER by Barry Johnson, P.E., M.S., amp Dresser & McKee and Dean Tuomari, Wayne ounty Department of Environment The
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT A. Existing Conditions Ramsey is fortunate to have an ample amount of natural resources and open space areas and a community attitude that is increasingly
Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria
Experience in Wetlands restoration and conservation concerning natural water retention measures Ministry of Environment and Water, Bulgaria Water management in Bulgaria - Water management in Bulgaria national
WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION
WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION Edward H. Kluitenberg, P.E., Applied Science, Inc. Gary W. Mercer, P.E., Camp, Dresser and McKee Vyto Kaunelis, Wayne County Department of
Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014
Estabrook Dam A Discussion of Alternatives Public Scoping Meeting June 5, 2014 Presenters Kevin Haley, PLA, Milwaukee County Don Pirrung, P.E., PH, AECOM Mike Hahn, P.E., PH, Southeastern Wisconsin Regional
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
4.2 Buena Vista Creek Watershed
Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
ANGORA FIRE RESTORATION PROJECT
ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Increasing water availability through juniper control.
Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 [email protected] Increasing water availability through juniper control. Throughout the region
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water
Backyard Buffers that Work for People and Nature by Restoring Ecological Function
Backyard Buffers that Work for People and Nature by Restoring Ecological Function What is a Wetland Buffer? A wetland buffer is a simple land management practice that is employed by municipalities to protect
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.
Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource
BROWNFIELD REDEVELOPMENT AND ECOLOGICAL RESTORATION AT INDIAN RIDGE MARSH, CHICAGO, ILLINOIS
BROWNFIELD REDEVELOPMENT AND ECOLOGICAL RESTORATION AT INDIAN RIDGE MARSH, CHICAGO, ILLINOIS Robert Smalley, U.S. Army Corps of Engineers City of Chicago Department of Environment Jack Brunner, Dennis
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
Arkansas River Corridor Vision & Master Plan
A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in
Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.
WATER QUALITY MANAGEMENT FOR ECOLOGICAL RESTORATION IN ANYANG STREAM Yu, M.J., Cho, Y.M. 2, Lee, S.K. 3 Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea. 2 Department
DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER
DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER Permit Expires: December 31, 2017 Regional General Permit No. 87-01 Issuing Office:
PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
Flood Damage Prevention in Delaware County, NY
Flood Damage Prevention in Delaware County, NY Susquehanna Basin 2 Villages, 8 Hamlets Schoharie Basin 1 Hamlet Cannonsville Basin 4 Villages, 6 Hamlets Pepacton Basin 2 Villages, 6 Hamlets Upper Delaware
Designing in Sustainability in an Utility Scale Photovoltaic Array. Tim Green, Brookhaven National Laboratory Richard Chandler, BP Solar October 2010
Designing in Sustainability in an Utility Scale Photovoltaic Array Tim Green, Brookhaven National Laboratory Richard Chandler, BP Solar October 2010 Biography Tim Green Currently the Natural & Cultural
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
Shooks Run Drainage Study Basic Terminology
Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather